H'                           In' Reply-Refer To:'
.W 'f[ '
            '
gg
                              Docket:~.50-298/89-15                                           ,
,
H'
In' Reply-Refer To:'
Docket:~.50-298/89-15
'
,
"
"
a
'
Nebraska Public Power. District-
<
' ATTN: -George A.-Trevors
.
i
-
Division Manager
Nuclear' Support
P.O. Box.499.
--,.
.
,
. Columbus, Nebraska 68602-0499
Gentlemen:'
Thank you for.your letter of May 26, 1989, in response to our letter and
Notice of Violation' dated May 1, 1989.. We have reviewed your reply and find.
,
it. responsive to the concerns raised in our Notice of Violation. We will'
review the in:plementation of your corrective actions during a future
. inspection to! determine that full compliance has been achieved and will be
maintained.
,
'
'
                  a
Sincere
    <
l
                              Nebraska Public Power. District-
&[&
                            ' ATTN: -George A.-Trevors
.
                                      -
James L. Milhoan, Director
                                                                        .
"
                                                                                                                                            i
Division of Reactor Projects
                                        Division Manager        Nuclear' Support
cC;
                    --,.      P.O. Box.499.
' Cooper Nuclear Station
  .
.
                    ,
-
                            . Columbus, Nebraska 68602-0499
1
                              Gentlemen:'
' ATTN: Guy. Horn, Division Manager
                                    Thank you for.your letter of May 26, 1989, in response to our letter and
of Nuclear Operations
  ,
.,
                              Notice of Violation' dated May 1, 1989.. We have reviewed your reply and find.
P.0; Box 98
                              it. responsive to the concerns raised in our Notice of Violation. We will'
~Brownville, Nebraska 68321
                              review the in:plementation of your corrective actions during a future
Kansas Radiation Control Program Director
                            . inspection to! determine that full compliance has been achieved and will be
Nebraska Radiation Control Program Director
                              maintained.                                    ,
RIV:RI:MQPS*
                                                                                                        '
C:MQPS *
                                                                                  Sincere
D:DRS*
                                                                .
D:D .
                                                                        l            &[&
LGilbert/cjg
                                                                                James L. Milhoan, Director
IBarnes
                                                                                                                                              "
LJCallan
                                                                                  Division of Reactor Projects
JLMilhoan
                              cC;
'
                1          ' Cooper Nuclear Station             .
/ /89
                                                                                                                                        -
/ /89
                            ' ATTN: Guy. Horn, Division Manager
/ /89
                                    .,
g//1/89
                                          of Nuclear Operations
*previously concurred
                              P.0; Box 98
ff0I
                            ~Brownville, Nebraska 68321
e i
                              Kansas Radiation Control Program Director
hh
                              Nebraska Radiation Control Program Director
,
                              RIV:RI:MQPS*           C:MQPS *             D:DRS*           D:D .
_
      '
_-
                              LGilbert/cjg           IBarnes             LJCallan         JLMilhoan
_ -
                                / /89                     / /89               / /89       g//1/89
_- --
                              *previously concurred
_
                                                                                                          ff0I
_ _-
                                                                                                                e i
_-_ -
                                                  hh         ,
_ __
              _         _-                   _ -       _- --             _     _ _-             _-_ -   _ __                     _-   _-
_-
_-


