{{#Wiki_filter:("" " %r y                                        UNITED STATES
{{#Wiki_filter:("" " %r
  y..         ,
UNITED STATES
                  ?.,                     NUCLEAR REQUt.ATORY COMMISSION
y
        I           E
y..
  ,.
,
                                                          REGION lil
?.,
I {g               f                               001 WARROMLLE ROAD
NUCLEAR REQUt.ATORY COMMISSION
                                                  ustE, twuois ooe.32-4nt
I
    g . . . . . ,g'
E
                                                    November 13, 1997
REGION lil
                                                                              .
,.
      Mr. M. Wadley, Vice Presic'ent
I
      Nuclear Generation
{g
      Northern States Power Company
f
      414 Nicollet Mall
001 WARROMLLE ROAD
      Minneapolls, MN 55401
g . . . . . ,g'
      SUBJECT:         MONTICELLO NRC INSPECTION REPORT NO. 50-263/97014(DRP); AND
ustE, twuois ooe.32-4nt
                        NOTICE OF VIOLATION
November 13, 1997
      Dear Mr. Wadley:                                                                                     -
.
      On October 13,1997, the NRC completed an inspection at your Monticello reactor facility The
Mr. M. Wadley, Vice Presic'ent
                                                                                                                      '
Nuclear Generation
      enclosed report presents the results of that inspection.
Northern States Power Company
      Durirg. (.ie 6-week period covered by this inspection period, your conduct of activities at the
414 Nicollet Mall
      Monticello facility was acceptable. 2ngineering personnel demonstrated a good questioning
Minneapolls, MN 55401
      ..ttitude in their identification of a potential non conservative setpoint for condensate storage tank
SUBJECT:
      low level. Ho vever, in two cases, plant personnel did not adequately evaluate current plant
MONTICELLO NRC INSPECTION REPORT NO. 50-263/97014(DRP); AND
      conditions This resulted in a failure to reelign the suction valves for the high pressure coolant             l
NOTICE OF VIOLATION
      injection and reactor core isolation cooling systems when a condensate storage tank level
Dear Mr. Wadley:
      instrumt nt was made inope.able, and in unanticipated valve movement during a surveillance
-
      test.
On October 13,1997, the NRC completed an inspection at your Monticello reactor facility The
        In addition, a violation of NRC requirements was identified. Specifically, the inspectors identified
'
        that the no1hwest portion of the vehicle ba'rier system did not meet regulatory requirements
enclosed report presents the results of that inspection.
        The violation is .:ited in the enclosed Notice of Violation and the circumstances periaining to the
Durirg. (.ie 6-week period covered by this inspection period, your conduct of activities at the
        violation are described in detailin the enclosed report. The violation is a concern because it was
Monticello facility was acceptable. 2ngineering personnel demonstrated a good questioning
        identified by the inspa . tors and the vulnerability was not noted during routine observations and
..ttitude in their identification of a potential non conservative setpoint for condensate storage tank
        inspections of the system by your staff. Our understanding of your ccrrective actions taken to
low level. Ho vever, in two cases, plant personnel did not adequately evaluate current plant
        correct the violation and prevent recurrence is discussed in Section S8.1 of the enclosed Report.
conditions This resulted in a failure to reelign the suction valves for the high pressure coolant
        Therefore, you are not required to respond to this letter unless the ir; formation in Section S8.1 of
l
        the report does not accurately reflect your coirective actions or your position, or if you choose to
injection and reactor core isolation cooling systems when a condensate storage tank level
        provide additionalinformation.
instrumt nt was made inope.able, and in unanticipated valve movement during a surveillance
                                                                                                                        1
test.
                                                                                                          \
In addition, a violation of NRC requirements was identified. Specifically, the inspectors identified
                                                                                                              I   )
that the no1hwest portion of the vehicle ba'rier system did not meet regulatory requirements
                                ,
The violation is .:ited in the enclosed Notice of Violation and the circumstances periaining to the
                                                                                                                ,
violation are described in detailin the enclosed report. The violation is a concern because it was
                9711210251 971113
identified by the inspa . tors and the vulnerability was not noted during routine observations and
                PDR   ADOCK 05000263
inspections of the system by your staff. Our understanding of your ccrrective actions taken to
                0                       PDR                                                                               .
correct the violation and prevent recurrence is discussed in Section S8.1 of the enclosed Report.
                                                                                                                    .
Therefore, you are not required to respond to this letter unless the ir; formation in Section S8.1 of
                                                                                                                        .
the report does not accurately reflect your coirective actions or your position, or if you choose to
provide additionalinformation.
1
\\
I
)
,
,
9711210251 971113
PDR
ADOCK 05000263
0
PDR
.
.
.


