The administered written examination and operating test, as well as documents related to the development and review (outlines, review comments and resolution, etc.) of the examination will be withheld from public disclosure until July 29, 2022. However, because two applicants received preliminary results letters due to receiving a non-passing grade on the written examination, the applicants were provided copies of the written examination material. For examination security purposes, your staff should consider the written examination material uncontrolled and exposed to the public. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations, Part 2.390, Public Inspections, Exemptions, Requests for Withholding.
The administered written examination and operating test, as well as documents related to the development and review (outlines, review comments and resolution, etc.) of the examination will be withheld from public disclosure until July 29, 2022. However, because two applicants received preliminary results letters due to receiving a non-passing grade on the written examination, the applicants were provided copies of the written examination material. For examination security purposes, your staff should consider the written examination material uncontrolled and exposed to the public. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations, Part 2.390, Public Inspections, Exemptions, Requests for Withholding.


Sincerely, Patricia J. Digitally signed by Patricia J. Pelke Pelke Date: 2020.08.13 11:51:53 -05'00'
Sincerely, Patricia J. Pelke, Chief Operations Branch Division of Reactor Safety  
Patricia J. Pelke, Chief Operations Branch Division of Reactor Safety Docket No. 50-255 License No. DPR-20
 
Docket No. 50-255 License No. DPR-20  


===Enclosures:===
===Enclosures:===
1. OL Examination Report 05000255/2020301 2. Post-Examination Comments, Evaluation, and Resolutions 3. Simulator Fidelity Report
1. OL Examination Report 05000255/2020301 2. Post-Examination Comments, Evaluation, and Resolutions 3. Simulator Fidelity Report  


REGION III==
REGION III==
Docket No: 50-255 License No: DPR-20 Report No: 05000255/2020301 Enterprise Identifier: L-2020-OLL-0034 Licensee: Entergy Nuclear Operations, Inc.
Docket No:
50-255 License No:
DPR-20 Report No:
05000255/2020301 Enterprise Identifier: L-2020-OLL-0034 Licensee:
Entergy Nuclear Operations, Inc.


Facility: Palisades Nuclear Plant Location: Covert, MI Dates: April 16, 2020, through July 6, 2020 Examiners: B. Bergeon, Operations Engineer, Chief Examiner C. Zoia, Senior Operations Engineer, Examiner D. Reeser, Operations Engineer, Examiner Approved by: P. Pelke, Chief Operations Branch Division of Reactor Safety Enclosure 1
Facility:
Palisades Nuclear Plant Location:
Covert, MI Dates:
April 16, 2020, through July 6, 2020 Examiners:
B. Bergeon, Operations Engineer, Chief Examiner C. Zoia, Senior Operations Engineer, Examiner D. Reeser, Operations Engineer, Examiner Approved by:
P. Pelke, Chief Operations Branch Division of Reactor Safety  


=SUMMARY=
=SUMMARY=
Examination Report 05000255/2020301; 04/16/2020-07/06/2020; Entergy Nuclear Operations,
Examination Report 05000255/2020301; 04/16/2020-07/06/2020; Entergy Nuclear Operations,  


Inc., Palisades Nuclear Plant; Initial License Examination Report.
Inc., Palisades Nuclear Plant; Initial License Examination Report.
Line 56: Line 66:


{{a|4OA5}}
{{a|4OA5}}
==4OA5 Other Activities==
==4OA5 Other Activities==
===.1 Initial Licensing Examinations===
===.1 Initial Licensing Examinations===
====a. Examination Scope====
====a. Examination Scope====
The U.S. Nuclear Regulatory Commission (NRC) examiners and members of the facility licensees staff used the guidance prescribed in NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 11, to develop, validate, administer, and grade the written examination and operating test. The written examination outlines were prepared by the NRC staff and were transmitted to the facility licensees staff. Members of the facility licensees staff prepared the operating test outlines and developed the written examination and operating test. The NRC examiners validated the proposed examination during the week of March 9, 2020, with the assistance of members of the facility licensees staff. During the onsite validation week, the examiners audited all nine license applications for accuracy. The facility licensee administered the written examination on April 16, 2020. The NRC examiners, with the assistance of members of the facility licensees staff, administered the operating test, consisting of job performance measures and dynamic simulator scenarios, during the period of June 22, 2020, through June 29, 2020.
The U.S. Nuclear Regulatory Commission (NRC) examiners and members of the facility licensees staff used the guidance prescribed in NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 11, to develop, validate, administer, and grade the written examination and operating test. The written examination outlines were prepared by the NRC staff and were transmitted to the facility licensees staff. Members of the facility licensees staff prepared the operating test outlines and developed the written examination and operating test. The NRC examiners validated the proposed examination during the week of March 9, 2020, with the assistance of members of the facility licensees staff. During the onsite validation week, the examiners audited all nine license applications for accuracy. The facility licensee administered the written examination on April 16, 2020. The NRC examiners, with the assistance of members of the facility licensees staff, administered the operating test, consisting of job performance measures and dynamic simulator scenarios, during the period of June 22, 2020, through June 29, 2020.
Line 83: Line 92:


===.2 Examination Security===
===.2 Examination Security===
====a. Scope====
====a. Scope====
The NRC examiners reviewed and observed the licensee's implementation of examination security requirements during the examination validation and administration to assure compliance with Title10 of the Code of Federal Regulations, Part 55.49, Integrity of Examinations and Tests. The examiners used the guidelines provided in NUREG-1021, Operator Licensing Examination Standards for Power Reactors, to determine acceptability of the licensees examination security activities.
The NRC examiners reviewed and observed the licensee's implementation of examination security requirements during the examination validation and administration to assure compliance with Title10 of the Code of Federal Regulations, Part 55.49, Integrity of Examinations and Tests. The examiners used the guidelines provided in NUREG-1021, Operator Licensing Examination Standards for Power Reactors, to determine acceptability of the licensees examination security activities.
Line 96: Line 104:


{{a|4OA6}}
{{a|4OA6}}
==4OA6 Management Meetings==
==4OA6 Management Meetings==
===.1 Debrief===
===.1 Debrief===
The chief examiner presented the examination teams preliminary observations and findings on June 29, 2020, to Mr. Walter Nelson, Training Manager, and other members of the Palisades Nuclear Plant staff.
The chief examiner presented the examination teams preliminary observations and findings on June 29, 2020, to Mr. Walter Nelson, Training Manager, and other members of the Palisades Nuclear Plant staff.


===.2 Exit Meeting===
===.2 Exit Meeting===
The chief examiner conducted an exit meeting on July 30, 2020, with Mr. Walter Nelson, Training Manager, and other members of the Palisades Nuclear Plant staff, by telephone. The chief examiner asked the licensee whether any of the material used to develop or administer the examination should be considered proprietary. Security related information, as used in the written examination, was determined to be considered proprietary information and is to be withheld from public disclosure in accordance with Title10 of the Code of Federal Regulations, Part 2.390, Public inspections, exemptions, requests for withholding.
The chief examiner conducted an exit meeting on July 30, 2020, with Mr. Walter Nelson, Training Manager, and other members of the Palisades Nuclear Plant staff, by telephone. The chief examiner asked the licensee whether any of the material used to develop or administer the examination should be considered proprietary. Security related information, as used in the written examination, was determined to be considered proprietary information and is to be withheld from public disclosure in accordance with Title10 of the Code of Federal Regulations, Part 2.390, Public inspections, exemptions, requests for withholding.


Line 112: Line 118:
SUPPLEMENTAL INFORMATION
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
KEY POINTS OF CONTACT
Licensee
Licensee  
: [[contact::D. Corbin]], Site Vice President
: [[contact::D. Corbin]], Site Vice President  
: [[contact::D. Lucy]], General Manager Plant Operations
: [[contact::D. Lucy]], General Manager Plant Operations  
: [[contact::B. Baker]], Senior Operations Manager
: [[contact::B. Baker]], Senior Operations Manager  
: [[contact::S. Moore]], Manager Operations Support
: [[contact::S. Moore]], Manager Operations Support  
: [[contact::J. Byrd]], Operations Manager
: [[contact::J. Byrd]], Operations Manager  
: [[contact::P. Adams]], Shift Manager
: [[contact::P. Adams]], Shift Manager  
: [[contact::W. Nelson]], Training Manager
: [[contact::W. Nelson]], Training Manager  
: [[contact::F. Korfias]], Training Superintendent
: [[contact::F. Korfias]], Training Superintendent  
: [[contact::K. Robinson]], Training Superintendent
: [[contact::K. Robinson]], Training Superintendent  
: [[contact::D. Karnes]], Operations Training Instructor
: [[contact::D. Karnes]], Operations Training Instructor  
: [[contact::R. Rendler]], Training Contractor
: [[contact::R. Rendler]], Training Contractor  
: [[contact::J. Hardy]], Regulatory Assurance Manager
: [[contact::J. Hardy]], Regulatory Assurance Manager  
: [[contact::B. Dodson]], Licensing Specialist
: [[contact::B. Dodson]], Licensing Specialist
U.S. Nuclear Regulatory Commission
U.S. Nuclear Regulatory Commission  
: [[contact::P. LaFlamme]], Senior Resident Inspector
: [[contact::P. LaFlamme]], Senior Resident Inspector  
: [[contact::C. St. Peters]], Resident Inspector
: [[contact::C. St. Peters]], Resident Inspector  
: [[contact::B. Bergeon]], Operations Engineer, Chief Examiner
: [[contact::B. Bergeon]], Operations Engineer, Chief Examiner  
: [[contact::C. Zoia]], Senior Operations Engineer, Examiner
: [[contact::C. Zoia]], Senior Operations Engineer, Examiner  
: [[contact::D. Reeser]], Operations Engineer, Examiner
: [[contact::D. Reeser]], Operations Engineer, Examiner
ITEMS OPENED, CLOSED, AND DISCUSSED
ITEMS OPENED, CLOSED, AND DISCUSSED
Line 136: Line 142:
None
None
LIST OF ACRONYMS USED
LIST OF ACRONYMS USED
ADAMS           Agencywide Documents Access and Management System
ADAMS
NRC             U.S. Nuclear Regulatory Commission
Agencywide Documents Access and Management System
NRC
U.S. Nuclear Regulatory Commission  
 
