Vogtle Project | J. Bernie Beasley Jr., P.E Somhern Nuclear Vice Paesident Operating Company. Inc. | ||
Vogtle Project 40 inverness Center Parkway - | |||
RO. Box 1295 i | RO. Box 1295 i | ||
Birmingham. Alabama 35201 Tel 205.992.7110 Fax 205.992.0403 SOUTHERN | Birmingham. Alabama 35201 Tel 205.992.7110 Fax 205.992.0403 SOUTHERN 1 | ||
i VOGTLE ELECTRIC GENERATING PLANT | COMPANY l | ||
Energy to Serve YourWorld" January 13, 1999 LCV-1169-L Docket Nos. | |||
50-424 50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Gentlemen: | |||
i VOGTLE ELECTRIC GENERATING PLANT MONTHLY OPERATING REPORT-DECEMBER 1998 Enclosed are the December 1998, monthly operating reports for Vogtle Electric Generating Plant (VEGP) Units 1 and 2. These reports are submitted in accordance with the Technical Specification 5.6.4. | |||
Sincerely, | Sincerely, | ||
. B. | |||
JBB/JLL Enclosures El- VEGP Unit 1 Monthly Operating Report - December 1998 | easley JBB/JLL Enclosures El-VEGP Unit 1 Monthly Operating Report - December 1998 E2-VEGP Unit 2 Monthly Operating Report - December 1998 | ||
E2- VEGP Unit 2 Monthly Operating Report - December 1998 | ) | ||
cc: | cc: | ||
U. S. Nuclear Regulatory Commission | Southern Nuclear Operating Company j | ||
Mr. J. T. Gasser Mr. M. Sheibani SNC Document Management i | |||
U. S. Nuclear Regulatory Commission | |||
9901210076 981231 | ,i j | ||
PDR | Mr. L. A. Reyes, Regional Administrator L / | ||
pgp | c I | ||
i Mr. D. Jaffe, Senior Project Manager, NRR y | |||
i Mr. J. Zeiler, Senior Resident Inspector, Vogtle | |||
/ | |||
., " O | |||
^ | |||
c 9901210076 981231 PDR ADOCK 05000424'." | |||
R pgp | |||
t | t s | ||
i l | i l | ||
ENCLOSURE 1 | ENCLOSURE 1 VOGTLE ELECTRIC GENERATING PLANT - UNIT 1 MONTiiLY OPERATING REPORT FOR DECEMBER 1998 l | ||
VOGTLE ELECTRIC GENERATING PLANT - UNIT 1 | t TABLE OF CONTENTS l | ||
MONTiiLY OPERATING REPORT FOR DECEMBER 1998 | l OPERATING DATA REPORT and CHALLENGES to POF.V and SAFETY VALVES. | ||
TABLE OF CONTENTS | Page El-1 UNIT S11UTDOWNS and NARRATIVE REPORT Page El-2 i | ||
l | |||
OPERATING DATA REPORT and CHALLENGES to POF.V and SAFETY VALVES . | |||
1 I | 1 I | ||
s e a | s e | ||
a r | |||
7 | |||
OPERATING DATA REPORT Dockit No.: | |||
Unit Name: | 50-424_ _ _. | ||
Unit Name: | |||
VEGP UNIT 1 Date: | |||
January 4,1999 Completed By: | |||
T.S. Hargis__ _ | |||
( | |||
Telephone: | |||
_70_6) 826-3469 Operating Status | _70_6) 826-3469 Operating Status | ||
: 1. Reporting Period: | : 1. Reporting Period: | ||
: 2. Design Electrical Rating (Net MWe): | December-1998 | ||
: 3. Maximum Dependable Capacity (Net MWe): | : 2. Design Electrical Rating (Net MWe): | ||
if69- | |||
: 5. Hours Generator On Line: | : 3. Maximum Dependable Capacity (Net MWe): | ||
: 6. Unit Reserve Shutdown Hours: | _, _ 1162 This Month Year _To Date Cumulative l | ||
: 7. Net Electrical Energy Generated (MWHe): | - 4. Number Of Hours Reactor Was Critical: | ||
CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY | 744.0 8760.0 89,732.0, | ||
l | : 5. Hours Generator On Line: | ||
744.0 8738.5 88,413.3 | |||
: 6. Unit Reserve Shutdown Hours: | |||
0.0 0.0 0.0 | |||
: 7. Net Electrical Energy Generated (MWHe): | |||
879,415 10,216,947 97,679,259 I | |||
CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY | |||
:S Date Tag No. | |||
' Event Description N/A N/A N/A l | |||
