==Inspection Report== | ==Inspection Report== | ||
Docket Number: 05000400 | Docket Number: | ||
05000400 | |||
License Number: NPF-63 | License Number: | ||
NPF-63 | |||
Report Number: 05000400/2022011 | Report Number: | ||
05000400/2022011 | |||
Enterprise Identifier: I-2022-011-0024 | Enterprise Identifier: | ||
I-2022-011-0024 | |||
Licensee: Duke Energy Progress, LLC | Licensee: | ||
Duke Energy Progress, LLC | |||
Facility: Shearon Harris Nuclear Power Plant | Facility: | ||
Shearon Harris Nuclear Power Plant | |||
Location: New Hill, NC 27562 | Location: | ||
New Hill, NC 27562 | |||
Inspection Dates: May 23, 2022 to June 10, 2022 | Inspection Dates: | ||
May 23, 2022 to June 10, 2022 | |||
Inspectors: S. Ninh, Senior Project Engineer W. Pursley, Health Physicist C. Smith, Resident Inspector R. Taylor, Senior Project Engineer A. Wilson, Senior Project Engineer (Team Lead) | Inspectors: | ||
S. Ninh, Senior Project Engineer | |||
Approved By: Matthew S. Fannon, Chief Reactor Projects Branch 4 Division of Reactor Projects | W. Pursley, Health Physicist | ||
C. Smith, Resident Inspector | |||
R. Taylor, Senior Project Engineer | |||
A. Wilson, Senior Project Engineer (Team Lead) | |||
Approved By: | |||
Matthew S. Fannon, Chief | |||
Reactor Projects Branch 4 | |||
Division of Reactor Projects | |||
=SUMMARY= | =SUMMARY= | ||
| Line 133: | Line 138: | ||
=DOCUMENTS REVIEWED= | =DOCUMENTS REVIEWED= | ||
Inspection Type Designation Description or Title Revision or | Inspection | ||
Procedure | |||
71152B Corrective Action | Type | ||
Documents | Designation | ||
Description or Title | |||
Revision or | |||
Date | |||
71152B | |||
Corrective Action | |||
Documents | |||
212531 | |||
22505 | |||
23719 | 23719 | ||
24273 | 24273 | ||
| Line 167: | Line 180: | ||
2348031 | 2348031 | ||
2349762 | 2349762 | ||
Inspection | |||
Procedure | |||
Type | |||
Designation | |||
Description or Title | |||
Revision or | |||
Date | |||
2350357 | 2350357 | ||
2351619 | 2351619 | ||
| Line 204: | Line 221: | ||
2379092 | 2379092 | ||
2379651 | 2379651 | ||
Inspection | |||
Procedure | |||
Type | |||
Designation | |||
Description or Title | |||
Revision or | |||
Date | |||
2379780 | 2379780 | ||
2380375 | 2380375 | ||
| Line 241: | Line 262: | ||
2409078 | 2409078 | ||
2409079 | 2409079 | ||
Inspection | |||
Procedure | |||
Type | |||
Designation | |||
Description or Title | |||
Revision or | |||
Date | |||
2409314 | 2409314 | ||
2410990 | 2410990 | ||
| Line 268: | Line 293: | ||
26647 | 26647 | ||
26973 | 26973 | ||
28530 | |||
Documents | Missed Maintenance Rule (a)(1) Evaluation | ||
Corrective Action | |||
Documents | |||
Resulting from | Resulting from | ||
Inspection | Inspection | ||
Engineering EC 419545 Acceptability of Valves Exceeding LLRT Admin Limits Exiting | 2430708 | ||
NRC PI&R Inspection Observation | |||
