ML20199K250: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:._                                                                                                  _
{{#Wiki_filter:._
f 8
f 8
November 20, 1997 Mr. Michael J. Colomb Site Executive Officer New York Power Authority Jamet A. FitzPatrick Nuclear Power Plant Post Office Box 41 Lycoming, NY 13093
November 20, 1997 Mr. Michael J. Colomb Site Executive Officer New York Power Authority Jamet A. FitzPatrick Nuclear Power Plant Post Office Box 41 Lycoming, NY 13093
Line 24: Line 24:


==Dear Mr. Colomb:==
==Dear Mr. Colomb:==
On October'21,1997, the NRC staff completed the semiannual Plant Performance Review
On October'21,1997, the NRC staff completed the semiannual Plant Performance Review
      .(PPR) of FitzPatrick. The staff conducts thew reviews for all operating nuclear power plants to develop an integrated understanding of safety performance. The results are used
.(PPR) of FitzPatrick. The staff conducts thew reviews for all operating nuclear power plants to develop an integrated understanding of safety performance. The results are used
      ' by NRC management to facilitate planning and allocation of inspection re:ources. The PPR for FitzPatrick involved the participation of all technical divisions in evaluating inspection results and safety performance information for the period March 1997 through October 1997. PPRs provide NRC management with a curent summary of licensee performance and' serve as inputs to the NRC Systematic Assessment of Licensee Performance (SALP)               I and senior management meeting (SMM) reviews.
' by NRC management to facilitate planning and allocation of inspection re:ources. The PPR for FitzPatrick involved the participation of all technical divisions in evaluating inspection results and safety performance information for the period March 1997 through October 1997. PPRs provide NRC management with a curent summary of licensee performance I
and' serve as inputs to the NRC Systematic Assessment of Licensee Performance (SALP) and senior management meeting (SMM) reviews.
This letter advises you of our planned inspection effort resulting from the FitzPatrick PPR reviews. It is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advence of inspector arrival onsite. The enclosure details our inspection plan at FitzPatrick for the next 6 months.
This letter advises you of our planned inspection effort resulting from the FitzPatrick PPR reviews. It is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advence of inspector arrival onsite. The enclosure details our inspection plan at FitzPatrick for the next 6 months.
Resident inspections are not listed due to their ongoing and continuous nature.
Resident inspections are not listed due to their ongoing and continuous nature.
Line 35: Line 35:


==Enclosure:==
==Enclosure:==
FitzPatrick Inspection Plan
FitzPatrick Inspection Plan kkll\\.h!.!..,
            ,nmomoenim                                                  kkll\.h!.!..,
.sgoI i
                                                                        .                        .sgoI i
,nmomoenim
_PDR- ADOCK 05000333                                                                               ,
_PDR-ADOCK 05000333 G
G           ~~
PDR M
PDR         .                    .
0FFiCIAL RECORD COPY
0FFiCIAL RECORD COPY                                     M
~~
                                                                                                          ~
~


l.
l.
Michael J. Colomb                                                               2 cc w/ encl:
Michael J. Colomb 2
cc w/ encl:
C. D. Rappleyes, Chairman at.d Chief Executive Officer E. Zettmann, President and Chief Operating Officer R. Hiney, Executive Vice President for Project Operations J. Knubel, Chief Nuclear Officer and Senior Vice President H. P. Salmon, Jr., Vice President of Nuclear Operations W. Josiger, Vice President - Engineering and Project Management J. Kelly, Director - Regulatory Affairs and Special Projects T. Dougherty, Vice President - Nuclear Engineering R. Deasy, Vice President - Appraisal and Compliance Services R. Patch, Director - Quality Assurance G. C. Goldstein, Assistant General Counsel C. D. Falson, Director, Nuclect Licensing, NYPA K. Peters, Licensing Manager T. Morra, Executive Chair, Four County Nuclear Safety Committee Supervisor, Town of Scriva C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law P. Eddy, Director, Electric Division, Department of Public Service, State of New York G. T. Goerir.g, Consultant, New York Power Authority J. E. Gagliardo, Consultant, New York Power Authority E. S. Beckjord, Consultant, New York Power Authority F. William Valentino, President, New York State Energy Research and Development Authority J. Spath, Program Director, New York State Energy Research and Development Authori:y
C. D. Rappleyes, Chairman at.d Chief Executive Officer E. Zettmann, President and Chief Operating Officer R. Hiney, Executive Vice President for Project Operations J. Knubel, Chief Nuclear Officer and Senior Vice President H. P. Salmon, Jr., Vice President of Nuclear Operations W. Josiger, Vice President - Engineering and Project Management J. Kelly, Director - Regulatory Affairs and Special Projects T. Dougherty, Vice President - Nuclear Engineering R. Deasy, Vice President - Appraisal and Compliance Services R. Patch, Director - Quality Assurance G. C. Goldstein, Assistant General Counsel C. D. Falson, Director, Nuclect Licensing, NYPA K. Peters, Licensing Manager T. Morra, Executive Chair, Four County Nuclear Safety Committee Supervisor, Town of Scriva C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law P. Eddy, Director, Electric Division, Department of Public Service, State of New York G. T. Goerir.g, Consultant, New York Power Authority J. E. Gagliardo, Consultant, New York Power Authority E. S. Beckjord, Consultant, New York Power Authority F. William Valentino, President, New York State Energy Research and Development Authority J. Spath, Program Director, New York State Energy Research and Development Authori:y


