{{#Wiki_filter:.         .                      . ___                                    -    . _. .                            __
{{#Wiki_filter:.
: l.   ~
l.
                                                                                                                                \
\\
,      $-          J. Bernie Beasley Jr., P.E   Somhern Nuclear                                                               I Vice Paesident               Operating Company. Inc.
~
Vogtle Project               40 inverness Center Parkway -
J. Bernie Beasley Jr., P.E Somhern Nuclear Vice Paesident Operating Company. Inc.
Vogtle Project 40 inverness Center Parkway -
RO. Box 1295 i
RO. Box 1295 i
Birmingham. Alabama 35201 Tel 205.992.7110 Fax 205.992.0403 SOUTHERN                           1 COMPANY                 l Energy to Serve YourWorld" January 13, 1999                                                                 LCV-1169-L Docket Nos.         50-424 50-425                                                                                   I U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Gentlemen:
Birmingham. Alabama 35201 Tel 205.992.7110 Fax 205.992.0403 SOUTHERN 1
i VOGTLE ELECTRIC GENERATING PLANT                                                 l MONTHLY OPERATING REPORT- DECEMBER 1998 Enclosed are the December 1998, monthly operating reports for Vogtle Electric Generating Plant (VEGP) Units 1 and 2. These reports are submitted in accordance with the Technical Specification 5.6.4.
COMPANY l
Energy to Serve YourWorld" January 13, 1999 LCV-1169-L Docket Nos.
50-424 50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Gentlemen:
i VOGTLE ELECTRIC GENERATING PLANT MONTHLY OPERATING REPORT-DECEMBER 1998 Enclosed are the December 1998, monthly operating reports for Vogtle Electric Generating Plant (VEGP) Units 1 and 2. These reports are submitted in accordance with the Technical Specification 5.6.4.
Sincerely,
Sincerely,
                                                                      . B. easley .
. B.
JBB/JLL Enclosures El- VEGP Unit 1 Monthly Operating Report - December 1998                                           !
easley JBB/JLL Enclosures El-VEGP Unit 1 Monthly Operating Report - December 1998 E2-VEGP Unit 2 Monthly Operating Report - December 1998
E2- VEGP Unit 2 Monthly Operating Report - December 1998                                           )
)
cc:     Southern Nuclear Operating Company                                                                   j Mr. J. T. Gasser Mr. M. Sheibani SNC Document Management i
cc:
U. S. Nuclear Regulatory Commission                                                           ,i     j c                Mr. L. A. Reyes, Regional Administrator                                                     L/       l Mr. D. Jaffe, Senior Project Manager, NRR                                         y             i I i Mr. J. Zeiler, Senior Resident Inspector, Vogtle                               /
Southern Nuclear Operating Company j
                                        ^
Mr. J. T. Gasser Mr. M. Sheibani SNC Document Management i
                                              ., " O c
U. S. Nuclear Regulatory Commission
9901210076 981231 "
,i j
PDR R        ADOCK 05000424'."
Mr. L. A. Reyes, Regional Administrator L /
pgp     _                                                                        ,
c I
i Mr. D. Jaffe, Senior Project Manager, NRR y
i Mr. J. Zeiler, Senior Resident Inspector, Vogtle
/
., " O
^
c 9901210076 981231 PDR ADOCK 05000424'."
R pgp


t
t s
        . . . .s     ..-
i l
i l
ENCLOSURE 1                                                                           -
ENCLOSURE 1 VOGTLE ELECTRIC GENERATING PLANT - UNIT 1 MONTiiLY OPERATING REPORT FOR DECEMBER 1998 l
VOGTLE ELECTRIC GENERATING PLANT - UNIT 1                                                           !
t TABLE OF CONTENTS l
MONTiiLY OPERATING REPORT FOR DECEMBER 1998                                                           l t
l OPERATING DATA REPORT and CHALLENGES to POF.V and SAFETY VALVES.
TABLE OF CONTENTS                                                                       .
Page El-1 UNIT S11UTDOWNS and NARRATIVE REPORT Page El-2 i
l l
OPERATING DATA REPORT and CHALLENGES to POF.V and SAFETY VALVES .                   Page El-1 UNIT S11UTDOWNS and NARRATIVE REPORT                                               Page El-2 i
1 I
1 I
s e a - -    --    ,,
s e
r                                7
a r
7


