ML20199F346: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:--
{{#Wiki_filter:--
Georgia Power Company
Georgia Power Company 6
  - 6 Routa 2 Box 299A Waynesboro, Georgia 30830 Telephone 404 554-9961 404 724-8114 Southem Company Services. Inc.
Routa 2 Box 299A Waynesboro, Georgia 30830 Telephone 404 554-9961 404 724-8114 Southem Company Services. Inc.
Post Office Box 2625 Birmingham. Alabama 35202 Tefephone 205 870 6011 Vogtle Proj.ect June 18, 1986 Director of Nuclear Reactor Regulation                                     File: X7BC35 Attention: Mr. B. J. Youngblood                                           Log:   GN-953 PWR Project Directorate #4 Division of PWR Licensing A U. S. Nuclear Regulatory Commission Washington, D.C. 20555 REF: BAILEY TO DENTON, GN-674, 3/5/86 NRC DOCKET NUMBERS 50-424 AND 50-425 CONSTRUCTION PERMIT NUMBERS CPPR-108 AND CPPR-109 V0GTLE ELECTRIC GENERATING PLANT - UNITS 1 AND 2 SER CONFIRMATORY ITEM 22: TMI ITEM II.F.2
Post Office Box 2625 Birmingham. Alabama 35202 Tefephone 205 870 6011 Vogtle Proj.ect June 18, 1986 Director of Nuclear Reactor Regulation File: X7BC35 Attention:
Mr. B. J. Youngblood Log:
GN-953 PWR Project Directorate #4 Division of PWR Licensing A U. S. Nuclear Regulatory Commission Washington, D.C.
20555 REF: BAILEY TO DENTON, GN-674, 3/5/86 NRC DOCKET NUMBERS 50-424 AND 50-425 CONSTRUCTION PERMIT NUMBERS CPPR-108 AND CPPR-109 V0GTLE ELECTRIC GENERATING PLANT - UNITS 1 AND 2 SER CONFIRMATORY ITEM 22: TMI ITEM II.F.2


==Dear Mr. Denton:==
==Dear Mr. Denton:==
The referenced letter contained an enclosure which describes the VEGP design to implement the requirements of TMI Item II.F.2, Inadequate Core Cooling.
The referenced letter contained an enclosure which describes the VEGP design to implement the requirements of TMI Item II.F.2, Inadequate Core Cooling.
Figure III of the enclosure was in error; attached is a corrected copy of Figure III. The figure is presented in the VEGP FSAR as Figure 4A-3 and will be updated in Amendment 25.
Figure III of the enclosure was in error; attached is a corrected copy of Figure III. The figure is presented in the VEGP FSAR as Figure 4A-3 and will be updated in Amendment 25.
If your staff requires any addit onal information, please do not hesitate to contact me.
If your staff requires any addit onal information, please do not hesitate to contact me.
Sincerely, J. A. Bailey Project Licensing Manager JAB /caa Attachment xc: R. E. Conway                           NRC Regional Administrator R. A. Thomas                       NRC Resident Inspector J. E. Joiner, Esquire             D. C. Teper B. W. Churchill, Esquire         W. C. Ramsey M. A. Miller (2)                   L. T. Gucwa B. Jones, Esquire                 C. W. Hayes G. Bockhold, Jr.                   Vogtle Project File 0513V
Sincerely, J. A. Bailey Project Licensing Manager JAB /caa Attachment xc:
R. E. Conway NRC Regional Administrator R. A. Thomas NRC Resident Inspector J. E. Joiner, Esquire D. C. Teper B. W. Churchill, Esquire W. C. Ramsey M. A. Miller (2)
L. T. Gucwa B. Jones, Esquire C. W. Hayes G. Bockhold, Jr.
Vogtle Project File
[
[
8606240290 860618                                                   e   f i PDR     ADOCK 05000424 E                     PDR
0513V 8606240290 860618 e
f i PDR ADOCK 05000424 E
PDR
 