              ,                                                                                                                       ._                                                       ._
,
                                                                                                                                                                                                        - _ - - _ - _ - _ _ - - _ -
.
    w
._
                                          .
._
                                  a:                               ,
- _ - - _ - _ - _ _ - - _ -
                                                                                                                            ; . p.       v           ;;
w
    I IJ                   t.                                      'a                t :;,
a:
                                                                                                                                                      ''
' a
    . ' t.gi '.                                     4                              9 / 'i                                                                       # * '
t :;,
                .;                                                                                >
; . p.
      m;g;:i . -                                 .
v
                                                                                  ,
;;
                                                                                                                . ,
,
                                                                                                                                    -       >
I IJ
                                                                                                                                                              ,
''
                                                                                                                                                                                        .                                              *
t.
                                                                                                              -'
. ' t.gi '.
                          ng
9 / 'i
                                                                                      ,
# * '
              '
4
                                                                                .
m;g;:i . -
                                                            '                  '
,
                                                        ..-
. ,
                                                    .                ,
-
                                                                                                                          ,      ,,,-                               _
>
                                                                                                                                                                                                                                  ,
.
                                                                        "                                                                      '
*
                                                                                                                                  '
.;
                                    }l g )< '                                                                         ,
>
                                                - l Nebraska Public Power District 1                                                  -2-                                      a
,
W1                                                                                                                                                                        '
.
                                                                          '                                                                      '
.
                                                              .                                                                                 ;,                                                    ,
,
                          .                                   !                                            -
-'
                                                                                                                                                                                                                                            '
'
                                                                                                    t  .                    -            ,
'
                                    *f                                      ,                                         y;
ng
                                                  ''                                                                ~'
'
                        ,
. . -
                                    ,
,
                                                    . . tcctoDMB(IE01):                                                          .4
, , , -
                                                                                                                                                    -       t
_
                                                                                                                                                                            m
,
                                                                                                                                                                            x
.
    . . ,
,
                                  ^ "
}l g )< '
                                                        bec!distrib. by RIV -                                          '                                             - ^
"
                                                                                                                                                          e                                                  -
                                                                                                                    '
'
'
          ,-
'
                                                    '
,
                                                        RRI. . r .?.                       .
- l Nebraska Public Power District 1
                                                                                                                              R..D. Martin, RA.                        .
-2-
          '
a
                    '
W1
                            :)                           SectionChief(DRP/C).-                                                 Lisa Shea, RM/ALF
'
                    ,                                  'RPB-DRSSi                                                 ,
'
                                                                                                                              MIS System
'
          ',                               .
.
                                                        RIV: File                      .
!
                                                                                                          ,'
-
                                                                                                          "
;,
                                                                                                                              Project Engineer (DRP/C)*
.
                                                      'RSTS Operator.                     <
,
                                                                                              . .                           ' DRP
'
g.                    .
t
                                  "i
.
                                                          P. O'Connor, NRR Project Manager (MS: 13-D-18)
''
                          + -                        .' DRS -               -
,
                                                ,                      m,
y;
          ,'
-
  '
,
                                                        L. Gilbert'
*f
. . tcctoDMB(IE01):
~'
.4
m
,
,
-
t
x
. . ,
^ "
bec!distrib. by RIV -
- ^
'
e
-
'
,-
RRI. . r
.?.
.
R..D. Martin, RA.
'
'
.
:)
SectionChief(DRP/C).-
Lisa Shea, RM/ALF
'
'
'RPB-DRSSi
MIS System
,
,
Project Engineer (DRP/C)*
RIV: File
.
,'
' DRP
',
.
"
'RSTS Operator.
. .
13-D-18)
<
P. O'Connor, NRR Project Manager (MS:
"i
g.
.
.' DRS -
-
+ -
m,
,
,'
L. Gilbert'
'
-
- 1. Barnes-
; ;-
; ;-
                  -
o f'4
                                                  - 1. Barnes-
!t
                                o f'
'
                                      4
,-1
              !t
' $
                      '
Y. .
          ,-1
'
                          '$         Y. .
%,/
                                                                                                                                                                                                                                            '
t
%,/                                                                                                                                                             t
[':
                      [':                         9
9
                                        4
4
      I
I
i                                                                                                                                                                                                                                           ;
i
      '- "
;
        .
'- "
                                                        ,
,
                              ,.
.
                                  (-
,.
            i
(-
                                              t
i
                                                                                                                                                                                                                                        l*'
t
  g                               + k;
l*'
    g'..
g
                                                                4
+ k;
          e                                   ,
g'..
      .q -                                                                                             ,
4
                                              .
e
                        _
,
                                                                                                                                                                            _________.__.___._______m                               _
.q -
,
.
_
_________.__.___._______m
_


