{{#Wiki_filter:February 25, 2021
{{#Wiki_filter:February 25, 2021  
Mr. David Rhoades
Senior VP, Exelon Generation Company, LLC
Mr. David Rhoades  
President and CNO, Exelon Nuclear
Senior VP, Exelon Generation Company, LLC  
4300 Winfield Road
President and CNO, Exelon Nuclear  
Warrenville, IL 60555
4300 Winfield Road  
SUBJECT: BRAIDWOOD GENERATING STATION, UNITS 1 AND 2 - NOTIFICATION OF
Warrenville, IL 60555  
              NRC FIRE PROTECTION TEAM INSPECTION REQUEST FOR INFORMATION;
              INSPECTION REPORT 05000456/2021010; 05000457/2021010
SUBJECT: BRAIDWOOD GENERATING STATION, UNITS 1 AND 2 - NOTIFICATION OF  
Dear Mr. Rhoades:
NRC FIRE PROTECTION TEAM INSPECTION REQUEST FOR INFORMATION;  
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)
INSPECTION REPORT 05000456/2021010; 05000457/2021010  
Region III staff will conduct a Fire Protection Team Inspection (FPTI) at your Braidwood
Generating Station, Units 1 and 2 beginning May 24, 2021. The inspection will be conducted in
Dear Mr. Rhoades:  
accordance with IP 71111.21N.05, Fire Protection Team Inspection (FPTI), dated
June 12, 2019.
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)  
The inspection will verify that plant Systems, Structures, and Components (SSCs) and/or
Region III staff will conduct a Fire Protection Team Inspection (FPTI) at your Braidwood  
administrative controls credited in the approved Fire Protection Program (FPP) can perform
Generating Station, Units 1 and 2 beginning May 24, 2021. The inspection will be conducted in  
their licensing basis function.
accordance with IP 71111.21N.05, Fire Protection Team Inspection (FPTI), dated  
The schedule for the inspection is as follows:
June 12, 2019.  
    *   Preparation week (R-III office): May 17, 2021
    *   Week 1 of onsite inspection: May 24 - 28, 2021
The inspection will verify that plant Systems, Structures, and Components (SSCs) and/or  
    *   Week 2 of onsite inspection: June 17 - 21, 2021
administrative controls credited in the approved Fire Protection Program (FPP) can perform  
Experience has shown that the baseline fire protection team inspections are extremely resource
their licensing basis function.  
intensive, both for the NRC inspectors and the licensee staff. In order to minimize the
inspection impact on the site and to ensure a productive inspection for both organizations, we
The schedule for the inspection is as follows:  
have enclosed a request for documents needed for the inspection. These documents have
been divided into three groups.
*  
The first group lists information necessary to aid the inspection team in choosing specific focus
Preparation week (R-III office): May 17, 2021  
areas for the inspection and to ensure that the inspection team is adequately prepared for the
*  
inspection. It is requested that this information be provided to the lead inspector via mail or
Week 1 of onsite inspection: May 24 - 28, 2021  
electronically no later than April 5, 2021.
*  
The second group of requested documents consists of those items that the team will review, or
Week 2 of onsite inspection: June 17 - 21, 2021  
need access to, during the inspection. Please have this information available by the first day of
the first onsite inspection week May 24, 2021.
Experience has shown that the baseline fire protection team inspections are extremely resource  
intensive, both for the NRC inspectors and the licensee staff. In order to minimize the  
inspection impact on the site and to ensure a productive inspection for both organizations, we  
have enclosed a request for documents needed for the inspection. These documents have  
been divided into three groups.  
The first group lists information necessary to aid the inspection team in choosing specific focus  
areas for the inspection and to ensure that the inspection team is adequately prepared for the  
inspection. It is requested that this information be provided to the lead inspector via mail or  
electronically no later than April 5, 2021.  
The second group of requested documents consists of those items that the team will review, or  
need access to, during the inspection. Please have this information available by the first day of  
the first onsite inspection week May 24, 2021.  


D. Rhoades                                         -2-
D. Rhoades  
The third group lists the information necessary to aid the inspection team in tracking issues
-2-  
identified as a result of the inspection. It is requested that this information be provided to the
The third group lists the information necessary to aid the inspection team in tracking issues  
lead inspector as the information is generated during the inspection.
identified as a result of the inspection. It is requested that this information be provided to the  
It is important that all of these documents are up to date and complete in order to minimize the
lead inspector as the information is generated during the inspection.  
number of additional documents requested during the preparation and/or the onsite portions of
the inspection.
It is important that all of these documents are up to date and complete in order to minimize the  
The lead inspector for this inspection is Mr. Jamie Benjamin. If there are any questions about
number of additional documents requested during the preparation and/or the onsite portions of  
the inspection or the material requested, please contact the lead inspector at 630-829-9747 or
the inspection.  
via e-mail at Jamie.Benjamin@nrc.gov.
This letter, its enclosure, and your response (if any) will be made available for public inspection
The lead inspector for this inspection is Mr. Jamie Benjamin. If there are any questions about  
and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document
the inspection or the material requested, please contact the lead inspector at 630-829-9747 or  
Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for
via e-mail at Jamie.Benjamin@nrc.gov.  
Withholding.
                                                Sincerely,
This letter, its enclosure, and your response (if any) will be made available for public inspection  
                                                /RA/
and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document  
                                                Jamie Benjamin, Reactor Inspector
Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for  
                                                Engineering Branch 2
Withholding.  
                                                Division of Reactor Safety
Docket Nos. 50-456 and 50-457
Sincerely,  
License Nos. NPF-72 and NPF-77
Enclosure:
/RA/  
Information Request for Fire Protection
Team Inspection
cc: Distribution via LISTSERV
Jamie Benjamin, Reactor Inspector  
Engineering Branch 2  
Division of Reactor Safety  
Docket Nos. 50-456 and 50-457  
License Nos. NPF-72 and NPF-77  
Enclosure:  
Information Request for Fire Protection  
Team Inspection  
cc: Distribution via LISTSERV  


