ML20199K061: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:- _ _ _ _ _ _ _ _ - _ _ - _             -
{{#Wiki_filter:- _ _ _ _ _ _ _ _ - _ _ - _
+ ,.
+,.
Entergy operotiorO,Inc.
Entergy operotiorO,Inc.
g=
g=
0f0ffl                                                                                                                                       $$ sam Tel 601437 640fs Fax J)1437 2h "
0f0ffl
4 Josep5 J. Hagan November 14, 1997                                                                                                                                             * [y''
$$ sam Tel 601437 640fs Fax J)1437 2h "
or cuino:> ear stam U.S. Nuclear Regulatory Commission Mail Station P1 137 Washington, D.C. 20555 Attention:               Document Control Desk
4 Josep5 J. Hagan November 14, 1997
* [y''
or cuino:> ear stam U.S. Nuclear Regulatory Commission Mail Station P1 137 Washington, D.C. 20555 Attention:
Document Control Desk


==SUBJECT:==
==SUBJECT:==
Grand Gulf Nuclear Station Unit 1 Dccket No. 50-416 License No. NPF-29 Monthly Operating Report GNRO-97/00110 Gentlemen:
Grand Gulf Nuclear Station Unit 1 Dccket No. 50-416 License No. NPF-29 Monthly Operating Report GNRO-97/00110 Gentlemen:
In accordance with the requirement of Technical Specification 5.6.4, Entergy Operations is providing the Monthly Operating Report for Grand Gulf Nu lear Station Unit 1 for October 1997, if you have any questions or require additional information, please contact this office.
In accordance with the requirement of Technical Specification 5.6.4, Entergy Operations is providing the Monthly Operating Report for Grand Gulf Nu lear Station Unit 1 for October
: 1997, if you have any questions or require additional information, please contact this office.
Yours truly, J
Yours truly, J
JJH/SDileg attachments: 1.                 parating Status                                                                                                                   l
JJH/SDileg attachments: 1.
: 2.     Average Daily Power Level                                                                                                           \\
parating Status l
: 3.         't Shutdown and Power Reductions 7
2.
cc:             (See Next Page)                                                                                                                                                       k 9711290306 971031 PDR             ADOCK 05000416 R                             PDR
Average Daily Power Level
                                                                                                                                                              \h ,h, \
\\\\
              . . . . . .          i.i..    ..
3.
't Shutdown and Power Reductions 7
cc:
(See Next Page) k 9711290306 971031 PDR ADOCK 05000416 R
PDR
\\h,h, \\
i.i..


j:6         ,
j:6 ir
ir                   .
.y
.y :.= o:         -*
:.= o:
.p-     ,.,
.p-
              ; GNRO-97/00110 i Page 2 of 3 -
; GNRO-97/00110 i Page 2 of 3 -
cc:             Mr. D. C, Hintz (w/a)
cc:
Mr. D. C, Hintz (w/a)
Mr. N. S. Reynolds (w/a)-
Mr. N. S. Reynolds (w/a)-
Mr. Jager Smith (w/a)
Mr. Jager Smith (w/a)
Mr. H. L Thomas (w/o)
Mr. H. L Thomas (w/o)
Ms. K. D. Weaver (w/a)
Ms. K. D. Weaver (w/a)
                              ' Mr. Leonard J. Callan (w/a)
' Mr. Leonard J. Callan (w/a)
Regional Administrator '
Regional Administrator '
U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive Suite 400 Arlington, TX 76011 Mr. Jack Donohew, Project Manager Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mall Stop 13H3 Washington, D.C. 20555
U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive Suite 400 Arlington, TX 76011 Mr. Jack Donohew, Project Manager Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mall Stop 13H3 Washington, D.C. 20555