  ,'        OPERATING DATA REPORT Dockit No.:           50-424_ _ _ .
OPERATING DATA REPORT Dockit No.:
Unit Name:           VEGP UNIT 1 Date:                 January 4,1999 Completed By:         T.S. Hargis__ _
50-424_ _ _.
              ,                                                                    Telephone:           (
Unit Name:
VEGP UNIT 1 Date:
January 4,1999 Completed By:
T.S. Hargis__ _
(
Telephone:
_70_6) 826-3469 Operating Status
_70_6) 826-3469 Operating Status
: 1. Reporting Period:                                     December- 1998
: 1. Reporting Period:
: 2. Design Electrical Rating (Net MWe):                           if69-
December-1998
: 3. Maximum Dependable Capacity (Net MWe):               _ , _ 1162 This Month     Year _To Date             Cumulative l
: 2. Design Electrical Rating (Net MWe):
          - 4. Number Of Hours Reactor Was Critical:                         744.0             8760.0                   89,732.0,
if69-
: 5. Hours Generator On Line:                                     744.0             8738.5                   88,413.3
: 3. Maximum Dependable Capacity (Net MWe):
: 6. Unit Reserve Shutdown Hours:                                     0.0                   0.0                     0.0
_, _ 1162 This Month Year _To Date Cumulative l
: 7. Net Electrical Energy Generated (MWHe):                     879,415         10,216,947                 97,679,259 I
- 4. Number Of Hours Reactor Was Critical:
CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY                       :S Date           Tag No.               ' Event Description N/A                 N/A                 N/A l
744.0 8760.0 89,732.0,
l                                                                         E1-1 1'
: 5. Hours Generator On Line:
744.0 8738.5 88,413.3
: 6. Unit Reserve Shutdown Hours:
0.0 0.0 0.0
: 7. Net Electrical Energy Generated (MWHe):
879,415 10,216,947 97,679,259 I
CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY
:S Date Tag No.
' Event Description N/A N/A N/A l
l E1-1 1'


m .      . . . . . _ .                        . - _ _          _ .    . _ . _ _ _ _ .
m.
l
* UNIT SHUTDOWNS Docket No.:
..
50-424_ _ _
* UNIT SHUTDOWNS                                                                                                                                   l Docket No.:                   50-424_ _ _                     i Unit Name:                   VEGP UNIT 1 Date:                         January _4_,19_99 Compieted By:                 T.S. Hargis Telephone:                   ,[7_06[826-3469 Reporting Ptdod:               _ December - 1998 i
i Unit Name:
l Type                                               Method of l
VEGP UNIT 1 Date:
F: Forced       Duration                           Shutting                   iCause/ Corrective Actions
January _4_,19_99 Compieted By:
: s. seeduw                                         I No.          gate                              (Hours)         Reason (1) ;Down (2)                           l Comments N/A             N/A             N/A           N/A             N/A                       N/A                                           N/A l                                               .
T.S. Hargis Telephone:
(1) REASON:                                                                       (2) METHOD:
,[7_06[826-3469 Reporting Pt od:
A- Equipment Failure (Explain) E Operator Training /Ucense Examination             1. Manual                     4. Continuation B MamtenanceorTest             F - Administrative                                 2. Manual Tnp/ Scram           5. Other C - Refueling                   G - Operational Error (Explain)                     3. Automaticinp/ Scram D - Regulatory Restriction     H - Other (Expbin)
_ December - 1998 d
l Type Method of l
i F: Forced Duration Shutting iCause/ Corrective Actions I
l Comments No.
gate
: s. seeduw (Hours)
Reason (1) ;Down (2)
N/A N/A N/A N/A N/A N/A N/A l
(1) REASON:
(2) METHOD:
A-Equipment Failure (Explain) E Operator Training /Ucense Examination
: 1. Manual
: 4. Continuation B MamtenanceorTest F - Administrative
: 2. Manual Tnp/ Scram
: 5. Other C - Refueling G - Operational Error (Explain)
: 3. Automaticinp/ Scram D - Regulatory Restriction H - Other (Expbin)
CAUSE/ CORRECTIVE ACTION / COMMENTS:
CAUSE/ CORRECTIVE ACTION / COMMENTS:
CAUSE:
CAUSE:
CORRECTIVE ACTION.;                                                                                                                               1
CORRECTIVE ACTION.;
                                                                                                                                                          )
1
)
i l
i l
NARRATIVE REPORT December 01,1998 00:00 Unit 1 at 100% power with no operating problems.
NARRATIVE REPORT December 01,1998 00:00 Unit 1 at 100% power with no operating problems.
Line 83: Line 122:
E1-2
E1-2