Michael J. Colomb'                                               3 Distribution w/ encl:
Michael J. Colomb' 3
Distribution w/ encl:
H. Miller, RA/W. Axelson, DRA (1)
H. Miller, RA/W. Axelson, DRA (1)
Nuclear Safety information Center (NSIC)
Nuclear Safety information Center (NSIC)
Line 54: Line 56:
NRC Resident inspector Region i Docket Room (with concurrences)
NRC Resident inspector Region i Docket Room (with concurrences)
J. Wiggins, DRS L. Nicholson, DRS J. Rogge, DRP A. Blamey, DRP D. Dempsey, DRS J. McFadden, DRS M. Oprendek, DRP R. Junod, DRP Distribution w/ encl: (VIA E-MAIL)
J. Wiggins, DRS L. Nicholson, DRS J. Rogge, DRP A. Blamey, DRP D. Dempsey, DRS J. McFadden, DRS M. Oprendek, DRP R. Junod, DRP Distribution w/ encl: (VIA E-MAIL)
K. Kennedy, RI EDO Coordinator S. Bajwa, NRR K. Cotton, NRR                                                                 A D. Hood, NRR M. Campion, RI Inspection Program Branch, NRR (IPAS)
K. Kennedy, RI EDO Coordinator S. Bajwa, NRR K. Cotton, NRR A
D. Hood, NRR M. Campion, RI Inspection Program Branch, NRR (IPAS)
DOCDESK s
DOCDESK s
DOCUMENT NAME: G:\ BRANCH 2\lNSPPPR. FIT To receive a copy of this document,ind;cate in the box: "C" = Copy without attachment / enclosure "E" = Copy with attachment / enclosure "N" = No copy YFICE                         Rl/ Q Qyl/DRP g / /             Rl/DRP n NAME                       ABlam'ey JPKaufmdn /g jf         JRogge(t}v DATE                         11/a>/97       111)d9MN'"
DOCUMENT NAME: G:\\ BRANCH 2\\lNSPPPR. FIT To receive a copy of this document,ind;cate in the box: "C" = Copy without attachment / enclosure "E" = Copy with attachment / enclosure "N" = No copy YFICE Rl/ Q Qyl/DRP g / /
                                                      ~
Rl/DRP n NAME ABlam'ey JPKaufmdn /g jf JRogge(t}v DATE 11/a>/97 111)d9MN'"
11/3,/978 OFFICIAL RECORD COPY
11/3,/978
~
OFFICIAL RECORD COPY


FITZPATRICK INSPECTION PLAN INSPECTION                 TITLE / PROGRAM AREA                     PLANNED         TYPE INSPECTION DATES             COMMENTS IP 86750-01       Solid radioactive waste management and               11/3/97 to       Core Inspection transportation of radioactive material               11/7/97 Ti 2515/133         Implementation of revised 49 CFR Parts               11/3/97 to       Temporary Instruction 100-179 and 10 CFR 71                                 11/7/97         (required by NRR/NMSS)
FITZPATRICK INSPECTION PLAN INSPECTION TITLE / PROGRAM AREA PLANNED TYPE INSPECTION DATES COMMENTS IP 86750-01 Solid radioactive waste management and 11/3/97 to Core Inspection transportation of radioactive material 11/7/97 Ti 2515/133 Implementation of revised 49 CFR Parts 11/3/97 to Temporary Instruction 100-179 and 10 CFR 71 11/7/97 (required by NRR/NMSS)
IP 81700-02         Physical security program                             3/16/98 to       Core inspection 3/20/98 IP 82701           Operational status of the EP program                 6/1/98 to 6/5/98 Core Ir.spection IP 92903           Followup on T!P issue                                 12/15/97 to     Regional reactive 12/19/97 IP 71001           Licensed Operator Requal                             4/20/98 to       Core inspection 4/24/98 r
IP 81700-02 Physical security program 3/16/98 to Core inspection 3/20/98 IP 82701 Operational status of the EP program 6/1/98 to 6/5/98 Core Ir.spection IP 92903 Followup on T!P issue 12/15/97 to Regional reactive 12/19/97 IP 71001 Licensed Operator Requal 4/20/98 to Core inspection 4/24/98 r
L
L
- . . - - - _ - - - - , _ - - -- -- --              --}}
--}}

Latest revision as of 04:15, 8 December 2024

Advises of Planned Insp Effort Resulting from Licensee PPR Reviews.Details of Insp Plan at Plant for Next 6 Months Encl
ML20199K250
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 11/20/1997
From: Rogge J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Michael Colomb
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
References
NUDOCS 9712010060
Download: ML20199K250 (4)