          .          .                                                                        Attachment i to GNRO 97/00110 DOCKET NO               50-416 DATE                   11/06/97 COMPLETED BY           S. D. Lin     )
Attachment i to GNRO 97/00110 DOCKET NO 50-416 DATE 11/06/97 COMPLETED BY S. D. Lin
TELEPHONE               (601) 437-6793 OPERATING STATUS
)
: 1. Un:t Name: GGNS UNIT 1
TELEPHONE (601) 437-6793 OPERATING STATUS 1.
: 2. Reporting Period: October 1997
Un:t Name: GGNS UNIT 1 2.
: 3. Licensed Thermal Power (MWt): 3833 MWT
Reporting Period: October 1997 3.
: 4. Nameplate Rating (Gross MWe): 1372.5 MWE
Licensed Thermal Power (MWt): 3833 MWT 4.
: 5. Design Electrical Rating (Net MWe): 1250 MWE
Nameplate Rating (Gross MWe): 1372.5 MWE 5.
: 6. Maximum Dependable Capacit';(Gross MWe): 1250 MWE                                                                   F
Design Electrical Rating (Net MWe): 1250 MWE 6.
: 7. Maximum Dependable Capacity (Net MWe):               1200 MWE 8,     if changes occur in Capacity Ratings (items 3 through 7) Since Last Report. Give Reason:                       N/A
Maximum Dependable Capacit';(Gross MWe): 1250 MWE F
: 9. Power Level To Which Restricted, if Any (Net MWe):                           N/A
7.
: 10. Reasons For Restrictions,if Any:           N/A Ihis Month                         Yr to Date     Cumulative 11, Hours in Reporting Period                                         745                 7.296         114.256           .
Maximum Dependable Capacity (Net MWe):
: 12. Number of Hours Reactor was Critical                               745.0               7.296.0       95.275.0
1200 MWE 8,
: 13. Reactor Reserve Shutdown Hours                               ,
if changes occur in Capacity Ratings (items 3 through 7) Since Last Report. Give Reason:
0               0                0
N/A 9.
: 14. Hours Generator On-Line                                           745.0               7.296.0       92.172.9
Power Level To Which Restricted, if Any (Net MWe):
: 15. Unit Reserve Shutdown Hours                                               0               0               0
N/A
: 16. Gross Thermal Energy Generated (MWH)                     2.852.063                 27.780.487     330.899.523
: 10. Reasons For Restrictions,if Any:
: 17. Gross Electrical Energy Generated (MWH)                         961.980           9.370.341_   106.642.272           3
N/A Ihis Month Yr to Date Cumulative 11, Hours in Reporting Period 745 7.296 114.256
: 18. Net Electrical Energy Generated (MWH)                           925.513           9.012.843 _ 102.237.188
: 12. Number of Hours Reactor was Critical 745.0 7.296.0 95.275.0
: 19. Unit Service Factor                                               100.0                 100.0             82.4
: 13. Reactor Reserve Shutdown Hours 0
: 20. Unit Availability Factor                                           100.0                 100.0             82.4
0 0
: 21. Unit Capacity Factor (Using MDC Net)                               103.5                 102.9             61 1
: 14. Hours Generator On-Line 745.0 7.296.0 92.172.9
: 22. Unit Capacity Factor (Using DER Net)                                   99.4             98.8             74.1
: 15. Unit Reserve Shutdown Hours 0
: 23. Unit Forced Outage Rate                                                   0.0             0.0               5.8
0 0
: 16. Gross Thermal Energy Generated (MWH) 2.852.063 27.780.487 330.899.523
: 17. Gross Electrical Energy Generated (MWH) 961.980 9.370.341_
106.642.272 3
: 18. Net Electrical Energy Generated (MWH) 925.513 9.012.843 _ 102.237.188
: 19. Unit Service Factor 100.0 100.0 82.4
: 20. Unit Availability Factor 100.0 100.0 82.4
: 21. Unit Capacity Factor (Using MDC Net) 103.5 102.9 61 1
: 22. Unit Capacity Factor (Using DER Net) 99.4 98.8 74.1
: 23. Unit Forced Outage Rate 0.0 0.0 5.8
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Daia, and Duration of Each):
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Daia, and Duration of Each):
Refuelino Outaoe #9 beoinnino on 04/11/98 @0000 hour for 32 Days
Refuelino Outaoe #9 beoinnino on 04/11/98 @0000 hour for 32 Days
: 25. If Shut Down At End of Report Period. Estimated Date of Startup:                                 N/A
: 25. If Shut Down At End of Report Period. Estimated Date of Startup:
N/A
: 26. Units in Test Status (Prior to Commercial Operation):
: 26. Units in Test Status (Prior to Commercial Operation):
Forecast       Achieved INITIAL CRITICALITY                                               08/18/82 INITIAL ELECTRICITY                                               10/20/84 COMMERCIAL OPERATION                                               07/01/85
Forecast Achieved INITIAL CRITICALITY 08/18/82 INITIAL ELECTRICITY 10/20/84 COMMERCIAL OPERATION 07/01/85
____              --                      __--__                              _-~
_-~