9 ENCLOSURE 2 t
9 ENCLOSURE 2 VOGTLE ELECTRIC GENERATING PLANT - UNIT 2 t
VOGTLE ELECTRIC GENERATING PLANT - UNIT 2 MONT11LY OPERATING REPORT FOR DECEMBER 1998 TABLE OF CONTENTS OPERATING DATA REPORT and CliALLENGES to PORV and SAFETY VALVES Page E2-1 UNIT SliUTDOWNS and NARRATIVE REPORT                           Page E2-2
MONT11LY OPERATING REPORT FOR DECEMBER 1998 TABLE OF CONTENTS OPERATING DATA REPORT and CliALLENGES to PORV and SAFETY VALVES Page E2-1 UNIT SliUTDOWNS and NARRATIVE REPORT Page E2-2
                          -t
-t


i
i OPERATING DATA REPORT Dock;t No.:
,        OPERATING DATA REPORT Dock;t No.:
50-425 _.__
50-425 _ .__
Unit Name:
Unit Name:           VEGP UNIT 2 Date:                 January 4,1999 Completed By:         T.S. Hargis
VEGP UNIT 2 Date:
                                                                                                            ~      ~
January 4,1999 Completed By:
          ,                                                                      Telephone:           [(706)826 3469 l
T.S. Hargis Telephone:
Operating Status                                                                                                         l
[(706)826 3469
: 1. Reporting Period:                                     December- 1998
~
: 2. Design Electrical Rating (Net MWe):                           1169_
~
: 3. Maximum Dependable Capacity (Net MWe):                         1167 This Month       Yearlo Date               Cumulative       i
Operating Status
: 4. Number Of Hours Reactor Was Critical:                         744.0               7414.9                     76,238.7 j
: 1. Reporting Period:
: 5. Hours Generator On Line:                                     744.0               7350.0                     75,509 5 l
December-1998
: 6. Unit Reserve Shutdown Hours:                                     0.0                 0.0                         0.0
: 2. Design Electrical Rating (Net MWe):
: 7. Net Electrical Energy Generated (MWHe):                     885,172           8,388,612                   83,975,338 CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES Date           Tag No.               ; Event Description N/A                 N/A         N/A I
1169_
i E2-1
: 3. Maximum Dependable Capacity (Net MWe):
1167 This Month Yearlo Date Cumulative i
: 4. Number Of Hours Reactor Was Critical:
744.0 7414.9 76,238.7 j
: 5. Hours Generator On Line:
744.0 7350.0 75,509 5
: 6. Unit Reserve Shutdown Hours:
0.0 0.0 0.0
: 7. Net Electrical Energy Generated (MWHe):
885,172 8,388,612 83,975,338 CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES Date Tag No.
; Event Description N/A N/A N/A i
E2-1


