ML20249B689: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:A.
{{#Wiki_filter:A.
s June 16, 1998
June 16, 1998 s
    <              Mr. Chris Demorit 45 Marcy Road Chaplin, CT 06235
Mr. Chris Demorit 45 Marcy Road Chaplin, CT 06235


==Dear Mr. Demorit:==
==Dear Mr. Demorit:==
I am responding to the fatter you sent to Chairman Shirley Ann Jackson of the U.S. Nuclear Regulatory Cornmission (NRC) dated June 1,1998, in which you expressed your concems regarding the restart of Millstone Unit 3.
I am responding to the fatter you sent to Chairman Shirley Ann Jackson of the U.S. Nuclear Regulatory Cornmission (NRC) dated June 1,1998, in which you expressed your concems regarding the restart of Millstone Unit 3.
The Commission has been intensively involved with a number of issues surrounding Millstone for over 2% years which have been articulated in the NRC staff's Millstone Restart Assessment Plan. The issues you have raised in your letter, such as the valve repair, the number of systems reviewed as part of the Independent Corrective Action Verification Program, and the number of deferred items, have each been reviewed by the NRC staff, documented in NRC
The Commission has been intensively involved with a number of issues surrounding Millstone for over 2% years which have been articulated in the NRC staff's Millstone Restart Assessment Plan. The issues you have raised in your letter, such as the valve repair, the number of systems reviewed as part of the Independent Corrective Action Verification Program, and the number of deferred items, have each been reviewed by the NRC staff, documented in NRC
                ' staff reports to the Commission, and discussed with the NRC Commissioners at either the May 1 or June 2,1998, Cc,mmission meetings. Enclosures 1 and 2 provide copies of the two staff reports to the Commission covering these topics. A number of these issues have also been discussed at meetings with the public held in the Waterford, Connecticut, area.
' staff reports to the Commission, and discussed with the NRC Commissioners at either the May 1 or June 2,1998, Cc,mmission meetings. Enclosures 1 and 2 provide copies of the two staff reports to the Commission covering these topics. A number of these issues have also been discussed at meetings with the public held in the Waterford, Connecticut, area.
Regarding schedules, the Commission has consistently indicated that their decisions on restart do not presuppose that any of the three plants will restart by any certain date. A Commission dccision authorizing the restart of any Millstone unit will be made only when the Com'mission is satisfied that the cc.9tions, which led to the extended shutdown, have been addressed to their satisfaction, regardless of the length that process may take. On June 15,1998, the Commission authorized the restart of Millstona Unit 3, subject to satisfactory completion of all remaining issues requiring NRC verification.
Regarding schedules, the Commission has consistently indicated that their decisions on restart do not presuppose that any of the three plants will restart by any certain date. A Commission dccision authorizing the restart of any Millstone unit will be made only when the Com' ission is m
satisfied that the cc.9tions, which led to the extended shutdown, have been addressed to their satisfaction, regardless of the length that process may take. On June 15,1998, the Commission authorized the restart of Millstona Unit 3, subject to satisfactory completion of all remaining issues requiring NRC verification.
I trust the information above is responsive to your concern.
I trust the information above is responsive to your concern.
Sincerely, OriginalSiEEMN William D. Travers, Director Special Projects Office Office of Nuclear Reactol Regulation
Sincerely, OriginalSiEEMN William D. Travers, Director Special Projects Office Office of Nuclear Reactol Regulation


