{{#Wiki_filter:February 09, 2021 MEMORANDUM TO:             Andrea Kock, Director Division of Fuel Management Office of Nuclear Material Safety and Safeguards FROM:                     Leira Cuadrado, Chief     /RA/     Leira Y.            Digitally signed by Leira Inspection and Oversight Branch                         Y. Cuadrado-Caraballo Division of Fuel Management Cuadrado-          Date: 2021.02.09 Office of Nuclear Material Safety   Caraballo          16:14:07 -05'00' and Safeguards
{{#Wiki_filter:February 09, 2021 MEMORANDUM TO:
Andrea Kock, Director Division of Fuel Management Office of Nuclear Material Safety and Safeguards FROM:
Leira Cuadrado, Chief  
/RA/
Inspection and Oversight Branch Division of Fuel Management Office of Nuclear Material Safety and Safeguards  


==SUBJECT:==
==SUBJECT:==
Line 22: Line 26:
the staff has achieved the objective of implementing the working group recommendations to enhance the ISFSI inspection manual chapters (IMCs) and inspection procedures (IPs).
the staff has achieved the objective of implementing the working group recommendations to enhance the ISFSI inspection manual chapters (IMCs) and inspection procedures (IPs).
This memorandum documents the implementation of the enhancement efforts, as well as remaining actions for early calendar year 2021.
This memorandum documents the implementation of the enhancement efforts, as well as remaining actions for early calendar year 2021.
CONTACT: Jeremy Tapp, NMSS/DFM/IOB 301-415-8047
CONTACT: Jeremy Tapp, NMSS/DFM/IOB 301-415-8047  


==Enclosure:==
==Enclosure:==
ISFSI: Implementation of Enhancement Efforts Leira Y.
Cuadrado-Caraballo Digitally signed by Leira Y. Cuadrado-Caraballo Date: 2021.02.09 16:14:07 -05'00'


ISFSI: Implementation of Enhancement Efforts
ML21006A040
*via email OFFICE DFM/IOB DFM/LA DFM/IOB DFM/IOB NAME AWu*
SFigueroa*
LCuadrado*
JTapp DATE 1/5/2021 1/6/2021 2/5/2021 2/9/2021


ML21006A040                                *via email OFFICE              DFM/IOB          DFM/LA          DFM/IOB        DFM/IOB NAME                  AWu*        SFigueroa*      LCuadrado*        JTapp DATE                1/5/2021        1/6/2021        2/5/2021        2/9/2021 Independent Spent Fuel Storage Installation Inspection Program:
Enclosure Independent Spent Fuel Storage Installation Inspection Program:
Implementation of Enhancement Efforts Background and Objective:
Implementation of Enhancement Efforts Background and Objective:
On June 4, 2019, a working group was formed as part of the Independent Spent Fuel Storage Installation (ISFSI) Inspection Program Enhancements Initiative to evaluate and enhance the U.S. Nuclear Regulatory Commissions (NRC) existing ISFSI inspection program by developing a clearer, more risk-informed, comprehensive, and consistent approach to ISFSI inspections across the four NRC regional offices that focuses on areas most important to safety (Agencywide Documents Access and Management System (ADAMS) Accession No. ML19155A273).
On June 4, 2019, a working group was formed as part of the Independent Spent Fuel Storage Installation (ISFSI) Inspection Program Enhancements Initiative to evaluate and enhance the U.S. Nuclear Regulatory Commissions (NRC) existing ISFSI inspection program by developing a clearer, more risk-informed, comprehensive, and consistent approach to ISFSI inspections across the four NRC regional offices that focuses on areas most important to safety (Agencywide Documents Access and Management System (ADAMS) Accession No. ML19155A273).
Line 40: Line 50:
The working group stated that implementation of the recommendations would result in a reliable, more risk-informed, comprehensive, and consistent approach to ISFSI inspections across the NRCs regional offices. The enhanced program would allow the NRC to maintain its mission while supporting the agencys ongoing vision of becoming a modern, risk-informed regulator by embracing improvements in decision-making and a graded approach to safety.
The working group stated that implementation of the recommendations would result in a reliable, more risk-informed, comprehensive, and consistent approach to ISFSI inspections across the NRCs regional offices. The enhanced program would allow the NRC to maintain its mission while supporting the agencys ongoing vision of becoming a modern, risk-informed regulator by embracing improvements in decision-making and a graded approach to safety.
Approval of Recommendations and Staff Plan for Implementation:
Approval of Recommendations and Staff Plan for Implementation:
By {{letter dated|date=March 19, 2020|text=letter dated March 19, 2020}} (ADAMS Accession No. ML20079E064), the Director of the Division of Fuel Management (DFM) of the Office of Nuclear Material Safety and Safeguards (NMSS) endorsed the working groups recommendations to implement risk-informed enhancements to the ISFSI inspection program, with completion of the enhancement activities Enclosure
By {{letter dated|date=March 19, 2020|text=letter dated March 19, 2020}} (ADAMS Accession No. ML20079E064), the Director of the Division of Fuel Management (DFM) of the Office of Nuclear Material Safety and Safeguards (NMSS) endorsed the working groups recommendations to implement risk-informed enhancements to the ISFSI inspection program, with completion of the enhancement activities  


