ML21090A085: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot change) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:V.C. Summer Nuclear Station Bradham Blvd & Hwy 215, | {{#Wiki_filter:V.C. Summer Nuclear Station Bradham Blvd & Hwy 215, Jenkinsville, SC 29065 Mailing Address: | ||
P.O. Box 88, Jenki nsville, SC 29065 DominionEnergy.com ATTN: Document Control Desk US Nuclear Regulatory Commission Washington, D.C. 20555-001 March 30, 2021 DOMINION ENERGY SOUTH CAROLINA, INC. | |||
VIRGIL C. SUMMER NUCLEAR STATION UNIT 1 DOCKET NO. 50-395 OPERA TING LICENSE NO. NPF-12 ANNUAL OPERATING REPORT lS1; Dominion | |||
VIRGIL C. SUMMER NUCLEAR STATION UNIT 1 DOCKET NO. 50-395 OPERA TING LICENSE NO. NPF-12 ANNUAL OPERATING REPORT Enclosed is the 2020 Annual Operating Report for the Dominion Energy South Carolina, Inc. Virgil C. Summer Nuclear Station Unit No. 1. This report is being submitted in accordance with Technical Specification 6 .9.1.4. | ~ | ||
If there are any questions, please call Tracey Stewart at (803) 931 -5663 . | Energy Serial No. 21 -108 LIC!TS/R0 Docket No. 50-395 License No. NPF-12 Enclosed is the 2020 Annual Operating Report for the Dominion Energy South Carolina, Inc. Virgil C. Summer Nuclear Station Unit No. 1. This report is being submitted in accordance with Technical Specification 6.9.1.4. | ||
Sincerely, George A. Lippard Site Vice President V. C. Summer Nuclear Station w/o enclosure unless noted cc: | If there are any questions, please call Tracey Stewart at (803) 931 -5663. | ||
Sincerely, George A. Lippard Site Vice President V. C. Summer Nuclear Station w/o enclosure unless noted cc: | |||
G. J. Lindamood - Santee Cooper L. Dudes - NRC V. Thomas - NRC PM M. L. Thomas - NRC NRC Resident Inspector Marsh USA, Inc. | |||
C. Logan (ANI) | C. Logan (ANI) | ||
REIRS Project Manager | REIRS Project Manager | ||
VIRGIL C. SUMMER NUCLEAR STATION UNIT 1 2020 ANNUAL OPERATING REPORT | VIRGIL C. SUMMER NUCLEAR STATION UNIT 1 2020 ANNUAL OPERATING REPORT | ||
Serial No. 21-108 Docket No. 50-395 VCSNS Annual Operating Report Page 1 of 4 | PREFACE Serial No. 21-108 Docket No. 50-395 VCSNS Annual Operating Report Page 1 of 4 The 2020 Annual Operating Report for the Virgil C. Summer Nuclear Station Unit 1 is hereby submitted in accordance with Technical Specification 6.9.1.4 under Docket Number 50-395 and Facility Operating License NPF-12. | ||
SECTION 1.0 2.0 3.0 4.0 TABLE OF CONTENTS TITLE Introduction Operational Data Operating Summary Failed Fuel Serial No. 21-108 Docket No. 50-395 VCSNS Annual Operating Report Page 2 of4 PAGE 3 | |||
3 3 | |||
Serial No. 21-108 Docket No. 50-395 VCSNS Annual Operating Report Page 3 | 4 | ||
==1.0 INTRODUCTION== | ==1.0 INTRODUCTION== | ||
Serial No. 21-108 Docket No. 50-395 VCSNS Annual Operating Report Page 3 of 4 The Virgil C. Summer Nuclear Station (VCSNS) utilizes a pressurized water reactor rated at 2900 MWT. The maximum dependable capacity is 966 MWe. | |||
The Virgil C. Summer Nuclear Station (VCSNS) utilizes a pressurized water reactor rated at 2900 MWT. The maximum dependable capacity is 966 MWe. | |||
The station is located approximately 26 miles northwest of Columbia, South Carolina. | The station is located approximately 26 miles northwest of Columbia, South Carolina. | ||