    _ _ _ . _ _ _
_ _ _ . _ _ _
  M'
M'
      e            **
**
            ,
e
                  ""
,
                                                                                                                  COOPER NUCLEAR ST ATioN
""
  .
COOPER NUCLEAR ST ATioN
                    *          Nebraska Public Power District                                             ''" * * "A*c"AWs L*L^Y^ "'"
*
                      CNSS897271
Nebraska Public Power District
                                                                                                                                                      .
''" * * "A*c"AWs L*L^Y^ "'"
                      May 26, 1989
.
                                                                                                                                                                ' '
CNSS897271
                                                                                                                                                  JUM - E
.
                                                                                                                                                    .
May 26, 1989
                      U.S. Nuclear Regulatory Commission
JUM - E
                      Attention: Document Control Desk
' '
                      Washington, DC 20555
.
                      Subject: NPPD Response to Notice of Violation - NRC Inspection Report No. 89-15
U.S. Nuclear Regulatory Commission
                      Gentlemen:
Attention: Document Control Desk
                      This letter is written in response to your letter dated May 1,                                                                     1989,
Washington, DC 20555
                      transmitting Inspection Report 50-298/89-15.                   Thereir. you indicated that
Subject: NPPD Response to Notice of Violation - NRC Inspection Report No. 89-15
                      certain of our activities were in violation of NRC requirements.
Gentlemen:
                      Following is a statement of the violations and our response in accordance with
This letter is written in response to your letter dated May 1,
                      10CFR2.201.
1989,
                      STATEMENT OF VIOLATION
transmitting Inspection Report 50-298/89-15.
                      Criterion IX of 10CFR Part 50 Appendix B specifies that measures shall be
Thereir. you indicated that
                      established to assure that welding is controlled and accomplished by qualified
certain of our activities were in violation of NRC requirements.
                      personnel using qualified procedures in accordance with applicable codes and
Following is a statement of the violations and our response in accordance with
                      other special requirements.
10CFR2.201.
                      Contrary to the abova:
STATEMENT OF VIOLATION
                            a.   Maintenance Procedure 7.7.15 does not control the hear input within
Criterion IX of 10CFR Part 50 Appendix B specifies that measures shall be
                                    the limits qualified as required by ASME Section IX, 1983 Edition,
established to assure that welding is controlled and accomplished by qualified
                                    for welding materials requiring impact properties.
personnel using qualified procedures in accordance with applicable codes and
                            b.   The post-weld heat treatment specified in Maintenance Prncedure 7.7.16
other special requirements.
                                  was not qualified by the supporting Procedures Qualification Report
Contrary to the abova:
                                    (PQR) as required by ASME Section IX,
a.
                            c.     Radiographic examination reports, 173-98061-2 and 173-98061-5, for
Maintenance Procedure 7.7.15 does not control the hear input within
                                    double wall radiography of two welder performance qualification
the limits qualified as required by ASME Section IX, 1983 Edition,
                                    tests recorded that the penetrameters were placed source-side inside
for welding materials requiring impact properties.
                                    the pipe although the radiographic procedure specified placement of
b.
                                    the penetrameters source-side and outside the pipe.
The post-weld heat treatment specified in Maintenance Prncedure 7.7.16
                            d.     Holding ovens containing E7018 electrodee were outside the
was not qualified by the supporting Procedures Qualification Report
                                    temperature range specified in Maintenance Procedure 7.7.3.2, and
(PQR) as required by ASME Section IX,
                                    the temperature was not being checked daily as required by the
c.
                                    procedure.
Radiographic examination reports, 173-98061-2 and 173-98061-5, for
                Qz %,m wr      ,i /_
double wall radiography of two welder performance qualification
                                    u (7         J/ '8                                                                                                                                     \
tests recorded that the penetrameters were placed source-side inside
                                                                                                                                                                                            i
the pipe although the radiographic procedure specified placement of
  _Ndi                                                                                                                                                                                   l
the penetrameters source-side and outside the pipe.
d.
Holding ovens containing E7018 electrodee were outside the
temperature range specified in Maintenance Procedure 7.7.3.2, and
the temperature was not being checked daily as required by the
procedure.
Qz %,m ,i /_ (7
J '8
/
\\
wr
u
i
_Ndi
l
i
L
L
                    w    ww        a
.PowerfulPride in Nebraska-
                                              .PowerfulPride in Nebraska-
.
                                          ,. w .       ._
.
                                                                      . = = + = - - .
w
                                                                                                                                                        .
ww
                                                                                                                                                          = = _
a
                                                                                                                                                                            .
,. w .
                                                                                                                                                                                  .-
._
                                                                                                                                                                                          i
. = = + = - - .
    _ = = _ _ _ _ _ - _ _ _ _ _ __ __ =_ __ .______ __ ~. ~_ __ __ .____=__. =
= = _
                                                                        _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ .         _ _ _ =_ _. __ _ _ _ = _ _ . _ _
.-
                                                                                                                    _ _ _ _ . _ _ _ _ _ _ _ _ _ .                   _______._____._______J
_ = = _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ ~ _ _ _ _ _ = _ _ _ _ _ . _
_ _ = _ . _ _ _ _ . ~ _ _ . _ _ _ . = _ _ = _ _ _ _ _ = _ _ . _ _
_ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ .
_ _ _ _ . _ _ _ _ _ _ _ _ _ .
_______._____._______J