D. Rhoades                                   -3-
D. Rhoades  
Letter to David Rhoades from Jamie Benjamin dated February 25, 2021.
-3-  
SUBJECT: BRAIDWOOD GENERATING STATION, UNITS 1 AND 2 - NOTIFICATION OF
Letter to David Rhoades from Jamie Benjamin dated February 25, 2021.  
            NRC FIRE PROTECTION TEAM INSPECTION REQUEST FOR INFORMATION;
            INSPECTION REPORT 05000456/2021010; 05000457/2021010
SUBJECT: BRAIDWOOD GENERATING STATION, UNITS 1 AND 2 - NOTIFICATION OF  
DISTRIBUTION:
NRC FIRE PROTECTION TEAM INSPECTION REQUEST FOR INFORMATION;  
Jessie Quichocho
INSPECTION REPORT 05000456/2021010; 05000457/2021010  
Mark Haire
RidsNrrDorlLpl3
DISTRIBUTION:  
RidsNrrPMBraidwood Resource
Jessie Quichocho  
RidsNrrDroIrib Resource
Mark Haire  
John Giessner
RidsNrrDorlLpl3  
Kenneth OBrien
RidsNrrPMBraidwood Resource  
Jamnes Cameron
RidsNrrDroIrib Resource  
Allan Barker
John Giessner  
DRPIII
Kenneth OBrien  
DRSIII
Jamnes Cameron  
ADAMS Accession Number: ML21057A102
Allan Barker  
    Publicly Available     Non-Publicly Available     Sensitive   Non-Sensitive
DRPIII  
OFFICE       RIII
DRSIII  
  NAME         JBenjamin:mb
              via e-mail
  DATE         02/25/2021
                                OFFICIAL RECORD COPY
ADAMS Accession Number: ML21057A102  
Publicly Available  
Non-Publicly Available
Sensitive  
Non-Sensitive  
OFFICE  
RIII  
   