l E1-1 1' | |||
m | m. | ||
* UNIT SHUTDOWNS Docket No.: | |||
50-424_ _ _ | |||
* UNIT SHUTDOWNS | i Unit Name: | ||
l Type | VEGP UNIT 1 Date: | ||
F: Forced | January _4_,19_99 Compieted By: | ||
: s. seeduw | T.S. Hargis Telephone: | ||
(1) REASON: | ,[7_06[826-3469 Reporting Pt od: | ||
A- Equipment Failure (Explain) E Operator Training /Ucense Examination | _ December - 1998 d | ||
l Type Method of l | |||
i F: Forced Duration Shutting iCause/ Corrective Actions I | |||
l Comments No. | |||
gate | |||
: s. seeduw (Hours) | |||
Reason (1) ;Down (2) | |||
N/A N/A N/A N/A N/A N/A N/A l | |||
(1) REASON: | |||
(2) METHOD: | |||
A-Equipment Failure (Explain) E Operator Training /Ucense Examination | |||
: 1. Manual | |||
: 4. Continuation B MamtenanceorTest F - Administrative | |||
: 2. Manual Tnp/ Scram | |||
: 5. Other C - Refueling G - Operational Error (Explain) | |||
: 3. Automaticinp/ Scram D - Regulatory Restriction H - Other (Expbin) | |||
CAUSE/ CORRECTIVE ACTION / COMMENTS: | CAUSE/ CORRECTIVE ACTION / COMMENTS: | ||
CAUSE: | CAUSE: | ||
CORRECTIVE ACTION.; | CORRECTIVE ACTION.; | ||
1 | |||
) | |||
i l | i l | ||
NARRATIVE REPORT December 01,1998 00:00 Unit 1 at 100% power with no operating problems. | NARRATIVE REPORT December 01,1998 00:00 Unit 1 at 100% power with no operating problems. | ||
| Line 83: | Line 122: | ||
E1-2 | E1-2 | ||
9 ENCLOSURE 2 | 9 ENCLOSURE 2 VOGTLE ELECTRIC GENERATING PLANT - UNIT 2 t | ||
VOGTLE ELECTRIC GENERATING PLANT - UNIT 2 MONT11LY OPERATING REPORT FOR DECEMBER 1998 TABLE OF CONTENTS OPERATING DATA REPORT and CliALLENGES to PORV and SAFETY VALVES Page E2-1 UNIT SliUTDOWNS and NARRATIVE REPORT | MONT11LY OPERATING REPORT FOR DECEMBER 1998 TABLE OF CONTENTS OPERATING DATA REPORT and CliALLENGES to PORV and SAFETY VALVES Page E2-1 UNIT SliUTDOWNS and NARRATIVE REPORT Page E2-2 | ||
-t | |||
i | i OPERATING DATA REPORT Dock;t No.: | ||
50-425 _.__ | |||
50-425 _ .__ | Unit Name: | ||
Unit Name: | VEGP UNIT 2 Date: | ||
January 4,1999 Completed By: | |||
T.S. Hargis Telephone: | |||
Operating Status | [(706)826 3469 | ||
: 1. Reporting Period: | ~ | ||
: 2. Design Electrical Rating (Net MWe): | ~ | ||
: 3. Maximum Dependable Capacity (Net MWe): | Operating Status | ||
: 4. Number Of Hours Reactor Was Critical: | : 1. Reporting Period: | ||
: 5. Hours Generator On Line: | December-1998 | ||
: 6. Unit Reserve Shutdown Hours: | : 2. Design Electrical Rating (Net MWe): | ||
: 7. Net Electrical Energy Generated (MWHe): | 1169_ | ||
: 3. Maximum Dependable Capacity (Net MWe): | |||
1167 This Month Yearlo Date Cumulative i | |||
: 4. Number Of Hours Reactor Was Critical: | |||
744.0 7414.9 76,238.7 j | |||
: 5. Hours Generator On Line: | |||
744.0 7350.0 75,509 5 | |||
: 6. Unit Reserve Shutdown Hours: | |||
0.0 0.0 0.0 | |||
: 7. Net Electrical Energy Generated (MWHe): | |||
885,172 8,388,612 83,975,338 CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES Date Tag No. | |||
; Event Description N/A N/A N/A i | |||
E2-1 | |||
- - ~. _. | |||
I | I l | ||
-UNIT SHUTDOWNS | |||
~ | |||
,4 Dock:t No.: | |||
i | 50-425 Unit Nime: | ||
Telephone: | VEGP ORIT 2 | ||
~ | |||
N/A | i Date: | ||
(1) REASON: | January 4,199'9 l | ||
A - Equipment Failure (Explain) | Completed By: | ||
D - Regulatory Restnction | T.S. Hargi,s_ | ||
CAUSE/ CORRECTIVE ACTION / COMMENTS: | Telephone: | ||