Engineering | |||
Changes | |||
ESR-9900169 Evaluation of Permanent Lead Shielding Installed on RHR | EC 419545 | ||
Acceptability of Valves Exceeding LLRT Admin Limits Exiting | |||
RFO-23 | |||
REVISION 0 | |||
ESR 9800571 | |||
Calculation HNP-C/STRS-1050, Evaluation of Permanent | |||
Lead Shielding Installed on RHR Pump 1A | |||
2/23/1998 | |||
Engineering | |||
Evaluations | |||
ESR-9900169 | |||
Evaluation of Permanent Lead Shielding Installed on RHR | |||
Pump | Pump | ||
01/28/2000 | |||
Inspection Type Designation Description or Title Revision or | Inspection | ||
Procedure | |||
Type | |||
Designation | |||
Description or Title | |||
Revision or | |||
Date | |||
EVAL-2020-HNP- | EVAL-2020-HNP- | ||
1065-00002161 | 1065-00002161 | ||
| Line 293: | Line 336: | ||
EVAL-2021-HNP- | EVAL-2021-HNP- | ||
5175-00002173 | 5175-00002173 | ||
Station Health Report - Emergency Diesel Generator and | |||
Auxiliaries | Auxiliaries | ||
AD-EG-ALL-1207 Plant Health Process for Bridging Strategy for Refurbishment | 2/31/2021 | ||
AD-EG-ALL-1207 | |||
Plant Health Process for Bridging Strategy for Refurbishment | |||
of the Siemens, Model RLN, 480V Circuit Breakers | of the Siemens, Model RLN, 480V Circuit Breakers | ||
CSD-AD-ALL- | CSD-AD-ALL- | ||
0004-01 | 0004-01 | ||
EVT-2085-2021- | CORRECTIVE ACTION PROGRAM REVIEW MEETING | ||
REVISION 7 | |||
EVT-2085-2021- | |||
00075447 | 00075447 | ||
EVT-5145-2021- | Maintenance Rule Manager Event | ||
EVT-5145-2021- | |||
00075253 | 00075253 | ||
EVT-5175-2021- | Maintenance Rule Manager Event | ||
EVT-5175-2021- | |||
00075457 | 00075457 | ||
MTG-2021- | Maintenance Rule Manager Event | ||
MTG-2021- | |||
00000291 | 00000291 | ||
MTG-2022- | Maintenance Rule Meeting Minutes | ||
MTG-2022- | |||
00000323 | 00000323 | ||
MTG-2022- | Maintenance Rule Meeting Minutes | ||
MTG-2022- | |||
00000328 | 00000328 | ||
MTG-2022- | Maintenance Rule Meeting Minutes | ||
MTG-2022- | |||
00000336 | 00000336 | ||
MTG-2022- | Maintenance Rule Meeting Minutes | ||
Miscellaneous | |||
MTG-2022- | |||
00000345 | 00000345 | ||
Inspection Type Designation Description or Title Revision or | Maintenance Rule Meeting Minutes | ||
Inspection | |||
Procedure | |||
Type | |||
Designation | |||
Description or Title | |||
Revision or | |||
Date | |||
TTC1018-N CAP | TTC1018-N CAP | ||
Overview for New | Overview for New | ||
Employees | Employees | ||
AD-LS-ALL--0003 | |||
AD-MN-ALL-0017 HOUSEKEEPING, MATERIAL CONDITION, AND SEISMIC | NRC AUDIT AND INSPECTION ACTIVITIES | ||
REVISION | |||
AD-MN-ALL-0017 | |||
HOUSEKEEPING, MATERIAL CONDITION, AND SEISMIC | |||
REQUIREMENTS FOR EQUIPMENT STORAGE | REQUIREMENTS FOR EQUIPMENT STORAGE | ||
AD-PI-ALL-0400 OPERATING EXPERIENCE PROGRAM REVISION | REVISION 1 | ||
ADMINISTRATIVE | AD-PI-ALL-0400 | ||
OPERATING EXPERIENCE PROGRAM | |||