==Enclosures:==
==Enclosures:==
: 1.         SECY-98-090, " Selected issues Related                                                                     1 to Recovery of Millstone Nuclear Power Station                                                               L Unit 3"
1.
: 2.         SECY-98-119, " Remaining Issues Related to                                                                       ;
SECY-98-090, " Selected issues Related 1
Recovery of Millstone Nuclear Power Station, Unit 3" Distribution (see next page)                                                                                         p p\\ _
to Recovery of Millstone Nuclear Power Station L
DOCUMENT NAME: P:Demorit,ltr:                                       M n ,     .      .e w.             me     a e,. w.m c . copy .an.r.n.ca   nu.ncio.u,. v - copy .. .et.cnm.ntioncio.or.   = . u. ecoy 0FFICE         TA/SP0       mn c 'D:SP0 // [                   /
Unit 3" 2.
NAME           RPerch % X -                       WTraveks] J /-
SECY-98-119, " Remaining Issues Related to Recovery of Millstone Nuclear Power Station, Unit 3" p p\\ _
DATE           06/14/98                           06/ h/98     /
Distribution (see next page)
                                                            ~l
\\
                                                                . . OFFICIAL RECORD COPY M     40058             h a                   ?
DOCUMENT NAME: P:Demorit,ltr:
PDR           ADOCK 05000423 H                               PM                     -
M n,
m yoce _
.e w.
C __                     _ _ _        .    - __    _ _ _ _ _                                                  :---_-- __      . __x         . _ _ _ _ _ __  .__
me a e,. w.m c. copy.an.r.n.ca nu.ncio.u,. v - copy...et.cnm.ntioncio.or.
=. u. ecoy 0FFICE TA/SP0 c 'D:SP0 //
[ /
mn NAME RPerch % X -
WTraveks] J /-
DATE 06/14/98 06/ h/98
/
~l
.. OFFICIAL RECORD COPY M 40058 h a
?
PDR ADOCK 05000423 H
PM m yoce _
C __
. __x


s-,
s-,
                      =
ACTWN
  ;.                                                                                                                                                                                                                                  ACTWN l
=
EDO Principal Correspondence Control FROM:                                                                                                     DUE: 06/18/98                                                                                             EDO CONTROL: G980368 DOC DT: 06/01/98 FINAL REPLY:
l EDO Principal Correspondence Control FROM:
Chrio Demor,iti                                                                                                         ,                            ,                                              _,              ,
DUE: 06/18/98 EDO CONTROL: G980368 DOC DT: 06/01/98 FINAL REPLY:
Chnplin, Conn'ecticut TO:
Chrio Demor,iti Chnplin, Conn'ecticut TO:
Chairman Jackcon FOR ST.GNATURE OF :                                                                                                                                                                           ** GRN **                    CRC NO: 98-0524 Collins, NRR DESC:                                                                                                                                                                                                                       ROUTING:
Chairman Jackcon FOR ST.GNATURE OF :
MILLSTONE                                                                                                                                                                                                                   Callan Thadani Thompson Norry Blaha Burns DATE: 06/05/98                                                                                                                                                                                                               Miller, RI ASSIGNED TO:                                                                                                         CONTACT:
** GRN CRC NO: 98-0524 Collins, NRR DESC:
                        .NRR                                                                                                                               Collins                                 _
ROUTING:
SPECIAL INSTRUCTIONS OR REMARKS:
MILLSTONE Callan Thadani Thompson Norry Blaha Burns DATE: 06/05/98 Miller, RI ASSIGNED TO:
NRR ACTION: SPO: Travers                                                                                                                                                                       --
CONTACT:
I NRR RECEIVED: 6/8/98                                                                                                                                                                                                     k                                                      i NRR Routing: C llins/Miraglia                                                                                                                                                                                         9gcTOR3 0FF!CE Sheron Tra vers                                                                                                                                  ,,,,            g6) C                                         ____.___        ,
.NRR Collins SPECIAL INSTRUCTIONS OR REMARKS:
Roe                                                                                                                                       L3) _       _-      -
I NRR ACTION: SPO: Travers k
Zimmerman                                                                                                                                                   - ~ ~ - ~ ~ ^
i NRR RECEIVED: 6/8/98 NRR Routing: C llins/Miraglia 9gcTOR3 0FF!CE Sheron g6)C Tra vers Roe L3) _
Zimmerman
- ~ ~ - ~ ~ ^
NRR Mailroom
NRR Mailroom


