{{#Wiki_filter:#". .. . . . ,\
{{#Wiki_filter:IM
IMUNITED 8TATES d,. /
#"......,\\
                                                                                                              ~
d,. /
                                                                                              # *M
~
  !            ~$                   NUCLEAR REGULATORY COMMISSION                     ~
UNITED 8TATES
f                       f/9 5               f                         W ASH WG TON,0. C. 20665
~$
                                                                                          >n' @.)#
NUCLEAR REGULATORY COMMISSION f # *M f/9 5
3 j                                                         .
f W ASH WG TON,0. C. 20665
{/,Y
' )#
        .....                                                            (f gAn 111985
~
                                                                                                    ,e/ ,
3 j
NOTE T0:           Richard H. Vollmer, Chairman Fire Protection Steering Comittee MI[I"     k!
>n @..,
                                                                                                    ;p FROM:               Victor Benaroya, Chief Chemical Engineering Branch, DE $ $ ~
(f
                                                                        /              " bdE        .
{/,Y gAn 111985
W.L     .h     -
,e/,
NOTE T0:
Richard H. Vollmer, Chairman MI[I" k!
Fire Protection Steering Comittee
;p FROM:
Victor Benaroya, Chief
/
bd
$ ~
Chemical Engineering Branch, DE $
E W.L
.h


==SUBJECT:==
==SUBJECT:==
STEERlhG COMMITTEE REPORT                                     n3]
STEERlhG COMMITTEE REPORT n3]
One of the statements we often hear is that Appendix R is confusing. For clarification, I suggest you include the following in the Fire Protection Steering Comittee report:
One of the statements we often hear is that Appendix R is confusing. For clarification, I suggest you include the following in the Fire Protection Steering Comittee report:
A segment of the industry stated Appendix R is confusing. Is the stipulation that Appendix R is confusing valid? The answer depends on how and who looks at it.                                                                 .
A segment of the industry stated Appendix R is confusing.
Is the stipulation that Appendix R is confusing valid? The answer depends on how and who looks at it.
Appendix R was developed to established required fire protection
(,
(,
Appendix R was developed to established required fire protection features for certain specific areas which remained unresolved in the fire protection safety evaluation reports issued in 1978-79.
features for certain specific areas which remained unresolved in the fire protection safety evaluation reports issued in 1978-79.
Since these open items were discussed at great length with the affected licensee, that licensee should certainly understand what was required to achieve full corpliance.
Since these open items were discussed at great length with the affected licensee, that licensee should certainly understand what was required to achieve full corpliance.
A team of a fire protection engineer with e systems engineer should be able to understand the Rule (Calvert Cliffs staff statement).
A team of a fire protection engineer with e systems engineer should be able to understand the Rule (Calvert Cliffs staff statement).
Because Appendix R does not stand on its own, to an individual without the requisite background and knowledge, Appendix R may be confusing.
Because Appendix R does not stand on its own, to an individual without the requisite background and knowledge, Appendix R may be confusing.
If you think it is appropriate, you may also include:
If you think it is appropriate, you may also include:
The inspection results of the first units indicated that the licensees had not performed the re-review of the three sections (Ill.G, ll!.J and !!!.0) mandated by the Regulation. This requirement was specifically identified in a letter sent to each licensee in February 1981.                                   -
The inspection results of the first units indicated that the licensees had not performed the re-review of the three sections (Ill.G, ll!.J and !!!.0) mandated by the Regulation. This requirement was specifically identified in a letter sent to each licensee in February 1981.
N                                                         -
N g
g                                 _
Victor Benaroya
Victor Benaroya                                       )
)
cc:     R. Ferguson T. Wambach T. Sullivan 4;p. 5 8808160242 PDR      FOIA 000705                                                                                       4   '
cc:
PDR JO!4ESBB,-92
R. Ferguson T. Wambach T. Sullivan 4;p. 5 8808160242 000705 4
                                          -.                                    .    ..}}
PDR FOIA PDR JO!4ESBB,-92
..}}

Latest revision as of 22:03, 6 December 2024

Requests That Listed Items Be Included in Fire Protection Steering Committee Rept,For Clarification
ML20207D948
Person / Time
Issue date: 03/11/1985
From: Benaroya V
Office of Nuclear Reactor Regulation
To: Vollmer R
Office of Nuclear Reactor Regulation
Shared Package
ML20151H089 List:
References
FOIA-88-92 NUDOCS 8808160242
Download: ML20207D948 (1)


Text

IM

  1. "......,\\

d,. /

~

UNITED 8TATES

~$

NUCLEAR REGULATORY COMMISSION f # *M f/9 5

f W ASH WG TON,0. C. 20665

' )#

~

3 j

>n @..,

(f

{/,Y gAn 111985

,e/,

NOTE T0:

Richard H. Vollmer, Chairman MI[I" k!

Fire Protection Steering Comittee

p FROM

Victor Benaroya, Chief

/

bd

$ ~

Chemical Engineering Branch, DE $

E W.L

.h

SUBJECT:

STEERlhG COMMITTEE REPORT n3]

One of the statements we often hear is that Appendix R is confusing. For clarification, I suggest you include the following in the Fire Protection Steering Comittee report:

A segment of the industry stated Appendix R is confusing.

Is the stipulation that Appendix R is confusing valid? The answer depends on how and who looks at it.

Appendix R was developed to established required fire protection

(,

features for certain specific areas which remained unresolved in the fire protection safety evaluation reports issued in 1978-79.

Since these open items were discussed at great length with the affected licensee, that licensee should certainly understand what was required to achieve full corpliance.

A team of a fire protection engineer with e systems engineer should be able to understand the Rule (Calvert Cliffs staff statement).

Because Appendix R does not stand on its own, to an individual without the requisite background and knowledge, Appendix R may be confusing.

If you think it is appropriate, you may also include:

The inspection results of the first units indicated that the licensees had not performed the re-review of the three sections (Ill.G, ll!.J and !!!.0) mandated by the Regulation. This requirement was specifically identified in a letter sent to each licensee in February 1981.

N g

Victor Benaroya

)

cc:

R. Ferguson T. Wambach T. Sullivan 4;p. 5 8808160242 000705 4

PDR FOIA PDR JO!4ESBB,-92

..