.              .e a.:     -
.e a.:
Attachment 2 to GNRO 97/00110 DOCKET NO             50-416       _
- to GNRO 97/00110 DOCKET NO 50-416 DATE 11/10/97 COMPLETED BY S. D. Lin TELEPHONE (801) 437-6793 MONTH October 1997 DAY. AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)
DATE                 11/10/97 COMPLETED BY         S. D. Lin TELEPHONE             (801) 437-6793 MONTH October 1997 DAY . AVERAGE DAILY POWER LEVEL             DAY AVERAGE DAILY POWER LEVEL (MWe Net)                               (MWe-Net) 1                 1232                     17                 1257 2                 1240                     18                 1240 3                 1245                     19                 1256 4                 1216                     20                 1245 5                 1232-                   21                 1243 6                 1230                     22                 M56 7                 1229                     23                 1249         ,
(MWe-Net) 1 1232 17 1257 2
8                  1228                     24                 1233 9                 1225                     25                 1225 10                 1228                     26                 1254 11                 1232                     27                 1265 12                 1230                     28                 1266 13                 1238                     20                 1259 14                 1254                     30                 1252-     .,
1240 18 1240 3
15                 1256                     31                 1242 16                 1257
1245 19 1256 4
1216 20 1245 5
1232-21 1243 6
1230 22 M56 7
1229 23 1249 8
1228 24 1233 9
1225 25 1225 10 1228 26 1254 11 1232 27 1265 12 1230 28 1266 13 1238 20 1259 14 1254 30 1252-15 1256 31 1242 16 1257


o
o v
* v Attachment 3 to GNRO-97/OO11C -                     ,
. to GNRO-97/OO11C -
DOCKET NO         50-416             '
DOCKET NO 50-416 DATE
DATE              -11/10/97 COMPLETED BY       S. D. Lin TELEPHONE         (601) 437-6793 UNIT SHUTDOWNS AND POuTR FIDUC110NS REPORT MONTH October 1997 No.       Date Type (1)     Duration   Reason     Method Of         Licensee Event     System Code       Component   Cause & Corr:ctive Action To Prevent Hours           (2)   Shutting Down     Report #             (4)             Code (5)     Recurrence (C&CA)
-11/10/97 COMPLETED BY S. D. Lin TELEPHONE (601) 437-6793 UNIT SHUTDOWNS AND POuTR FIDUC110NS REPORT MONTH October 1997 No.
Date Type (1)
Duration Reason Method Of Licensee Event System Code Component Cause & Corr:ctive Action To Prevent Hours (2)
Shutting Down Report #
(4)
Code (5)
Recurrence (C&CA)
Reactor O)
Reactor O)
None 1                 2                             3                     '4                                                 5 F: Forced         Reason:                       Method:                 Exhibit G - Instructions for Prepara: ion of       Exhibi~ l - Same Source                       l S: Scheduled     A-Equipment Failure (Explain) 1-Manual               Data Entry Sheets for Licensee Event B-Maintenance or Test         2-Manual Sda           Report (LER) File (NUREG4)l61)
None 1
C-Refueling                   3-Automatic Scram D-Regulatory Restriction       4-Continued E-Operator Training &         5-Reduced load Licensing Examination     6-Other F-Administrative G-Operational Error (Explain)
2 3
'4 5
F: Forced Reason:
Method:
Exhibit G - Instructions for Prepara: ion of Exhibi~ l - Same Source l
S: Scheduled A-Equipment Failure (Explain) 1-Manual Data Entry Sheets for Licensee Event B-Maintenance or Test 2-Manual Sda Report (LER) File (NUREG4)l61)
C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Continued E-Operator Training &
5-Reduced load Licensing Examination 6-Other F-Administrative G-Operational Error (Explain)
H-Other (Explain)
H-Other (Explain)
                                                                                                                                            -,            . -__ _ _ _ .}}
.}}

Latest revision as of 04:16, 8 December 2024

Monthly Operating Rept for Oct 1997 for Grand Gulf Nuclear Station,Unit 1
ML20199K061
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 10/31/1997
From: Hagan J, Lin S
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GNRO-97-00110, GNRO-97-110, NUDOCS 9711280306
Download: ML20199K061 (5)


Text

- _ _ _ _ _ _ _ _ - _ _ - _

+,.

Entergy operotiorO,Inc.

g=

0f0ffl

$$ sam Tel 601437 640fs Fax J)1437 2h "

4 Josep5 J. Hagan November 14, 1997

  • [y

or cuino:> ear stam U.S. Nuclear Regulatory Commission Mail Station P1 137 Washington, D.C. 20555 Attention:

Document Control Desk

SUBJECT:

Grand Gulf Nuclear Station Unit 1 Dccket No. 50-416 License No. NPF-29 Monthly Operating Report GNRO-97/00110 Gentlemen:

In accordance with the requirement of Technical Specification 5.6.4, Entergy Operations is providing the Monthly Operating Report for Grand Gulf Nu lear Station Unit 1 for October

1997, if you have any questions or require additional information, please contact this office.

Yours truly, J

JJH/SDileg attachments: 1.

parating Status l

2.

Average Daily Power Level

\\\\

3.