Text

._

f 8

November 20, 1997 Mr. Michael J. Colomb Site Executive Officer New York Power Authority Jamet A. FitzPatrick Nuclear Power Plant Post Office Box 41 Lycoming, NY 13093

SUBJECT:

PLANT PERFORMANCE REVIEW (PPR) FITZPATRICK

Dear Mr. Colomb:

On October'21,1997, the NRC staff completed the semiannual Plant Performance Review

.(PPR) of FitzPatrick. The staff conducts thew reviews for all operating nuclear power plants to develop an integrated understanding of safety performance. The results are used

' by NRC management to facilitate planning and allocation of inspection re:ources. The PPR for FitzPatrick involved the participation of all technical divisions in evaluating inspection results and safety performance information for the period March 1997 through October 1997. PPRs provide NRC management with a curent summary of licensee performance I

and' serve as inputs to the NRC Systematic Assessment of Licensee Performance (SALP) and senior management meeting (SMM) reviews.

This letter advises you of our planned inspection effort resulting from the FitzPatrick PPR reviews. It is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advence of inspector arrival onsite. The enclosure details our inspection plan at FitzPatrick for the next 6 months.

Resident inspections are not listed due to their ongoing and continuous nature.

We willinfer.n you of any changes to the inspection plan. If you have any questions, please contact me at (610) 337-5146.

Sincerely, Original Signed by:

John F. Rogge, Chief Projects Branch 2 Division of Reactor Projects Cocket Nos. Docket No. 50-333 License No. DPR-59

Enclosure:

FitzPatrick Inspection Plan kkll\\.h!.!..,

.sgoI i

,nmomoenim

_PDR-ADOCK 05000333 G

PDR M

0FFiCIAL RECORD COPY

~~

~

l.

Michael J. Colomb 2

cc w/ encl:

C. D. Rappleyes, Chairman at.d Chief Executive Officer E. Zettmann, President and Chief Operating Officer R. Hiney, Executive Vice President for Project Operations J. Knubel, Chief Nuclear Officer and Senior Vice President H. P. Salmon, Jr., Vice President of Nuclear Operations W. Josiger, Vice President - Engineering and Project Management J. Kelly, Director - Regulatory Affairs and Special Projects T. Dougherty, Vice President - Nuclear Engineering R. Deasy, Vice President - Appraisal and Compliance Services R. Patch, Director - Quality Assurance G. C. Goldstein, Assistant General Counsel C. D. Falson, Director, Nuclect Licensing, NYPA K. Peters, Licensing Manager T. Morra, Executive Chair, Four County Nuclear Safety Committee Supervisor, Town of Scriva C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law P. Eddy, Director, Electric Division, Department of Public Service, State of New York G. T. Goerir.g, Consultant, New York Power Authority J. E. Gagliardo, Consultant, New York Power Authority E. S. Beckjord, Consultant, New York Power Authority F. William Valentino, President, New York State Energy Research and Development Authority J. Spath, Program Director, New York State Energy Research and Development Authori:y

Michael J. Colomb' 3

Distribution w/ encl:

H. Miller, RA/W. Axelson, DRA (1)

Nuclear Safety information Center (NSIC)

PUBLIC -

NRC Resident inspector Region i Docket Room (with concurrences)

J. Wiggins, DRS L. Nicholson, DRS J. Rogge, DRP A. Blamey, DRP D. Dempsey, DRS J. McFadden, DRS M. Oprendek, DRP R. Junod, DRP Distribution w/ encl: (VIA E-MAIL)

K. Kennedy, RI EDO Coordinator S. Bajwa, NRR K. Cotton, NRR A

D. Hood, NRR M. Campion, RI Inspection Program Branch, NRR (IPAS)

DOCDESK s

DOCUMENT NAME: G:\\ BRANCH 2\\lNSPPPR. FIT To receive a copy of this document,ind;cate in the box: "C" = Copy without attachment / enclosure "E" = Copy with attachment / enclosure "N" = No copy YFICE Rl/ Q Qyl/DRP g / /

Rl/DRP n NAME ABlam'ey JPKaufmdn /g jf JRogge(t}v DATE 11/a>/97 111)d9MN'"

11/3,/978

~

OFFICIAL RECORD COPY

FITZPATRICK INSPECTION PLAN INSPECTION TITLE / PROGRAM AREA PLANNED TYPE INSPECTION DATES COMMENTS IP 86750-01 Solid radioactive waste management and 11/3/97 to Core Inspection transportation of radioactive material 11/7/97 Ti 2515/133 Implementation of revised 49 CFR Parts 11/3/97 to Temporary Instruction 100-179 and 10 CFR 71 11/7/97 (required by NRR/NMSS)

IP 81700-02 Physical security program 3/16/98 to Core inspection 3/20/98 IP 82701 Operational status of the EP program 6/1/98 to 6/5/98 Core Ir.spection IP 92903 Followup on T!P issue 12/15/97 to Regional reactive 12/19/97 IP 71001 Licensed Operator Requal 4/20/98 to Core inspection 4/24/98 r

L

--