NRC Resolution to the Palisades Nuclear Station Post-Examination Comments
NRC Resolution to the Palisades Nuclear Station Post-Examination Comments
RO Question 7
RO Question 7
The plant has just been shut down from a 100 day run at full power.
The plant has just been shut down from a 100 day run at full power.  
  *   Component Cooling Water Temperature is 95o
*
: [[contact::F.
Component Cooling Water Temperature is 95oF.  
  *   E-60A]], Shutdown Cooling (SDC) Heat Exchanger is unavailable.
*
E-60A, Shutdown Cooling (SDC) Heat Exchanger is unavailable.
Given these conditions, complete the following statements:
Given these conditions, complete the following statements:
The SDC system _(1) meet its design basis.
The SDC system _(1) meet its design basis.
With SDC in service and a loss of air to CV-3212, CV-3213, CV-3223, and CV-3224, SDC HX
With SDC in service and a loss of air to CV-3212, CV-3213, CV-3223, and CV-3224, SDC HX
Isolation valves occurs, PCS flows through the SDC HXs _(2)_.
Isolation valves occurs, PCS flows through the SDC HXs _(2)_.  
            (1)                 (2)
 
A. can                 stops
(1)  
B. can                 continues
(2)
C. can NOT             stops
A. can
D. can NOT             continues
stops
B. can
continues
C. can NOT
stops
D. can NOT
continues  
 
Answer: D
Answer: D
Reference(s) provided to NRC:
Reference(s) provided to NRC:  
    *   PL-SDC Shutdown Cooling Lesson Plan, Rev. 7
*
    *   Final Safety Analysis Report, Chapter 6, Engineered Safeguards Systems, Rev. 52
PL-SDC Shutdown Cooling Lesson Plan, Rev. 7  
*
Final Safety Analysis Report, Chapter 6, Engineered Safeguards Systems, Rev. 52
Applicant Comment:
Applicant Comment:
Challenge to Question 7. There should be two correct answers. Both (B) and (D) are correct
Challenge to Question 7. There should be two correct answers. Both (B) and (D) are correct
Line 168: Line 187:
Additionally, the PCS temperature is not provided in question 7. At Palisades, shutdown
Additionally, the PCS temperature is not provided in question 7. At Palisades, shutdown
cooling (SDC) is only placed in service during modes 4, 5, and 6. These three modes are
cooling (SDC) is only placed in service during modes 4, 5, and 6. These three modes are
less than 300 degrees Fahrenheit PCS Tcold.
less than 300 degrees Fahrenheit PCS Tcold.  
 
Based on the above, it is required to make assumptions on current plant parameters (i.e., Tcold
Based on the above, it is required to make assumptions on current plant parameters (i.e., Tcold
and time after shutdown). Either parameter is vital to answer the first part of the question
and time after shutdown). Either parameter is vital to answer the first part of the question
Line 188: Line 208:
NRC Evaluation/Resolution:
NRC Evaluation/Resolution:
The distractor/answer choices under discussion consist of the following:
The distractor/answer choices under discussion consist of the following:
Distractor B:
Distractor B:  
  (1) can
(1) can  
  (2) continues
(2) continues
Answer D:
Answer D:  
  (1) can NOT
(1) can NOT  
  (2) continues
(2) continues
The stem of the question explicitly provided the following key information to the applicant:
The stem of the question explicitly provided the following key information to the applicant:  
    * The plant has just been shutdown from a 100 day run at full power.
* The plant has just been shutdown from a 100 day run at full power.  
    * Component Cooling Water Temperature is 95o
* Component Cooling Water Temperature is 95oF.  
: [[contact::F.
* E-60A, Shutdown Cooling (SDC) Heat Exchanger is unavailable.
    * E-60A]], Shutdown Cooling (SDC) Heat Exchanger is unavailable.
Part 1 of this question asks, given the initial conditions, if the SDC system meets its design
Part 1 of this question asks, given the initial conditions, if the SDC system meets its design
basis. The design basis for the SDC system is described in the facility licensees Final Safety
basis. The design basis for the SDC system is described in the facility licensees Final Safety
Analysis Report (FSAR) Section 6.1 and the Shutdown Cooling system Lesson Plan PL-SDC
Analysis Report (FSAR) Section 6.1 and the Shutdown Cooling system Lesson Plan PL-SDC
as:
as:  
 
The system is designed to cool the primary system from 300°F to refueling
The system is designed to cool the primary system from 300°F to refueling
temperature with the low-pressure injection pumps and 90°F component cooling
temperature with the low-pressure injection pumps and 90°F component cooling
Line 210: Line 230:
sensible heat during Plant cooldowns and cold shutdowns. The units, operating
sensible heat during Plant cooldowns and cold shutdowns. The units, operating
together, are sized to hold the refueling temperature with the design component
together, are sized to hold the refueling temperature with the design component
cooling water temperature of 90o
cooling water temperature of 90oF.
: [[contact::F.
Under the conditions provided in the question stem, the SDC system can NOT meet its design
Under the conditions provided in the question stem]], the SDC system can NOT meet its design
basis and Distractor (B) can NOT be correct, for two distinct reasons:
basis and Distractor (B) can NOT be correct, for two distinct reasons:
1) The CCW inlet temperature to the SDC Heat Exchanger (95oF) exceeds that
1) The CCW inlet temperature to the SDC Heat Exchanger (95oF) exceeds that
Line 231: Line 250:
No questions associated with the adequacy of conditions, or any other aspect of Question 7,
No questions associated with the adequacy of conditions, or any other aspect of Question 7,
were raised by the applicant or any of the other applicants during administration of the exam.
were raised by the applicant or any of the other applicants during administration of the exam.
Therefore, the NRC concluded that no change to the key for this exam question was required.
Therefore, the NRC concluded that no change to the key for this exam question was required.  
 
POST-EXAMINATION COMMENTS, EVALUATION, AND RESOLUTIONS
POST-EXAMINATION COMMENTS, EVALUATION, AND RESOLUTIONS
RO Question 63
RO Question 63
The plant is in MODE 1 at 13% power, preparing for synchronization,
The plant is in MODE 1 at 13% power, preparing for synchronization,  
    * Main Turbine is at 1800 RPM
*
    * The Primary, Backup, and Coastdown Relays (386P, B, and C) have NOT been reset
Main Turbine is at 1800 RPM  
Then,
*
    * Actual main turbine speed reaches 1900 RPM
The Primary, Backup, and Coastdown Relays (386P, B, and C) have NOT been reset
    * Reactor Power rises to 16% by Nuclear Instrumentation
Then,  
At the turbine controls in the Main Control Room, the operator observes the closure of ...
*
Actual main turbine speed reaches 1900 RPM  
*
Reactor Power rises to 16% by Nuclear Instrumentation
At the turbine controls in the Main Control Room, the operator observes the closure of...
A. ONLY the Main Stop valves
A. ONLY the Main Stop valves
B. ONLY the Governor and Intercept valves
B. ONLY the Governor and Intercept valves
C. ONLY the Governor and Reheat Stop valves
C. ONLY the Governor and Reheat Stop valves  
: [[contact::D. ALL the Main Stop]], Governor, Intercept, and Reheat Stop valves
: [[contact::D. ALL the Main Stop]], Governor, Intercept, and Reheat Stop valves  
 