  _ _ _ _ _ _ _ _ _ .
_ _ _ _ _ _ _ _ _ .
i
i
                        jU.S.-Nuc1 car Regulatory Commission-
jU.S.-Nuc1 car Regulatory Commission-
  3 ._'                 ',May 26, 1989
3 ._'
                      -
',May 26, 1989
                            P.nge 2+
P.nge 2+
l      .
-
I'                                e.  The temperature range of 150-200*F, specified In Maintenance
l
l                                      Procedure 7.7.3.2 for electrode holding ovens does not comply with
l                                     AWS Dl.1-85, which states that E7018 electrodes shall be heated to
                                      at least 250'F.
.
.
                            REASON TOR THE VIOLATION
I'
e.
The temperature range of 150-200*F, specified In Maintenance
l
Procedure 7.7.3.2 for electrode holding ovens does not comply with
l
l
l'                         The reason for violation items "a" and "b" was inadequate review of new
AWS Dl.1-85, which states that E7018 electrodes shall be heated to
L                           procedures for compliance to applicable codes.       As such, Maintenance
at least 250'F.
.
REASON TOR THE VIOLATION
l
l'
The reason for violation items "a"
and "b" was inadequate review of new
L
procedures for compliance to applicable codes.
As such, Maintenance
l~
l~
                            Procedure 7.7.15 and 7.7.16 were net in compliance with ASME Section IX as
Procedure 7.7.15 and 7.7.16 were net in compliance with ASME Section IX as
                            indicated in violation items "a" and "b".
indicated in violation items "a" and "b".
                            The reason for violation item     "c" was originally believed to be a
The reason for violation item "c"
was originally believed to be a
typographical error in the NDE contractor's reports.
However, it was later
,
,
                            typographical error in the NDE contractor's reports. However, it was later
l
l                          found that due to an error on the part of the contract NDE technician, actual
found that due to an error on the part of the contract NDE technician, actual
                            misplacement of the penetrameters had occurred with respect to the
misplacement of the penetrameters had occurred with respect to the
l-                         requirements specified in the applicable revision of the contractor's
l-
!                           procedure. This error was not subsequently detected by Cooper Nuclear Station
requirements specified in the applicable revision of the contractor's
                            (CNS) personnel.
!
                            The reason for violation item "d" was inadequate review of new procedures for
procedure. This error was not subsequently detected by Cooper Nuclear Station
                            impact upon existing practices. As such, personnel responsible for field
(CNS) personnel.
                            implementation of new welding procedures were not fully aware of required
The reason for violation item "d" was inadequate review of new procedures for
                            changes.
impact upon existing practices.
                            The reason for violation item "e" was failure to identify the constraints of
As such, personnel responsible for field
                            the more limiting code.     In lieu of AWS DI.1, CNS had conformed to ASME
implementation of new welding procedures were not fully aware of required
                            Section II and previous manufacturers' recommendations for electrode storage
changes.
                            temperature. The temperature range specified in Maintenance Procedure 7.7.3.2
The reason for violation item "e" was failure to identify the constraints of
                            adequately meets the recommendations of ASME Section II; however, the
the more limiting code.
                            requirements of AWS DI.1 are more limiting than the recommendations of ASME
In lieu of AWS DI.1, CNS had conformed to ASME
                            Section II.
Section II and previous manufacturers' recommendations for electrode storage
                            Nebraska Public Power Dictrict admits to the violation as stated.
temperature. The temperature range specified in Maintenance Procedure 7.7.3.2
                            CORRECTIVE STEPS WICH HAVE BEEN TAKEN AND THE RESULTS ACHIEVED
adequately meets the recommendations of ASME Section II; however, the
l                           1.   Item a:   Procedural controls were implemented to restrict welding which
requirements of AWS DI.1 are more limiting than the recommendations of ASME
Section II.
Nebraska Public Power Dictrict admits to the violation as stated.
CORRECTIVE STEPS WICH HAVE BEEN TAKEN AND THE RESULTS ACHIEVED
l
1.
Item a:
Procedural controls were implemented to restrict welding which
i
i
requires notch toughness qualification until existing
'
'
                                            requires notch toughness qualification until existing
procedures are revised to include the necessary controls for
                                            procedures are revised to include the necessary controls for
heat input.
                                            heat input.   It should be noted that no welds were made per
It should be noted that no welds were made per
                                            Maintenance Procedure 7.7.15 to materials which require impact
Maintenance Procedure 7.7.15 to materials which require impact
                                            testing.
testing.
                            2.   Item b:   A change to Maintenance Procedure 7.7.16 has been implemented
2.
                                            to remove the non-qualified post-weld heat treatment. This
Item b:
                                            measure will ensure that processes specified will be qualified
A change to Maintenance Procedure 7.7.16 has been implemented
                                            by the supporting PQR. It should be noted that no welds were
to remove the non-qualified post-weld heat treatment.
                                            made per Maintenance Procedure 7.7.16 which required post-weld
This
                                            treatment.
measure will ensure that processes specified will be qualified
by the supporting PQR.
It should be noted that no welds were
made per Maintenance Procedure 7.7.16 which required post-weld
treatment.
l
l
l
l
                                                                                                          J
J