CAUSE; | _(706) 826-3469 Reporting Period: | ||
December - 1998 l | |||
{ Type jMethod of lCause/ Corrective Actions jF: Forced Duration Shutting | |||
's: seedul No. | |||
Date (Hours) | |||
Reason (1) | |||
Down (2) l Comments t | |||
N/A N/A N/A N/A N/A N/A N/A l | |||
(1) REASON: | |||
(2) METHOD: | |||
A - Equipment Failure (Explain) | |||
E Operator Training / License Examination | |||
: 1. Manual | |||
: 4. Continuabon B - Maintenance or Test F - Administrative | |||
: 2. Manual Tnp/ Scram | |||
: 5. Other C - Refuehng G - Operational Error (Explain) | |||
: 3. AutomaticTrip/ Scram D - Regulatory Restnction H - Other (Explain) | |||
CAUSE/ CORRECTIVE ACTION / COMMENTS: | |||
i l | |||
CAUSE; 1 | |||
CORRECTNEACTJON: | |||
) | |||
CRITICALPATH WAS-1 J | |||
L l | |||
I l | I l | ||
1-NARRATIVE REPORT December 01,1998 00:00 Unit 2 at 100% power with no operating problems. | 1-NARRATIVE REPORT December 01,1998 00:00 Unit 2 at 100% power with no operating problems. | ||
Latest revision as of 07:53, 10 December 2024
| ML20199E756 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 12/31/1998 |
| From: | Beasley J, Hargis T SOUTHERN NUCLEAR OPERATING CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| LCV-1169-L, NUDOCS 9901210076 | |
| Download: ML20199E756 (7) | |
Text
.
l.
\\
~
J. Bernie Beasley Jr., P.E Somhern Nuclear Vice Paesident Operating Company. Inc.
Vogtle Project 40 inverness Center Parkway -
RO. Box 1295 i
Birmingham. Alabama 35201 Tel 205.992.7110 Fax 205.992.0403 SOUTHERN 1
COMPANY l
Energy to Serve YourWorld" January 13, 1999 LCV-1169-L Docket Nos.
50-424 50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Gentlemen:
i VOGTLE ELECTRIC GENERATING PLANT MONTHLY OPERATING REPORT-DECEMBER 1998 Enclosed are the December 1998, monthly operating reports for Vogtle Electric Generating Plant (VEGP) Units 1 and 2. These reports are submitted in accordance with the Technical Specification 5.6.4.
Sincerely,
. B.
easley JBB/JLL Enclosures El-VEGP Unit 1 Monthly Operating Report - December 1998 E2-VEGP Unit 2 Monthly Operating Report - December 1998
)
cc:
Southern Nuclear Operating Company j
Mr. J. T. Gasser Mr. M. Sheibani SNC Document Management i
U. S. Nuclear Regulatory Commission
,i j
Mr. L. A. Reyes, Regional Administrator L /
c I
i Mr. D. Jaffe, Senior Project Manager, NRR y
i Mr. J. Zeiler, Senior Resident Inspector, Vogtle
/
., " O
^
c 9901210076 981231 PDR ADOCK 05000424'."
R pgp
t s
i l
ENCLOSURE 1 VOGTLE ELECTRIC GENERATING PLANT - UNIT 1 MONTiiLY OPERATING REPORT FOR DECEMBER 1998 l
t TABLE OF CONTENTS l
l OPERATING DATA REPORT and CHALLENGES to POF.V and SAFETY VALVES.
Page El-1 UNIT S11UTDOWNS and NARRATIVE REPORT Page El-2 i
1 I
s e
a r
7
OPERATING DATA REPORT Dockit No.:
50-424_ _ _.
Unit Name:
VEGP UNIT 1 Date:
January 4,1999 Completed By:
T.S. Hargis__ _
(
Telephone:
_70_6) 826-3469 Operating Status
- 1. Reporting Period:
December-1998
- 2. Design Electrical Rating (Net MWe):
if69-
- 3. Maximum Dependable Capacity (Net MWe):
_, _ 1162 This Month Year _To Date Cumulative l
- 4. Number Of Hours Reactor Was Critical:
744.0 8760.0 89,732.0,
- 5. Hours Generator On Line:
744.0 8738.5 88,413.3
- 6. Unit Reserve Shutdown Hours:
0.0 0.0 0.0
- 7. Net Electrical Energy Generated (MWHe):
879,415 10,216,947 97,679,259 I
CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY
- S Date Tag No.