      . . . _ - . . . _            _            .      - - ~ . _.             .        -        _                              >            - - - - -
- - ~. _.
I               .                .
I l
              ~
-UNIT SHUTDOWNS
,4     '
~
                    -UNIT SHUTDOWNS Dock:t No.:               50-425   ~    -          l Unit Nime:               VEGP ORIT 2               '
,4 Dock:t No.:
i                                                                                                   Date:                     January 4,199'9 l                                                                                                   Completed By:             T.S. Hargi,s_
50-425 Unit Nime:
Telephone:             _(706) 826-3469 Reporting Period:               December - 1998 l                                                     { Type                                       jMethod of jF: Forced       Duration                     Shutting               lCause/ Corrective Actions
VEGP ORIT 2
                                                      's: seedul No.             Date                           (Hours)       Reason (1)     Down (2)               l Comments t
~
N/A               N/A             N/A         N/A           N/A               N/A             N/A l
i Date:
(1) REASON:                                                                 (2) METHOD:
January 4,199'9 l
A - Equipment Failure (Explain) E Operator Training / License Examination   1. Manual                 4. Continuabon B - Maintenance or Test         F - Administrative                           2. Manual Tnp/ Scram     5. Other C - Refuehng                   G - Operational Error (Explain)             3. AutomaticTrip/ Scram l
Completed By:
D - Regulatory Restnction       H - Other (Explain)                                                                             ;
T.S. Hargi,s_
CAUSE/ CORRECTIVE ACTION / COMMENTS:                                                                                             i l
Telephone:
CAUSE;                                                                                                                           ;
_(706) 826-3469 Reporting Period:
1 CORRECTNEACTJON:                                                                                                                 )
December - 1998 l
1 CRITICALPATH WAS-J L                                                                                                                                                       l l
{ Type jMethod of lCause/ Corrective Actions jF: Forced Duration Shutting
's: seedul No.
Date (Hours)
Reason (1)
Down (2) l Comments t
N/A N/A N/A N/A N/A N/A N/A l
(1) REASON:
(2) METHOD:
A - Equipment Failure (Explain)
E Operator Training / License Examination
: 1. Manual
: 4. Continuabon B - Maintenance or Test F - Administrative
: 2. Manual Tnp/ Scram
: 5. Other C - Refuehng G - Operational Error (Explain)
: 3. AutomaticTrip/ Scram D - Regulatory Restnction H - Other (Explain)
CAUSE/ CORRECTIVE ACTION / COMMENTS:
i l
CAUSE; 1
CORRECTNEACTJON:
)
CRITICALPATH WAS-1 J
L l
I l
I l
1-NARRATIVE REPORT December 01,1998 00:00 Unit 2 at 100% power with no operating problems.
1-NARRATIVE REPORT December 01,1998 00:00 Unit 2 at 100% power with no operating problems.

Latest revision as of 07:53, 10 December 2024

Monthly Operating Repts for Dec 1998 for Vogtle Electric Generating Plant,Units 1 & 2.With
ML20199E756
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 12/31/1998
From: Beasley J, Hargis T
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LCV-1169-L, NUDOCS 9901210076
Download: ML20199E756 (7)


Text

.

l.

\\

~

J. Bernie Beasley Jr., P.E Somhern Nuclear Vice Paesident Operating Company. Inc.

Vogtle Project 40 inverness Center Parkway -

RO. Box 1295 i

Birmingham. Alabama 35201 Tel 205.992.7110 Fax 205.992.0403 SOUTHERN 1

COMPANY l

Energy to Serve YourWorld" January 13, 1999 LCV-1169-L Docket Nos.

50-424 50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Gentlemen:

i VOGTLE ELECTRIC GENERATING PLANT MONTHLY OPERATING REPORT-DECEMBER 1998 Enclosed are the December 1998, monthly operating reports for Vogtle Electric Generating Plant (VEGP) Units 1 and 2. These reports are submitted in accordance with the Technical Specification 5.6.4.

Sincerely,

. B.

easley JBB/JLL Enclosures El-VEGP Unit 1 Monthly Operating Report - December 1998 E2-VEGP Unit 2 Monthly Operating Report - December 1998

)

cc:

Southern Nuclear Operating Company j

Mr. J. T. Gasser Mr. M. Sheibani SNC Document Management i

U. S. Nuclear Regulatory Commission

,i j

Mr. L. A. Reyes, Regional Administrator L /

c I

i Mr. D. Jaffe, Senior Project Manager, NRR y

i Mr. J. Zeiler, Senior Resident Inspector, Vogtle

/

., " O

^

c 9901210076 981231 PDR ADOCK 05000424'."

R pgp

t s

i l

ENCLOSURE 1 VOGTLE ELECTRIC GENERATING PLANT - UNIT 1 MONTiiLY OPERATING REPORT FOR DECEMBER 1998 l

t TABLE OF CONTENTS l

l OPERATING DATA REPORT and CHALLENGES to POF.V and SAFETY VALVES.

Page El-1 UNIT S11UTDOWNS and NARRATIVE REPORT Page El-2 i

1 I

s e

a r

7

OPERATING DATA REPORT Dockit No.:

50-424_ _ _.

Unit Name:

VEGP UNIT 1 Date:

January 4,1999 Completed By:

T.S. Hargis__ _

(

Telephone:

_70_6) 826-3469 Operating Status

1. Reporting Period:

December-1998

2. Design Electrical Rating (Net MWe):

if69-

3. Maximum Dependable Capacity (Net MWe):

_, _ 1162 This Month Year _To Date Cumulative l

- 4. Number Of Hours Reactor Was Critical:

744.0 8760.0 89,732.0,

5. Hours Generator On Line:

744.0 8738.5 88,413.3

6. Unit Reserve Shutdown Hours:

0.0 0.0 0.0

7. Net Electrical Energy Generated (MWHe):

879,415 10,216,947 97,679,259 I

CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY

S Date Tag No.