          . - . _
. - . _
  ,_                lU.S.fNuc1 car Regulatory Commission
lU.S.fNuc1 car Regulatory Commission
      -
,_
        "
, ;M:y 26, 1989
                  , ;M:y 26, 1989
-
                      ,Page 3
"
  .,
,Page 3
                    .3.   ' Item c:' An audit of the . responsible NDE technician's work has been
.,
                                      inftiated by the NDE contractor'e Quality Assurance Department.
.3.
                                      The results of this audit will indicate if other of the NDE
' Item c:'
                                      technician's inspection practices are in error and require.
An audit of the . responsible NDE technician's work has been
                                      further review.     If other substantial deviations are noted in
inftiated by the NDE contractor'e Quality Assurance Department.
                                      the. technician's practices, the- authorization. for the
The results of this audit will indicate if other of the NDE
                                      technician to continue to perform NDE at CNS will be revoked.
technician's inspection practices are in error and require.
                                      A review of the velder qualification records has been performed-
further review.
                                      and welders who have been qualified by the erroneous method
If other substantial deviations are noted in
                                      indicated in violation item "c" have been identified; their
the. technician's practices,
                                      authorization to perform the affected welds has been revoked.
the- authorization. for the
                                      This measure precludes further production-of the affected welds
technician to continue to perform NDE at CNS will be revoked.
                                      - by personnel whose qualifications are in question.                     The
A review of the velder qualification records has been performed-
                                      appropriate shop supervisors have been directed to identify
and welders who have been qualified by the erroneous method
                                      affected production welds, if any, wh'ch were made by those
indicated in violation item "c" have been identified; their
                                      personnel whose qualifications are in question.               Either the
authorization to perform the affected welds has been revoked.
                                      appropriate welders will be re-qualified, or NDE will be
This measure precludes further production-of the affected welds
                                      performed for affected welds to verify weld acceptability, if
- by personnel whose qualifications are in question.
                                      practical.     If welders are not available for re-qualification
The
                                      or if NDE is not possible, the welds will be removed and
appropriate shop supervisors have been directed to identify
                                      performed by qualified personnel. Those actions listed herein
affected production welds, if any, wh'ch were made by those
                                      which have not yet been completed will be completed prior to
personnel whose qualifications are in question.
                                      startup from the 1989 Outage.
Either the
                      4.   Item d:   Maintenance personnel who are responsible for issuing
appropriate welders will be re-qualified, or NDE will be
                                      electrodes for field use have been instructed to check and log
performed for affected welds to verify weld acceptability, if
                                      the holding oven temperature daily. This measure, combined
practical.
                                      with the increased Q.C. effort in the welding area, will ensure
If welders are not available for re-qualification
                                      compliance with Maintenance Procedure 7.7.3.2.               Maintenance
or if NDE is not possible, the welds will be removed and
                                      Procedure 7.7.3.2 will be changed to reflect these instructions
performed by qualified personnel. Those actions listed herein
                                      prior to startup from the 1989 Outage.
which have not yet been completed will be completed prior to
                      5.   Item e:   A change to Maintenance Procedure 7.7.3.2 has been implemented
startup from the 1989 Outage.
                                      to increase' the holding oven temperature range to 255'F to
4.
                                      295'F.   This measure, combined with actions taken in response
Item d:
                                      to violation item "d" and recently implemented Q.C. checks,
Maintenance personnel who are responsible for issuing
                                      will ensure procedural compliance to AWS DI.1-85 and to
electrodes for field use have been instructed to check and log
                                      manufacturer's recommendations.
the holding oven temperature daily.
                      CORRECTIVE STEPS WHICH WILL BE TAKEN TO AVOID FURTHER VIOLATIONS
This measure, combined
                      1.   A Nonconformance Report (NCR) has been initiated for the mispositioned
with the increased Q.C. effort in the welding area, will ensure
                            penetrameters as described in violation item     "c".   This action provides
compliance with Maintenance Procedure 7.7.3.2.
l                           the means for CNS to document the root cause for this deviation and to
Maintenance
                            document and track those corrective actions which will be taken to
Procedure 7.7.3.2 will be changed to reflect these instructions
                            preclude recurrence. Root cause determination and resolution of field
prior to startup from the 1989 Outage.
                            welds (if any) will be completed prior to startup from the 1989 Outage.
5.
                            Long term corrective actions which are identified as a result of the
Item e:
                            evaluation will be implemented by October, 1989.
A change to Maintenance Procedure 7.7.3.2 has been implemented
to increase' the holding oven temperature range to 255'F to
295'F.
This measure, combined with actions taken in response
to violation item "d" and recently implemented Q.C. checks,
will ensure procedural compliance to AWS DI.1-85 and to
manufacturer's recommendations.
CORRECTIVE STEPS WHICH WILL BE TAKEN TO AVOID FURTHER VIOLATIONS
1.
A Nonconformance Report (NCR) has been initiated for the mispositioned
penetrameters as described in violation item "c".
This action provides
l
the means for CNS to document the root cause for this deviation and to
document and track those corrective actions which will be taken to
preclude recurrence.
Root cause determination and resolution of field
welds (if any) will be completed prior to startup from the 1989 Outage.
Long term corrective actions which are identified as a result of the
evaluation will be implemented by October, 1989.
l
l
l
l
                                                              _                   _       _ _ _ _ _     _ _ _
_
_
_ _ _ _ _
_ _ _