NAME  
JBenjamin:mb  
via e-mail  
   
DATE  
02/25/2021  
OFFICIAL RECORD COPY  


        FIRE PROTECTION TEAM INSPECTION SUPPORTING DOCUMENTATION
FIRE PROTECTION TEAM INSPECTION SUPPORTING DOCUMENTATION  
I. Information Requested Prior to the Inspection Preparation Week
  The following information is requested by April 5, 2021. If you have any questions
  regarding this request, please call the lead inspector as soon as possible. All information
Enclosure
  should be sent to Jamie Benjamin (e-mail address Jamie.Benjamin@nrc.gov). Electronic
I.  
  media is preferred (e.g. via Share File System).
Information Requested Prior to the Inspection Preparation Week  
  1. One set of hard-copy documents for facility layout drawings which identify plant fire area
      delineation; areas protected by automatic fire suppression and detection; and locations
The following information is requested by April 5, 2021. If you have any questions  
      of fire protection equipment.
regarding this request, please call the lead inspector as soon as possible. All information  
  2. Licensing Information:
should be sent to Jamie Benjamin (e-mail address Jamie.Benjamin@nrc.gov). Electronic  
      a. All NRC Safety Evaluation Reports (SERs) applicable to fire protection (specifically
media is preferred (e.g. via Share File System).  
            including those SERs referenced by the plant fire protection license condition) and all
            licensing correspondence referenced by the SERs;
1. One set of hard-copy documents for facility layout drawings which identify plant fire area  
      b. All licensing correspondence associated with the comparison to Standard Review
delineation; areas protected by automatic fire suppression and detection; and locations  
            Plan (NUREG-0800), Section 9.5.1 or equivalent for licensing purposes;
of fire protection equipment.  
      c. Exemptions from 10 CFR 50.48 and 10 CFR Part 50, Appendix R, and associated
            licensing correspondence;
2. Licensing Information:  
      d. For pre-1979 plants, all licensing correspondence associated with those sections of
            10 CFR Part 50, Appendix R, that are not applicable to the plant under
a. All NRC Safety Evaluation Reports (SERs) applicable to fire protection (specifically  
            10 CFR 50.48(b)(1). Specifically, the licensing correspondence associated with
including those SERs referenced by the plant fire protection license condition) and all  
            those fire protection features proposed or implemented by the licensee that have
licensing correspondence referenced by the SERs;  
            been accepted by the NRC staff as satisfying the provisions of Appendix A to Branch
            Technical Position (BTP) APCSB 9.5-1 reflected in the NRC fire protection SERs
b. All licensing correspondence associated with the comparison to Standard Review  
            issued before February 19, 1981, (10 CFR 50.48(b)(1)(i)); or those fire protection
Plan (NUREG-0800), Section 9.5.1 or equivalent for licensing purposes;  
            features, which were accepted by the NRC staff in comprehensive fire protection
            SERs issued before Appendix A to BTP APCSB 9.5-1 was published in August 1976
c. Exemptions from 10 CFR 50.48 and 10 CFR Part 50, Appendix R, and associated  
            (10 CFR 50.48(b)(1)(ii)); and
licensing correspondence;  
      e. The final safety analysis report sections applicable to fire protection, FHA, and SSA
            in effect at the time of original licensing.
d. For pre-1979 plants, all licensing correspondence associated with those sections of  
  3. Fire Protection Program:
10 CFR Part 50, Appendix R, that are not applicable to the plant under  
      a. A listing of changes made to the FPP since the last triennial fire protection
10 CFR 50.48(b)(1). Specifically, the licensing correspondence associated with  
            inspection;
those fire protection features proposed or implemented by the licensee that have  
      b. For pre-1979 plants, a listing of the protection methodologies identified under
been accepted by the NRC staff as satisfying the provisions of Appendix A to Branch  
            10 CFR Part 50, Appendix R, Section III.G used to achieve compliance for fire
Technical Position (BTP) APCSB 9.5-1 reflected in the NRC fire protection SERs  
            zones/areas. That is, please specify whether 3-hour rated fire barriers;
issued before February 19, 1981, (10 CFR 50.48(b)(1)(i)); or those fire protection  
            (Section III.G.2.a), 20-foot separation along with detection and suppression;
features, which were accepted by the NRC staff in comprehensive fire protection  
            (Section III.G.2.b), 1-hour rated fire barriers with detection and suppression;
SERs issued before Appendix A to BTP APCSB 9.5-1 was published in August 1976  
            (Section III.G.2.c), or alternative shutdown capability; (Section III.G.3) is used as a
(10 CFR 50.48(b)(1)(ii)); and  
            strategy for each selected fire zone/area;
                                                                                            Enclosure
e. The final safety analysis report sections applicable to fire protection, FHA, and SSA  
in effect at the time of original licensing.  
3. Fire Protection Program:  
a. A listing of changes made to the FPP since the last triennial fire protection  
inspection;  
b. For pre-1979 plants, a listing of the protection methodologies identified under  
10 CFR Part 50, Appendix R, Section III.G used to achieve compliance for fire  
zones/areas. That is, please specify whether 3-hour rated fire barriers;  
(Section III.G.2.a), 20-foot separation along with detection and suppression;  
(Section III.G.2.b), 1-hour rated fire barriers with detection and suppression;  
(Section III.G.2.c), or alternative shutdown capability; (Section III.G.3) is used as a  
strategy for each selected fire zone/area;


      FIRE PROTECTION TEAM INSPECTION SUPPORTING DOCUMENTATION
FIRE PROTECTION TEAM INSPECTION SUPPORTING DOCUMENTATION  
  c. A list of Generic Letter 86-10 evaluations (i.e., a list of adverse to safe shutdown
        evaluations);
2
  d. A list of applicable codes and standards related to the design of plant fire protection
c. A list of Generic Letter 86-10 evaluations (i.e., a list of adverse to safe shutdown  
        features. The list should include National Fire Protection Association (NFPA) code
evaluations);  
        versions committed to (i.e., the NFPA Codes of Record);
  e. List of plant deviations from code commitments and associated evaluations;
d. A list of applicable codes and standards related to the design of plant fire protection  
  f.   Fire Protection Program and/or Fire Protection Plan document;
features. The list should include National Fire Protection Association (NFPA) code  
  g. (If available) Fire Probabilistic Risk Assessment (PRA) Summary Report or full PRA
versions committed to (i.e., the NFPA Codes of Record);  
        document (if summary document not available);
  h. List of the top 25 highest fire CDF scenarios for each unit;
e. List of plant deviations from code commitments and associated evaluations;  
  i.   List of Fire Areas/Zones ranked by contribution to CDF. i.e., ranking of highest to
        lowest risk fire areas/zones;
f.  
  j.   List of the top 25 highest fire LERF scenarios for each unit; and
Fire Protection Program and/or Fire Protection Plan document;  
  k. Risk ranking of operator actions and/or recovery actions from your site-specific PRA
        sorted by RAW and human reliability worksheets for these items.
g. (If available) Fire Probabilistic Risk Assessment (PRA) Summary Report or full PRA  
4. Facility Information:
document (if summary document not available);  
  a. Piping and instrumentation (flow) diagrams showing the components used to achieve
        and maintain hot standby and cold shutdown for fires outside the control room, and
h. List of the top 25 highest fire CDF scenarios for each unit;  
        those components used for those areas requiring alternative shutdown capability;
  b. One-line schematic drawings of the electrical distribution system for 4160 Volts
i.  
        alternating current (Vac) down to 480Vac;
List of Fire Areas/Zones ranked by contribution to CDF. i.e., ranking of highest to  
  c. One-line schematic drawings of the electrical distribution system for 250 Volts direct
lowest risk fire areas/zones;  
        current (Vdc) and 125Vdc systems as applicable;
  d. Logic diagrams showing the components used to achieve and maintain hot standby
j.  
        and cold shutdown; and
List of the top 25 highest fire LERF scenarios for each unit; and  
  e. Safe shutdown cable routing database (requested electronically, such as on compact
        disc, if available).
k. Risk ranking of operator actions and/or recovery actions from your site-specific PRA  
5. Operations Response for Fire Protection:
sorted by RAW and human reliability worksheets for these items.  
  a. Plant operating procedures which specify the initial operations response to a fire
        alarm or annunciator.
4. Facility Information:  
                                              2
a. Piping and instrumentation (flow) diagrams showing the components used to achieve  
and maintain hot standby and cold shutdown for fires outside the control room, and  
those components used for those areas requiring alternative shutdown capability;  
b. One-line schematic drawings of the electrical distribution system for 4160 Volts  
alternating current (Vac) down to 480Vac;  
c. One-line schematic drawings of the electrical distribution system for 250 Volts direct  
current (Vdc) and 125Vdc systems as applicable;  
d. Logic diagrams showing the components used to achieve and maintain hot standby  
and cold shutdown; and  
e. Safe shutdown cable routing database (requested electronically, such as on compact  
disc, if available).  
5. Operations Response for Fire Protection:  
a. Plant operating procedures which specify the initial operations response to a fire  
alarm or annunciator.  


