ML20199J386: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 19: Line 19:
=Text=
=Text=
{{#Wiki_filter:_
{{#Wiki_filter:_
  A
A
                                                                                                        :
:
        '                                  November 20, 1997                                           :
,
,  ,j .
,j .
                                                                                                        !
November 20, 1997
                                                                                                        l
:
                                                                                                        ,
'
          Mr. Donald A. Reid
!
          Senior Vice President, Oparations
l
          Vermont Yankee Nuclear Power Corporadon
,
          RD 5, Box 169
Mr. Donald A. Reid
          Ferry Road
Senior Vice President, Oparations
          Brattleboro, Vermont 05301
Vermont Yankee Nuclear Power Corporadon
                                                                                                        i
RD 5, Box 169
          SUBJECT: VERMONT YANKEE EXAMINATION REPORT 50 271/97 09
Ferry Road
          Dear Mr. Reid:                                                                               ,
Brattleboro, Vermont 05301
          During the period of September 2-4,1997, the NRC administered initial exams to four
i
          employees of your company who had applied for licenses to operate the Vermont Yankee
SUBJECT: VERMONT YANKEE EXAMINATION REPORT 50 271/97 09
          Nuclear Power Station. At the conclusion of the examinations, the praliminary findings
Dear Mr. Reid:
                                                                                                        '
,
          were discussed with Mr. Kevin Bronson and members of your staff.
During the period of September 2-4,1997, the NRC administered initial exams to four
          Two of the four applicants passed the exarns. One applicant failed the written and
employees of your company who had applied for licenses to operate the Vermont Yankee
          operating portion of the exam, and one applicant failed the operating portion of the exam.
Nuclear Power Station. At the conclusion of the examinations, the praliminary findings
          For the two applicants who failed the operating test, directing shift operations when using
'
          emergency procedures was a significant area of weak performance. Contributing to this         ,
were discussed with Mr. Kevin Bronson and members of your staff.
          weakness may have been the useability of the Vermont Yankee emergency operating
Two of the four applicants passed the exarns. One applicant failed the written and
          procedures. We understand that you are in the process of an emergency procedure
operating portion of the exam, and one applicant failed the operating portion of the exam.
          revision and control room layout study which may result in improved human factors and         ,
For the two applicants who failed the operating test, directing shift operations when using
          useability of your emergency operating procedures. We are interested in your perspectives
emergency procedures was a significant area of weak performance. Contributing to this
          and conclusions regarding the candidates' wem performance, and request a written
,
          response addressing such.
weakness may have been the useability of the Vermont Yankee emergency operating
          In accordance with 10 CFR 2.790 of the NRC's " Rules of Practics," a' copy of this letter
procedures. We understand that you are in the process of an emergency procedure
          and its enclosures will be placed in the NRC Public Document Room (PDR).
,
                                                                                                        ,
revision and control room layout study which may result in improved human factors and
                                                                                          -
useability of your emergency operating procedures. We are interested in your perspectives
                                                                                                  Il    .
and conclusions regarding the candidates' wem performance, and request a written
                                                                                                ( 29
response addressing such.
                                                                                                        '
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practics," a' copy of this letter
                                                                                                -
and its enclosures will be placed in the NRC Public Document Room (PDR).
                                        fl
,
                                                                                                        .
Il
                          .                           -
-
                                                                  .         ._      .
.
( 29
'
-
fl
.
.
-
.
.
.