OFFICE OF THE SECRETARY CORRESPONDENCE CONTROL TICKET PAPER NUMBER:   CRC-98-0524                     LOGGING DATE: Jun     3 98 ACTION OFFICE:   EDO AUTHOR:           CHRIS DEMORIT AFFILIATION:     CONNECTICUT ADDRESSEE:       CHAIRMAN JACKSON LETTER DATE:     Jun 1 98           FILE CODE: ID&R 5 MILLSTONE
OFFICE OF THE SECRETARY CORRESPONDENCE CONTROL TICKET PAPER NUMBER:
CRC-98-0524 LOGGING DATE: Jun 3 98 ACTION OFFICE:
EDO AUTHOR:
CHRIS DEMORIT AFFILIATION:
CONNECTICUT ADDRESSEE:
CHAIRMAN JACKSON LETTER DATE:
Jun 1 98 FILE CODE: ID&R 5 MILLSTONE


==SUBJECT:==
==SUBJECT:==
MILLSTONE NUL 'AR POWER PLANT ACTION:           Direct Reply DISTRIBUTION:     CHAIRMAN, COMRS. j   43 SPECIAL HANDLING: SECY TO ACK CONSTITUENT:
MILLSTONE NUL 'AR POWER PLANT ACTION:
Direct Reply DISTRIBUTION:
CHAIRMAN, COMRS.
j 43 SPECIAL HANDLING: SECY TO ACK CONSTITUENT:
NOTES:
NOTES:
DATE DUE:         Jun 1h 98 SIGNATURE:         .                              DATE SIGNED:
DATE DUE:
Jun 1h 98 SIGNATURE:
DATE SIGNED:
AFFILIATION:
AFFILIATION:
EDO -- G980365
EDO -- G980365 J
__                J


June 1,                 1998 Dr. Jackson, I beseech you, please do not allow Unit III at Millstone nuclear power station to restart. Whats the rush to restart? Could it be that Northeast Utilities must get this unit online by July'1 to recover their so called stranded costs from Connecticut Bill 5005- the utility restructuring bill?
June 1, 1998 Dr. Jackson, I beseech you, please do not allow Unit III at Millstone nuclear power station to restart.
Whats the rush to restart?
Could it be that Northeast Utilities must get this unit online by July'1 to recover their so called stranded costs from Connecticut Bill 5005-the utility restructuring bill?
One cannot go a few days in Connecticut without hearing some outrageous tale of NU's ineptitude and avaricious behavior.
One cannot go a few days in Connecticut without hearing some outrageous tale of NU's ineptitude and avaricious behavior.
This week the headlines are about how NU lobbyists met 23 times with you and other NRC commissioners 1                                                 Although "no laws were broken" it just proves who has more access to those who make the decisions.
This week the headlines are about how NU lobbyists met 23 times with you and other NRC commissioners 1 Although "no laws were broken" it just proves who has more access to those who make the decisions.
Nonetheless, the week before it was about a leaky. valve at '
Nonetheless, the week before it was about a leaky. valve at '
Unit III. Eventhough you, Dr. Jackson, feel NU handled this much better than a leak in 1993, I do not feel NU handled Unis well at all. How can they have responded well when the equipment needed to isolate the valve was not there? This alone is clear evidence that NU is cutting corners in a rush toirestart. Don't you think so?
Unit III.
I could go on, but I realize the time constraints, as you will be voting on this issue very soon.                                                 But I do have a few questions- why only check 5 out of 88 risk and safety significant systems at Unit III?   (And because the NRC.does not have the funds to check all these systems is not a suitable answer.)
Eventhough you, Dr. Jackson, feel NU handled this much better than a leak in 1993, I do not feel NU handled Unis well at all.
The public safety is at risk!                                                 (The funds could be there if someone with enough authority thought it were important enough.) Also how can almost 7,000 material deficiencies be deferred till after restart? Please respond. And please keep these unsafe and mismanaged plants offline.
How can they have responded well when the equipment needed to isolate the valve was not there?
This alone is clear evidence that NU is cutting corners in a rush toirestart.
Don't you think so?
I could go on, but I realize the time constraints, as you will be voting on this issue very soon.
But I do have a few questions-why only check 5 out of 88 risk and safety significant systems at Unit III?
(And because the NRC.does not have the funds to check all these systems is not a suitable answer.)
The public safety is at risk!
(The funds could be there if someone with enough authority thought it were important enough.)
Also how can almost 7,000 material deficiencies be deferred till after restart?
Please respond.
And please keep these unsafe and mismanaged plants offline.
Thank you for your time, Chris Demorit 45 Marcy Road Chaplin, CT 06235 l
Thank you for your time, Chris Demorit 45 Marcy Road Chaplin, CT 06235 l
g.
g.
                                              ,           4 a         s c                                                                                                                                                             -
4
,a s
c