                                                                                                                                  --             _ .
--
                                                                                                                                                      _ - _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ - - _ _ . _ _ _ - _ _ _ _ - _ _
_ .
                                        u
_ - _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ - - _ _ . _ _ _ - _ _ _ _ - _ _
      g _. . U.S.sNuclear.Ragulatory Commission
u
                            y,f,..iMzy 26, 1989
g _. . U.S.sNuclear.Ragulatory Commission
                                          .Page 4
y,f,..iMzy 26, 1989
  .,''
.Page 4
                                          2.   . Contract welding engineering services have been obtained from a qualified.
. , ' '
                                                . vendor to review the CNS welding program to verify procedural' adequacy,
2.
                                                : code compliance, and. field implementation.                                                                             In addition, the contractor
. Contract welding engineering services have been obtained from a qualified.
                                                will provide welding program enhancements which will facilitate better
. vendor to review the CNS welding program to verify procedural' adequacy,
                                                  control over the welding program by CNS personnel responsible for welding
: code compliance, and. field implementation.
                                                program overview. .. The scheduled completion date for this action is
In addition, the contractor
                                                  October, 1989.
will provide welding program enhancements which will facilitate better
                                          3.     In concert with the' contracted k'elding Engineer's review, recommended-
control over the welding program by CNS personnel responsible for welding
                                                welding procedure additions, deletions, and changes will be implemented.
program overview. .. The scheduled completion date for this action is
                                                  The scheduled completion date for this action is October, 1989.
October, 1989.
                                          DATE LTEN FULL COMPLIANCE WILL' BE ACHIEVED
3.
                                          The corrective steps noted will be implemented on the dates specified herein,
In concert with the' contracted k'elding Engineer's review, recommended-
                                          with full compliance achieved by October, 1989.
welding procedure additions, deletions, and changes will be implemented.
                                          If you have any questions regarding this response, please contact G. R. Horn
The scheduled completion date for this action is October, 1989.
                                          at the site or me.
DATE LTEN FULL COMPLIANCE WILL' BE ACHIEVED
                                          Sincerely,
The corrective steps noted will be implemented on the dates specified herein,
                                                                                    b
with full compliance achieved by October, 1989.
                                          G. A. Trevors
If you have any questions regarding this response, please contact G. R. Horn
                                          Division Manager of
at the site or me.
                                          Nuclear Support
Sincerely,
                                          GAT:sa
b
                                          cc:       . Nuclear Regulatory Commission
G. A. Trevors
                                                  Region IV
Division Manager of
                                                  Arlington, Texas
Nuclear Support
                                                  NRC Resident Inspector
GAT:sa
                                                  Cooper Nuclear Station
cc:
. Nuclear Regulatory Commission
Region IV
Arlington, Texas
NRC Resident Inspector
Cooper Nuclear Station
1
1
  - _ _ - _ _ - _ - _ _ _ _ _ _ _ _ _ _                   _ _ _ _ _ _ _ _ - _ - _ _ . _ _ _ _ _ . _ . _ _ - _ _ _ _ - - - - _ _ _ _ _ - - _ - _ _                                               -__---______-__--__--_-___----_-_--_-_b
- _ _ - _ _ - _ - _ _ _ _ _ _ _ _ _ _
_ _ _ _ _ _ _ _ - _ - _ _ .
_ _ _ _ _ . _ . _ _ - _ _ _ _ - - - - _ _ _ _ _ - - _ - _ _
-__---______-__--__--_-___----_-_--_-_b
}}
}}

Latest revision as of 03:44, 2 December 2024

Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-298/89-15
ML20244E355
Person / Time
Site: Cooper Entergy icon.png
Issue date: 06/14/1989
From: Mihoan J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Trevors G
NEBRASKA PUBLIC POWER DISTRICT
References
NUDOCS 8906200287
Download: ML20244E355 (2)


See also: IR 05000298/1989015

Text

_ _ _ _ _ _ _ _ _

l " :.,h _ _

Q'

%;

,.

.W 'f[ '

gg

,

H'

In' Reply-Refer To:'

Docket:~.50-298/89-15

'

,

"

a

'

Nebraska Public Power. District-

<

' ATTN: -George A.-Trevors

.

i

-

Division Manager

Nuclear' Support

P.O. Box.499.

--,.

.

,

. Columbus, Nebraska 68602-0499

Gentlemen:'

Thank you for.your letter of May 26, 1989, in response to our letter and

Notice of Violation' dated May 1, 1989.. We have reviewed your reply and find.

,

it. responsive to the concerns raised in our Notice of Violation. We will'

review the in:plementation of your corrective actions during a future

. inspection to! determine that full compliance has been achieved and will be

maintained.

,

'

Sincere

l

&[&

.

James L. Milhoan, Director

"

Division of Reactor Projects

cC;

' Cooper Nuclear Station

.

-

1

' ATTN: Guy. Horn, Division Manager

of Nuclear Operations

.,

P.0; Box 98

~Brownville, Nebraska 68321

Kansas Radiation Control Program Director

Nebraska Radiation Control Program Director

RIV:RI:MQPS*

C:MQPS *

D:DRS*

D:D .

LGilbert/cjg

IBarnes

LJCallan

JLMilhoan

'

/ /89

/ /89

/ /89

g//1/89

  • previously concurred

ff0I

e i

hh

,

_

_-

_ -

_- --

_

_ _-

_-_ -

_ __

_-

_-

,

.

._

._

- _ - - _ - _ - _ _ - - _ -

w

a:

' a

t :;,

. p.

v

,

I IJ

t.

. ' t.gi '.

9 / 'i

  1. * '

4

m;g;:i . -

,

. ,

-

>

.