Answer: D
Answer: D
Reference(s) provided to NRC:
Reference(s) provided to NRC:  
    *   ARP-1, Turbine Condenser and Feedwater Scheme, Rev 85
*
    *   Drawing E-17, Sheet 9, Logic Diagram Turbine-Generator Trips and Fast Transfer,
ARP-1, Turbine Condenser and Feedwater Scheme, Rev 85  
Rev 25
*
    *   Drawing E-121, Sheet 1, Schematic Diagram, Turbine Control, Rev 43
Drawing E-17, Sheet 9, Logic Diagram Turbine-Generator Trips and Fast Transfer,
    *   SOP-8, Main Turbine and Generating System, Rev 111
Rev 25  
    *   PL-EHC, Main Turbine Control and Supervisory, Rev 8
*
Drawing E-121, Sheet 1, Schematic Diagram, Turbine Control, Rev 43  
*
SOP-8, Main Turbine and Generating System, Rev 111  
*
PL-EHC, Main Turbine Control and Supervisory, Rev 8
Applicant Comment:
Applicant Comment:
No applicants challenged Question 63.
No applicants challenged Question 63.
Line 265: Line 295:
Indirect Trip Lockout Relay, be reset. Without resetting these relays, DEH will continue to dump
Indirect Trip Lockout Relay, be reset. Without resetting these relays, DEH will continue to dump
and will not be able to actuate the Main Stop, Governor, Intercept, and Reheat Stop valves.
and will not be able to actuate the Main Stop, Governor, Intercept, and Reheat Stop valves.
POST-EXAMINATION COMMENTS, EVALUATION, AND RESOLUTIONS
POST-EXAMINATION COMMENTS, EVALUATION, AND RESOLUTIONS  
 
Since the stem indicates that the Main Turbine is operating at 1800 RPM, these relays MUST
Since the stem indicates that the Main Turbine is operating at 1800 RPM, these relays MUST
be reset, therefore the conditions of the stem are technically incorrect. The facility recommends
be reset, therefore the conditions of the stem are technically incorrect. The facility recommends
Line 292: Line 323:
C relays.
C relays.
Therefore, the NRC concluded that no correct answer existed, and the question should be
Therefore, the NRC concluded that no correct answer existed, and the question should be
deleted from the administered examination.
deleted from the administered examination.  
 
RO Question 74
RO Question 74
Question 74 withheld from public disclosure due to security related content.
Question 74 withheld from public disclosure due to security related content.
Reference(s) provided to NRC:
Reference(s) provided to NRC:  
    *   EN-TQ-113, Initial License Operator Training Program, Rev 17
*
EN-TQ-113, Initial License Operator Training Program, Rev 17
Applicant Comment:
Applicant Comment:
Challenge to Question 74.
Challenge to Question 74.
Line 322: Line 355:
The fact that a K/A does have a learning corresponding facility training objective,
The fact that a K/A does have a learning corresponding facility training objective,
was not covered in training, or is subject to selection in multiple tiers are not
was not covered in training, or is subject to selection in multiple tiers are not
sufficient bases for eliminating the K/A from any tier of the outline.
sufficient bases for eliminating the K/A from any tier of the outline.  
POST-EXAMINATION COMMENTS, EVALUATION, AND RESOLUTIONS
 
POST-EXAMINATION COMMENTS, EVALUATION, AND RESOLUTIONS  
 
The given K/A was accepted by both the facility licensee and the NRC, an acceptable question
The given K/A was accepted by both the facility licensee and the NRC, an acceptable question
was developed, validated, and approved by both the facility licensee and the NRC, failing to
was developed, validated, and approved by both the facility licensee and the NRC, failing to
Line 345: Line 380:
: [[contact::A. Therefore]], the NRC concluded that no change to the key for this exam question was
: [[contact::A. Therefore]], the NRC concluded that no change to the key for this exam question was
required.
required.
POST-EXAMINATION COMMENTS, EVALUATION, AND RESOLUTIONS
POST-EXAMINATION COMMENTS, EVALUATION, AND RESOLUTIONS  
 
SRO Question 84
SRO Question 84
SRO ONLY:
SRO ONLY:
Line 354: Line 390:
LCO 3.0.9, which addresses situations where required barriers are unable to perform their
LCO 3.0.9, which addresses situations where required barriers are unable to perform their
related support functions and provides instructions and conditions for meeting the supported
related support functions and provides instructions and conditions for meeting the supported
system LCOs __(2)__ applicable to Fire Barriers.
system LCOs __(2)__ applicable to Fire Barriers.  
                  (1)                   (2)
 
A. must be stopped             is
(1)  
B. must be stopped             is NOT
 
C. can continue               is
(2)
D. can continue               is NOT
A. must be stopped
is
B. must be stopped
is NOT
C. can continue
is
D. can continue
is NOT  
 
Answer: C
Answer: C
Reference(s) provided to NRC:
Reference(s) provided to NRC:  
    *   LCO 3.0.9, Limiting Condition For Operation (LCO) Applicability,
*
Amendment 252
LCO 3.0.9, Limiting Condition For Operation (LCO) Applicability,
    *   BLCO 3.0.9 Bases, Limiting Condition For Operation (LCO)
Amendment 252  
Applicability Bases, Revised 07/26/2017
*
    *   Admin 4.49, Non Power Operation Fire Risk Management,
BLCO 3.0.9 Bases, Limiting Condition For Operation (LCO)
Applicability Bases, Revised 07/26/2017  
*
Admin 4.49, Non Power Operation Fire Risk Management,
Rev. 0
Rev. 0
Applicant Comment:
Applicant Comment:
Line 374: Line 421:
3.0.9 does not apply. Recommend accepting answers a and b.
3.0.9 does not apply. Recommend accepting answers a and b.
Facility Position on Applicant Comment:
Facility Position on Applicant Comment:
The station does not support the applicants assertion for the reason below:
The station does not support the applicants assertion for the reason below:  
POST-EXAMINATION COMMENTS, EVALUATION, AND RESOLUTIONS
 
POST-EXAMINATION COMMENTS, EVALUATION, AND RESOLUTIONS  
 
This question requires knowledge of the applicability of LCO 3.0.9 to Fire Doors. The site team
This question requires knowledge of the applicability of LCO 3.0.9 to Fire Doors. The site team
reviewed LCO 3.0.9 bases, which states:
reviewed LCO 3.0.9 bases, which states:
Line 387: Line 436:
NRC Evaluation/Resolution:
NRC Evaluation/Resolution:
The distractor/answer choices under discussion consist of the following:
The distractor/answer choices under discussion consist of the following:
Distractor A:
Distractor A:  
(1) must be stopped
(1) must be stopped  
(2) is
(2) is
Answer B:
Answer B:  
(1) must be stopped
(1) must be stopped  
(2) is NOT
(2) is NOT
Part 2 of the stem of the question explicitly asks the applicant:
Part 2 of the stem of the question explicitly asks the applicant:
Line 412: Line 461:
Barriers are doors, walls, floor plugs, curbs, hatches, installed structures or components, or
Barriers are doors, walls, floor plugs, curbs, hatches, installed structures or components, or
other devices, not explicitly described in Technical Specifications, that support the performance
other devices, not explicitly described in Technical Specifications, that support the performance
of the safety function of systems described in Technical Specifications.
of the safety function of systems described in Technical Specifications.  
POST-EXAMINATION COMMENTS, EVALUATION, AND RESOLUTIONS
 
POST-EXAMINATION COMMENTS, EVALUATION, AND RESOLUTIONS  
 
This provision does not apply to barriers which support ventilation systems or to fire barriers.
This provision does not apply to barriers which support ventilation systems or to fire barriers.
The Technical Specifications for ventilation systems provide specific Conditions for inoperable
The Technical Specifications for ventilation systems provide specific Conditions for inoperable
Line 424: Line 475:
requirements and associated plant programs. Therefore, Distractor A cannot be considered a
requirements and associated plant programs. Therefore, Distractor A cannot be considered a
correct answer, because part 2 of the distractor was not correct. Therefore, the NRC concluded
correct answer, because part 2 of the distractor was not correct. Therefore, the NRC concluded
that no change to the key for this exam question was required.
that no change to the key for this exam question was required.  
POST-EXAMINATION COMMENTS, EVALUATION, AND RESOLUTIONS
 
POST-EXAMINATION COMMENTS, EVALUATION, AND RESOLUTIONS  
 
SRO Question 89
SRO Question 89
SRO ONLY:
SRO ONLY:
The plant is in MODE 1, with the instrumentation issues listed below:
The plant is in MODE 1, with the instrumentation issues listed below:
Instrument                                           Issue
Instrument  
LI-0702, A SG Narrow Range Level                   failed low
 
LI-0757B, A SG Wide Range Level                   failed high
Issue
FI-0727A, Aux Feedwater Flow to B SG               failed high
LI-0702, A SG Narrow Range Level
LI-0752D, B SG Safety Channel                     failed low
failed low
LI-0757B, A SG Wide Range Level
failed high
FI-0727A, Aux Feedwater Flow to B SG
failed high
LI-0752D, B SG Safety Channel  
 
failed low
Given these conditions:
Given these conditions:
The number of INOPERABLE Post Accident Monitoring (PAM) Instrument(s) is __(1)__.
The number of INOPERABLE Post Accident Monitoring (PAM) Instrument(s) is __(1)__.
Line 439: Line 499:
B. two
B. two
C. three
C. three
D. four
D. four  
 