                                                                ._                                                           _ _____
._
    M.Wadley                                         2-
_
    In accordance with 10 CFR 2.790 of the NRC's * Rules of Practice," a copy of this letter and its
_____
    enclosures will be placed in the NRC Public Document Room.
M.Wadley
                                          Sincerely,
2-
                                                                                                                            s
In accordance with 10 CFR 2.790 of the NRC's * Rules of Practice," a copy of this letter and its
enclosures will be placed in the NRC Public Document Room.
Sincerely,
s
'
e
N
Ge4 rey E. Grard, Director J
'
'
'
                                                                        e
Division of Reactor Projects
                                                          '
,
                                                        '
Docket No. 50-263
                                          Ge4 rey E. Grard,      N Director J
License No. DPR+22
                      ,
.
                                          Division of Reactor Projects
-
    Docket No. 50-263
Enclosurns:
    License No. DPR+22
1. Notice of Violation
.                                                                                                                                     -
2. Inspection Report No. 50-263/97014(DRP)
    Enclosurns:   1. Notice of Violation
cc vincis:
                    2. Inspection Report No. 50-263/97014(DRP)
Plant Manager, Monticello
    cc vincis:     Plant Manager, Monticello
State Liaison Officer,
                    State Liaison Officer,
State of Minnesota
                    State of Minnesota
>,
>,
  6
6
                                                                          L
L
                                                            ._.             __ _ . _ . _ _ _ _ . _ _ _ . _ . _ _ _ . _ _ __             -
._.
__ _ . _ . _ _ _ _ . _ _ _ . _ . _ _ _ . _ _ __
-


                                                                                                                                  _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
l
l
l
l
      M.Wadley                                                               -2-
M.Wadley
      In accordance ivith 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its
-2-
      enclor.ures will be placed in the NRC Public Document Room.
In accordance ivith 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its
                                                                Sincerely,
enclor.ures will be placed in the NRC Public Document Room.
                                                                  /s/ Geoffrey E. Grant
Sincerely,
                                                                Geoffrey E. Grant, Director
/s/ Geoffrey E. Grant
                                                                  Division of Reactor Projects
Geoffrey E. Grant, Director
        Docket No. 50 263
Division of Reactor Projects
        License No. DPR 22
Docket No. 50 263
        Enclosures:         1. Notice of Violation
License No. DPR 22
                            2. Inspection Report
Enclosures:
                                  No. 50-263/n7014(DRP)
1. Notice of Violation
        cc w/encls:           Plant Manager, Monticello
2. Inspection Report
                              State Liaison Officer,
No. 50-263/n7014(DRP)
                                State of Minneso's
cc w/encls:
        Djitribution:
Plant Manager, Monticello
        Docket File wiencls                                                   DRP w/encls
State Liaison Officer,
  +Jii< PUBLIC.lE-019/encls                                                   Rlli PRR wlencls
State of Minneso's
        OC/LFDCB wlencls                                                     Project Manager, NRR w/encls
Djitribution:
        SRI Monticello w/encls                                               Rlli Enf. Coordinator w/ancis
Docket File wiencls
        A. B. Beach w/encls                                                   CAA1 w/encls (E mail)
DRP w/encls
        Deputy RA w/encls                                                   DRS (2) w/encls
+Jii< PUBLIC.lE-019/encls
        TSS w/encls                                                           DOCDESK (E mail)
Rlli PRR wlencls
        DOCUMENT NAME:                 R:\insprpts\ powers \MONT\ MON 97014,DRP
OC/LFDCB wlencls
        i . <.i . ,o ry .. ,,,i. e o.,     i,.iir . . i., o,. i,. . c . car v '*"''a u' ="a* h ''''d '' ' - cai v ""'' * " ar ** ''c'
Project Manager, NRR w/encls
                                                                                                                                -
SRI Monticello w/encls
                                                                                                                                                                      T - S' ean_
Rlli Enf. Coordinator w/ancis
                                                                                                                                  /
A. B. Beach w/encls
            OFFICE         Rill                     T       Rlli                         L~     Rlli             .
CAA1 w/encls (E mail)
                                                                                                                                O                                     Rlli
Deputy RA w/encls
            NAME            Kunow[dh                         JMCB Ma fn                         Cre             908                                                 GrantD
DRS (2) w/encls
                                                                                                                                                                                    UU
TSS w/encls
            DATE             11//e /97                         11f.407                             11/(0/97                                                             11/\3/97
DOCDESK (E mail)
                                                                OFFICIAL RECORD COPY
DOCUMENT NAME:
R:\\insprpts\\ powers \\MONT\\ MON 97014,DRP
i . <.i . ,o ry .. ,,,i.
e o.,
i,.iir . . i., o,. i,. . c . car v
'*"''a u' ="a* h ''''d '' ' - cai v ""'' * " ar ** ''c' T - S' ean_
-
/
OFFICE
Rill
T
Rlli
L~
Rlli
.
O
Rlli
Kunow[dh
GrantD
JMCB Ma fn
Cre
908
NAME
UU
DATE
11//e /97
11f.407
11/(0/97
11/\\3/97
OFFICIAL RECORD COPY
I
I
}}
}}

Latest revision as of 07:56, 10 December 2024

Forwards Insp Rept 50-263/97-14 on 970830-1013 & Notice of Violation.Inspectors Identified That Northwest Portion of Vehicle Barrier Sys Did Not Meet Regulatory Requirements
ML20199E570
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 11/13/1997
From: Grant G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Wadley M
NORTHERN STATES POWER CO.
Shared Package
ML20199E574 List:
References
50-263-97-14, NUDOCS 9711210251
Download: ML20199E570 (3)


See also: IR 05000263/1997014

Text

("" " %r

UNITED STATES

y

y..