g


g                            ==
==
F                   1 I   vesset               I                                                                                                                     '
F 1
l       L                   J RANCE                 .
I vesset I
DIFTERENTIAL               WIDE             DYNAMIC PRE 3SURE               RANGE             HEAD NfDRAUUC isotAton                                       PRESS RTD 4
l L
J RANCE i
DIFTERENTIAL WIDE DYNAMIC PRE 3SURE RANGE HEAD NfDRAUUC PRESS isotAton j
RTD l
l 4
)
)
m HvoRAuuc isotAron nro     Rio 3
m HvoRAuuc isotAron nro Rio 3
'  ',                                                        REACTOR VESSEL LEVEL i   INSTRUMENTATION FLUID LAYOUT DRAWING ROURE lit
REACTOR VESSEL LEVEL i
_            _ _              _ _ _        __            -_-__ _                              _ _ _ - .      _      . - _ _ _. _ - _ - -}}
INSTRUMENTATION FLUID LAYOUT DRAWING ROURE lit
- -}}

Latest revision as of 07:48, 10 December 2024

Forwards Corrected Figure III to 860305 Submittal Concerning Design to Implement Requirements of SER Confirmatory Item 22,TMI Item II.F.2, Inadequate Core Cooling. Figure Will Be Updated in Amend 25 to FSAR as Figure 4A-3
ML20199F346
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 06/18/1986
From: Bailey J
GEORGIA POWER CO.
To: Youngblood B
Office of Nuclear Reactor Regulation
References
TASK-2.F.2, TASK-TM GN-953, NUDOCS 8606240290
Download: ML20199F346 (2)


Text

--

Georgia Power Company 6

Routa 2 Box 299A Waynesboro, Georgia 30830 Telephone 404 554-9961 404 724-8114 Southem Company Services. Inc.

Post Office Box 2625 Birmingham. Alabama 35202 Tefephone 205 870 6011 Vogtle Proj.ect June 18, 1986 Director of Nuclear Reactor Regulation File: X7BC35 Attention:

Mr. B. J. Youngblood Log:

GN-953 PWR Project Directorate #4 Division of PWR Licensing A U. S. Nuclear Regulatory Commission Washington, D.C.

20555 REF: BAILEY TO DENTON, GN-674, 3/5/86 NRC DOCKET NUMBERS 50-424 AND 50-425 CONSTRUCTION PERMIT NUMBERS CPPR-108 AND CPPR-109 V0GTLE ELECTRIC GENERATING PLANT - UNITS 1 AND 2 SER CONFIRMATORY ITEM 22: TMI ITEM II.F.2

Dear Mr. Denton:

The referenced letter contained an enclosure which describes the VEGP design to implement the requirements of TMI Item II.F.2, Inadequate Core Cooling.

Figure III of the enclosure was in error; attached is a corrected copy of Figure III. The figure is presented in the VEGP FSAR as Figure 4A-3 and will be updated in Amendment 25.

If your staff requires any addit onal information, please do not hesitate to contact me.

Sincerely, J. A. Bailey Project Licensing Manager JAB /caa Attachment xc:

R. E. Conway NRC Regional Administrator R. A. Thomas NRC Resident Inspector J. E. Joiner, Esquire D. C. Teper B. W. Churchill, Esquire W. C. Ramsey M. A. Miller (2)

L. T. Gucwa B. Jones, Esquire C. W. Hayes G. Bockhold, Jr.

Vogtle Project File

[

0513V 8606240290 860618 e

f i PDR ADOCK 05000424 E

PDR

g

==

F 1

I vesset I

l L

J RANCE i

DIFTERENTIAL WIDE DYNAMIC PRE 3SURE RANGE HEAD NfDRAUUC PRESS isotAton j

RTD l

l 4

)

m HvoRAuuc isotAron nro Rio 3

REACTOR VESSEL LEVEL i

INSTRUMENTATION FLUID LAYOUT DRAWING ROURE lit

- -