expected by the end of calendar year 2020, and full implementation of the new ISFSI inspection program starting in calendar year 2021.
expected by the end of calendar year 2020, and full implementation of the new ISFSI inspection program starting in calendar year 2021.
Line 51: Line 61:
Implementation of Recommendations:
Implementation of Recommendations:
To date, the staff has completed all IP and IMC revisions required of the ISFSI inspection program enhancement effort. The following procedures have been issued for use, with an effective date of January 1, 2021:
To date, the staff has completed all IP and IMC revisions required of the ISFSI inspection program enhancement effort. The following procedures have been issued for use, with an effective date of January 1, 2021:
IP/IMC                                   Title IP 60853     OnSite Fabrication of Components and Construction of an ISFSI IP 60854     Preoperational Testing of an ISFSI IP 60855     Operation of an ISFSI IP 60856     Review of 10 CFR 72.212(b) Evaluations IP 60857     Review of 10 CFR 72.48 Evaluations IP 60858     Away-From-Reactor ISFSI Inspection Guidance IMC 2690     Inspection Program for Storage of Spent Reactor Fuel and Reactor-Related Greater-Than-Class C Waste at Independent Spent Fuel Storage Installations and for 10 CFR Part 71 Transportation Packagings IMC 2691     Technical Basis for the Independent Spent Fuel Storage Installation Inspection Program Additionally, two training sessions were conducted to familiarize inspection staff with the revisions to the IPs and IMCs, and to ensure common understanding of any new content. The first training session was recorded for future use and made available to the staff as a reference.
IP/IMC Title IP 60853 OnSite Fabrication of Components and Construction of an ISFSI IP 60854 Preoperational Testing of an ISFSI IP 60855 Operation of an ISFSI IP 60856 Review of 10 CFR 72.212(b) Evaluations IP 60857 Review of 10 CFR 72.48 Evaluations IP 60858 Away-From-Reactor ISFSI Inspection Guidance IMC 2690 Inspection Program for Storage of Spent Reactor Fuel and Reactor-Related Greater-Than-Class C Waste at Independent Spent Fuel Storage Installations and for 10 CFR Part 71 Transportation Packagings IMC 2691 Technical Basis for the Independent Spent Fuel Storage Installation Inspection Program  
 