REVISION | |||
ADMINISTRATIVE | |||
PROCEDURE, | PROCEDURE, | ||
AD-EG-ALL-1214 | AD-EG-ALL-1214 | ||
ADMINISTRATIVE | CONDITION MONITORING OF STRUCTURES | ||
PROCEDURE, | REVISION 1 | ||
ADMINISTRATIVE | |||
PROCEDURE, | |||
AD-WC-ALL-0210 | AD-WC-ALL-0210 | ||
ADMINISTRATIVE | WORK REQUEST INITIATION, SCREENING, | ||
PRIORITIZATION AND CLASSIFICATION. | |||
REVISION | |||
ADMINISTRATIVE | |||
PROCEDURE, | PROCEDURE, | ||
AD-EG-ALL-1104 | AD-EG-ALL-1104 | ||
ADMINISTRATIVE | OBSOLESCENCE PROGRAM | ||
PROCEDURE, | REVISION 5 | ||
ADMINISTRATIVE | |||
PROCEDURE, | |||
AD-EG-ALL-1202, | AD-EG-ALL-1202, | ||
ADMINISTRATIVE | PREVENTIVE MAINTENANCE AND SURVEILLANCE | ||
TESTING ADMINISTRATION | |||
REVISION | |||
ADMINISTRATIVE | |||
PROCEDURE, | PROCEDURE, | ||
AD-EG-ALL-1206 | AD-EG-ALL-1206 | ||
ADMINISTRATIVE | EQUIPMENT RELIABILITY CLASSIFICATION | ||
REVISION 6 | |||
ADMINISTRATIVE | |||
PROCEDURE, | PROCEDURE, | ||
AD-EG-ALL-1210 | AD-EG-ALL-1210 | ||
MAINTENANCE RULE PROGRAM | |||
REVISION 2 | |||
ADMINISTRATIVE | |||
PROCEDURE, | PROCEDURE, | ||
AD-EG-ALL-1210 | AD-EG-ALL-1210 | ||
ADMINISTRATIVE | MAINTENANCE RULE PROGRAM | ||
REVISION 3 | |||
ADMINISTRATIVE | |||
PROCEDURE, | PROCEDURE, | ||
AD-EG-ALL-1650 | AD-EG-ALL-1650 | ||
ADMINISTRATIVE BORIC ACID CORROSION CONTROL PROGRAM - REVISION 4. | LICENSE RENEWAL AGING MANAGEMENT | ||
Inspection Type Designation Description or Title Revision or | REVISION 4 | ||
Procedures | |||
PROCEDURE, | ADMINISTRATIVE BORIC ACID CORROSION CONTROL PROGRAM - | ||
REVISION 4. | |||
Inspection | |||
Procedure | |||
Type | |||
Designation | |||
Description or Title | |||
Revision or | |||
Date | |||
PROCEDURE, | |||
AD-EG-PWR-1611 | AD-EG-PWR-1611 | ||
ADMINISTRATIVE | IMPLEMENTATION | ||
ADMINISTRATIVE | |||
PROCEDURE, | PROCEDURE, | ||
AD-OP-ALL-0105 | AD-OP-ALL-0105 | ||
ADMINISTRATIVE | OPERABILITY DETERMINATIONS | ||
PROCEDURE, | REVISION 6 | ||
ADMINISTRATIVE | |||
PROCEDURE, | |||
AD-PI-ALL-0100 | AD-PI-ALL-0100 | ||
ADMINISTRATIVE | CORRECTIVE ACTION PROGRAM | ||
REVISION | |||
ADMINISTRATIVE | |||
PROCEDURE, | PROCEDURE, | ||
AD-PI-ALL-0101 | AD-PI-ALL-0101 | ||
ROOT CAUSE EVALUATION | |||
REVISION 8 | |||
ADMINISTRATIVE | |||
PROCEDURE, | PROCEDURE, | ||
AD-PI-ALL-0106 | AD-PI-ALL-0106 | ||
ADMINISTRATIVE | CAUSE INVESTIGATION CHECKLISTS | ||
PROCEDURE, | REVISION 7 | ||
ADMINISTRATIVE | |||
PROCEDURE, | |||
AD-RP-ALL-5000 | AD-RP-ALL-5000 | ||
PREPARATION AND SHIPMENT OF RADIOACTIVE | |||
PROCEDURE, | MATERIAL AND RADIOACTIVE WASTE | ||
REVISION 5 | |||
ADMINISTRATIVE | |||
PROCEDURE, | |||
AD-WC-ALL-0250 | AD-WC-ALL-0250 | ||
AP-038 DEFICIENCY TAG PROCEDURE REVISION | WORK IMPLEMENTATION AND COMPLETION | ||
ENGINEERING | REVISION | ||
SURVEILLANCE | AP-038 | ||
DEFICIENCY TAG PROCEDURE | |||
REVISION | |||
ENGINEERING | |||
SURVEILLANCE | |||