                                          . . _ .         . _               __ . _ - _ . ._   ..
. . _ .
  *
. _
                                                                                                      l
__
      .
. _ - _
                                                                                                      \
.
.   .                                                                                                  ;
._
                                                                                                      i
..
        Mr. Donalo     9 eld                         2
*
        Should you have any questions regarding this information, please contact Don Florek of my     -
\\
                                                                                                      '
.
        staff at (610) 337 6186 or me at (6101337 5211.
.
                                                    Sincerely,
.
                                                                                                      i
i
                                                    Glenn Meyer, Chief                               l
Mr. Donalo
                                                                                                      l
9 eld
                                                    Operations and Human Performance Branch
2
                                                    Division of Reactor Safety
Should you have any questions regarding this information, please contact Don Florek of my
        Docket No.: 50 271                                                                           l
-
        - License No.: DPR 28                                                                         ;
'
        Enclosures:   Examination Report 50 271/97 009
staff at (610) 337 6186 or me at (6101337 5211.
        cc w/oncl:
Sincerely,
        R. McCullough, Operating Experience Coordinator Vermont Yankee -
i
        R. Wancryk, Director, Safety and Regulatory Affairs
Glenn Meyer, Chief
        G. Maret, Plant Manager
l
        J. Duffy, Licensing Engineer, Vermont Yankee Nuclear Power Corporation
Operations and Human Performance Branch
        J. Gilroy, Director, Vermont Public Interest Research Group, Inc.
Division of Reactor Safety
        D. Tefft, Administrator, Bureau of Radiological Health, State of New Hampshire               ]
Docket No.: 50 271
                                                                                                      '
- License No.: DPR 28
        Chief, Safety Unit, Office of the Attorney General, Commonwealth of Massachusetts
Enclosures:
        D. Lewis, Esquire
Examination Report 50 271/97 009
        G. Bisbee, Esquire                                                                           ,
cc w/oncl:
        J. Block, Esquire
R. McCullough, Operating Experience Coordinator Vermont Yankee -
        T. Rapone, Massachusetts Executive Office of Public .cLaty                                     ,
R. Wancryk, Director, Safety and Regulatory Affairs
        State of New Hampshire, SLO Designee
G. Maret, Plant Manager
        State of Vermont, SLO Designeo
J. Duffy, Licensing Engineer, Vermont Yankee Nuclear Power Corporation
        Commonwealth of Massachusetts, SLO Designee
J. Gilroy, Director, Vermont Public Interest Research Group, Inc.
        D. Katz, Citizens Awareness Network (CAN)
D. Tefft, Administrator, Bureau of Radiological Health, State of New Hampshire
        M. Mervine.-Training Manager
]
                                                                                                        ,
Chief, Safety Unit, Office of the Attorney General, Commonwealth of Massachusetts
                                                                                                        i
'
                                                                                                      l
D. Lewis, Esquire
                                                                                                      ;
G. Bisbee, Esquire
,
J. Block, Esquire
T. Rapone, Massachusetts Executive Office of Public .cLaty
,
State of New Hampshire, SLO Designee
State of Vermont, SLO Designeo
Commonwealth of Massachusetts, SLO Designee
D. Katz, Citizens Awareness Network (CAN)
M. Mervine.-Training Manager
,
i
l
;