1     ,
1
  ;6:     . .
;6:
          't ji                   ' Letter to Chris Demorit dated:     June 16, 1998 Distribution: (w/o enclosures)
't ji
                    ~ Docket File (w/originalincoming)
' Letter to Chris Demorit dated:
                      - PUBLIC '
June 16, 1998 Distribution:
(w/o enclosures)
~ Docket File (w/originalincoming)
- PUBLIC '
SPO R/F -
SPO R/F -
EDO G980368 CRC No, .98-0524 EDO R/F NRR Mailroom (w/ copy.of incoming)
EDO G980368 CRC No,.98-0524 EDO R/F NRR Mailroom (w/ copy.of incoming)
* LCallan               AThadani       HThompson . PNorry   'JBlaha SBurns               HMiller, RI   SCollins   FMiraglia BBoger BSheron               JRoe           RZimmerman 9
LCallan AThadani HThompson.
PNorry
'JBlaha SBurns HMiller, RI SCollins FMiraglia BBoger BSheron JRoe RZimmerman 9
30
30
                                                                                            ~
~
                                                                                            .~}}
.~}}

Latest revision as of 14:03, 30 November 2024

Responds to to Chairman Jackson,Expressing Concerns Re Restart of Unit 3.On 980615,Commission Authorized Restart of Unit 3,subj to Satisfactory Completion of All Remaining Issues Requiring NRC Verification
ML20249B689
Person / Time
Site: Millstone Dominion icon.png
Issue date: 06/16/1998
From: Travers W
NRC (Affiliation Not Assigned)
To: Demorit C
AFFILIATION NOT ASSIGNED
References
NUDOCS 9806240058
Download: ML20249B689 (4)


Text

A.

June 16, 1998 s

Mr. Chris Demorit 45 Marcy Road Chaplin, CT 06235

Dear Mr. Demorit:

I am responding to the fatter you sent to Chairman Shirley Ann Jackson of the U.S. Nuclear Regulatory Cornmission (NRC) dated June 1,1998, in which you expressed your concems regarding the restart of Millstone Unit 3.

The Commission has been intensively involved with a number of issues surrounding Millstone for over 2% years which have been articulated in the NRC staff's Millstone Restart Assessment Plan. The issues you have raised in your letter, such as the valve repair, the number of systems reviewed as part of the Independent Corrective Action Verification Program, and the number of deferred items, have each been reviewed by the NRC staff, documented in NRC

' staff reports to the Commission, and discussed with the NRC Commissioners at either the May 1 or June 2,1998, Cc,mmission meetings. Enclosures 1 and 2 provide copies of the two staff reports to the Commission covering these topics. A number of these issues have also been discussed at meetings with the public held in the Waterford, Connecticut, area.

Regarding schedules, the Commission has consistently indicated that their decisions on restart do not presuppose that any of the three plants will restart by any certain date. A Commission dccision authorizing the restart of any Millstone unit will be made only when the Com' ission is m

satisfied that the cc.9tions, which led to the extended shutdown, have been addressed to their satisfaction, regardless of the length that process may take. On June 15,1998, the Commission authorized the restart of Millstona Unit 3, subject to satisfactory completion of all remaining issues requiring NRC verification.

I trust the information above is responsive to your concern.

Sincerely, OriginalSiEEMN William D. Travers, Director Special Projects Office Office of Nuclear Reactol Regulation

Enclosures:

1.

SECY-98-090, " Selected issues Related 1

to Recovery of Millstone Nuclear Power Station L

Unit 3" 2.

SECY-98-119, " Remaining Issues Related to Recovery of Millstone Nuclear Power Station, Unit 3" p p\\ _

Distribution (see next page)

\\

DOCUMENT NAME: P:Demorit,ltr:

M n,

.e w.

me a e,. w.m c. copy.an.r.n.ca nu.ncio.u,. v - copy...et.cnm.ntioncio.or.