          FIRE PROTECTION TEAM INSPECTION SUPPORTING DOCUMENTATION
FIRE PROTECTION TEAM INSPECTION SUPPORTING DOCUMENTATION  
    6. Corrective Actions:
        a. Listing of open and closed fire protection condition reports (i.e., problem identification
3
            forms and their resolution reports) since the date of the last triennial fire protection
6. Corrective Actions:  
            inspection; and
        b. List of current fire impairments, including duration.
a. Listing of open and closed fire protection condition reports (i.e., problem identification  
    7. General Information:
forms and their resolution reports) since the date of the last triennial fire protection  
        a. A listing of abbreviations and/or designators for plant systems;
inspection; and  
        b. Organization charts of site personnel down to the level of fire protection staff
            personnel; and
b. List of current fire impairments, including duration.  
        c. A phone list for onsite licensee personnel.
II. Information Requested to Be Available on First Day of the First Onsite
7. General Information:  
    Inspection Week (May 24, 2021)
    The following information is requested to be provided on the first day of inspection. It is
a. A listing of abbreviations and/or designators for plant systems;  
    requested that this information be provided on three sets of CDs (searchable, if possible).
    1. Program Procedures:
b. Organization charts of site personnel down to the level of fire protection staff  
        a. Procedures for:
personnel; and  
            i.   Administrative controls (such as allowed out of service times and compensatory
                measures) for fire protection systems and components;
c. A phone list for onsite licensee personnel.  
            ii. Control of transient combustibles; and
            iii. Control of hot work.
II. Information Requested to Be Available on First Day of the First Onsite  
        b. List of maintenance and surveillance testing procedures for alternative shutdown
Inspection Week (May 24, 2021)  
            capability and fire barriers, detectors, pumps, and suppression systems; and
        c. List of maintenance procedures which routinely verify fuse breaker coordination in
The following information is requested to be provided on the first day of inspection. It is  
            accordance with the post-fire safe shutdown coordination analysis.
requested that this information be provided on three sets of CDs (searchable, if possible).  
    2. Design and Equipment Information (for only selected fire zone/area(s) and/or SSCs
        to be determined during inspection preparation week):
1. Program Procedures:  
        a. Coordination calculations and/or justifications that verify fuse/breaker coordination for
            SSCs that are fed off of the same electrical buses as components in the protected
a. Procedures for:  
            safe shutdown train;
      b. Copies of significant fire protection and post-fire safe shutdown related design
i.  
            change package descriptions (including their associated 10 CFR 50.59 evaluations)
Administrative controls (such as allowed out of service times and compensatory  
            and Generic Letter (GL) 86-10 (or adverse to safe shutdown) evaluations;
measures) for fire protection systems and components;  
        c. Gaseous suppression system pre-operational testing, if applicable, for selected fire
ii. Control of transient combustibles; and  
            zones/areas;
iii. Control of hot work.  
                                                  3
b. List of maintenance and surveillance testing procedures for alternative shutdown  
capability and fire barriers, detectors, pumps, and suppression systems; and  
c. List of maintenance procedures which routinely verify fuse breaker coordination in  
accordance with the post-fire safe shutdown coordination analysis.  
2. Design and Equipment Information (for only selected fire zone/area(s) and/or SSCs  
to be determined during inspection preparation week):  
a. Coordination calculations and/or justifications that verify fuse/breaker coordination for  
SSCs that are fed off of the same electrical buses as components in the protected  
safe shutdown train;  
b. Copies of significant fire protection and post-fire safe shutdown related design  
change package descriptions (including their associated 10 CFR 50.59 evaluations)  
and Generic Letter (GL) 86-10 (or adverse to safe shutdown) evaluations;  
c. Gaseous suppression system pre-operational testing, if applicable, for selected fire  
zones/areas;


