ML20202D904: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 19: Line 19:
=Text=
=Text=
{{#Wiki_filter:.
{{#Wiki_filter:.
                                                    JUL 071936
JUL 071936
.
.
    Docket Nos. 50-443
Docket Nos. 50-443
    Public Service of New Hampshire
Public Service of New Hampshire
    ATTN:   Mr. Robert J. Harrison
ATTN:
            President and Chief Executive Of ficer
Mr. Robert J. Harrison
    P. O. Box 330
President and Chief Executive Of ficer
    Manchester, New Hampshire 03105
P. O. Box 330
    Gentlemen:
Manchester, New Hampshire 03105
    Subject:   Inspection Report No. 50-443/86-31
Gentlemen:
    This refers to the routine safety inspection conducted by Mr. Peter C. Wen of
Subject:
    this office on June 2-6, 1986, at the Seabrook Station, Unit 1, of activities
Inspection Report No. 50-443/86-31
    authorized by NRC License No. CPPR-135 and to the discussions of our findings
This refers to the routine safety inspection conducted by Mr. Peter C. Wen of
    held by Mr. Wen with Mr. D. G. McLain of your staf f at the conclusion of the
this office on June 2-6, 1986, at the Seabrook Station, Unit 1, of activities
    inspection.
authorized by NRC License No. CPPR-135 and to the discussions of our findings
    Areas examined during this inspection are described in the NRC Degion I Inspec-
held by Mr. Wen with Mr. D. G. McLain of your staf f at the conclusion of the
    tion Report which is enclosed with this letter. Within these areas, the in-
inspection.
    spection consisted of selective examinations of procedures and representative
Areas examined during this inspection are described in the NRC Degion I Inspec-
    records, interviews with personnel, and observations by the inspector.
tion Report which is enclosed with this letter. Within these areas, the in-
    Within the scope of this inspection, no violations were observed.
spection consisted of selective examinations of procedures and representative
    No reply to this letter is required. Your cooperation with us in this matter
records, interviews with personnel, and observations by the inspector.
    is appreciated.
Within the scope of this inspection, no violations were observed.
                                                Sincerely,
No reply to this letter is required. Your cooperation with us in this matter
                                                  Original Signed Fy
is appreciated.
                                                  Lee H. Bettenhausen
Sincerely,
                                            ft. Stewart D. Ebneter, Director
Original Signed Fy
                                          %U    Division of Reactor Safety
Lee H. Bettenhausen
    Enclosure: NRC Region I Inspection Report Number 50-443/86-31
ft. Stewart D. Ebneter, Director
    cc w/ encl:
%
    John DeVincentis, Director, Engineering and Licensing
Division of Reactor Safety
    William B. Derrickson, Senior Vice President
U
    Warren Hall, Operational Services Supervisor
Enclosure: NRC Region I Inspection Report Number 50-443/86-31
    Donald E. Moody, Station Manager - Seabrook Station                                 '
cc w/ encl:
    Gerald F. Mcdonald, Construction QA Manager
John DeVincentis, Director, Engineering and Licensing
    Pubite Document Room (POR)                                                     ,
William B. Derrickson, Senior Vice President
    local Public Document Room (LPDR)                                          / (p()
Warren Hall, Operational Services Supervisor
    Nuclear Safety Information Center (NSIC)                                     /
Donald E. Moody, Station Manager - Seabrook Station
    NRC Resident Inspector                                                           g%
Gerald F. Mcdonald, Construction QA Manager
    State of New Hampshire
'
                          _ ~ nretCIAL RECORD COPY         IR SB 86-31 - 0001.0.0
Pubite Document Room (POR)
  8607140246 860707                                        06/24/86
/ (p()
  PDR   ADOCK 05000443
,
  G                   PM
local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
/
NRC Resident Inspector
g%
State of New Hampshire
8607140246 860707
~ nretCIAL RECORD COPY
IR SB 86-31 - 0001.0.0
_
06/24/86
PDR
ADOCK 05000443
G
PM


.
    Public Service of New Hampshire            2
.
.
    bec w/ incl:
Public Service of New Hampshire
    Region I Docket Room (with concurrences)
2
    Management Assistant, DRMA (w/o encl)
.
    T. C. Elsasser, Chief, PBd3C, DRP
bec w/ incl:
                                                                            ,
Region I Docket Room (with concurrences)
                                          4
Management Assistant, DRMA (w/o encl)
                                                                              .
T. C. Elsasser, Chief, PBd3C, DRP
                            #
,
    n
4
        f
.
    <f'en/geb       R k'A 77
<f'en/geb
                    Es_ jcath       1ettenhausen
f
  , y/J/86         7/3/86           7/97/86
R k'A 77
                                0FFICIAL RECORD COPY IR SB 86-31 - 0001.1.0
#
                                                    06/24/86
Es_ jcath
1ettenhausen
n
y/J/86
7/3/86
7/97/86
,
0FFICIAL RECORD COPY
IR SB 86-31 - 0001.1.0
06/24/86
}}
}}

Latest revision as of 03:08, 8 December 2024

Forwards Safety Insp Rept 50-443/86-31 on 860602-06.No Violation Noted
ML20202D904
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 07/07/1986
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Harrison R
PUBLIC SERVICE CO. OF NEW HAMPSHIRE
Shared Package
ML20202D909 List:
References
NUDOCS 8607140246
Download: ML20202D904 (2)


See also: IR 05000443/1986031

Text

.

JUL 071936

.

Docket Nos. 50-443

Public Service of New Hampshire

ATTN:

Mr. Robert J. Harrison

President and Chief Executive Of ficer

P. O. Box 330

Manchester, New Hampshire 03105

Gentlemen:

Subject:

Inspection Report No. 50-443/86-31

This refers to the routine safety inspection conducted by Mr. Peter C. Wen of

this office on June 2-6, 1986, at the Seabrook Station, Unit 1, of activities

authorized by NRC License No. CPPR-135 and to the discussions of our findings

held by Mr. Wen with Mr. D. G. McLain of your staf f at the conclusion of the

inspection.

Areas examined during this inspection are described in the NRC Degion I Inspec-

tion Report which is enclosed with this letter. Within these areas, the in-

spection consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no violations were observed.

No reply to this letter is required. Your cooperation with us in this matter

is appreciated.

Sincerely,

Original Signed Fy

Lee H. Bettenhausen

ft. Stewart D. Ebneter, Director

%

Division of Reactor Safety

U

Enclosure: NRC Region I Inspection Report Number 50-443/86-31

cc w/ encl:

John DeVincentis, Director, Engineering and Licensing

William B. Derrickson, Senior Vice President

Warren Hall, Operational Services Supervisor

Donald E. Moody, Station Manager - Seabrook Station

Gerald F. Mcdonald, Construction QA Manager

'

Pubite Document Room (POR)

/ (p()

,

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

/

NRC Resident Inspector

g%

State of New Hampshire

8607140246 860707

~ nretCIAL RECORD COPY

IR SB 86-31 - 0001.0.0

_

06/24/86

PDR

ADOCK 05000443

G

PM

.

Public Service of New Hampshire

2

.

bec w/ incl:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl)

T. C. Elsasser, Chief, PBd3C, DRP

,

4

.

<f'en/geb

f

R k'A 77

Es_ jcath

1ettenhausen

n

y/J/86

7/3/86

7/97/86

,

0FFICIAL RECORD COPY

IR SB 86-31 - 0001.1.0

06/24/86