L-2021-115, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 26 Annual Submittal and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 10: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (StriderTol Bot change) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:}} | ||
Revision as of 08:44, 29 November 2024
| ML21147A127 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie, Point Beach, Seabrook, Turkey Point |
| Issue date: | 05/24/2021 |
| From: | Lesniak T Florida Power & Light Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| L-2021-115 | |
| Download: ML21147A127 (185) | |