ML20246M404: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:.                                                          -        - - - _ - _                                    .
{{#Wiki_filter:.
4
4
_: '        ,~.tl
,~.tl o.
                    . . . o.
N '
N '
4 M
4 M
                                                                                  .                                                        Log: # TXX-89648 O                                             File # 10035-r         =                                                       10305 Ref.. # 10CFR55 M# ELECTRIC.
Log: # TXX-89648 O
File # 10035-r
=
10305 Ref.. # 10CFR55 M# ELECTRIC.
September.-1, 1989 Executive Vice President
September.-1, 1989 Executive Vice President
                                  'Mr.LKenneth E. Perkins Chief, . Operator Licensing Branch U. S. Nuclear Regulatory Commission
'Mr.LKenneth E. Perkins Chief,. Operator Licensing Branch U. S. Nuclear Regulatory Commission
-                            'OWFN-10D r Washington, D. C. 20555
'OWFN-10D -
Washington, D. C.
20555 r


==SUBJECT:==
==SUBJECT:==
COMANCHE PEIK STEAM ELECTRIC STATION (CPSES)
COMANCHE PEIK STEAM ELECTRIC STATION (CPSES)
DOCKET NO. 50-445
DOCKET NO. 50-445 RESPONSE TO GENERIC LETTER 89-12 4
        .                                              RESPONSE TO GENERIC LETTER 89-12 4
OPERATOR LICENSING EXAMINATION SCHEDULE
OPERATOR LICENSING EXAMINATION SCHEDULE


==Dear Mr. Perkins:==
==Dear Mr. Perkins:==
 
Enclosed-are our. proposed schedules for Operator Licensing Examinations and 7
7                          Enclosed- are our. proposed schedules for Operator Licensing Examinations and Requalification Examinations. These proposed' schedules provide the requested information regarding anticipated dates for the examinations and the number of.
Requalification Examinations. These proposed' schedules provide the requested information regarding anticipated dates for the examinations and the number of.
personnel expected to take an examination on that date.
personnel expected to take an examination on that date.
Very truly yours.
Very truly yours.
Y.7, Y                   pf' W. J. Cahill, Jr.
Y.7, Y pf' W. J. Cahill, Jr.
By:     Mi                                 a Roger"D. Walker" Manager, Nuclear Licensing GLB/smp Enclosures (2) c - Mr. R. D.~ Martin, Region IV Mr. J. L. Pellet. Region IV Mr. J. H. iillson, NRR-OSP Resident       g ectotz . CPSES (3) (clo)
By:
      . r
Mi a
    '4
Roger"D. Walker" Manager, Nuclear Licensing GLB/smp Enclosures (2) c - Mr. R.
                            .V 400Nonh Olive Street LB 81 Dallas, Texas 75201 fY L___                     -
D.~ Martin, Region IV Mr. J. L. Pellet. Region IV Mr. J. H. iillson, NRR-OSP Resident g ectotz CPSES (3) (clo)
. r
'4
.V fY 400Nonh Olive Street LB 81 Dallas, Texas 75201 L___