' Event Description N/A N/A N/A l
l E1-1 1'
m.
- UNIT SHUTDOWNS Docket No.:
50-424_ _ _
i Unit Name:
VEGP UNIT 1 Date:
January _4_,19_99 Compieted By:
T.S. Hargis Telephone:
,[7_06[826-3469 Reporting Pt od:
_ December - 1998 d
l Type Method of l
i F: Forced Duration Shutting iCause/ Corrective Actions I
l Comments No.
gate
- s. seeduw (Hours)
Reason (1) ;Down (2)
N/A N/A N/A N/A N/A N/A N/A l
(1) REASON:
(2) METHOD:
A-Equipment Failure (Explain) E Operator Training /Ucense Examination
- 1. Manual
- 4. Continuation B MamtenanceorTest F - Administrative
- 2. Manual Tnp/ Scram
- 5. Other C - Refueling G - Operational Error (Explain)
- 3. Automaticinp/ Scram D - Regulatory Restriction H - Other (Expbin)
CAUSE/ CORRECTIVE ACTION / COMMENTS:
CAUSE:
CORRECTIVE ACTION.;
1
)
i l
NARRATIVE REPORT December 01,1998 00:00 Unit 1 at 100% power with no operating problems.
December 29,199811:35 Ur!; 1 cereted to 86% power in response to secondary transient induced by isol. of extr. steam December 30,1998 01:00 Unit i retume.iio 100% power following the derate.
Dece7ber 31,1998 23:59 Ur.it i e' 600% power wi'.h rio operating problems.
E1-2
9 ENCLOSURE 2 VOGTLE ELECTRIC GENERATING PLANT - UNIT 2 t
MONT11LY OPERATING REPORT FOR DECEMBER 1998 TABLE OF CONTENTS OPERATING DATA REPORT and CliALLENGES to PORV and SAFETY VALVES Page E2-1 UNIT SliUTDOWNS and NARRATIVE REPORT Page E2-2
-t
i OPERATING DATA REPORT Dock;t No.:
50-425 _.__
Unit Name:
VEGP UNIT 2 Date:
January 4,1999 Completed By:
T.S. Hargis Telephone:
[(706)826 3469
~
~
Operating Status
- 1. Reporting Period:
December-1998
- 2. Design Electrical Rating (Net MWe):
1169_
- 3. Maximum Dependable Capacity (Net MWe):
1167 This Month Yearlo Date Cumulative i
- 4. Number Of Hours Reactor Was Critical:
744.0 7414.9 76,238.7 j
- 5. Hours Generator On Line:
744.0 7350.0 75,509 5
- 6. Unit Reserve Shutdown Hours:
0.0 0.0 0.0
- 7. Net Electrical Energy Generated (MWHe):
885,172 8,388,612 83,975,338 CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES Date Tag No.
- Event Description N/A N/A N/A i
E2-1
- - ~. _.
I l
-UNIT SHUTDOWNS
~
,4 Dock:t No.:
50-425 Unit Nime:
VEGP ORIT 2
~
i Date:
January 4,199'9 l
Completed By:
T.S. Hargi,s_
Telephone:
_(706) 826-3469 Reporting Period:
December - 1998 l
{ Type jMethod of lCause/ Corrective Actions jF: Forced Duration Shutting
's: seedul No.
Date (Hours)
Reason (1)
Down (2) l Comments t
N/A N/A N/A N/A N/A N/A N/A l
(1) REASON:
(2) METHOD:
A - Equipment Failure (Explain)
E Operator Training / License Examination
- 1. Manual
- 4. Continuabon B - Maintenance or Test F - Administrative
- 2. Manual Tnp/ Scram
- 5. Other C - Refuehng G - Operational Error (Explain)
- 3. AutomaticTrip/ Scram D - Regulatory Restnction H - Other (Explain)
CAUSE/ CORRECTIVE ACTION / COMMENTS:
i l
CAUSE; 1
CORRECTNEACTJON:
)
CRITICALPATH WAS-1 J
L l
I l
1-NARRATIVE REPORT December 01,1998 00:00 Unit 2 at 100% power with no operating problems.
December 31,1998 23:59 Unit 2 at 100% power with no operating problems.
E2-2 I
1 l'