ML20238D117: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot change) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:. | ||
December 30, 1987 Docket No. 99900064/87-01 Ingersoll-P.and Engineered. Pump Division ATTN: 'Mr. D. M. Cote, Vice President Pump Group World Wide Operations 942 Memorial Parkttay Phillipsburg, New Jersey 08865 Gentleman: | |||
Engineered. Pump Division ATTN: 'Mr. D. M. Cote, Vice President Pump Group World Wide Operations 942 Memorial Parkttay Phillipsburg, New Jersey 08865 Gentleman: | Thank you for your letter of December 18, 1987, in response to our j | ||
Thank you for your letter of December 18, 1987, in response to our | {{letter dated|date=November 10, 1987|text=letter dated November 10, 1987}}. We have reviewed you. reply and find it j | ||
is responsive to the concerns raised in our Notice of Violation and Notice of Nonconformance. -We will review the implementation of your corrective | |||
-i actions during a future inspection to determine that full compliance has been achieved and will be maintained. | |||
Sincerely, i | Sincerely, i | ||
lS/ | lS/ | ||
James C. Stone, Acting Chief Vendor Inspection Branch Division of Reactor Inspection and Safeguards Office of Nuclear Reactor Regulation Distribution: m (RIUS Code IEiO f i | James C. Stone, Acting Chief Vendor Inspection Branch Division of Reactor Inspection and Safeguards Office of Nuclear Reactor Regulation Distribution: m (RIUS Code IEiO f i j | ||
DRIS Reading File JPartlow BGrimes JStone EBaker JConway 1 | VIB Reading File DRIS Reading File JPartlow BGrimes JStone EBaker JConway 1 | ||
OFC | |||
s...........p. | :VIB:DRIS:NRR 0 | ||
NAM | RIS RIS s...........p. | ||
nway:mgc | y.....: | ||
DATE .1-2A/1/87 | g _.:..............:............. :_............ | ||
8801040108 871230 PDR | NAM nway:mgc | ||
:EfBaker one DATE.1-2A/1/87 | |||
:12/9/87 | |||
:12/5d/87 8801040108 871230 PDR GA999 ENVINGE 99900064. | |||
DCD | |||
Dacombar 30, 1987 Docket No. 99900064/87-01 Ingersoll-Rand Engineered Pump Division ATTN: Mr. D. M. Cote Vice President Pump Group World Wide Operations | Dacombar 30, 1987 Docket No. 99900064/87-01 Ingersoll-Rand Engineered Pump Division ATTN: Mr. D. M. Cote Vice President Pump Group World Wide Operations 942 Memorial Parkway l | ||
942 Memorial Parkway | l Phillipsburg, New Jersey 08865 l | ||
Gentleman: | Gentleman: | ||
Thank you for your letter of December 18, 1987, in response to our {{letter dated|date=November 10, 1987|text=letter dated November 10, 1987}}. We have reviewed your reply and find it is responsive to the concerns raised in our Notice of Violation and Notice | Thank you for your letter of December 18, 1987, in response to our {{letter dated|date=November 10, 1987|text=letter dated November 10, 1987}}. We have reviewed your reply and find it is responsive to the concerns raised in our Notice of Violation and Notice J | ||
of Nonconformance. We will review the implementation of your corrective | l of Nonconformance. We will review the implementation of your corrective l | ||
actions during a future inspection to determine that full compliance has been achieved and will be maintained. | I actions during a future inspection to determine that full compliance has been achieved and will be maintained. | ||
Sincerely, | ] | ||
Sincerely, iS/ | |||
James C. Stone, Acting Chief Vendor Inspection Branch Division of Reactor Inspection and Safeguards | l' James C. Stone, Acting Chief | ||
~ | |||
Office of Nuclear Reactor Regulation Distribution: | Vendor Inspection Branch Division of Reactor Inspection and Safeguards Office of Nuclear Reactor Regulation Distribution: | ||
RIDS Code IE:09 VIB Reading File DRIS Reading File JPartlow BGrimes JStone | RIDS Code IE:09 VIB Reading File DRIS Reading File JPartlow BGrimes JStone i | ||
EBaker q | |||
NAM | JConway 0FC | ||
nway:mgc | :VIB:DRI5:NRR S4DRIS : | ||
l | RIS g.G......: | ||
v | NAM nway:mgc Baker o | ||
l DATE : | |||
/1/87 | |||
:128d/87 | |||
:12/5d/87 v | |||
>3 MQ | |||
[ | [ | ||
o,, | o,, | ||
UNITED STATES | |||
\\ | |||
NUCLEAR REGULATORY COMMISSION o | |||
5 g | |||
WASHINGTON, D. C. 20555 | |||
.....[ | |||
December 30, 1987 Docket No. 99900064/87-01 | |||
( | ( | ||
Ingersoll-Rand Engineered Pump Division ATTN: Mr. D. M. Cote Vice President Pump Group World Wide Operations 942 Memorial Parkway Phillipsburg, New Jersey 08865 Gentleman: | Ingersoll-Rand Engineered Pump Division ATTN: Mr. D. M. Cote Vice President Pump Group World Wide Operations 942 Memorial Parkway Phillipsburg, New Jersey 08865 Gentleman: | ||