Answer: A
Answer: A
Reference(s) provided to NRC:
Reference(s) provided to NRC:  
    * LCO 3.3.7, Post Accident Monitoring (PAM) Instrumentation, Amendment 221
*
    * Regulatory Guide 1.97, Instrumentation For Light-Water Cooled Nuclear Power Plants
LCO 3.3.7, Post Accident Monitoring (PAM) Instrumentation, Amendment 221  
To Assess Plant And Environs Conditions During And Following An Accident, Rev. 3
*
    * Operating Requirement Manual (ORM) Table 3.17.6, Rev. 15
Regulatory Guide 1.97, Instrumentation For Light-Water Cooled Nuclear Power Plants
    * Final Safety Analysis Report, Appendix 7C, Rev. 34
To Assess Plant And Environs Conditions During And Following An Accident, Rev. 3  
    * EN-OP-129, Operations Equipment Labeling
*
Operating Requirement Manual (ORM) Table 3.17.6, Rev. 15  
*
Final Safety Analysis Report, Appendix 7C, Rev. 34  
*
EN-OP-129, Operations Equipment Labeling
Applicant Comment:
Applicant Comment:
Challenge to Question 89. The correct answer should be (B), two inoperable instruments based
Challenge to Question 89. The correct answer should be (B), two inoperable instruments based
Line 459: Line 525:
inoperable. The following points support that FI-0727A is considered a PAM instrument while
inoperable. The following points support that FI-0727A is considered a PAM instrument while
answering this question:
answering this question:
POST-EXAMINATION COMMENTS, EVALUATION, AND RESOLUTIONS
POST-EXAMINATION COMMENTS, EVALUATION, AND RESOLUTIONS  
 
1. When reviewing question 89, I recognized that LI-0757B was a TS 3.3.7 instrument and
1. When reviewing question 89, I recognized that LI-0757B was a TS 3.3.7 instrument and
realized it was inoperable. I also recognized that FI-0727A is required post-accident to
realized it was inoperable. I also recognized that FI-0727A is required post-accident to
Line 471: Line 538:
Type D, Category 2 instrument for PWRs that is required to be available to the
Type D, Category 2 instrument for PWRs that is required to be available to the
operator to monitor operation of the safety system and inform the operator of the
operator to monitor operation of the safety system and inform the operator of the
necessity for unplanned actions to mitigate the consequences of an accident.
necessity for unplanned actions to mitigate the consequences of an accident.  
                (See reference 2, highlighted sections page 3 paragraph 2 and page 27)
(See reference 2, highlighted sections page 3 paragraph 2 and page 27)
b. At Palisades, FI-0727A is listed as a Type D, Category 2 instrument in
b. At Palisades, FI-0727A is listed as a Type D, Category 2 instrument in
Appendix 7C, Palisades Plant Regulatory Guide 1.97 Rev. 3 Parameter
Appendix 7C, Palisades Plant Regulatory Guide 1.97 Rev. 3 Parameter
Line 501: Line 568:
depicts FI-0727A with a blue label and provides the note from drawing E-49.
depicts FI-0727A with a blue label and provides the note from drawing E-49.
Facility Position on Applicant Comment:
Facility Position on Applicant Comment:
The station does not support the candidates assertion for the reason below:
The station does not support the candidates assertion for the reason below:  
POST-EXAMINATION COMMENTS, EVALUATION, AND RESOLUTIONS
 
POST-EXAMINATION COMMENTS, EVALUATION, AND RESOLUTIONS  
 
Post-Accident Monitoring Instrumentation (PAM) is discussed in LCO 3.3.7 and its basis.
Post-Accident Monitoring Instrumentation (PAM) is discussed in LCO 3.3.7 and its basis.
From LCO 3.3.7 basis:
From LCO 3.3.7 basis:
Line 509: Line 578:
actions can be determined. The required instruments are identified in FSAR
actions can be determined. The required instruments are identified in FSAR
Appendix 7C (Ref. 1) and address the recommendations of Regulatory Guide
Appendix 7C (Ref. 1) and address the recommendations of Regulatory Guide
1.97 (Ref. 2), as required by Supplement 1 to NUREG-0737, TMI Action Items
1.97 (Ref. 2), as required by Supplement 1 to NUREG-0737, TMI Action Items  
        (Ref. 3).
(Ref. 3).
It is the stations position that Regulatory Guide 1.97 is not the governing document for
It is the stations position that Regulatory Guide 1.97 is not the governing document for
determination as to whether an instrument is a PAM instrument or not, but that LCO 3.3.7 is
determination as to whether an instrument is a PAM instrument or not, but that LCO 3.3.7 is
Line 528: Line 597:
Flow to B SG was also considered a PAM instrument required to be OPERABLE, and that the
Flow to B SG was also considered a PAM instrument required to be OPERABLE, and that the
stem lacked sufficient information to differentiate whether Post Accident Monitoring (PAM)
stem lacked sufficient information to differentiate whether Post Accident Monitoring (PAM)
Instrument(s) should only include Technical Specification LCO 3.3.7, Post Accident Monitoring
Instrument(s) should only include Technical Specification LCO 3.3.7, Post Accident Monitoring  
(PAM) Instrumentation instruments or, all instruments as specified in Regulatory Guide (RG)
(PAM) Instrumentation instruments or, all instruments as specified in Regulatory Guide (RG)
1.97, Instrumentation for Light-Water-Cooled Nuclear Power Plants to Address Plant and
1.97, Instrumentation for Light-Water-Cooled Nuclear Power Plants to Address Plant and
Line 542: Line 611:
provides for how the facility incorporates the recommendations of RG 1.97 Rev. 3, however, not
provides for how the facility incorporates the recommendations of RG 1.97 Rev. 3, however, not
all instruments listed in RG 1.97 Rev. 3 or FSAR Appendix 7C are considered PAM Instruments.
all instruments listed in RG 1.97 Rev. 3 or FSAR Appendix 7C are considered PAM Instruments.
POST-EXAMINATION COMMENTS, EVALUATION, AND RESOLUTIONS
POST-EXAMINATION COMMENTS, EVALUATION, AND RESOLUTIONS  
 
LCO 3.3.7 specifically details which of those FSAR Appendix 7C instruments are PAM
LCO 3.3.7 specifically details which of those FSAR Appendix 7C instruments are PAM
instruments.
instruments.
Line 561: Line 631:
conditions that are stated in the question. The applicant incorrectly assumed that all RG 1.97
conditions that are stated in the question. The applicant incorrectly assumed that all RG 1.97
Rev. 3 instruments were to be included.
Rev. 3 instruments were to be included.
Furthermore, NUREG-1021, Operator Licensing Examination Standards for Power Reactor
Furthermore, NUREG-1021, Operator Licensing Examination Standards for Power Reactor  
(Rev. 11), Appendix E, Policies and Guidelines for Taking NRC Examination, Subsection B,
(Rev. 11), Appendix E, Policies and Guidelines for Taking NRC Examination, Subsection B,
Written Examination Guidelines, Paragraph B.7, states, in part, If you have any questions
Written Examination Guidelines, Paragraph B.7, states, in part, If you have any questions
Line 574: Line 644:
Instrumentation for monitoring systems operation. Therefore, the NRC concluded that no
Instrumentation for monitoring systems operation. Therefore, the NRC concluded that no
change was required to the key for this exam question.
change was required to the key for this exam question.
SIMULATOR FIDELITY REPORT
SIMULATOR FIDELITY REPORT  
Facility Licensee:                       Palisades Nuclear Plant
 
Facility Docket No:                     050-255
Facility Licensee:
Operating Tests Administered:           June 22, 2020, through June 29, 2020
Palisades Nuclear Plant
Facility Docket No:
050-255
Operating Tests Administered:
June 22, 2020, through June 29, 2020
The following documents observations made by the U.S. Nuclear Regulatory Commission
The following documents observations made by the U.S. Nuclear Regulatory Commission
examination team during the initial operator license examination. These observations do
examination team during the initial operator license examination. These observations do
Line 587: Line 661:
During the conduct of the simulator portion of the operating tests, the following items were
During the conduct of the simulator portion of the operating tests, the following items were
observed:
observed:
ITEM                                         DESCRIPTION
ITEM
None                   N/A
DESCRIPTION
3
None
N/A
}}
}}

Latest revision as of 07:11, 3 December 2024

NRC Initial License Examination Report 05000255/2020301
ML20226A112
Person / Time
Site: Palisades Entergy icon.png
Issue date: 08/13/2020
From: Patricia Pelke
Operations Branch III
To: Corbin D
Entergy Nuclear Operations
Bergeon B
Shared Package
ML19213A174 List:
References
Download: ML20226A112 (24)


Text

August 13, 2020

SUBJECT:

PALISADES NUCLEAR PLANTNRC INITIAL LICENSE EXAMINATION REPORT 05000255/2020301

Dear Mr. Corbin:

On July 6, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed the initial operator licensing examination process for license applicants employed at your Palisades Nuclear Plant.

The enclosed report documents the results of those examinations. Preliminary observations noted during the examination process were discussed on June 30, 2020, with yourself and other members of your staff. An exit meeting was conducted by telephone on July 30, 2020, with Mr. Walter Nelson, Training Director, other members of your staff, and Mr. Bryan Bergeon, Chief Operator Licensing Examiner, to review the final grading of the written examination for the license applicants. During the telephone conversation, NRC resolutions of the plants post-examination comments, received by the NRC on July 6, 2020, were discussed.