Additionally, two training sessions were conducted to familiarize inspection staff with the revisions to the IPs and IMCs, and to ensure common understanding of any new content. The first training session was recorded for future use and made available to the staff as a reference.
As of December 31, 2020, the status of the working group recommendations is as follows:
As of December 31, 2020, the status of the working group recommendations is as follows:
Recommendation                   Status as of           Additional Actions December 2020                Required 1     A triennial inspection frequency for Completed in IMC       Not Applicable routine inspections                  2690 2     Inspections performed by qualified   Completed in IMC        Not Applicable inspectors using current             2690 qualification requirements for ISFSI inspectors or application of a partial qualification option for inspectors that may complete specific aspects of ISFSI inspections 3     A revised level of effort for each   Completed in all IPs   Not Applicable applicable inspection procedure 4     ISFSI inspections funded solely by   Completed for Fiscal    NRR will retire the following the SFST business line               Year (FY) 2022         IPs in Quarter 1 of calendar year (CY) 2021, after The Office of Nuclear   applicable inspection Reactor Regulation     reports have been issued:
Recommendation Status as of December 2020 Additional Actions Required 1
(NRR) transferred       IPs 60854.1, 60855.1, their funding portion   60856.1.
A triennial inspection frequency for routine inspections Completed in IMC 2690 Not Applicable 2
for ISFSI efforts for FY2022 and beyond to NMSS.
Inspections performed by qualified inspectors using current qualification requirements for ISFSI inspectors or application of a partial qualification option for inspectors that may complete specific aspects of ISFSI inspections Completed in IMC 2690 Not Applicable 3
A revised level of effort for each applicable inspection procedure Completed in all IPs Not Applicable 4
ISFSI inspections funded solely by the SFST business line Completed for Fiscal Year (FY) 2022 The Office of Nuclear Reactor Regulation (NRR) transferred their funding portion for ISFSI efforts for FY2022 and beyond to NMSS.
Revised IMC 2690 to remove the references to IPs 60854.1, 60855.1, 60856.1.
Revised IMC 2690 to remove the references to IPs 60854.1, 60855.1, 60856.1.
NRR revised IMC 2515, Appendix C to remove the references to IPs 60854.1, 60855.1, 60856.1.
NRR revised IMC 2515, Appendix C to remove the references to IPs 60854.1, 60855.1, 60856.1.
5     Follow-on efforts to assess and     These follow-on        Assessment of additional provide recommendation for           efforts were outside    areas are planned as enhancement in areas not covered     the scope of staffs   follows:
NRR will retire the following IPs in Quarter 1 of calendar year (CY) 2021, after applicable inspection reports have been issued:
by this effort:                      implementation effort in CY 2020.
IPs 60854.1, 60855.1, 60856.1.
: a. Inspection readiness for                                a. An effort is currently transportation of spent nuclear                              ongoing by a separate fuel                                                        working group. Staff will evaluate the results and findings of this effort and determine if enhancements to inspection guidance are necessary.
5 Follow-on efforts to assess and provide recommendation for enhancement in areas not covered by this effort:
: b. Develop inspection guidance        b. Staff will be evaluating and resources for Consolidated        the necessary oversight Interim Storage Facilities            framework for CISFs in (CISFs)                              CY 2021.
: a. Inspection readiness for transportation of spent nuclear fuel These follow-on efforts were outside the scope of staffs implementation effort in CY 2020.
: c. Creation of an ISFSI Center of    c. The staff will monitor the Expertise (COE)                      implementation of the enhanced program that just became effective in January 2021 and evaluate the need for a COE before the end of FY 2022.
Assessment of additional areas are planned as follows:
: d. Develop self-assessment            d. The staff will monitor the process for the ISFSI                implementation of the inspection program                    enhanced program that just became effective in January 2021 and evaluate the need for a self-assessment process before the end of FY 2022.
: a. An effort is currently ongoing by a separate working group. Staff will
                                  }}
: b. Develop inspection guidance and resources for Consolidated Interim Storage Facilities (CISFs)
: c. Creation of an ISFSI Center of Expertise (COE)
: d. Develop self-assessment process for the ISFSI inspection program evaluate the results and findings of this effort and determine if enhancements to inspection guidance are necessary.
: b. Staff will be evaluating the necessary oversight framework for CISFs in CY 2021.
: c. The staff will monitor the implementation of the enhanced program that just became effective in January 2021 and evaluate the need for a COE before the end of FY 2022.
: d. The staff will monitor the implementation of the enhanced program that just became effective in January 2021 and evaluate the need for a self-assessment process before the end of FY 2022.}}

Latest revision as of 11:40, 29 November 2024

Memorandum: Implementation of Enhancement Efforts to the ISFSI Inspection Program with Enclosure
ML21006A040
Person / Time
Issue date: 02/09/2021
From: Leira Cuadrado
NRC/NMSS/DFM/IOB
To: Andrea Kock
Division of Fuel Management
Wu A
References
Download: ML21006A040 (6)


Text

February 09, 2021 MEMORANDUM TO:

Andrea Kock, Director Division of Fuel Management Office of Nuclear Material Safety and Safeguards FROM:

Leira Cuadrado, Chief

/RA/

Inspection and Oversight Branch Division of Fuel Management Office of Nuclear Material Safety and Safeguards

SUBJECT:

IMPLEMENTATION OF ENHANCEMENT EFFORTS TO THE INDEPENDENT SPENT FUEL STORAGE INSTALLATION INSPECTION PROGRAM By letter dated March 19, 2020 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML20079E064), the Director of the Division of Fuel Management (DFM) of the Office of Nuclear Material Safety and Safeguards (NMSS) endorsed recommendations to implement risk-informed enhancements to the independent spent fuel storage installation (ISFSI) inspection program (ADAMS Accession No. ML20078P093).