Thank you for your letter of December 18, 1987, in response to our {{letter dated|date=November 10, 1987|text=letter dated November 10,1987}}. We have reviewed your reply and find it | Thank you for your letter of December 18, 1987, in response to our {{letter dated|date=November 10, 1987|text=letter dated November 10,1987}}. We have reviewed your reply and find it j | ||
is responsive to the concerns raised in our Notice of Violation and Hotice of Nonconformance. We will review the implementation of your corrective-actions during a future inspection to determine that full compliance has- | |||
~ | |||
been achieved and will be maintained. | been achieved and will be maintained. | ||
Sincerely | Sincerely, | ||
]@ | |||
James C. Stone, Acting Chief | James C. Stone, Acting Chief Vendor Inspection Branch Division of Reactor Inspection and Safeguards Office of Nuclear Reactor Regulation | ||
Vendor Inspection Branch Division of Reactor Inspection and Safeguards Office of Nuclear Reactor Regulation | .c | ||
- _ _ _ _ _ _ _ _ _.. _ _ _ _ _ _ _ _ _, _. _ _ _ -. _ _ _ _, _ _ _ _ _ _. - _ _ _ _ _ _}} | |||
- _ _ _ _ _ _ _ _ _ . . _ _ _ _ _ _ _ _ _ , _ . _ _ _ - . _ _ _ _ , _ _ _ _ _ _ . - _ _ _ _ _ _}} | |||
Latest revision as of 05:43, 2 December 2024
| ML20238D117 | |
| Person / Time | |
|---|---|
| Issue date: | 12/30/1987 |
| From: | Stone J Office of Nuclear Reactor Regulation |
| To: | Cote D INGERSOLL-RAND CO. |
| References | |
| REF-QA-99900064 NUDOCS 8801040108 | |
| Download: ML20238D117 (3) | |
Text
.
December 30, 1987 Docket No. 99900064/87-01 Ingersoll-P.and Engineered. Pump Division ATTN: 'Mr. D. M. Cote, Vice President Pump Group World Wide Operations 942 Memorial Parkttay Phillipsburg, New Jersey 08865 Gentleman:
Thank you for your letter of December 18, 1987, in response to our j
letter dated November 10, 1987. We have reviewed you. reply and find it j
is responsive to the concerns raised in our Notice of Violation and Notice of Nonconformance. -We will review the implementation of your corrective
-i actions during a future inspection to determine that full compliance has been achieved and will be maintained.
Sincerely, i
lS/
James C. Stone, Acting Chief Vendor Inspection Branch Division of Reactor Inspection and Safeguards Office of Nuclear Reactor Regulation Distribution: m (RIUS Code IEiO f i j
VIB Reading File DRIS Reading File JPartlow BGrimes JStone EBaker JConway 1
OFC
- VIB:DRIS:NRR 0
RIS RIS s...........p.
y.....:
g _.:..............:............. :_............
NAM nway:mgc
- EfBaker one DATE.1-2A/1/87
- 12/9/87
- 12/5d/87 8801040108 871230 PDR GA999 ENVINGE 99900064.
Dacombar 30, 1987 Docket No. 99900064/87-01 Ingersoll-Rand Engineered Pump Division ATTN: Mr. D. M. Cote Vice President Pump Group World Wide Operations 942 Memorial Parkway l
l Phillipsburg, New Jersey 08865 l
Gentleman:
Thank you for your letter of December 18, 1987, in response to our letter dated November 10, 1987. We have reviewed your reply and find it is responsive to the concerns raised in our Notice of Violation and Notice J
l of Nonconformance. We will review the implementation of your corrective l
I actions during a future inspection to determine that full compliance has been achieved and will be maintained.
]
Sincerely, iS/
l' James C. Stone, Acting Chief
~
Vendor Inspection Branch Division of Reactor Inspection and Safeguards Office of Nuclear Reactor Regulation Distribution:
RIDS Code IE:09 VIB Reading File DRIS Reading File JPartlow BGrimes JStone i
EBaker q
JConway 0FC
- VIB:DRI5:NRR S4DRIS :
RIS g.G......:
NAM nway:mgc Baker o
l DATE :
/1/87
- 128d/87
- 12/5d/87 v
>3 MQ
[
o,,
UNITED STATES
\\
NUCLEAR REGULATORY COMMISSION o
5 g
WASHINGTON, D. C. 20555
.....[
December 30, 1987 Docket No. 99900064/87-01
(
Ingersoll-Rand Engineered Pump Division ATTN: Mr. D. M. Cote Vice President Pump Group World Wide Operations 942 Memorial Parkway Phillipsburg, New Jersey 08865 Gentleman:
Thank you for your letter of December 18, 1987, in response to our letter dated November 10,1987. We have reviewed your reply and find it j
is responsive to the concerns raised in our Notice of Violation and Hotice of Nonconformance. We will review the implementation of your corrective-actions during a future inspection to determine that full compliance has-
~
been achieved and will be maintained.
Sincerely,
]@
James C. Stone, Acting Chief Vendor Inspection Branch Division of Reactor Inspection and Safeguards Office of Nuclear Reactor Regulation
.c
- _ _ _ _ _ _ _ _ _.. _ _ _ _ _ _ _ _ _, _. _ _ _ -. _ _ _ _, _ _ _ _ _ _. - _ _ _ _ _ _