      FIRE PROTECTION TEAM INSPECTION SUPPORTING DOCUMENTATION
FIRE PROTECTION TEAM INSPECTION SUPPORTING DOCUMENTATION  
  d. Hydraulic calculations and supporting test data which demonstrate operability for
        water suppression systems;
4
  e. Alternating current (ac) coordination calculations for 4160Vac down to 480Vac
d. Hydraulic calculations and supporting test data which demonstrate operability for  
        electrical systems; and
water suppression systems;  
  f.   List of all fire protection or Appendix R calculations.
3. Assessment and Corrective Actions:
e. Alternating current (ac) coordination calculations for 4160Vac down to 480Vac  
  The three most recent fire protection Quality Assurance audits and/or fire protection self-
electrical systems; and  
  assessments.
4. Any updates to information previously provided.
f.  
5. Classic Fire Protection (for only selected fire zone/area(s) and/or SSCs to be
List of all fire protection or Appendix R calculations.  
  determined during inspection preparation week):
  a. Copy of fire protection program implementing procedures (e.g., administrative
3. Assessment and Corrective Actions:  
        controls, surveillance testing, and fire brigade);
  b. Pre-fire plans for selected fire area(s); and
The three most recent fire protection Quality Assurance audits and/or fire protection self-
  c. List of fire protection system design changes completed in the last three years.
assessments.  
6. Electrical (for only selected fire zone/area(s) and/or SSCs to be determined during
  inspection preparation week):
4. Any updates to information previously provided.  
  a. Nuclear safety circuit coordination analysis for fuse and breaker coordination of safe
        shutdown components;
5. Classic Fire Protection (for only selected fire zone/area(s) and/or SSCs to be  
  b. Administrative or configuration control procedures that govern fuse replacement
determined during inspection preparation week):  
        (e.g., fuse control procedures);
  c. Maintenance procedures that verify breaker over-current trip settings to ensure
a. Copy of fire protection program implementing procedures (e.g., administrative  
        coordination remains functional, for post-fire nuclear safety capability components;
controls, surveillance testing, and fire brigade);  
  d. Last surveillance demonstrating operability of those components operated from the
        primary control stations;
b. Pre-fire plans for selected fire area(s); and  
  e. Schematic or elementary diagrams for circuits (only for selected SSCs) to be
        reviewed (C-size paper drawings);
c. List of fire protection system design changes completed in the last three years.  
  f.   Cable routing for components and equipment credited for post-fire nuclear safety
        capability systems and components;
6. Electrical (for only selected fire zone/area(s) and/or SSCs to be determined during  
  g. List of post-fire nuclear safety capability system and component design changes
inspection preparation week):  
        completed in the last three years; and
  h. List of identified fire induced circuit failure analyses.
a. Nuclear safety circuit coordination analysis for fuse and breaker coordination of safe  
                                                4
shutdown components;  
b. Administrative or configuration control procedures that govern fuse replacement  
(e.g., fuse control procedures);  
c. Maintenance procedures that verify breaker over-current trip settings to ensure  
coordination remains functional, for post-fire nuclear safety capability components;  
d. Last surveillance demonstrating operability of those components operated from the  
primary control stations;  
e. Schematic or elementary diagrams for circuits (only for selected SSCs) to be  
reviewed (C-size paper drawings);  
f.  
Cable routing for components and equipment credited for post-fire nuclear safety  
capability systems and components;  
g. List of post-fire nuclear safety capability system and component design changes  
completed in the last three years; and  
h. List of identified fire induced circuit failure analyses.