=. u. ecoy 0FFICE TA/SP0 c 'D:SP0 //

[ /

mn NAME RPerch % X -

WTraveks] J /-

DATE 06/14/98 06/ h/98

/

~l

.. OFFICIAL RECORD COPY M 40058 h a

?

PDR ADOCK 05000423 H

PM m yoce _

C __

. __x

s-,

ACTWN

=

l EDO Principal Correspondence Control FROM:

DUE: 06/18/98 EDO CONTROL: G980368 DOC DT: 06/01/98 FINAL REPLY:

Chrio Demor,iti Chnplin, Conn'ecticut TO:

Chairman Jackcon FOR ST.GNATURE OF :

    • GRN CRC NO: 98-0524 Collins, NRR DESC:

ROUTING:

MILLSTONE Callan Thadani Thompson Norry Blaha Burns DATE: 06/05/98 Miller, RI ASSIGNED TO:

CONTACT:

.NRR Collins SPECIAL INSTRUCTIONS OR REMARKS:

I NRR ACTION: SPO: Travers k

i NRR RECEIVED: 6/8/98 NRR Routing: C llins/Miraglia 9gcTOR3 0FF!CE Sheron g6)C Tra vers Roe L3) _

Zimmerman

- ~ ~ - ~ ~ ^

NRR Mailroom

OFFICE OF THE SECRETARY CORRESPONDENCE CONTROL TICKET PAPER NUMBER:

CRC-98-0524 LOGGING DATE: Jun 3 98 ACTION OFFICE:

EDO AUTHOR:

CHRIS DEMORIT AFFILIATION:

CONNECTICUT ADDRESSEE:

CHAIRMAN JACKSON LETTER DATE:

Jun 1 98 FILE CODE: ID&R 5 MILLSTONE

SUBJECT:

MILLSTONE NUL 'AR POWER PLANT ACTION:

Direct Reply DISTRIBUTION:

CHAIRMAN, COMRS.

j 43 SPECIAL HANDLING: SECY TO ACK CONSTITUENT:

NOTES:

DATE DUE:

Jun 1h 98 SIGNATURE:

DATE SIGNED:

AFFILIATION:

EDO -- G980365 J

June 1, 1998 Dr. Jackson, I beseech you, please do not allow Unit III at Millstone nuclear power station to restart.

Whats the rush to restart?

Could it be that Northeast Utilities must get this unit online by July'1 to recover their so called stranded costs from Connecticut Bill 5005-the utility restructuring bill?

One cannot go a few days in Connecticut without hearing some outrageous tale of NU's ineptitude and avaricious behavior.

This week the headlines are about how NU lobbyists met 23 times with you and other NRC commissioners 1 Although "no laws were broken" it just proves who has more access to those who make the decisions.

Nonetheless, the week before it was about a leaky. valve at '

Unit III.

Eventhough you, Dr. Jackson, feel NU handled this much better than a leak in 1993, I do not feel NU handled Unis well at all.

How can they have responded well when the equipment needed to isolate the valve was not there?

This alone is clear evidence that NU is cutting corners in a rush toirestart.

Don't you think so?

I could go on, but I realize the time constraints, as you will be voting on this issue very soon.

But I do have a few questions-why only check 5 out of 88 risk and safety significant systems at Unit III?

(And because the NRC.does not have the funds to check all these systems is not a suitable answer.)

The public safety is at risk!

(The funds could be there if someone with enough authority thought it were important enough.)

Also how can almost 7,000 material deficiencies be deferred till after restart?

Please respond.

And please keep these unsafe and mismanaged plants offline.

Thank you for your time, Chris Demorit 45 Marcy Road Chaplin, CT 06235 l

g.

4

,a s

c

1

6

't ji

' Letter to Chris Demorit dated:

June 16, 1998 Distribution:

(w/o enclosures)

~ Docket File (w/originalincoming)

- PUBLIC '

SPO R/F -

EDO G980368 CRC No,.98-0524 EDO R/F NRR Mailroom (w/ copy.of incoming)

LCallan AThadani HThompson.

PNorry

'JBlaha SBurns HMiller, RI SCollins FMiraglia BBoger BSheron JRoe RZimmerman 9

30

~

.~