.;

>

,

.

.

,

-'

'

'

ng

'

. . -

,

, , , -

_

,

.

,

}l g )< '

"

'

'

,

- l Nebraska Public Power District 1

-2-

a

W1

'

'

'

.

!

-

,

.

,

'

t

.

,

y;

-

,

  • f

. . tcctoDMB(IE01):

~'

.4

m

,

,

-

t

x

. . ,

^ "

bec!distrib. by RIV -

- ^

'

e

-

'

,-

RRI. . r

.?.

.

R..D. Martin, RA.

'

'

.

)

SectionChief(DRP/C).-

Lisa Shea, RM/ALF

'

'

'RPB-DRSSi

MIS System

,

,

Project Engineer (DRP/C)*

RIV: File

.

,'

' DRP

',

.

"

'RSTS Operator.

. .

13-D-18)

<

P. O'Connor, NRR Project Manager (MS:

"i

g.

.

.' DRS -

-

+ -

m,

,

,'

L. Gilbert'

'

-

- 1. Barnes-

;-

o f'4

!t

'

,-1

' $

Y. .

'

%,/

t

[':

9

4

I

i

'- "

,

.

,.

(-

i

t

l*'

g

+ k;

g'..

4

e

,

.q -

,

.

_

_________.__.___._______m

_

_ _ _ . _ _ _

M'

e

,

""

COOPER NUCLEAR ST ATioN

Nebraska Public Power District

" * * "A*c"AWs L*L^Y^ "'"

.

CNSS897271

.

May 26, 1989

JUM - E

' '

.

U.S. Nuclear Regulatory Commission

Attention: Document Control Desk

Washington, DC 20555

Subject: NPPD Response to Notice of Violation - NRC Inspection Report No. 89-15

Gentlemen:

This letter is written in response to your letter dated May 1,

1989,

transmitting Inspection Report 50-298/89-15.

Thereir. you indicated that

certain of our activities were in violation of NRC requirements.

Following is a statement of the violations and our response in accordance with

10CFR2.201.

STATEMENT OF VIOLATION

Criterion IX of 10CFR Part 50 Appendix B specifies that measures shall be

established to assure that welding is controlled and accomplished by qualified

personnel using qualified procedures in accordance with applicable codes and

other special requirements.

Contrary to the abova:

a.

Maintenance Procedure 7.7.15 does not control the hear input within

the limits qualified as required by ASME Section IX, 1983 Edition,

for welding materials requiring impact properties.

b.

The post-weld heat treatment specified in Maintenance Prncedure 7.7.16

was not qualified by the supporting Procedures Qualification Report

(PQR) as required by ASME Section IX,

c.

Radiographic examination reports, 173-98061-2 and 173-98061-5, for

double wall radiography of two welder performance qualification

tests recorded that the penetrameters were placed source-side inside

the pipe although the radiographic procedure specified placement of

the penetrameters source-side and outside the pipe.

d.

Holding ovens containing E7018 electrodee were outside the

temperature range specified in Maintenance Procedure 7.7.3.2, and

the temperature was not being checked daily as required by the

procedure.

Qz %,m ,i /_ (7

J '8

/

\\

wr

u

i

_Ndi

l

i

L

.PowerfulPride in Nebraska-

.

.

w

ww

a

,. w .

._

. = = + = - - .

= = _

.-

_ = = _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ ~ _ _ _ _ _ = _ _ _ _ _ . _

_ _ = _ . _ _ _ _ . ~ _ _ . _ _ _ . = _ _ = _ _ _ _ _ = _ _ . _ _

_ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ .

_ _ _ _ . _ _ _ _ _ _ _ _ _ .

_______._____._______J

_ _ _ _ _ _ _ _ _ .

i

jU.S.-Nuc1 car Regulatory Commission-

3 ._'

',May 26, 1989

P.nge 2+

-

l

.

I'

e.

The temperature range of 150-200*F, specified In Maintenance

l

Procedure 7.7.3.2 for electrode holding ovens does not comply with

l

AWS Dl.1-85, which states that E7018 electrodes shall be heated to

at least 250'F.

.

REASON TOR THE VIOLATION

l

l'

The reason for violation items "a"

and "b" was inadequate review of new

L

procedures for compliance to applicable codes.

As such, Maintenance

l~

Procedure 7.7.15 and 7.7.16 were net in compliance with ASME Section IX as

indicated in violation items "a" and "b".

The reason for violation item "c"

was originally believed to be a

typographical error in the NDE contractor's reports.

However, it was later

,

l

found that due to an error on the part of the contract NDE technician, actual

misplacement of the penetrameters had occurred with respect to the

l-

requirements specified in the applicable revision of the contractor's

!

procedure. This error was not subsequently detected by Cooper Nuclear Station

(CNS) personnel.

The reason for violation item "d" was inadequate review of new procedures for

impact upon existing practices.

As such, personnel responsible for field

implementation of new welding procedures were not fully aware of required

changes.