The NRC examiners administered an initial license examination operating test during the weeks of June 22, 2020, and June 29, 2020. The written examination was administered by Palisades Nuclear Plants training department personnel on April 16, 2020. Eight Senior Reactor Operator and one Reactor Operator applicant were administered license examinations. The results of the examinations were finalized on July 29, 2020. Seven applicants passed all sections of their respective examinations. Six applicants were issued senior operator licenses and one applicant was issued an operator license. Two applicants failed one or more sections of the administered examination and were issued Preliminary Results Letters.

The administered written examination and operating test, as well as documents related to the development and review (outlines, review comments and resolution, etc.) of the examination will be withheld from public disclosure until July 29, 2022. However, because two applicants received preliminary results letters due to receiving a non-passing grade on the written examination, the applicants were provided copies of the written examination material. For examination security purposes, your staff should consider the written examination material uncontrolled and exposed to the public. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations, Part 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Patricia J. Pelke, Chief Operations Branch Division of Reactor Safety

Docket No. 50-255 License No. DPR-20

Enclosures:

1. OL Examination Report 05000255/2020301 2. Post-Examination Comments, Evaluation, and Resolutions 3. Simulator Fidelity Report

REGION III==

Docket No:

50-255 License No:

DPR-20 Report No:

05000255/2020301 Enterprise Identifier: L-2020-OLL-0034 Licensee:

Entergy Nuclear Operations, Inc.

Facility:

Palisades Nuclear Plant Location:

Covert, MI Dates:

April 16, 2020, through July 6, 2020 Examiners:

B. Bergeon, Operations Engineer, Chief Examiner C. Zoia, Senior Operations Engineer, Examiner D. Reeser, Operations Engineer, Examiner Approved by:

P. Pelke, Chief Operations Branch Division of Reactor Safety

SUMMARY

Examination Report 05000255/2020301; 04/16/2020-07/06/2020; Entergy Nuclear Operations,

Inc., Palisades Nuclear Plant; Initial License Examination Report.

The announced initial operator licensing examination was conducted by regional Nuclear Regulatory Commission examiners in accordance with the guidance of NUREG-1021,

Operator Licensing Examination Standards for Power Reactors, Revision 11.

Examination Summary Seven of nine applicants passed all sections of their respective examinations. Six applicants were issued senior operator licenses and one applicant was issued an operator license. Two applicants failed one or more sections of the administered examination and were issued preliminary results letters. (Section 4OA5.1)

REPORT DETAILS

4OA5 Other Activities

.1 Initial Licensing Examinations

a. Examination Scope

The U.S. Nuclear Regulatory Commission (NRC) examiners and members of the facility licensees staff used the guidance prescribed in NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 11, to develop, validate, administer, and grade the written examination and operating test. The written examination outlines were prepared by the NRC staff and were transmitted to the facility licensees staff. Members of the facility licensees staff prepared the operating test outlines and developed the written examination and operating test. The NRC examiners validated the proposed examination during the week of March 9, 2020, with the assistance of members of the facility licensees staff. During the onsite validation week, the examiners audited all nine license applications for accuracy. The facility licensee administered the written examination on April 16, 2020. The NRC examiners, with the assistance of members of the facility licensees staff, administered the operating test, consisting of job performance measures and dynamic simulator scenarios, during the period of June 22, 2020, through June 29, 2020.

b. Findings

(1) Written Examination The NRC examiners determined that the written examination, as proposed by the licensee, was within the range of acceptability expected for a proposed examination.

Less than or equal to 20 percent of the proposed examination questions were determined to be unsatisfactory and required modification or replacement.

During the validation of the written examination, several questions were modified or replaced. All changes made to the written examination were made in accordance with NUREG-1021, Operator Licensing Examination Standards for Power Reactors, and were documented on Form ES-401-9, Written Examination Review Worksheet. The Form ES-401-9, the written examination outlines (ES-401-1 and ES-401-3), and both the proposed and final written examinations, will be available electronically in the NRC Public Document Room or from the Publicly Available Records component of NRCs Agencywide Documents Access and Management System (ADAMS) on July 30, 2022, (ADAMS Accession Numbers ML19213A180, ML19213A181, ML19213A184, and ML19213A183, respectively).

On July 6, 2020, the licensee submitted documentation noting that there were five post-examination comments for consideration by the NRC examiners when grading the written examination. The post-examination comments are documented in 2 of this report.

The NRC examiners completed grading of the written examination on July 28, 2020, and conducted a review of each missed question to determine the accuracy and validity of the examination questions.

(2) Operating Test The NRC examiners determined that the operating test, as originally proposed by the licensee, was within the range of acceptability expected for a proposed examination.

Following the review and validation of the operating test, extensive modifications were made to two job performance measures, minor modifications were made to several other job performance measures, and minor modifications were made to the dynamic simulator scenarios. All changes made to the operating test were made in accordance with NUREG-1021, Operator Licensing Examination Standards for Power Reactors, and were documented on Form ES-301-7, Operating Test Review Worksheet. The Form ES-301-7, the operating test outlines (ES-301-1, ES-301-2, and ES-D-1s), and both the proposed and final operating tests, will be available electronically in the NRC Public Document Room or from the Publicly Available Records component of NRCs ADAMS on July 30, 2022, (ADAMS Accession Numbers ML19213A180, ML19213A181, ML19213A184, and ML19213A183, respectively).

The NRC examiners completed grading of the operating test on July 29, 2020.

(3) Examination Results Eight applicants at the Senior Reactor Operator level and one applicant at the Reactor Operator level were administered written examinations and operating tests.

Seven applicants passed all portions of their examinations. Seven applicants were issued their respective operating licenses on July 29, 2020. Two Senior Reactor Operator applicants failed the written examination portion of the administered examination and were issued Preliminary Results Letters.

.2 Examination Security

a. Scope

The NRC examiners reviewed and observed the licensee's implementation of examination security requirements during the examination validation and administration to assure compliance with Title10 of the Code of Federal Regulations, Part 55.49, Integrity of Examinations and Tests. The examiners used the guidelines provided in NUREG-1021, Operator Licensing Examination Standards for Power Reactors, to determine acceptability of the licensees examination security activities.

b. Findings

(1) During administration of the operating test, a facility training instructor signed onto the exam security agreement communicated the combination to the simulator door lock to another facility training instructor outside of the NRC exam security envelope without first validating that the facility training instructor was signed onto the exam security agreement. Another facility training instructor overheard the conversation and changed the combination to the simulator door lock before the other training instructor could enter the NRC exam security envelope. The training instructor who received the combination for the simulator door lock was subsequently determined to be on the exam security agreement, but this was not validated prior to providing the combination. A follow-up evaluation determined that no exam compromise occurred and therefore, no replacement of examination material was warranted. This issue, which was of minor significance, was documented in Condition Report (CR) CR-PLP-2020-01975.
(2) During the administration of the operating test, a procedure was identified by an applicant as not being adequately erased on two separate occasions. In one instance, an applicant opened an Abnormal Operating Procedure and identified the first step was place-kept. The step had no Response Not Obtained and the place-keeping provided no pertinent information to the applicant, other than that the procedure had been performed.

The applicant stopped, notified the Chief Examiner, and a clean procedure was provided to the applicant. Similarly, in the other instance, an applicant opened the Operating Requirements Manual (ORM) to validate equipment inoperability, and the conditions to be entered were place-kept. In this instance, the applicant had written on their rough log the inoperable equipment and the conditions to be entered prior to consulting the ORM.

A follow-up evaluation determined that no exam compromise occurred and therefore, that no replacement of examination material was warranted. These issues, which were of minor significance, were documented in Condition Report CR-PLP-2020-01990.

4OA6 Management Meetings

.1 Debrief

The chief examiner presented the examination teams preliminary observations and findings on June 29, 2020, to Mr. Walter Nelson, Training Manager, and other members of the Palisades Nuclear Plant staff.

.2 Exit Meeting

The chief examiner conducted an exit meeting on July 30, 2020, with Mr. Walter Nelson, Training Manager, and other members of the Palisades Nuclear Plant staff, by telephone. The chief examiner asked the licensee whether any of the material used to develop or administer the examination should be considered proprietary. Security related information, as used in the written examination, was determined to be considered proprietary information and is to be withheld from public disclosure in accordance with Title10 of the Code of Federal Regulations, Part 2.390, Public inspections, exemptions, requests for withholding.

ATTACHMENT:

SUPPLEMENTAL INFORMATION

SUPPLEMENTAL INFORMATION

KEY POINTS OF CONTACT

Licensee

D. Corbin, Site Vice President
D. Lucy, General Manager Plant Operations
B. Baker, Senior Operations Manager
S. Moore, Manager Operations Support
J. Byrd, Operations Manager
P. Adams, Shift Manager
W. Nelson, Training Manager
F. Korfias, Training Superintendent
K. Robinson, Training Superintendent
D. Karnes, Operations Training Instructor
R. Rendler, Training Contractor
J. Hardy, Regulatory Assurance Manager
B. Dodson, Licensing Specialist

U.S. Nuclear Regulatory Commission

P. LaFlamme, Senior Resident Inspector
C. St. Peters, Resident Inspector
B. Bergeon, Operations Engineer, Chief Examiner
C. Zoia, Senior Operations Engineer, Examiner
D. Reeser, Operations Engineer, Examiner

ITEMS OPENED, CLOSED, AND DISCUSSED

Opened, Closed, and Discussed

None

LIST OF ACRONYMS USED

ADAMS

Agencywide Documents Access and Management System

NRC

U.S. Nuclear Regulatory Commission

NRC Resolution to the Palisades Nuclear Station Post-Examination Comments

RO Question 7

The plant has just been shut down from a 100 day run at full power.