          FIRE PROTECTION TEAM INSPECTION SUPPORTING DOCUMENTATION
FIRE PROTECTION TEAM INSPECTION SUPPORTING DOCUMENTATION  
    7. Operations:
        a. List of procedures that implement Cold Shutdown Repairs (if applicable for selected
5
            fire area);
7. Operations:  
        b. For Cold Shutdown Repairs, provide the following:
            i. Procedure for inventory and inspection (i.e., needed tools, material, etc.); and
a. List of procedures that implement Cold Shutdown Repairs (if applicable for selected  
            ii. Most recent inspection and inventory results.
fire area);  
        c. List of licensed operator Job Performance Measures for operator actions required to
            achieve and maintain post-fire nuclear safety performance criteria (for selected SSCs
b. For Cold Shutdown Repairs, provide the following:  
            and fire area);
        d. For Radio communications, provide the following:
i.  
            i.   Communications Plan for firefighting and post-fire safe shutdown manual actions;
Procedure for inventory and inspection (i.e., needed tools, material, etc.); and  
            ii. Repeater locations;
ii. Most recent inspection and inventory results.  
            iii. Cable routing for repeater power supply cables;
            iv. Radio coverage test results; and
c. List of licensed operator Job Performance Measures for operator actions required to  
            v.   Radio Dead Spot locations in the plant.
achieve and maintain post-fire nuclear safety performance criteria (for selected SSCs  
        e. Environmental and habitability evaluations for post-fire operator actions
and fire area);  
            (temperature, smoke, humidity, SCBAs, etc.).
    8. Administrative Control, Oversight, and Corrective Action Programs:
d. For Radio communications, provide the following:  
        a. Self-assessments, peer assessments, and audits of fire protection activities for
            the last three years;
i.  
        b. Self-assessments, peer assessments, and audits of post-fire nuclear safety
Communications Plan for firefighting and post-fire safe shutdown manual actions;  
            capability methodology for the last three years; and
ii. Repeater locations;  
        c. List of fire event analysis reports for the last three years.
iii. Cable routing for repeater power supply cables;  
    9. Any updates to information previously provided.
iv. Radio coverage test results; and  
III. Information Requested to Be Provided Throughout the Inspection
v. Radio Dead Spot locations in the plant.  
    1. Copies of any corrective action documents generated as a result of the inspection teams
        questions or queries during this inspection.
e. Environmental and habitability evaluations for post-fire operator actions  
    2. Copies of the list of questions submitted by the inspection team members and the
(temperature, smoke, humidity, SCBAs, etc.).  
        status/resolution of the information requested (provided daily during the inspection to
        each inspection team member).
8. Administrative Control, Oversight, and Corrective Action Programs:  
                                                    5
a. Self-assessments, peer assessments, and audits of fire protection activities for  
the last three years;  
b. Self-assessments, peer assessments, and audits of post-fire nuclear safety  
capability methodology for the last three years; and  
c. List of fire event analysis reports for the last three years.  
9. Any updates to information previously provided.  
III. Information Requested to Be Provided Throughout the Inspection  
1. Copies of any corrective action documents generated as a result of the inspection teams  
questions or queries during this inspection.  
2. Copies of the list of questions submitted by the inspection team members and the  
status/resolution of the information requested (provided daily during the inspection to  
each inspection team member).
}}
}}

Revision as of 10:48, 29 November 2024

Notification of NRC Fire Protection Team Inspection Request for Information; Inspection Report 05000456/2021010; 05000457/2021010
ML21057A102
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 02/25/2021
From: Jamie Benjamin
Division of Reactor Safety III
To: Rhoades D
Exelon Generation Co, Exelon Nuclear
References
IR 2021010
Download: ML21057A102 (8)


See also: IR 05000456/2021010

Text

February 25, 2021

Mr. David Rhoades

Senior VP, Exelon Generation Company, LLC

President and CNO, Exelon Nuclear

4300 Winfield Road

Warrenville, IL 60555

SUBJECT: BRAIDWOOD GENERATING STATION, UNITS 1 AND 2 - NOTIFICATION OF

NRC FIRE PROTECTION TEAM INSPECTION REQUEST FOR INFORMATION;

INSPECTION REPORT 05000456/2021010; 05000457/2021010

Dear Mr. Rhoades:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)

Region III staff will conduct a Fire Protection Team Inspection (FPTI) at your Braidwood

Generating Station, Units 1 and 2 beginning May 24, 2021. The inspection will be conducted in

accordance with IP 71111.21N.05, Fire Protection Team Inspection (FPTI), dated

June 12, 2019.

The inspection will verify that plant Systems, Structures, and Components (SSCs) and/or

administrative controls credited in the approved Fire Protection Program (FPP) can perform

their licensing basis function.

The schedule for the inspection is as follows:

Preparation week (R-III office): May 17, 2021

Week 1 of onsite inspection: May 24 - 28, 2021

Week 2 of onsite inspection: June 17 - 21, 2021

Experience has shown that the baseline fire protection team inspections are extremely resource

intensive, both for the NRC inspectors and the licensee staff. In order to minimize the

inspection impact on the site and to ensure a productive inspection for both organizations, we

have enclosed a request for documents needed for the inspection. These documents have

been divided into three groups.

The first group lists information necessary to aid the inspection team in choosing specific focus

areas for the inspection and to ensure that the inspection team is adequately prepared for the

inspection. It is requested that this information be provided to the lead inspector via mail or

electronically no later than April 5, 2021.

The second group of requested documents consists of those items that the team will review, or

need access to, during the inspection. Please have this information available by the first day of

the first onsite inspection week May 24, 2021.

D. Rhoades

-2-

The third group lists the information necessary to aid the inspection team in tracking issues

identified as a result of the inspection. It is requested that this information be provided to the

lead inspector as the information is generated during the inspection.

It is important that all of these documents are up to date and complete in order to minimize the

number of additional documents requested during the preparation and/or the onsite portions of

the inspection.

The lead inspector for this inspection is Mr. Jamie Benjamin. If there are any questions about

the inspection or the material requested, please contact the lead inspector at 630-829-9747 or

via e-mail at Jamie.Benjamin@nrc.gov.

This letter, its enclosure, and your response (if any) will be made available for public inspection

and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document

Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for

Withholding.

Sincerely,

/RA/

Jamie Benjamin, Reactor Inspector

Engineering Branch 2

Division of Reactor Safety

Docket Nos. 50-456 and 50-457

License Nos. NPF-72 and NPF-77

Enclosure:

Information Request for Fire Protection

Team Inspection

cc: Distribution via LISTSERV

D. Rhoades

-3-

Letter to David Rhoades from Jamie Benjamin dated February 25, 2021.

