ML20245C150: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:__. | {{#Wiki_filter:__. | ||
3,> | 3,> | ||
e MAR 3 01989 | |||
~ | |||
The Patriot Led'ger o ' | The Patriot Led'ger o ' | ||
ATTN: Ms. Donna MacLearn Editor 13-19 Temple Street | ATTN: Ms. Donna MacLearn Editor 13-19 Temple Street Quincy, Massachusetts 02169 | ||
==Dear Ms. MacLearn:== | ==Dear Ms. MacLearn:== | ||
'I noted your: article dated March 15, 1989, regarding claims of a. Itpse 'in' NRC inspection coverage at the Pilgrim Nuclear Power Station. | |||
Enclosed foriyour-information 'are copies of recent NRC Pilgriin Biweekly Status reports. "These widely distributed, publicly 'available, reports give ;some information regarding. our inspection program and indicate what periods of; time twe chose to provide-24-hour: inspection coverage. | |||
Enclosed foriyour- information 'are copies of recent NRC Pilgriin Biweekly Status reports. "These widely distributed, publicly 'available, reports give ;some information regarding. our inspection program and indicate what periods of; time twe chose to provide-24-hour: inspection coverage. | NRC has tan extraordinary. inspection program,in place at Pilgrim, in order to-s closely monitor and' evaluate -the ' facility's ' performance ' during' return to full | ||
NRC has tan extraordinary. inspection program ,in place at Pilgrim, in order to-s closely monitor and' evaluate -the ' facility's ' performance ' during' return to full | . power: operation. Since the NRC Commissioners' decision in December to endorse the NRC. staff recommendation to allow restart and power ascension to proceed, NRC has-devoted over 3,000 person-hours of direct inspection to Pilgrim. | ||
' For:your information,.I have' written Mrs. Fleming to! inform her,.as others have-verbally,lthat she is mistaken in her contention that there were no inspectors onsite the evening'of. March 4, 1989. | |||
Sincerely, Original Spd W A. Randy EDM A. Randy Blough, Chief Reactor Projects Section No. 3B Division of Reactor Projects | |||
Sincerely, | |||
Original Spd W A. Randy EDM A. Randy Blough, Chief Reactor Projects Section No. 3B Division of Reactor Projects | |||
==Enclosures:== | ==Enclosures:== | ||
As stated cc w/encls: | As stated cc w/encls: | ||
Ms. Jane Fleming Public Document Room-(PDR) | Ms. Jane Fleming Public Document Room-(PDR) | ||
Loca1'Public Document Room (LPDR) 0FFICIAL RECORD COPY BLOUGH 481 3/29/89 - 0001.0.0 03/30/89 | Loca1'Public Document Room (LPDR) 0FFICIAL RECORD COPY BLOUGH 481 3/29/89 - 0001.0.0 03/30/89 i0 18904270029ls9033o | ||
.{DR'ADOCK 05000293 | |||
PDC | . }4G PDC | ||
y The Patriot Ledger | y The Patriot Ledger 2 | ||
Restart Panel Members' T. Gwynn, OCM/LZ T. Elsasser, OCM/KC M. Callahan, GPA/CA' K. Abraham, PA0 - RI RI:DRP | bec w/encls: | ||
Restart Panel Members' T. Gwynn, OCM/LZ T. Elsasser, OCM/KC M. Callahan, GPA/CA' K. Abraham, PA0 - RI RI:DRP RI:DRP RBlough/mjd 4 Wiggins 3/ 0/89 3[{/89 3 | |||
0FFICIAL RECORD COPY BLOUGH 481 3/29/89 - 0002.0.0 03/29/89 | |||
_. _}} | |||
Latest revision as of 03:14, 2 December 2024
| ML20245C150 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 03/30/1989 |
| From: | Blough A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Maclearn D PATRIOT LEDGER, QUINCY, MA |
| References | |
| NUDOCS 8904270029 | |
| Download: ML20245C150 (2) | |
Text
__.
3,>
e MAR 3 01989
~
The Patriot Led'ger o '
ATTN: Ms. Donna MacLearn Editor 13-19 Temple Street Quincy, Massachusetts 02169
Dear Ms. MacLearn:
'I noted your: article dated March 15, 1989, regarding claims of a. Itpse 'in' NRC inspection coverage at the Pilgrim Nuclear Power Station.
Enclosed foriyour-information 'are copies of recent NRC Pilgriin Biweekly Status reports. "These widely distributed, publicly 'available, reports give ;some information regarding. our inspection program and indicate what periods of; time twe chose to provide-24-hour: inspection coverage.
NRC has tan extraordinary. inspection program,in place at Pilgrim, in order to-s closely monitor and' evaluate -the ' facility's ' performance ' during' return to full
. power: operation. Since the NRC Commissioners' decision in December to endorse the NRC. staff recommendation to allow restart and power ascension to proceed, NRC has-devoted over 3,000 person-hours of direct inspection to Pilgrim.
' For:your information,.I have' written Mrs. Fleming to! inform her,.as others have-verbally,lthat she is mistaken in her contention that there were no inspectors onsite the evening'of. March 4, 1989.
Sincerely, Original Spd W A. Randy EDM A. Randy Blough, Chief Reactor Projects Section No. 3B Division of Reactor Projects
Enclosures:
As stated cc w/encls:
Ms. Jane Fleming Public Document Room-(PDR)
Loca1'Public Document Room (LPDR) 0FFICIAL RECORD COPY BLOUGH 481 3/29/89 - 0001.0.0 03/30/89 i0 18904270029ls9033o
.{DR'ADOCK 05000293
. }4G PDC
y The Patriot Ledger 2
bec w/encls:
Restart Panel Members' T. Gwynn, OCM/LZ T. Elsasser, OCM/KC M. Callahan, GPA/CA' K. Abraham, PA0 - RI RI:DRP RI:DRP RBlough/mjd 4 Wiggins 3/ 0/89 3[{/89 3
0FFICIAL RECORD COPY BLOUGH 481 3/29/89 - 0002.0.0 03/29/89
_. _