Component Cooling Water Temperature is 95oF.

E-60A, Shutdown Cooling (SDC) Heat Exchanger is unavailable.

Given these conditions, complete the following statements:

The SDC system _(1) meet its design basis.

With SDC in service and a loss of air to CV-3212, CV-3213, CV-3223, and CV-3224, SDC HX

Isolation valves occurs, PCS flows through the SDC HXs _(2)_.

(1)

(2)

A. can

stops

B. can

continues

C. can NOT

stops

D. can NOT

continues

Answer: D

Reference(s) provided to NRC:

PL-SDC Shutdown Cooling Lesson Plan, Rev. 7

Final Safety Analysis Report, Chapter 6, Engineered Safeguards Systems, Rev. 52

Applicant Comment:

Challenge to Question 7. There should be two correct answers. Both (B) and (D) are correct

based on an ambiguous time reference and/or no reference to Primary Coolant System (PCS)

temperature.

When reviewing the question, the first sentence states, The plant has just been shutdown from

a 100 day run at full power. The initial conditions, specifically the word just, is ambiguous and

allows interpretation of the frame of reference. For instance, if you have a 100-day frame of

reference for a refueling outage, is it reasonable to discuss two days (48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />) into the outage

that the plant was just shut down.

Additionally, the PCS temperature is not provided in question 7. At Palisades, shutdown

cooling (SDC) is only placed in service during modes 4, 5, and 6. These three modes are

less than 300 degrees Fahrenheit PCS Tcold.

Based on the above, it is required to make assumptions on current plant parameters (i.e., Tcold

and time after shutdown). Either parameter is vital to answer the first part of the question

correctly. Without knowing the time after shutdown (specifically greater or less than 27.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />)

or Tcold (greater or less than 130 degrees F) either answer (B) or (D) could be correct based on

the assumption of the student.

Facility Position on Applicant Comment:

The station does not agree with the candidates assertion for the reason below:

Part 1 of this question asks if the system meets its design basis, which is described in FSAR 6.1

and PL-SDC as:

The system is designed to cool the primary water from 300oF to refueling

temperature with the low-pressure injection pumps and 90oF component cooling

water. The maximum pressure of the primary coolant during this cooldown is

270 psia.

The stem specifies that CCW inlet temperature is 95oF, which is above the design basis

temperature of the SDC system. This means distractor B cannot be correct. The secondary

part of this question is not being challenged.

The facility recommends that the grading of this question remains as approved.

NRC Evaluation/Resolution:

The distractor/answer choices under discussion consist of the following:

Distractor B:

(1) can

(2) continues

Answer D:

(1) can NOT

(2) continues

The stem of the question explicitly provided the following key information to the applicant:

  • The plant has just been shutdown from a 100 day run at full power.
  • Component Cooling Water Temperature is 95oF.

Part 1 of this question asks, given the initial conditions, if the SDC system meets its design

basis. The design basis for the SDC system is described in the facility licensees Final Safety

Analysis Report (FSAR) Section 6.1 and the Shutdown Cooling system Lesson Plan PL-SDC

as:

The system is designed to cool the primary system from 300°F to refueling

temperature with the low-pressure injection pumps and 90°F component cooling

water. The maximum pressure of the primary coolant during this cooldown is

270 psia.

The shutdown cooling heat exchangers are used to remove decay heat and

sensible heat during Plant cooldowns and cold shutdowns. The units, operating

together, are sized to hold the refueling temperature with the design component

cooling water temperature of 90oF.

Under the conditions provided in the question stem, the SDC system can NOT meet its design

basis and Distractor (B) can NOT be correct, for two distinct reasons:

1) The CCW inlet temperature to the SDC Heat Exchanger (95oF) exceeds that

of the designed value in FSAR Section 6.1 and FSAR Table 6.4 (90oF), and

2) Both SDC Heat Exchangers are required to be operating in order to meet the

design basis, as discussed in FSAR Section 6.1.

The challenge to the question pertains to part 1 of the question, and whether assumptions of

information not provided in the question stem are necessary to determine whether the SDC

system can meet its design basis. With the information provided in the question stem, both the

time from shutdown from full power and the PCS temperature are unnecessary to determine

whether the SDC system can meet its design basis.

NUREG-1021, Operator Licensing Examination Standards for Power Reactor (Rev. 11),

Appendix E, Policies and Guidelines for Taking NRC Examination, Subsection B, Written

Examination Guidelines, Paragraph B.7, states, in part, If you have any questions concerning

the intent or the initial conditions of a question, do not hesitate to ask them before answering

the question. The applicant was briefed on the contents of APPENDIX E prior to exam

administration, and all paragraph items contained in Subsection B were read verbatim.

No questions associated with the adequacy of conditions, or any other aspect of Question 7,

were raised by the applicant or any of the other applicants during administration of the exam.

Therefore, the NRC concluded that no change to the key for this exam question was required.

POST-EXAMINATION COMMENTS, EVALUATION, AND RESOLUTIONS

RO Question 63

The plant is in MODE 1 at 13% power, preparing for synchronization,

Main Turbine is at 1800 RPM

The Primary, Backup, and Coastdown Relays (386P, B, and C) have NOT been reset

Then,

Actual main turbine speed reaches 1900 RPM

Reactor Power rises to 16% by Nuclear Instrumentation

At the turbine controls in the Main Control Room, the operator observes the closure of...

A. ONLY the Main Stop valves

B. ONLY the Governor and Intercept valves

C. ONLY the Governor and Reheat Stop valves

D. ALL the Main Stop, Governor, Intercept, and Reheat Stop valves

Answer: D

Reference(s) provided to NRC:

ARP-1, Turbine Condenser and Feedwater Scheme, Rev 85

Drawing E-17, Sheet 9, Logic Diagram Turbine-Generator Trips and Fast Transfer,

Rev 25

Drawing E-121, Sheet 1, Schematic Diagram, Turbine Control, Rev 43

SOP-8, Main Turbine and Generating System, Rev 111

PL-EHC, Main Turbine Control and Supervisory, Rev 8

Applicant Comment:

No applicants challenged Question 63.

Facility Position on Applicant Comment:

The facility licensee discovered new technical information proposing the question is technically

incorrect and has no correct answers.

The drawing [E-17 sheet 9] depicts the contacts in the shelf state (de-energized) position,

however this circuit is an energized to actuate and trip the turbine vice a safety circuit that

would normally de-energize to cause the trip. SOP-8, Main Turbine and Generating System,

section 7.1, K-1 Turbine Generator, step 7.1.1.z directs that relays 386P, Gen Direct Trip

Lockout Relay (primary), 386B, Gen Direct Trip Lockout Relay (backup), and 386C, Generator

Indirect Trip Lockout Relay, be reset. Without resetting these relays, DEH will continue to dump

and will not be able to actuate the Main Stop, Governor, Intercept, and Reheat Stop valves.

POST-EXAMINATION COMMENTS, EVALUATION, AND RESOLUTIONS

Since the stem indicates that the Main Turbine is operating at 1800 RPM, these relays MUST

be reset, therefore the conditions of the stem are technically incorrect. The facility recommends

throwing out the question as it is technically incorrect and therefore has no correct answers.

NRC Evaluation/Resolution:

The initial conditions provided in the question stem indicate that the Main Turbine is operating at

1800 RPM with the Primary, Backup, and Coastdown Relays (386P, B, and C) NOT reset.

Newly discovered technical information showed that the 386P, B, and C relays must, in fact,

be reset in order to even latch the turbine. SOP-8, Main Turbine and Generating System,

section 7.1, K-1 Turbine Generator, step 7.1.1.z directs that relays 386P, Gen Direct Trip

Lockout Relay (primary), 386B, Gen Direct Trip Lockout Relay (backup), and 386C,

Generator Indirect Trip Lockout Relay, be reset prior to latching the turbine.

This was further shown in the facility licensees drawings, E-17 sheet 9 and E-121 Sheet 1,

depict the 386P, B, and C contacts in the shelf state (de-energized) position, however this circuit

is an energized to actuate (and trip the turbine) vice a safety circuit that would normally de-

energize to cause the trip. Without resetting these 386P, B, and C relays, the Solenoid Trip

20/AST relay remains energized and Electrohydraulic Control (EHC) fluid will continually dump

to the EHC reservoir, and will not be able to actuate the Main Stop, Governor, Intercept, and

Reheat Stop valves. The Main Stop, Governor, Intercept, and Reheat Stop valves are all

hydraulic to open valves. With EHC continually dumping to the reservoir, these valves would

not be initially opened. Therefore, the initial conditions could not be met [the valves in question

could not be opened, the turbine could not be latched, and the turbine speed could not be

accelerated to 1800 rpm] with the 386P, B, and C relays not reset. Therefore, the question is

not operationally valid and there is no correct answer, since the turbine cannot be latched (much

less reach 1900 RPM, as provided in the question stem) without first resetting the 386P, B, and

C relays.

