ML20207B211: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 20: | Line 20: | ||
e r | e r | ||
ARKANSAS POWER & LIGHT COMPANY FOST OGICE BOX 551 UTTLE ROCK. ARKANSAS 72203 (5011371-4000 July 20, 1988 1CAh078810 Document Control Desk Mail Station P1-137 Washington, DC 20555 t | ARKANSAS POWER & LIGHT COMPANY FOST OGICE BOX 551 UTTLE ROCK. ARKANSAS 72203 (5011371-4000 July 20, 1988 1CAh078810 Document Control Desk Mail Station P1-137 Washington, DC 20555 t | ||
ATTN: | ATTN: | ||
Mr. Jose A. Calvo, Director Project Director, Region IV Division of Reactor Projects III, IV, V and Special Projects | |||
==SUBJECT:== | ==SUBJECT:== | ||
| Line 26: | Line 27: | ||
==Dear Mr. Calvo:== | ==Dear Mr. Calvo:== | ||
In accordance with Arkansas Nuclear One, Unit 1 (ANO-1) Technical Specifications 4.4.2.2 and 6.12.4, the Arkansas Power and Light Company (AP&L) is submitting the report of activities conducted pursuant to the fif teenth (15th) year surveillance inspection of the ANO-1 reactor building post-tensioning system. | In accordance with Arkansas Nuclear One, Unit 1 (ANO-1) Technical Specifications 4.4.2.2 and 6.12.4, the Arkansas Power and Light Company (AP&L) is submitting the report of activities conducted pursuant to the fif teenth (15th) year surveillance inspection of the ANO-1 reactor building post-tensioning system. | ||
The results of the surveillance indicate that no abncrnal degradation is evident in the ANO-1 reactor building post-tensioning system, four (4) copies of the final report are enclosed. | The results of the surveillance indicate that no abncrnal degradation is evident in the ANO-1 reactor building post-tensioning system, four (4) copies of the final report are enclosed. | ||
Very truly yours. | Very truly yours. | ||
n Dan R. Howard Mar.tger Licensing CRH:MT:de | |||
' p\\ | |||
1 | |||
h | \\ | ||
\\ h 7 nn n~w f | |||
8308020268 850700 | |||
- - - - -}} | |||
Latest revision as of 22:35, 6 December 2024
| ML20207B211 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 07/20/1988 |
| From: | Howard D ARKANSAS POWER & LIGHT CO. |
| To: | Calvo J Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20207B217 | List: |
| References | |
| NUDOCS 8808020268 | |
| Download: ML20207B211 (1) | |
Text
-
e r
ARKANSAS POWER & LIGHT COMPANY FOST OGICE BOX 551 UTTLE ROCK. ARKANSAS 72203 (5011371-4000 July 20, 1988 1CAh078810 Document Control Desk Mail Station P1-137 Washington, DC 20555 t
ATTN:
Mr. Jose A. Calvo, Director Project Director, Region IV Division of Reactor Projects III, IV, V and Special Projects
SUBJECT:
Arkansas Nuclear One - Unit 1 Docket No. 50-313 License No. DPR-51 Fif teenth Year Tendon Surveillance Report
Dear Mr. Calvo:
In accordance with Arkansas Nuclear One, Unit 1 (ANO-1) Technical Specifications 4.4.2.2 and 6.12.4, the Arkansas Power and Light Company (AP&L) is submitting the report of activities conducted pursuant to the fif teenth (15th) year surveillance inspection of the ANO-1 reactor building post-tensioning system.
The results of the surveillance indicate that no abncrnal degradation is evident in the ANO-1 reactor building post-tensioning system, four (4) copies of the final report are enclosed.
Very truly yours.
n Dan R. Howard Mar.tger Licensing CRH:MT:de
' p\\
1
\\
\\ h 7 nn n~w f
8308020268 850700
- - - - -