't Shutdown and Power Reductions 7

cc:

(See Next Page) k 9711290306 971031 PDR ADOCK 05000416 R

PDR

\\h,h, \\

i.i..

j:6 ir

.y

.= o:

.p-

GNRO-97/00110 i Page 2 of 3 -

cc:

Mr. D. C, Hintz (w/a)

Mr. N. S. Reynolds (w/a)-

Mr. Jager Smith (w/a)

Mr. H. L Thomas (w/o)

Ms. K. D. Weaver (w/a)

' Mr. Leonard J. Callan (w/a)

Regional Administrator '

U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive Suite 400 Arlington, TX 76011 Mr. Jack Donohew, Project Manager Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mall Stop 13H3 Washington, D.C. 20555

Attachment i to GNRO 97/00110 DOCKET NO 50-416 DATE 11/06/97 COMPLETED BY S. D. Lin

)

TELEPHONE (601) 437-6793 OPERATING STATUS 1.

Un:t Name: GGNS UNIT 1 2.

Reporting Period: October 1997 3.

Licensed Thermal Power (MWt): 3833 MWT 4.

Nameplate Rating (Gross MWe): 1372.5 MWE 5.

Design Electrical Rating (Net MWe): 1250 MWE 6.

Maximum Dependable Capacit';(Gross MWe): 1250 MWE F

7.

Maximum Dependable Capacity (Net MWe):

1200 MWE 8,

if changes occur in Capacity Ratings (items 3 through 7) Since Last Report. Give Reason:

N/A 9.

Power Level To Which Restricted, if Any (Net MWe):

N/A

10. Reasons For Restrictions,if Any:

N/A Ihis Month Yr to Date Cumulative 11, Hours in Reporting Period 745 7.296 114.256

12. Number of Hours Reactor was Critical 745.0 7.296.0 95.275.0
13. Reactor Reserve Shutdown Hours 0

0 0

14. Hours Generator On-Line 745.0 7.296.0 92.172.9
15. Unit Reserve Shutdown Hours 0

0 0

16. Gross Thermal Energy Generated (MWH) 2.852.063 27.780.487 330.899.523
17. Gross Electrical Energy Generated (MWH) 961.980 9.370.341_

106.642.272 3

18. Net Electrical Energy Generated (MWH) 925.513 9.012.843 _ 102.237.188
19. Unit Service Factor 100.0 100.0 82.4
20. Unit Availability Factor 100.0 100.0 82.4
21. Unit Capacity Factor (Using MDC Net) 103.5 102.9 61 1
22. Unit Capacity Factor (Using DER Net) 99.4 98.8 74.1
23. Unit Forced Outage Rate 0.0 0.0 5.8
24. Shutdowns Scheduled Over Next 6 Months (Type, Daia, and Duration of Each):

Refuelino Outaoe #9 beoinnino on 04/11/98 @0000 hour for 32 Days

25. If Shut Down At End of Report Period. Estimated Date of Startup:

N/A

26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY 08/18/82 INITIAL ELECTRICITY 10/20/84 COMMERCIAL OPERATION 07/01/85

_-~

.e a.:

- to GNRO 97/00110 DOCKET NO 50-416 DATE 11/10/97 COMPLETED BY S. D. Lin TELEPHONE (801) 437-6793 MONTH October 1997 DAY. AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)

(MWe-Net) 1 1232 17 1257 2

1240 18 1240 3

1245 19 1256 4

1216 20 1245 5

1232-21 1243 6

1230 22 M56 7

1229 23 1249 8

1228 24 1233 9

1225 25 1225 10 1228 26 1254 11 1232 27 1265 12 1230 28 1266 13 1238 20 1259 14 1254 30 1252-15 1256 31 1242 16 1257

o v

. to GNRO-97/OO11C -

DOCKET NO 50-416 DATE

-11/10/97 COMPLETED BY S. D. Lin TELEPHONE (601) 437-6793 UNIT SHUTDOWNS AND POuTR FIDUC110NS REPORT MONTH October 1997 No.

Date Type (1)

Duration Reason Method Of Licensee Event System Code Component Cause & Corr:ctive Action To Prevent Hours (2)

Shutting Down Report #

(4)

Code (5)

Recurrence (C&CA)

Reactor O)

None 1

2 3

'4 5

F: Forced Reason:

Method:

Exhibit G - Instructions for Prepara: ion of Exhibi~ l - Same Source l

S: Scheduled A-Equipment Failure (Explain) 1-Manual Data Entry Sheets for Licensee Event B-Maintenance or Test 2-Manual Sda Report (LER) File (NUREG4)l61)

C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Continued E-Operator Training &

5-Reduced load Licensing Examination 6-Other F-Administrative G-Operational Error (Explain)

H-Other (Explain)

.