2.0 OPERATIONAL DATA For the reporting period of January 1 through December 31, 2020, the station operated at a capacity factor of 91.1 % (using maximum dependable capacity) and a unit availability of 91.1 %. The reactor was critical for a total of 8046.0 hours, the generator remained on line 8003.3 hours and the total gross electrical energy generated for 2020 was 8,041,633 MWH. | 2.0 OPERATIONAL DATA For the reporting period of January 1 through December 31, 2020, the station operated at a capacity factor of 91.1 % (using maximum dependable capacity) and a unit availability of 91.1 %. The reactor was critical for a total of 8046.0 hours, the generator remained on line 8003.3 hours and the total gross electrical energy generated for 2020 was 8,041,633 MWH. | ||
3.0 | 3.0 OPERA TING | ||
==SUMMARY== | ==SUMMARY== | ||
VCSNS Unit No.1 operated at 100% power from January 1st through April 10th. On April 10th the plant was shut down to begin Refueling Outage Twenty-Five (RF-25) when the Main Generator Breaker was opened at 21 :56. The outage was completed on May 10th at 23:36 when the generator breaker was closed. Reactor power was restored to 100% on May 15th at 11 :20. | |||
VCSNS Unit No. 1 operated at 100% power from May 15th to July 27th. On July 27th power was reduced to 83% following a Circulating Water Pump trip. Reactor power was restored to 100% on July 30th. | |||
VCSNS Unit No. 1 operated at 100% power from July 30th to August 22nd. On August 22nd power was reduced to 86% following a Circulating Water Pump trip. Reactor power was maintained at 86% for the remainder of August for replacement of the pump motor. Entering the month of September, plant power was 85%. The plant was shut down on September 7th to repair an air leak on the actuator of a Feedwater Isolation Valve. The shutdown ended on September 10th and the plant returned to 85% power. Due to seasonal conditions, as ambient temperature and Gire Water inlet temperature began to decrease, power was increased starting on September 14th. Reactor power was restored to 100% on September 25th. | |||
The unit remained at 100% power for the remainder of 2020. | |||
Forced Power Reduction > 20% Exceeding 4 Hours Serial No. 21-108 Docket No. 50-395 VCSNS Annual Operating Report Page 4 of4 On September 7th the plant was shut down to repair an air leak on the actuator of a Feedwater Isolation Valve. The shutdown ended on September 10th and the plant returned to 85% power. The total outage duration was 59.03 hours. | |||
Serial No. 21-108 Docket No. 50-395 VCSNS Annual Operating Report Page 4 of4 | |||
4.0 FAILED FUEL VCSNS did not have any indications of failed fuel in 2020.}} | 4.0 FAILED FUEL VCSNS did not have any indications of failed fuel in 2020.}} | ||
Latest revision as of 09:59, 29 November 2024
| ML21090A085 | |
| Person / Time | |
|---|---|
| Site: | Summer |
| Issue date: | 03/30/2021 |
| From: | Lippard G Dominion Energy South Carolina |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| 21-108 | |
| Download: ML21090A085 (6) | |
Text
V.C. Summer Nuclear Station Bradham Blvd & Hwy 215, Jenkinsville, SC 29065 Mailing Address:
P.O. Box 88, Jenki nsville, SC 29065 DominionEnergy.com ATTN: Document Control Desk US Nuclear Regulatory Commission Washington, D.C. 20555-001 March 30, 2021 DOMINION ENERGY SOUTH CAROLINA, INC.
VIRGIL C. SUMMER NUCLEAR STATION UNIT 1 DOCKET NO. 50-395 OPERA TING LICENSE NO. NPF-12 ANNUAL OPERATING REPORT lS1; Dominion
~
Energy Serial No. 21 -108 LIC!TS/R0 Docket No. 50-395 License No. NPF-12 Enclosed is the 2020 Annual Operating Report for the Dominion Energy South Carolina, Inc. Virgil C. Summer Nuclear Station Unit No. 1. This report is being submitted in accordance with Technical Specification 6.9.1.4.