              -                                         -           .         --         -.       -         --                 ._       .-       -         .
-
    .
-
                ...                                                                                                                                               '
.
  .     .s
--
                                                                                                                                                                  I
-.
                  Mr. Donald A. Reid                                             3
-
                  Distribution w/ encl:                                                                                                                         ;
--
                  Region i Docket Room (with concurrences)                                                                                                       ;
._
                                                                                                                                                                  '
.-
                  PUBLIC
-
                  Nuclear Safety Information Center (NSIC)                                                                                                       i
.
                  NRC Resident inspector                                                                                                                         l
.
                  H. Miller, RA
. . .
                  W. Axelson, DRA
'
                  J. Wiggins, DRS
.
                  L. Nicholsorr, DRS
.s
                  G. Meyer, DRS                                                                                                                                 r
I
                  D. Florek, DRS
Mr. Donald A. Reid
                  D. Screnci, PAO (2)
3
                  G. Morris, DRS                                                                                                                                 l
Distribution w/ encl:
                  C. Cowgill, DRP                                                                                                                               l
;
                  D. Bearde, DRP                                                                                                                                 i
Region i Docket Room (with concurrences)
                  DRS File
;
                                                                                                                                                                  ,
PUBLIC
                  Distribution w/enct (VIA E MAIL):
'
                  W. Dean, OEDO
Nuclear Safety Information Center (NSIC)
.                  K. Jabbour, NRR
i
                  S. Bajwa, NRR
NRC Resident inspector
                  R. Correla, NRR
l
                  F. Talbot, NRR
H. Miller, RA
                  laspection Program Branch, NRR (IPAS)                                                                                                         ,
W. Axelson, DRA
                  DOCDESK
J. Wiggins, DRS
                                                                                                                                                                  i
L. Nicholsorr, DRS
                                                                                                                                                                  k
G. Meyer, DRS
                                                                                                                                                                  i
r
                                                                                                                                                                  e
D. Florek, DRS
                                                                                                ,
D. Screnci, PAO (2)
      DOCUMENT NAME: A: VY9709,EX
G. Morris, DRS
      Ta eccche a e.py ut thin % A i.dic.ie in ihe boi: c = copy wiinous attachmentrenclosure 'E' = copy wlih attachment /cncksure 'N' = No copy
l
      OFFICE -     Rl/pfS)V, ,              l     Rl/DRS               l, Rl/                         Rl/                               l Rl/         l
C. Cowgill, DRP
      NAME         DFI)rW /)                     GMeyer         j     /
l
      DATE         OV26/97 //                   y/,g/97 KV                 09/ /97                   09/ /97                             09/ /97
D. Bearde, DRP
                      '                           "'
i
                                                                  QFflCIAL RECORD COPY
DRS File
                ..               . _ _ _ .               _ _ _ .     -                   . .     . . . _ , _ _ _ , . . , _ . . . . _ ,           ,     _ _ _
,
Distribution w/enct (VIA E MAIL):
W. Dean, OEDO
K. Jabbour, NRR
.
S. Bajwa, NRR
R. Correla, NRR
F. Talbot, NRR
laspection Program Branch, NRR (IPAS)
,
DOCDESK
i
k
i
e
,
DOCUMENT NAME: A: VY9709,EX
Ta eccche a e.py ut thin % A i.dic.ie in ihe boi: c = copy wiinous attachmentrenclosure
'E' = copy wlih attachment /cncksure
'N' = No copy
OFFICE - Rl/pfS)V,
l
Rl/DRS
l, Rl/
Rl/
l
Rl/
l
,
NAME
DFI)rW /)
GMeyer
j
/
DATE
OV26/97 //
y/,g/97 KV
09/ /97
09/ /97
09/ /97
'
"'
QFflCIAL RECORD COPY
..
.
.
_ _ _ .
-
. .
. . . _ , _ _ _ , . . , _ . . . . _ ,
,
_ _ _
}}
}}

Latest revision as of 04:24, 8 December 2024

Forwards Exam Rept 50-271/97-09 Administered on 970902-04 to Four Employees Who Applied for Licenses to Operate Vermont Yankee Nuclear Power Station.Two of Four Applicants Passed Exams
ML20199J386
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 11/20/1997
From: Meyer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Reid D
VERMONT YANKEE NUCLEAR POWER CORP.
Shared Package
ML20199J392 List:
References
50-271-97-09, 50-271-97-9, NUDOCS 9711280134
Download: ML20199J386 (3)


See also: IR 05000271/1997009

Text

_

A

,

,j .

November 20, 1997

'

!

l

,

Mr. Donald A. Reid

Senior Vice President, Oparations

Vermont Yankee Nuclear Power Corporadon

RD 5, Box 169

Ferry Road

Brattleboro, Vermont 05301

i

SUBJECT: VERMONT YANKEE EXAMINATION REPORT 50 271/97 09

Dear Mr. Reid:

,

During the period of September 2-4,1997, the NRC administered initial exams to four

employees of your company who had applied for licenses to operate the Vermont Yankee

Nuclear Power Station. At the conclusion of the examinations, the praliminary findings

'

were discussed with Mr. Kevin Bronson and members of your staff.