With the execution of the ISFSI Implementation Plan (ADAMS Accession No. ML20189A031),

the staff has achieved the objective of implementing the working group recommendations to enhance the ISFSI inspection manual chapters (IMCs) and inspection procedures (IPs).

This memorandum documents the implementation of the enhancement efforts, as well as remaining actions for early calendar year 2021.

CONTACT: Jeremy Tapp, NMSS/DFM/IOB 301-415-8047

Enclosure:

ISFSI: Implementation of Enhancement Efforts Leira Y.

Cuadrado-Caraballo Digitally signed by Leira Y. Cuadrado-Caraballo Date: 2021.02.09 16:14:07 -05'00'

ML21006A040

  • via email OFFICE DFM/IOB DFM/LA DFM/IOB DFM/IOB NAME AWu*

SFigueroa*

LCuadrado*

JTapp DATE 1/5/2021 1/6/2021 2/5/2021 2/9/2021

Enclosure Independent Spent Fuel Storage Installation Inspection Program:

Implementation of Enhancement Efforts Background and Objective:

On June 4, 2019, a working group was formed as part of the Independent Spent Fuel Storage Installation (ISFSI) Inspection Program Enhancements Initiative to evaluate and enhance the U.S. Nuclear Regulatory Commissions (NRC) existing ISFSI inspection program by developing a clearer, more risk-informed, comprehensive, and consistent approach to ISFSI inspections across the four NRC regional offices that focuses on areas most important to safety (Agencywide Documents Access and Management System (ADAMS) Accession No. ML19155A273).

The primary objective of the working group was to improve the effectiveness, efficiency, and consistency of ISFSI inspections, as well as the budget, planning, and tracking mechanisms used by the agency. To do so, the staff leveraged best practices of the existing program, while evaluating stakeholder recommendations on how to enhance and improve the NRCs oversight of ISFSIs. The working group used probabilistic risk analyses, byproduct material radiation exposure studies, subject matter expertise, operating experience, and lessons learned from the last 30 years of ISFSI inspection history to inform the recommended enhancements to the program.

Recommendations:

As summarized in a letter dated March 18, 2020 (ADAMS Accession No. ML20078P093), the working group recommended a more risk-informed inspection program consisting of five safety focus areas (risk-significant areas) in the oversight program and includes:

1) A triennial inspection frequency for routine inspections,
2) Use of the current qualification requirements or application of a partial qualified concept as part of the new cross-qualification program,
3) A revised level of effort estimate and a refocusing on the more risk-significant ISFSI activities for each applicable inspection procedure, and
4) ISFSI inspection program to be funded solely by the Spent Fuel Storage and Transportation (SFST) business line.

The working group stated that implementation of the recommendations would result in a reliable, more risk-informed, comprehensive, and consistent approach to ISFSI inspections across the NRCs regional offices. The enhanced program would allow the NRC to maintain its mission while supporting the agencys ongoing vision of becoming a modern, risk-informed regulator by embracing improvements in decision-making and a graded approach to safety.

Approval of Recommendations and Staff Plan for Implementation:

By letter dated March 19, 2020 (ADAMS Accession No. ML20079E064), the Director of the Division of Fuel Management (DFM) of the Office of Nuclear Material Safety and Safeguards (NMSS) endorsed the working groups recommendations to implement risk-informed enhancements to the ISFSI inspection program, with completion of the enhancement activities

expected by the end of calendar year 2020, and full implementation of the new ISFSI inspection program starting in calendar year 2021.

On July 16, 2020 (ADAMS Accession No. ML20189A031), the staff developed an implementation plan, with the objective to implement the working group recommendations to enhance the ISFSIs inspection manual chapters (IMCs) and inspection procedures (IPs).