SUBJECT: BRAIDWOOD GENERATING STATION, UNITS 1 AND 2 - NOTIFICATION OF

NRC FIRE PROTECTION TEAM INSPECTION REQUEST FOR INFORMATION;

INSPECTION REPORT 05000456/2021010; 05000457/2021010

DISTRIBUTION:

Jessie Quichocho

Mark Haire

RidsNrrDorlLpl3

RidsNrrPMBraidwood Resource

RidsNrrDroIrib Resource

John Giessner

Kenneth OBrien

Jamnes Cameron

Allan Barker

DRPIII

DRSIII

ADAMS Accession Number: ML21057A102

Publicly Available

Non-Publicly Available

Sensitive

Non-Sensitive

OFFICE

RIII

NAME

JBenjamin:mb

via e-mail

DATE

02/25/2021

OFFICIAL RECORD COPY

FIRE PROTECTION TEAM INSPECTION SUPPORTING DOCUMENTATION

Enclosure

I.

Information Requested Prior to the Inspection Preparation Week

The following information is requested by April 5, 2021. If you have any questions

regarding this request, please call the lead inspector as soon as possible. All information

should be sent to Jamie Benjamin (e-mail address Jamie.Benjamin@nrc.gov). Electronic

media is preferred (e.g. via Share File System).

1. One set of hard-copy documents for facility layout drawings which identify plant fire area

delineation; areas protected by automatic fire suppression and detection; and locations

of fire protection equipment.

2. Licensing Information:

a. All NRC Safety Evaluation Reports (SERs) applicable to fire protection (specifically

including those SERs referenced by the plant fire protection license condition) and all

licensing correspondence referenced by the SERs;

b. All licensing correspondence associated with the comparison to Standard Review

Plan (NUREG-0800), Section 9.5.1 or equivalent for licensing purposes;

c. Exemptions from 10 CFR 50.48 and 10 CFR Part 50, Appendix R, and associated

licensing correspondence;

d. For pre-1979 plants, all licensing correspondence associated with those sections of

10 CFR Part 50, Appendix R, that are not applicable to the plant under

10 CFR 50.48(b)(1). Specifically, the licensing correspondence associated with

those fire protection features proposed or implemented by the licensee that have

been accepted by the NRC staff as satisfying the provisions of Appendix A to Branch

Technical Position (BTP) APCSB 9.5-1 reflected in the NRC fire protection SERs

issued before February 19, 1981, (10 CFR 50.48(b)(1)(i)); or those fire protection

features, which were accepted by the NRC staff in comprehensive fire protection

SERs issued before Appendix A to BTP APCSB 9.5-1 was published in August 1976

(10 CFR 50.48(b)(1)(ii)); and

e. The final safety analysis report sections applicable to fire protection, FHA, and SSA

in effect at the time of original licensing.

3. Fire Protection Program:

a. A listing of changes made to the FPP since the last triennial fire protection

inspection;

b. For pre-1979 plants, a listing of the protection methodologies identified under

10 CFR Part 50, Appendix R, Section III.G used to achieve compliance for fire

zones/areas. That is, please specify whether 3-hour rated fire barriers;

(Section III.G.2.a), 20-foot separation along with detection and suppression;

(Section III.G.2.b), 1-hour rated fire barriers with detection and suppression;

(Section III.G.2.c), or alternative shutdown capability; (Section III.G.3) is used as a

strategy for each selected fire zone/area;

FIRE PROTECTION TEAM INSPECTION SUPPORTING DOCUMENTATION

2

c. A list of Generic Letter 86-10 evaluations (i.e., a list of adverse to safe shutdown

evaluations);

d. A list of applicable codes and standards related to the design of plant fire protection

features. The list should include National Fire Protection Association (NFPA) code

versions committed to (i.e., the NFPA Codes of Record);

e. List of plant deviations from code commitments and associated evaluations;

f.

Fire Protection Program and/or Fire Protection Plan document;

g. (If available) Fire Probabilistic Risk Assessment (PRA) Summary Report or full PRA

document (if summary document not available);

h. List of the top 25 highest fire CDF scenarios for each unit;

i.

List of Fire Areas/Zones ranked by contribution to CDF. i.e., ranking of highest to

lowest risk fire areas/zones;

j.

List of the top 25 highest fire LERF scenarios for each unit; and

k. Risk ranking of operator actions and/or recovery actions from your site-specific PRA

sorted by RAW and human reliability worksheets for these items.

4. Facility Information:

a. Piping and instrumentation (flow) diagrams showing the components used to achieve

and maintain hot standby and cold shutdown for fires outside the control room, and

those components used for those areas requiring alternative shutdown capability;

b. One-line schematic drawings of the electrical distribution system for 4160 Volts

alternating current (Vac) down to 480Vac;

c. One-line schematic drawings of the electrical distribution system for 250 Volts direct

current (Vdc) and 125Vdc systems as applicable;

d. Logic diagrams showing the components used to achieve and maintain hot standby

and cold shutdown; and

e. Safe shutdown cable routing database (requested electronically, such as on compact

disc, if available).