Two of the four applicants passed the exarns. One applicant failed the written and

operating portion of the exam, and one applicant failed the operating portion of the exam.

For the two applicants who failed the operating test, directing shift operations when using

emergency procedures was a significant area of weak performance. Contributing to this

,

weakness may have been the useability of the Vermont Yankee emergency operating

procedures. We understand that you are in the process of an emergency procedure

,

revision and control room layout study which may result in improved human factors and

useability of your emergency operating procedures. We are interested in your perspectives

and conclusions regarding the candidates' wem performance, and request a written

response addressing such.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practics," a' copy of this letter

and its enclosures will be placed in the NRC Public Document Room (PDR).

,

Il

-

.

( 29

'

-

fl

.

.

-

.

.

.

. . _ .

. _

__

. _ - _

.

._

..

\\

.

.

.

i

Mr. Donalo

9 eld

2

Should you have any questions regarding this information, please contact Don Florek of my

-

'

staff at (610) 337 6186 or me at (6101337 5211.

Sincerely,

i

Glenn Meyer, Chief

l

Operations and Human Performance Branch

Division of Reactor Safety

Docket No.: 50 271

- License No.: DPR 28

Enclosures:

Examination Report 50 271/97 009

cc w/oncl:

R. McCullough, Operating Experience Coordinator Vermont Yankee -

R. Wancryk, Director, Safety and Regulatory Affairs

G. Maret, Plant Manager

J. Duffy, Licensing Engineer, Vermont Yankee Nuclear Power Corporation

J. Gilroy, Director, Vermont Public Interest Research Group, Inc.

D. Tefft, Administrator, Bureau of Radiological Health, State of New Hampshire

]

Chief, Safety Unit, Office of the Attorney General, Commonwealth of Massachusetts

'

D. Lewis, Esquire

G. Bisbee, Esquire

,

J. Block, Esquire

T. Rapone, Massachusetts Executive Office of Public .cLaty

,

State of New Hampshire, SLO Designee

State of Vermont, SLO Designeo

Commonwealth of Massachusetts, SLO Designee

D. Katz, Citizens Awareness Network (CAN)

M. Mervine.-Training Manager

,

i

l

-

-

.

--

-.

-

--

._

.-

-

.

.

. . .

'

.

.s

I

Mr. Donald A. Reid

3

Distribution w/ encl:

Region i Docket Room (with concurrences)

PUBLIC

'

Nuclear Safety Information Center (NSIC)

i

NRC Resident inspector

l

H. Miller, RA

W. Axelson, DRA

J. Wiggins, DRS

L. Nicholsorr, DRS

G. Meyer, DRS

r

D. Florek, DRS

D. Screnci, PAO (2)

G. Morris, DRS

l

C. Cowgill, DRP

l

D. Bearde, DRP

i

DRS File

,

Distribution w/enct (VIA E MAIL):

W. Dean, OEDO

K. Jabbour, NRR

.

S. Bajwa, NRR

R. Correla, NRR

F. Talbot, NRR

laspection Program Branch, NRR (IPAS)

,

DOCDESK

i

k

i

e

,

DOCUMENT NAME: A: VY9709,EX

Ta eccche a e.py ut thin % A i.dic.ie in ihe boi: c = copy wiinous attachmentrenclosure

'E' = copy wlih attachment /cncksure

'N' = No copy

OFFICE - Rl/pfS)V,

l

Rl/DRS

l, Rl/

Rl/

l

Rl/

l

,

NAME

DFI)rW /)

GMeyer

j

/

DATE

OV26/97 //

y/,g/97 KV

09/ /97

09/ /97

09/ /97

'

"'

QFflCIAL RECORD COPY

..

.

.

_ _ _ .

-

. .

. . . _ , _ _ _ , . . , _ . . . . _ ,

,

_ _ _