,

?.,

NUCLEAR REQUt.ATORY COMMISSION

I

E

REGION lil

,.

I

{g

f

001 WARROMLLE ROAD

g . . . . . ,g'

ustE, twuois ooe.32-4nt

November 13, 1997

.

Mr. M. Wadley, Vice Presic'ent

Nuclear Generation

Northern States Power Company

414 Nicollet Mall

Minneapolls, MN 55401

SUBJECT:

MONTICELLO NRC INSPECTION REPORT NO. 50-263/97014(DRP); AND

NOTICE OF VIOLATION

Dear Mr. Wadley:

-

On October 13,1997, the NRC completed an inspection at your Monticello reactor facility The

'

enclosed report presents the results of that inspection.

Durirg. (.ie 6-week period covered by this inspection period, your conduct of activities at the

Monticello facility was acceptable. 2ngineering personnel demonstrated a good questioning

..ttitude in their identification of a potential non conservative setpoint for condensate storage tank

low level. Ho vever, in two cases, plant personnel did not adequately evaluate current plant

conditions This resulted in a failure to reelign the suction valves for the high pressure coolant

l

injection and reactor core isolation cooling systems when a condensate storage tank level

instrumt nt was made inope.able, and in unanticipated valve movement during a surveillance

test.

In addition, a violation of NRC requirements was identified. Specifically, the inspectors identified

that the no1hwest portion of the vehicle ba'rier system did not meet regulatory requirements

The violation is .:ited in the enclosed Notice of Violation and the circumstances periaining to the

violation are described in detailin the enclosed report. The violation is a concern because it was

identified by the inspa . tors and the vulnerability was not noted during routine observations and

inspections of the system by your staff. Our understanding of your ccrrective actions taken to

correct the violation and prevent recurrence is discussed in Section S8.1 of the enclosed Report.

Therefore, you are not required to respond to this letter unless the ir; formation in Section S8.1 of

the report does not accurately reflect your coirective actions or your position, or if you choose to

provide additionalinformation.

1

\\

I

)

,

,

9711210251 971113

PDR

ADOCK 05000263

0

PDR

.

.

.

._

_

_____

M.Wadley

2-

In accordance with 10 CFR 2.790 of the NRC's * Rules of Practice," a copy of this letter and its

enclosures will be placed in the NRC Public Document Room.

Sincerely,

s

'

e

N

Ge4 rey E. Grard, Director J

'

'

Division of Reactor Projects

,

Docket No. 50-263

License No. DPR+22

.

-

Enclosurns:

1. Notice of Violation

2. Inspection Report No. 50-263/97014(DRP)

cc vincis:

Plant Manager, Monticello

State Liaison Officer,

State of Minnesota

>,

6

L

._.

__ _ . _ . _ _ _ _ . _ _ _ . _ . _ _ _ . _ _ __

-

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

l

l

M.Wadley

-2-

In accordance ivith 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its

enclor.ures will be placed in the NRC Public Document Room.

Sincerely,

/s/ Geoffrey E. Grant

Geoffrey E. Grant, Director

Division of Reactor Projects

Docket No. 50 263

License No. DPR 22

Enclosures:

1. Notice of Violation

2. Inspection Report

No. 50-263/n7014(DRP)

cc w/encls:

Plant Manager, Monticello

State Liaison Officer,

State of Minneso's

Djitribution:

Docket File wiencls

DRP w/encls

+Jii< PUBLIC.lE-019/encls

Rlli PRR wlencls

OC/LFDCB wlencls

Project Manager, NRR w/encls

SRI Monticello w/encls

Rlli Enf. Coordinator w/ancis

A. B. Beach w/encls

CAA1 w/encls (E mail)

Deputy RA w/encls

DRS (2) w/encls

TSS w/encls

DOCDESK (E mail)

DOCUMENT NAME:

R:\\insprpts\\ powers \\MONT\\ MON 97014,DRP

i . <.i . ,o ry .. ,,,i.

e o.,

i,.iir . . i., o,. i,. . c . car v

'*"a u' ="a* h 'd ' - cai v "" * " ar ** c' T - S' ean_

-

/

OFFICE

Rill

T

Rlli

L~

Rlli

.

O

Rlli

Kunow[dh

GrantD

JMCB Ma fn

Cre

908

NAME

UU

DATE

11//e /97

11f.407

11/(0/97

11/\\3/97

OFFICIAL RECORD COPY