t
t p
                *  - ~
,i.
p      ,i.                                                                                                    . Enclosure 1 9
- ~
PROPOSED OPERATOR LICt.NSING EXAMINATION SCHEDULE FDPMAT Facility : CPSES                                   NRC Region IV FY 1990
. Enclosure 1 9
                                                  'FY 1991           FY 1992                                                                           FY 1993 (10/1/89-9/30/90)(10/1/90-9/30/91)(10/1/91-9/30/92)(10/1/92-9/30/93)
PROPOSED OPERATOR LICt.NSING EXAMINATION SCHEDULE FDPMAT Facility : CPSES NRC Region IV FY 1990
            -1. ' Assigned Date (GL89-03)         NOVEMBER         NOVEMBER         NOVEMBER                                                                     NOVEMBER     -
'FY 1991 FY 1992 FY 1993 (10/1/89-9/30/90)(10/1/90-9/30/91)(10/1/91-9/30/92)(10/1/92-9/30/93)
                #RO                     O               8                                                                                           4
-1.
                #SRO Instant           'O               2                 2                                                                             2
' Assigned Date (GL89-03)
                #SRO Upgrade           0               6                 2                                                                             2 iSRO Limited           0               0                 0                                                                             0
NOVEMBER NOVEMBER NOVEMBER NOVEMBER
: 2. Assigned Date     ,
#RO O
(GL'89-03)         JUNE             JUNE               JUNE                                                                         JUNE
8 4
                  #RO                   O               6                 6                                                                             6 iSR0 Instant -       0               0                 0                                                                             0
#SRO Instant
                #SRO Upgrade           6               2                 2                                                                             2
'O 2
                #SRO Limited           0               0                 0                                                                             0
2 2
        'Please indicate initial cold license examinations by placing an asterisk (*) by the date. Please indicate examinations intended to extend an operator's license to a second or subsequent unit with two asterisks (**). (for example, if Unit 1 is in operation and Unit 2 is approaching fuel load, and three RO' candidates with'no prev 1ous license are to be examined on both Units 1 and 2, and five RO candidates licensed on Unit I are~to be examined to extend their licenses toUnit2,thenindicate"R03,5**.")
#SRO Upgrade 0
6 2
2 iSRO Limited 0
0 0
0 2.
Assigned Date (GL'89-03)
JUNE JUNE JUNE JUNE
#RO O
6 6
6 iSR0 Instant -
0 0
0 0
#SRO Upgrade 6
2 2
2
#SRO Limited 0
0 0
0
'Please indicate initial cold license examinations by placing an asterisk (*) by the date.
Please indicate examinations intended to extend an operator's license to a second or subsequent unit with two asterisks (**).
(for example, if Unit 1 is in operation and Unit 2 is approaching fuel load, and three RO' candidates with'no prev 1ous license are to be examined on both Units 1 and 2, and five RO candidates licensed on Unit I are~to be examined to extend their licenses toUnit2,thenindicate"R03,5**.")
8
8


l' Esclosure 2 PROPOSED ItEWALIFICAT10ll SCHEDULE FORitAT FACILITY:CPSES                                                           NRC RE610N IV Planned Simulation Facillty Ceritfication/ Approval Date: 7/31/90 FY 1990                   FY 1991               FY 1992                 FY 1993 (10/1/89-9/30/90)         (10/1/90-9/30/91)       (10/1/91-9/30/92)       (10/1/92-9/30/93)
l' Esclosure 2 PROPOSED ItEWALIFICAT10ll SCHEDULE FORitAT FACILITY:CPSES NRC RE610N IV Planned Simulation Facillty Ceritfication/ Approval Date: 7/31/90 FY 1990 FY 1991 FY 1992 FY 1993 (10/1/89-9/30/90)
WEEK 1                   6/4/90                   5/20/91               5/18/92                 5/28193 WEEK 2                 6/11/90                   5/27/91               5/25/92                 5/31/93 WEEK 3                 6/18/90                   6/3/91                 6/1/92                 6/7/93 WEEK 4                 6/25/90                   6/10/91                 6/8/92                 6/14/93 MEK 5                   7/2/90                   6/17/91               6/15/92                 6/21/93 WEEK 6                   7/9/90                   6/24/91               6/22/92                 6/28/93
(10/1/90-9/30/91)
_.      .____--__-_______-___m}}
(10/1/91-9/30/92)
(10/1/92-9/30/93)
WEEK 1 6/4/90 5/20/91 5/18/92 5/28193 WEEK 2 6/11/90 5/27/91 5/25/92 5/31/93 WEEK 3 6/18/90 6/3/91 6/1/92 6/7/93 WEEK 4 6/25/90 6/10/91 6/8/92 6/14/93 MEK 5 7/2/90 6/17/91 6/15/92 6/21/93 WEEK 6 7/9/90 6/24/91 6/22/92 6/28/93
.____--__-_______-___m}}

Latest revision as of 22:22, 1 December 2024

Forwards Proposed Schedules for Operator Licensing Exams & Requalification Exams in Response to Generic Ltr 89-12
ML20246M404
Person / Time
Site: Comanche Peak Luminant icon.png
Issue date: 09/01/1989
From: William Cahill
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Perkins K
NRC
References
GL-89-12, TXX-89648, NUDOCS 8909070152
Download: ML20246M404 (3)


Text

.