Therefore, the NRC concluded that no correct answer existed, and the question should be

deleted from the administered examination.

RO Question 74

Question 74 withheld from public disclosure due to security related content.

Reference(s) provided to NRC:

EN-TQ-113, Initial License Operator Training Program, Rev 17

Applicant Comment:

Challenge to Question 74.

This topic was not trained on prior to the exam and the procedures were not made available to

candidates until the training was conducted (security sensitive procedures not for public

disclosure).

Facility Position on Applicant Comment:

The station supports the applicants assertion for the reason below:

While the K/A is applicable to Palisades, Fleet Procedure EN-TQ-113, Initial License Operator

Training Program, places topics such as Extreme Damage Mitigation Guidelines and B.5.b in

the Post-NRC Exam transition training portion of the training program. Candidate performance

on this question was 100% failure as the topic and AOPs have yet to be presented to the class.

The facility recommends throwing out this question as the subject matter is directed for training

in the post-NRC exam portion of the training program.

NRC Evaluation/Resolution:

The applicant, with support of the facility licensee, contends that due to the facility licensees

procedure, EN-TQ-113 Initial License Operator Training Program, not requiring that the

material be taught until the post-ILE (Initial License Exam) portion of the training program, the

question should be deleted from the administered examination.

While the facility licensees procedure EN-TQ-113 Attachment 9.1 Section IX may allow for

presentation of the various topics (B.5.b, EDGMs, FLEX, etc.) the Post-NRC Transition

Training phase of the training program, failing to cover/train on a specific topic or objective

within the training program is not bounds for dismissing the topic or K/A. Per NUREG-1021

ES-401 D.1.

The fact that a K/A does have a learning corresponding facility training objective,

was not covered in training, or is subject to selection in multiple tiers are not

sufficient bases for eliminating the K/A from any tier of the outline.

POST-EXAMINATION COMMENTS, EVALUATION, AND RESOLUTIONS

The given K/A was accepted by both the facility licensee and the NRC, an acceptable question

was developed, validated, and approved by both the facility licensee and the NRC, failing to

cover the topic within the bounds of the training program is not subject for dismissal of the

question post-exam administration.

Additionally, the facility licensee has the following training program learning objective that was

associated with the question:

Given a Security threat, implement the required actions in accordance with

AOP-44, Response to Attack on Palisades.

NUREG-1021, Operator Licensing Examination Standards for Power Reactor (Rev. 11),

Appendix E, Policies and Guidelines for Taking NRC Examination, Subsection B, Written

Examination Guidelines, Paragraph B.7, states, in part, If you have any questions concerning

the intent or the initial conditions of a question, do not hesitate to ask them before answering

the question. The applicant was briefed on the contents of APPENDIX E prior to exam

administration, and all paragraph items contained in Subsection B were read verbatim.

No questions associated with the adequacy of conditions, or any other aspect of Question 74,

were raised by the applicant or any of the other applicants during administration of the exam.

The question is a valid question as-administered, as discussed in NUREG 1021 ES-401 D.1,

and the existence of a facility licensee training program learning objective directly supporting the

K/

A. Therefore, the NRC concluded that no change to the key for this exam question was

required.

POST-EXAMINATION COMMENTS, EVALUATION, AND RESOLUTIONS

SRO Question 84

SRO ONLY:

The plant is in MODE 5 for a maintenance outage.

An UNPLANNED ENTRY into a Higher Risk Plant Operating States (HRPOS) is required.

Given these conditions, complete the following statements:

Any Hot work in progress __(1)__.

LCO 3.0.9, which addresses situations where required barriers are unable to perform their

related support functions and provides instructions and conditions for meeting the supported

system LCOs __(2)__ applicable to Fire Barriers.

(1)

(2)

A. must be stopped

is

B. must be stopped

is NOT

C. can continue

is

D. can continue

is NOT

Answer: C

Reference(s) provided to NRC:

LCO 3.0.9, Limiting Condition For Operation (LCO) Applicability,

Amendment 252

BLCO 3.0.9 Bases, Limiting Condition For Operation (LCO)

Applicability Bases, Revised 07/26/2017

Admin 4.49, Non Power Operation Fire Risk Management,

Rev. 0

Applicant Comment:

The question does not specify a barrier in question. Several barriers in the plant are both fire

and flood or HELB doors. These barriers fire functions are not covered by LCO 3.0.9, but 3.0.9

does still apply to them for other functions. Question seems too non-specific to blatantly state

3.0.9 does not apply. Recommend accepting answers a and b.

Facility Position on Applicant Comment:

The station does not support the applicants assertion for the reason below:

POST-EXAMINATION COMMENTS, EVALUATION, AND RESOLUTIONS

This question requires knowledge of the applicability of LCO 3.0.9 to Fire Doors. The site team

reviewed LCO 3.0.9 bases, which states:

This provision does not apply to barriers which support ventilation systems or to fire barriers.

The Technical Specifications for ventilation systems provide specific Conditions for inoperable

barriers. Fire barriers are addressed by other regulatory requirements and associated plant

programs.

The question stem was determined to be correct as written and requires no further information

to answer the question posed.

The facility recommends no change to the grading of this question.

NRC Evaluation/Resolution:

The distractor/answer choices under discussion consist of the following:

Distractor A:

(1) must be stopped

(2) is

Answer B:

(1) must be stopped

(2) is NOT

Part 2 of the stem of the question explicitly asks the applicant:

LCO 3.0.9, which addresses situations where required barriers are unable to perform their

related support functions and provides instructions and conditions for meeting the supported

system LCOs ___(2)___ applicable to Fire Barriers.

The applicant contended that the question did not specify a specific barrier in question, and

while several barriers (fire and flood or HELB doors) are not covered by Technical

Specification LCO 3.0.9, but the LCO still applies to those barriers for other functions.

NUREG-1021, Operator Licensing Examination Standards for Power Reactor (Rev. 11),

Appendix E, Policies and Guidelines for Taking NRC Examination, Subsection B, Written

Examination Guidelines, Paragraph B.7, states, in part, If you have any questions concerning

the intent or the initial conditions of a question, do not hesitate to ask them before answering

the question. The applicant was briefed on the contents of APPENDIX E prior to exam

administration, and all paragraph items contained in Subsection B were read verbatim.

No questions associated with the adequacy of conditions, or any other aspect of Question 84,

were raised by the applicant or any of the other applicants during administration of the exam.

The LCO 3.0.9 Bases specifically states that the provisions of the LCO do not apply to Fire

Barriers. Per LCO 3.0.9 Bases:

Barriers are doors, walls, floor plugs, curbs, hatches, installed structures or components, or

other devices, not explicitly described in Technical Specifications, that support the performance

of the safety function of systems described in Technical Specifications.

POST-EXAMINATION COMMENTS, EVALUATION, AND RESOLUTIONS

This provision does not apply to barriers which support ventilation systems or to fire barriers.

The Technical Specifications for ventilation systems provide specific Conditions for inoperable

barriers. Fire barriers are addressed by other regulatory requirements and associated plant

programs.

While a specific barrier is not provided, as the applicant contended, providing a specific barrier

is not necessary to answer part 2 of the question. Part 2 of the question only asked whether

LCO 3.0.9 was applicable to Fire Barriers. According to the LCO 3.0.9 Bases, as referenced,

LCO 3.0.9 does not apply to fire barriers and fire barriers are addressed by other regulatory

requirements and associated plant programs. Therefore, Distractor A cannot be considered a

correct answer, because part 2 of the distractor was not correct. Therefore, the NRC concluded

that no change to the key for this exam question was required.

POST-EXAMINATION COMMENTS, EVALUATION, AND RESOLUTIONS

SRO Question 89

SRO ONLY:

The plant is in MODE 1, with the instrumentation issues listed below:

Instrument

Issue

LI-0702, A SG Narrow Range Level

failed low

LI-0757B, A SG Wide Range Level

failed high

FI-0727A, Aux Feedwater Flow to B SG

failed high

LI-0752D, B SG Safety Channel

failed low

Given these conditions:

The number of INOPERABLE Post Accident Monitoring (PAM) Instrument(s) is __(1)__.

A. one

B. two

C. three

D. four

Answer: A

Reference(s) provided to NRC:

LCO 3.3.7, Post Accident Monitoring (PAM) Instrumentation, Amendment 221

Regulatory Guide 1.97, Instrumentation For Light-Water Cooled Nuclear Power Plants

To Assess Plant And Environs Conditions During And Following An Accident, Rev. 3

Operating Requirement Manual (ORM) Table 3.17.6, Rev. 15

Final Safety Analysis Report, Appendix 7C, Rev. 34

EN-OP-129, Operations Equipment Labeling

Applicant Comment:

Challenge to Question 89. The correct answer should be (B), two inoperable instruments based

on the stem of the question.