Specifically, the staff aimed to implement the following recommendations:

1) The inspection frequency for routine loading campaigns and monitoring operations at ISFSIs should be extended from every two years, not to exceed three years, to a triennial frequency. The working group also recommended that the inspection frequency for extended loading campaigns be quarterly.
2) ISFSI inspectors should continue to be qualified using the formal qualification process in IMC 1246 and supplemented with the new cross-qualification program for IMC 1245, Appendix C1/C2 qualified inspectors if applicable.
3) The level of effort for each IP should to be adjusted as outlined in the working groups final recommendations report Section 3.

Recommendation #4, the funding of ISFSI inspections by the SFST business line, was not included in the implementation plan as it was already completed at the time of plan development. One additional recommendation, Recommendation #5, regarding future efforts to assess and provide recommendation for enhancements in areas not covered by this effort, was not undertaken by the implementation working group as there had not been specific areas identified to be further assessed at the time the inspection procedures were being revised.

Implementation of Recommendations:

To date, the staff has completed all IP and IMC revisions required of the ISFSI inspection program enhancement effort. The following procedures have been issued for use, with an effective date of January 1, 2021:

IP/IMC Title IP 60853 OnSite Fabrication of Components and Construction of an ISFSI IP 60854 Preoperational Testing of an ISFSI IP 60855 Operation of an ISFSI IP 60856 Review of 10 CFR 72.212(b) Evaluations IP 60857 Review of 10 CFR 72.48 Evaluations IP 60858 Away-From-Reactor ISFSI Inspection Guidance IMC 2690 Inspection Program for Storage of Spent Reactor Fuel and Reactor-Related Greater-Than-Class C Waste at Independent Spent Fuel Storage Installations and for 10 CFR Part 71 Transportation Packagings IMC 2691 Technical Basis for the Independent Spent Fuel Storage Installation Inspection Program

Additionally, two training sessions were conducted to familiarize inspection staff with the revisions to the IPs and IMCs, and to ensure common understanding of any new content. The first training session was recorded for future use and made available to the staff as a reference.

As of December 31, 2020, the status of the working group recommendations is as follows:

Recommendation Status as of December 2020 Additional Actions Required 1

A triennial inspection frequency for routine inspections Completed in IMC 2690 Not Applicable 2

Inspections performed by qualified inspectors using current qualification requirements for ISFSI inspectors or application of a partial qualification option for inspectors that may complete specific aspects of ISFSI inspections Completed in IMC 2690 Not Applicable 3

A revised level of effort for each applicable inspection procedure Completed in all IPs Not Applicable 4

ISFSI inspections funded solely by the SFST business line Completed for Fiscal Year (FY) 2022 The Office of Nuclear Reactor Regulation (NRR) transferred their funding portion for ISFSI efforts for FY2022 and beyond to NMSS.

Revised IMC 2690 to remove the references to IPs 60854.1, 60855.1, 60856.1.

NRR revised IMC 2515, Appendix C to remove the references to IPs 60854.1, 60855.1, 60856.1.

NRR will retire the following IPs in Quarter 1 of calendar year (CY) 2021, after applicable inspection reports have been issued:

IPs 60854.1, 60855.1, 60856.1.

5 Follow-on efforts to assess and provide recommendation for enhancement in areas not covered by this effort:

a. Inspection readiness for transportation of spent nuclear fuel These follow-on efforts were outside the scope of staffs implementation effort in CY 2020.

Assessment of additional areas are planned as follows:

a. An effort is currently ongoing by a separate working group. Staff will
b. Develop inspection guidance and resources for Consolidated Interim Storage Facilities (CISFs)
c. Creation of an ISFSI Center of Expertise (COE)
d. Develop self-assessment process for the ISFSI inspection program evaluate the results and findings of this effort and determine if enhancements to inspection guidance are necessary.
b. Staff will be evaluating the necessary oversight framework for CISFs in CY 2021.
c. The staff will monitor the implementation of the enhanced program that just became effective in January 2021 and evaluate the need for a COE before the end of FY 2022.
d. The staff will monitor the implementation of the enhanced program that just became effective in January 2021 and evaluate the need for a self-assessment process before the end of FY 2022.