4

,~.tl o.

N '

4 M

Log: # TXX-89648 O

File # 10035-r

=

10305 Ref.. # 10CFR55 M# ELECTRIC.

September.-1, 1989 Executive Vice President

'Mr.LKenneth E. Perkins Chief,. Operator Licensing Branch U. S. Nuclear Regulatory Commission

'OWFN-10D -

Washington, D. C.

20555 r

SUBJECT:

COMANCHE PEIK STEAM ELECTRIC STATION (CPSES)

DOCKET NO. 50-445 RESPONSE TO GENERIC LETTER 89-12 4

OPERATOR LICENSING EXAMINATION SCHEDULE

Dear Mr. Perkins:

Enclosed-are our. proposed schedules for Operator Licensing Examinations and 7

Requalification Examinations. These proposed' schedules provide the requested information regarding anticipated dates for the examinations and the number of.

personnel expected to take an examination on that date.

Very truly yours.

Y.7, Y pf' W. J. Cahill, Jr.

By:

Mi a

Roger"D. Walker" Manager, Nuclear Licensing GLB/smp Enclosures (2) c - Mr. R.

D.~ Martin, Region IV Mr. J. L. Pellet. Region IV Mr. J. H. iillson, NRR-OSP Resident g ectotz CPSES (3) (clo)

. r

'4

.V fY 400Nonh Olive Street LB 81 Dallas, Texas 75201 L___

t p

,i.

- ~

. Enclosure 1 9

PROPOSED OPERATOR LICt.NSING EXAMINATION SCHEDULE FDPMAT Facility : CPSES NRC Region IV FY 1990

'FY 1991 FY 1992 FY 1993 (10/1/89-9/30/90)(10/1/90-9/30/91)(10/1/91-9/30/92)(10/1/92-9/30/93)

-1.

' Assigned Date (GL89-03)

NOVEMBER NOVEMBER NOVEMBER NOVEMBER

  1. RO O

8 4

  1. SRO Instant

'O 2

2 2

  1. SRO Upgrade 0

6 2

2 iSRO Limited 0

0 0

0 2.

Assigned Date (GL'89-03)

JUNE JUNE JUNE JUNE

  1. RO O

6 6

6 iSR0 Instant -

0 0

0 0

  1. SRO Upgrade 6

2 2

2

  1. SRO Limited 0

0 0

0

'Please indicate initial cold license examinations by placing an asterisk (*) by the date.

Please indicate examinations intended to extend an operator's license to a second or subsequent unit with two asterisks (**).

(for example, if Unit 1 is in operation and Unit 2 is approaching fuel load, and three RO' candidates with'no prev 1ous license are to be examined on both Units 1 and 2, and five RO candidates licensed on Unit I are~to be examined to extend their licenses toUnit2,thenindicate"R03,5**.")

8

l' Esclosure 2 PROPOSED ItEWALIFICAT10ll SCHEDULE FORitAT FACILITY:CPSES NRC RE610N IV Planned Simulation Facillty Ceritfication/ Approval Date: 7/31/90 FY 1990 FY 1991 FY 1992 FY 1993 (10/1/89-9/30/90)

(10/1/90-9/30/91)

(10/1/91-9/30/92)

(10/1/92-9/30/93)

WEEK 1 6/4/90 5/20/91 5/18/92 5/28193 WEEK 2 6/11/90 5/27/91 5/25/92 5/31/93 WEEK 3 6/18/90 6/3/91 6/1/92 6/7/93 WEEK 4 6/25/90 6/10/91 6/8/92 6/14/93 MEK 5 7/2/90 6/17/91 6/15/92 6/21/93 WEEK 6 7/9/90 6/24/91 6/22/92 6/28/93