When answering question 89, both FI-0727A, Aux Feedwater Flow to Steam Gen E-50B, and

LI-0757B, A Steam Generator Wide Range Level, Post Accident Monitoring (PAM) Instruments

were inoperable. The answer key states the correct answer is (A), One PAM instrument is

inoperable. The question stem does not specify that only Technical Specification (TS) 3.3.7

PAM instruments should be considered to answer the question. Additionally, LI-0757B is a

TS 3.3.7 indication, but the question analysis states LI-0757B is the only PAM instrument

inoperable. The following points support that FI-0727A is considered a PAM instrument while

answering this question:

POST-EXAMINATION COMMENTS, EVALUATION, AND RESOLUTIONS

1. When reviewing question 89, I recognized that LI-0757B was a TS 3.3.7 instrument and

realized it was inoperable. I also recognized that FI-0727A is required post-accident to

monitor auxiliary feedwater flow to the Bravo Steam Generator (B S/G). There was no

reference to TS 3.3.7 in the question stem and interpreted the question to be asking

about all Regulatory Guide 1.97, Instrumentation For Light-Water Cooled Nuclear

Power Plants To Assess Plant And Environs Conditions During And Following An

Accident instruments. I even wrote Reg. Guide 1.97 on my exam. (Also, ORM

section 3.17.6, See explanation below)

a. Reg. Guide 1.97 states auxiliary feedwater flow indication is considered a

Type D, Category 2 instrument for PWRs that is required to be available to the

operator to monitor operation of the safety system and inform the operator of the

necessity for unplanned actions to mitigate the consequences of an accident.

(See reference 2, highlighted sections page 3 paragraph 2 and page 27)

b. At Palisades, FI-0727A is listed as a Type D, Category 2 instrument in

Appendix 7C, Palisades Plant Regulatory Guide 1.97 Rev. 3 Parameter

Summary Table, of the Palisades Final Safety Analysis Report (FSAR). (see

reference 1, document page 15). FSAR Section 7.4.3.2.1 Auxiliary Feedwater

Flow Controls and Isolation Design Basis states that Reliable AFW flow and

steam generator level instrumentation are necessary in order to adequately

determine and control, from the control room or alternate shutdown stations, the

performance of the safety-related portion of the Auxiliary Feedwater System

since the operation of this system is considered as an anticipated operational

occurrence by 10 CFR 50, Appendix A, GDC 13. (See Reference 5, first

paragraph highlighted on page 7.4-12 of 7.4-21)

c. Additionally, FSAR section 7.4.3.2.3 states, The performance of the safety-

related portion of the AFW system can be assessed by the AFW flow indicators,

two for each steam generator located in the control room and alternate stations

outside the control room and a wide-range water level indicator for each steam

generator. (see Reference 5, page 7.4-15 of 7.4-21)

2. The question stem states INOPERABLE. The Palisades Operating Requirements

Manual (ORM) Table 3.17.6 items 6.1 and 6.2 address inoperability of the auxiliary

feedwater flow indicators and specifically uses the word inoperable in the condition

statements and in the Specification statement for section 3.17.6 of the ORM. (see

reference 3) When I read the question, I knew the ORM specifically required operability

of the auxiliary feedwater indications and further convinced me that the question was

asking about all Reg. Guide 1.97 instruments in the stem.

3. Instrument labeling in the control room is controlled by EN-OP-129, Operations

Equipment Labeling, and specifically drawing E-49, Nameplate Standards. Note 7 of

E-49 requires that all Reg. Guide 1.97 instruments will be labeled in blue. Reference 4

depicts FI-0727A with a blue label and provides the note from drawing E-49.

Facility Position on Applicant Comment:

The station does not support the candidates assertion for the reason below:

POST-EXAMINATION COMMENTS, EVALUATION, AND RESOLUTIONS

Post-Accident Monitoring Instrumentation (PAM) is discussed in LCO 3.3.7 and its basis.

From LCO 3.3.7 basis:

The availability of PAM instrumentation is important so that responses to

corrective actions can be observed and the need for, and magnitude of, further

actions can be determined. The required instruments are identified in FSAR

Appendix 7C (Ref. 1) and address the recommendations of Regulatory Guide 1.97 (Ref. 2), as required by Supplement 1 to NUREG-0737, TMI Action Items

(Ref. 3).

It is the stations position that Regulatory Guide 1.97 is not the governing document for

determination as to whether an instrument is a PAM instrument or not, but that LCO 3.3.7 is

the governing document and that Regulatory Guide 1.97 recommendations have already been

addressed. Based on this, only one PAM instrument is INOPERABLE as described in

LCO 3.3.7.

The facility recommends that the question should be graded as approved.

NRC Evaluation/Resolution:

The distractor/answer choices under discussion consist of the following:

Answer A:

A. one

Distractor B:

B. two

The stem of the question explicitly asks the applicant:

The number of INOPERABLE Post Accident Monitoring (PAM) Instrument(s) is __(1)__.

The applicant contended that the Auxiliary Feedwater flow indication, FI-0727A Aux Feedwater

Flow to B SG was also considered a PAM instrument required to be OPERABLE, and that the

stem lacked sufficient information to differentiate whether Post Accident Monitoring (PAM)

Instrument(s) should only include Technical Specification LCO 3.3.7, Post Accident Monitoring

(PAM) Instrumentation instruments or, all instruments as specified in Regulatory Guide (RG) 1.97, Instrumentation for Light-Water-Cooled Nuclear Power Plants to Address Plant and

Environs Conditions During and Following an Accident.

While FI-0727A was INOPERABLE per Operating Requirements Manual (ORM) 3.17.6 Other

Instrumentation Action 6.1 and 6.2 (for Auxiliary Feedwater flow indication as listed in ORM

Table 3.17.6), as the applicant contended, FI-0727A is not a PAM Instrument. PAM

Instrumentation is controlled by LCO 3.3.7 and PAM Instruments are specified in LCO 3.3.7

Table 3.3.7-1 Post Accident Monitoring Instrumentation. LCO 3.3.7 is the facility licensees

governing document that defines the instrumentation that is included as Post Accident

Monitoring (PAM) Instruments. The facility licensees Final Safety Analysis Report (FSAR)

Appendix 7C, Palisades Plant Regulatory Guide 1.97, Rev. 3 Parameter Summary Table

provides for how the facility incorporates the recommendations of RG 1.97 Rev. 3, however, not

all instruments listed in RG 1.97 Rev. 3 or FSAR Appendix 7C are considered PAM Instruments.

POST-EXAMINATION COMMENTS, EVALUATION, AND RESOLUTIONS

LCO 3.3.7 specifically details which of those FSAR Appendix 7C instruments are PAM

instruments.

FI-0727A is a Type D, Category 2 instrument per FSAR Appendix 7C (and RG 1.97 Rev. 3) that

provides for monitoring systems operation. As such, FI-0727A is covered under ORM 3.17.6

Other Instrumentation, which states:

The Safety Functions required by Specification 3.17.6 provide alarm and

indication functions to assist the operator in monitoring plant conditions. None of

the required functions provide automatic actions assumed to be available in the

safety analysis, therefore, operation may continue even though the function is

degraded or lost provided that the specified action is met.

The applicant assumed that all RG 1.97 Rev. 3 instruments should be considered when

answering the question, however, the stem specifically asked for Post Accident Monitoring

Instruments. There was no implication that any other instrumentation should be considered. It

was incorrect to make such assumptions. NUREG-1021 (Rev. 11), Appendix E, Paragraph B.7

also states, in part, When answering a question, do not make assumptions regarding

conditions that are not specified in the question unless they occur as a consequence of other

conditions that are stated in the question. The applicant incorrectly assumed that all RG 1.97

Rev. 3 instruments were to be included.

Furthermore, NUREG-1021, Operator Licensing Examination Standards for Power Reactor

(Rev. 11), Appendix E, Policies and Guidelines for Taking NRC Examination, Subsection B,

Written Examination Guidelines, Paragraph B.7, states, in part, If you have any questions

concerning the intent or the initial conditions of a question, do not hesitate to ask them before

answering the question. The applicant was briefed on the contents of APPENDIX E prior to

exam administration, and all paragraph items contained in Subsection B were read verbatim.

No questions associated with the adequacy of conditions, or any other aspect of Question 89,

were raised by the applicant or any of the other applicants during administration of the exam.

Based on the information provided in the question stem, there is only ONE INOPERABLE Post

Accident Monitoring (PAM) Instrumentation, LI-0757B, A SG Wide Range Level. FI-0727A,

while INOPERABLE, is not Post Accident Monitoring Instrumentation and is considered Other

Instrumentation for monitoring systems operation. Therefore, the NRC concluded that no

change was required to the key for this exam question.

SIMULATOR FIDELITY REPORT

Facility Licensee:

Palisades Nuclear Plant

Facility Docket No:

050-255

Operating Tests Administered:

June 22, 2020, through June 29, 2020

The following documents observations made by the U.S. Nuclear Regulatory Commission

examination team during the initial operator license examination. These observations do

not constitute audit or inspection findings and are not, without further verification and review,

indicative of non-compliance with Title 10 of the Code of Federal Regulations, Part 55.45(b).

These observations do not affect U.S. Nuclear Regulatory Commission certification or approval

of the simulation facility other than to provide information which may be used in future

evaluations. No licensee action is required in response to these observations.

During the conduct of the simulator portion of the operating tests, the following items were

observed:

ITEM

DESCRIPTION

None