If there are any questions, please call Tracey Stewart at (803) 931 -5663.
Sincerely, George A. Lippard Site Vice President V. C. Summer Nuclear Station w/o enclosure unless noted cc:
G. J. Lindamood - Santee Cooper L. Dudes - NRC V. Thomas - NRC PM M. L. Thomas - NRC NRC Resident Inspector Marsh USA, Inc.
C. Logan (ANI)
REIRS Project Manager
VIRGIL C. SUMMER NUCLEAR STATION UNIT 1 2020 ANNUAL OPERATING REPORT
PREFACE Serial No.21-108 Docket No. 50-395 VCSNS Annual Operating Report Page 1 of 4 The 2020 Annual Operating Report for the Virgil C. Summer Nuclear Station Unit 1 is hereby submitted in accordance with Technical Specification 6.9.1.4 under Docket Number 50-395 and Facility Operating License NPF-12.
SECTION 1.0 2.0 3.0 4.0 TABLE OF CONTENTS TITLE Introduction Operational Data Operating Summary Failed Fuel Serial No.21-108 Docket No. 50-395 VCSNS Annual Operating Report Page 2 of4 PAGE 3
3 3
4
1.0 INTRODUCTION
Serial No.21-108 Docket No. 50-395 VCSNS Annual Operating Report Page 3 of 4 The Virgil C. Summer Nuclear Station (VCSNS) utilizes a pressurized water reactor rated at 2900 MWT. The maximum dependable capacity is 966 MWe.
The station is located approximately 26 miles northwest of Columbia, South Carolina.
2.0 OPERATIONAL DATA For the reporting period of January 1 through December 31, 2020, the station operated at a capacity factor of 91.1 % (using maximum dependable capacity) and a unit availability of 91.1 %. The reactor was critical for a total of 8046.0 hours0 days <br />0 hours <br />0 weeks <br />0 months <br />, the generator remained on line 8003.3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> and the total gross electrical energy generated for 2020 was 8,041,633 MWH.
3.0 OPERA TING
SUMMARY
VCSNS Unit No.1 operated at 100% power from January 1st through April 10th. On April 10th the plant was shut down to begin Refueling Outage Twenty-Five (RF-25) when the Main Generator Breaker was opened at 21 :56. The outage was completed on May 10th at 23:36 when the generator breaker was closed. Reactor power was restored to 100% on May 15th at 11 :20.
VCSNS Unit No. 1 operated at 100% power from May 15th to July 27th. On July 27th power was reduced to 83% following a Circulating Water Pump trip. Reactor power was restored to 100% on July 30th.
VCSNS Unit No. 1 operated at 100% power from July 30th to August 22nd. On August 22nd power was reduced to 86% following a Circulating Water Pump trip. Reactor power was maintained at 86% for the remainder of August for replacement of the pump motor. Entering the month of September, plant power was 85%. The plant was shut down on September 7th to repair an air leak on the actuator of a Feedwater Isolation Valve. The shutdown ended on September 10th and the plant returned to 85% power. Due to seasonal conditions, as ambient temperature and Gire Water inlet temperature began to decrease, power was increased starting on September 14th. Reactor power was restored to 100% on September 25th.
The unit remained at 100% power for the remainder of 2020.
Forced Power Reduction > 20% Exceeding 4 Hours Serial No.21-108 Docket No. 50-395 VCSNS Annual Operating Report Page 4 of4 On September 7th the plant was shut down to repair an air leak on the actuator of a Feedwater Isolation Valve. The shutdown ended on September 10th and the plant returned to 85% power. The total outage duration was 59.03 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />.
4.0 FAILED FUEL VCSNS did not have any indications of failed fuel in 2020.