The reason for violation item "e" was failure to identify the constraints of

the more limiting code.

In lieu of AWS DI.1, CNS had conformed to ASME

Section II and previous manufacturers' recommendations for electrode storage

temperature. The temperature range specified in Maintenance Procedure 7.7.3.2

adequately meets the recommendations of ASME Section II; however, the

requirements of AWS DI.1 are more limiting than the recommendations of ASME

Section II.

Nebraska Public Power Dictrict admits to the violation as stated.

CORRECTIVE STEPS WICH HAVE BEEN TAKEN AND THE RESULTS ACHIEVED

l

1.

Item a:

Procedural controls were implemented to restrict welding which

i

requires notch toughness qualification until existing

'

procedures are revised to include the necessary controls for

heat input.

It should be noted that no welds were made per

Maintenance Procedure 7.7.15 to materials which require impact

testing.

2.

Item b:

A change to Maintenance Procedure 7.7.16 has been implemented

to remove the non-qualified post-weld heat treatment.

This

measure will ensure that processes specified will be qualified

by the supporting PQR.

It should be noted that no welds were

made per Maintenance Procedure 7.7.16 which required post-weld

treatment.

l

l

J

. - . _

lU.S.fNuc1 car Regulatory Commission

,_

, ;M:y 26, 1989

-

"

,Page 3

.,

.3.

' Item c:'

An audit of the . responsible NDE technician's work has been

inftiated by the NDE contractor'e Quality Assurance Department.

The results of this audit will indicate if other of the NDE

technician's inspection practices are in error and require.

further review.

If other substantial deviations are noted in

the. technician's practices,

the- authorization. for the

technician to continue to perform NDE at CNS will be revoked.

A review of the velder qualification records has been performed-

and welders who have been qualified by the erroneous method

indicated in violation item "c" have been identified; their

authorization to perform the affected welds has been revoked.

This measure precludes further production-of the affected welds

- by personnel whose qualifications are in question.

The

appropriate shop supervisors have been directed to identify

affected production welds, if any, wh'ch were made by those

personnel whose qualifications are in question.

Either the

appropriate welders will be re-qualified, or NDE will be

performed for affected welds to verify weld acceptability, if

practical.

If welders are not available for re-qualification

or if NDE is not possible, the welds will be removed and

performed by qualified personnel. Those actions listed herein

which have not yet been completed will be completed prior to

startup from the 1989 Outage.

4.

Item d:

Maintenance personnel who are responsible for issuing

electrodes for field use have been instructed to check and log

the holding oven temperature daily.

This measure, combined

with the increased Q.C. effort in the welding area, will ensure

compliance with Maintenance Procedure 7.7.3.2.

Maintenance

Procedure 7.7.3.2 will be changed to reflect these instructions

prior to startup from the 1989 Outage.

5.

Item e:

A change to Maintenance Procedure 7.7.3.2 has been implemented

to increase' the holding oven temperature range to 255'F to

295'F.

This measure, combined with actions taken in response

to violation item "d" and recently implemented Q.C. checks,

will ensure procedural compliance to AWS DI.1-85 and to

manufacturer's recommendations.

CORRECTIVE STEPS WHICH WILL BE TAKEN TO AVOID FURTHER VIOLATIONS

1.

A Nonconformance Report (NCR) has been initiated for the mispositioned

penetrameters as described in violation item "c".

This action provides

l

the means for CNS to document the root cause for this deviation and to

document and track those corrective actions which will be taken to

preclude recurrence.

Root cause determination and resolution of field

welds (if any) will be completed prior to startup from the 1989 Outage.

Long term corrective actions which are identified as a result of the

evaluation will be implemented by October, 1989.

l

l

_

_

_ _ _ _ _

_ _ _

--

_ .

_ - _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ - - _ _ . _ _ _ - _ _ _ _ - _ _

u

g _. . U.S.sNuclear.Ragulatory Commission

y,f,..iMzy 26, 1989

.Page 4

. , ' '

2.

. Contract welding engineering services have been obtained from a qualified.

. vendor to review the CNS welding program to verify procedural' adequacy,

code compliance, and. field implementation.

In addition, the contractor

will provide welding program enhancements which will facilitate better

control over the welding program by CNS personnel responsible for welding

program overview. .. The scheduled completion date for this action is

October, 1989.

3.

In concert with the' contracted k'elding Engineer's review, recommended-

welding procedure additions, deletions, and changes will be implemented.

The scheduled completion date for this action is October, 1989.

DATE LTEN FULL COMPLIANCE WILL' BE ACHIEVED

The corrective steps noted will be implemented on the dates specified herein,

with full compliance achieved by October, 1989.

If you have any questions regarding this response, please contact G. R. Horn

at the site or me.

Sincerely,

b

G. A. Trevors

Division Manager of

Nuclear Support

GAT:sa

cc:

. Nuclear Regulatory Commission

Region IV

Arlington, Texas

NRC Resident Inspector

Cooper Nuclear Station

1