' Event Description N/A N/A N/A l

l E1-1 1'

m.

  • UNIT SHUTDOWNS Docket No.:

50-424_ _ _

i Unit Name:

VEGP UNIT 1 Date:

January _4_,19_99 Compieted By:

T.S. Hargis Telephone:

,[7_06[826-3469 Reporting Pt od:

_ December - 1998 d

l Type Method of l

i F: Forced Duration Shutting iCause/ Corrective Actions I

l Comments No.

gate

s. seeduw (Hours)

Reason (1) ;Down (2)

N/A N/A N/A N/A N/A N/A N/A l

(1) REASON:

(2) METHOD:

A-Equipment Failure (Explain) E Operator Training /Ucense Examination

1. Manual
4. Continuation B MamtenanceorTest F - Administrative
2. Manual Tnp/ Scram
5. Other C - Refueling G - Operational Error (Explain)
3. Automaticinp/ Scram D - Regulatory Restriction H - Other (Expbin)

CAUSE/ CORRECTIVE ACTION / COMMENTS:

CAUSE:

CORRECTIVE ACTION.;

1

)

i l

NARRATIVE REPORT December 01,1998 00:00 Unit 1 at 100% power with no operating problems.

December 29,199811:35 Ur!; 1 cereted to 86% power in response to secondary transient induced by isol. of extr. steam December 30,1998 01:00 Unit i retume.iio 100% power following the derate.

Dece7ber 31,1998 23:59 Ur.it i e' 600% power wi'.h rio operating problems.

E1-2

9 ENCLOSURE 2 VOGTLE ELECTRIC GENERATING PLANT - UNIT 2 t

MONT11LY OPERATING REPORT FOR DECEMBER 1998 TABLE OF CONTENTS OPERATING DATA REPORT and CliALLENGES to PORV and SAFETY VALVES Page E2-1 UNIT SliUTDOWNS and NARRATIVE REPORT Page E2-2

-t

i OPERATING DATA REPORT Dock;t No.:

50-425 _.__

Unit Name:

VEGP UNIT 2 Date:

January 4,1999 Completed By:

T.S. Hargis Telephone:

[(706)826 3469

~

~

Operating Status

1. Reporting Period:

December-1998

2. Design Electrical Rating (Net MWe):

1169_

3. Maximum Dependable Capacity (Net MWe):

1167 This Month Yearlo Date Cumulative i

4. Number Of Hours Reactor Was Critical:

744.0 7414.9 76,238.7 j

5. Hours Generator On Line:

744.0 7350.0 75,509 5

6. Unit Reserve Shutdown Hours:

0.0 0.0 0.0

7. Net Electrical Energy Generated (MWHe):

885,172 8,388,612 83,975,338 CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES Date Tag No.

Event Description N/A N/A N/A i

E2-1

- - ~. _.

I l

-UNIT SHUTDOWNS

~

,4 Dock:t No.:

50-425 Unit Nime:

VEGP ORIT 2

~

i Date:

January 4,199'9 l

Completed By:

T.S. Hargi,s_

Telephone:

_(706) 826-3469 Reporting Period:

December - 1998 l

{ Type jMethod of lCause/ Corrective Actions jF: Forced Duration Shutting

's: seedul No.

Date (Hours)

Reason (1)

Down (2) l Comments t

N/A N/A N/A N/A N/A N/A N/A l

(1) REASON:

(2) METHOD:

A - Equipment Failure (Explain)

E Operator Training / License Examination

1. Manual
4. Continuabon B - Maintenance or Test F - Administrative
2. Manual Tnp/ Scram
5. Other C - Refuehng G - Operational Error (Explain)
3. AutomaticTrip/ Scram D - Regulatory Restnction H - Other (Explain)

CAUSE/ CORRECTIVE ACTION / COMMENTS:

i l

CAUSE; 1

CORRECTNEACTJON:

)

CRITICALPATH WAS-1 J

L l

I l

1-NARRATIVE REPORT December 01,1998 00:00 Unit 2 at 100% power with no operating problems.

December 31,1998 23:59 Unit 2 at 100% power with no operating problems.

E2-2 I

1 l'