5. Operations Response for Fire Protection:

a. Plant operating procedures which specify the initial operations response to a fire

alarm or annunciator.

FIRE PROTECTION TEAM INSPECTION SUPPORTING DOCUMENTATION

3

6. Corrective Actions:

a. Listing of open and closed fire protection condition reports (i.e., problem identification

forms and their resolution reports) since the date of the last triennial fire protection

inspection; and

b. List of current fire impairments, including duration.

7. General Information:

a. A listing of abbreviations and/or designators for plant systems;

b. Organization charts of site personnel down to the level of fire protection staff

personnel; and

c. A phone list for onsite licensee personnel.

II. Information Requested to Be Available on First Day of the First Onsite

Inspection Week (May 24, 2021)

The following information is requested to be provided on the first day of inspection. It is

requested that this information be provided on three sets of CDs (searchable, if possible).

1. Program Procedures:

a. Procedures for:

i.

Administrative controls (such as allowed out of service times and compensatory

measures) for fire protection systems and components;

ii. Control of transient combustibles; and

iii. Control of hot work.

b. List of maintenance and surveillance testing procedures for alternative shutdown

capability and fire barriers, detectors, pumps, and suppression systems; and

c. List of maintenance procedures which routinely verify fuse breaker coordination in

accordance with the post-fire safe shutdown coordination analysis.

2. Design and Equipment Information (for only selected fire zone/area(s) and/or SSCs

to be determined during inspection preparation week):

a. Coordination calculations and/or justifications that verify fuse/breaker coordination for

SSCs that are fed off of the same electrical buses as components in the protected

safe shutdown train;

b. Copies of significant fire protection and post-fire safe shutdown related design

change package descriptions (including their associated 10 CFR 50.59 evaluations)

and Generic Letter (GL) 86-10 (or adverse to safe shutdown) evaluations;

c. Gaseous suppression system pre-operational testing, if applicable, for selected fire

zones/areas;

FIRE PROTECTION TEAM INSPECTION SUPPORTING DOCUMENTATION

4

d. Hydraulic calculations and supporting test data which demonstrate operability for

water suppression systems;

e. Alternating current (ac) coordination calculations for 4160Vac down to 480Vac

electrical systems; and

f.

List of all fire protection or Appendix R calculations.

3. Assessment and Corrective Actions:

The three most recent fire protection Quality Assurance audits and/or fire protection self-

assessments.

4. Any updates to information previously provided.

5. Classic Fire Protection (for only selected fire zone/area(s) and/or SSCs to be

determined during inspection preparation week):

a. Copy of fire protection program implementing procedures (e.g., administrative

controls, surveillance testing, and fire brigade);

b. Pre-fire plans for selected fire area(s); and

c. List of fire protection system design changes completed in the last three years.

6. Electrical (for only selected fire zone/area(s) and/or SSCs to be determined during

inspection preparation week):

a. Nuclear safety circuit coordination analysis for fuse and breaker coordination of safe

shutdown components;

b. Administrative or configuration control procedures that govern fuse replacement

(e.g., fuse control procedures);

c. Maintenance procedures that verify breaker over-current trip settings to ensure

coordination remains functional, for post-fire nuclear safety capability components;

d. Last surveillance demonstrating operability of those components operated from the

primary control stations;

e. Schematic or elementary diagrams for circuits (only for selected SSCs) to be

reviewed (C-size paper drawings);

f.

Cable routing for components and equipment credited for post-fire nuclear safety

capability systems and components;

g. List of post-fire nuclear safety capability system and component design changes

completed in the last three years; and

h. List of identified fire induced circuit failure analyses.

FIRE PROTECTION TEAM INSPECTION SUPPORTING DOCUMENTATION

5

7. Operations:

a. List of procedures that implement Cold Shutdown Repairs (if applicable for selected

fire area);

b. For Cold Shutdown Repairs, provide the following:

i.

Procedure for inventory and inspection (i.e., needed tools, material, etc.); and

ii. Most recent inspection and inventory results.

c. List of licensed operator Job Performance Measures for operator actions required to

achieve and maintain post-fire nuclear safety performance criteria (for selected SSCs

and fire area);

d. For Radio communications, provide the following:

i.

Communications Plan for firefighting and post-fire safe shutdown manual actions;

ii. Repeater locations;

iii. Cable routing for repeater power supply cables;

iv. Radio coverage test results; and

v. Radio Dead Spot locations in the plant.

e. Environmental and habitability evaluations for post-fire operator actions

(temperature, smoke, humidity, SCBAs, etc.).

8. Administrative Control, Oversight, and Corrective Action Programs:

a. Self-assessments, peer assessments, and audits of fire protection activities for

the last three years;

b. Self-assessments, peer assessments, and audits of post-fire nuclear safety

capability methodology for the last three years; and

c. List of fire event analysis reports for the last three years.

9. Any updates to information previously provided.

III. Information Requested to Be Provided Throughout the Inspection

1. Copies of any corrective action documents generated as a result of the inspection teams

questions or queries during this inspection.

2. Copies of the list of questions submitted by the inspection team members and the

status/resolution of the information requested (provided daily during the inspection to

each inspection team member).