TEST, NUMBER: | TEST, NUMBER: | ||
EST-212 | EST-212 | ||
PM-E0044 480 VAC SIEMENS TYPE RLN(F) LOAD CENTER BREAKER | TYPE C LOCAL LEAK RATE TESTS | ||
AND CUBICLE | REVISION | ||
PM-E0044 | |||
Radiation Surveys HNP-M-Follow-up Survey in Chemistry Lab Following Dose Rate 05/05/2021 | 480 VAC SIEMENS TYPE RLN(F) LOAD CENTER BREAKER | ||
AND CUBICLE P.M. | |||
REVISION | |||
24, 25 | |||
20-HNP-SEC-NUCLEAR OVERSIGHT - AUDIT HARRIS PHYSICAL | Radiation Surveys HNP-M- | ||
210505-8 | |||
Follow-up Survey in Chemistry Lab Following Dose Rate | |||
Alarm | |||
05/05/2021 | |||
20-FLEET- | |||
CAP-01 | |||
NUCLEAR OVERSIGHT - AUDIT FLEET PERFORMANCE | |||
IMPROVEMENT AND CORRECTIVE ACTION PROGRAM | |||
Self-Assessments | |||
20-HNP-SEC- | |||
NUCLEAR OVERSIGHT - AUDIT HARRIS PHYSICAL | |||
SECURITY | SECURITY | ||
Inspection Type Designation Description or Title Revision or | Inspection | ||
Procedure | |||
21-HNP-ENG-NUCLEAR OVERSIGHT - AUDIT HARRIS ENGINEERING | Type | ||
21-HNP-MNT-NUCLEAR OVERSIGHT - AUDIT HARRIS MAINTENANCE | Designation | ||
Description or Title | |||
Revision or | |||
Date | |||
21-HNP-ENG- | |||
NUCLEAR OVERSIGHT - AUDIT HARRIS ENGINEERING | |||
21-HNP-MNT- | |||
NUCLEAR OVERSIGHT - AUDIT HARRIS MAINTENANCE | |||
AND SPECIAL PROCESSES | AND SPECIAL PROCESSES | ||
22-HNP-FIRE-NUCLEAR OVERSIGHT - AUDIT | 22-HNP-FIRE- | ||
NUCLEAR OVERSIGHT - AUDIT | |||
HARRIS FIRE PROTECTION | HARRIS FIRE PROTECTION | ||
22-HNP-OPT-NUCLEAR OVERSIGHT - AUDIT HARRIS OPERATIONS | 22-HNP-OPT- | ||
NUCLEAR OVERSIGHT - AUDIT HARRIS OPERATIONS | |||
TRAINING | TRAINING | ||
2340613-05 | 2340613-05 | ||
2363582-05 Operator Knowledge of Important Parameters and Control 08/17/2021 | 20 CR Initiation Rate Analysis | ||
2370171-05 Operational Risk 03/04/2021 | 07/22/2020 | ||
2406757-05 HNP 2022 NRC PI&R Readiness Assessment | 2363582-05 | ||
RP Bench | Operator Knowledge of Important Parameters and Control | ||
Strength 5-2-22 | 08/17/2021 | ||
2370171-05 | |||
Operational Risk | |||
03/04/2021 | |||
2406757-05 | |||
HNP 2022 NRC PI&R Readiness Assessment | |||
2/17/2022 | |||
RP Bench | |||
Strength 5-2-22 | |||
(1).xlxs (Excel | |||
Spreadsheet) | Spreadsheet) | ||
Work Orders | Harris Radiation Protection Technician Qualification Tracker | ||
05/22/2022 | |||
Work Orders | |||
2339383 | |||
2340658 | 2340658 | ||
2359190 | 2359190 | ||
| Line 420: | Line 559: | ||
2410990 | 2410990 | ||
2412354 | 2412354 | ||
Inspection Type Designation Description or Title Revision or | Inspection | ||
Procedure | |||
Type | |||
Designation | |||
Description or Title | |||
Revision or | |||
Date | |||
2413948 | 2413948 | ||
20459046 | 20459046 | ||
| Line 427: | Line 571: | ||
20460102 | 20460102 | ||
203719 | 203719 | ||
W/O 98704-1 Perform PM E0044, Perform 480VAC Cubicle and Breaker | W/O 98704-1 | ||
Perform PM E0044, Perform 480VAC Cubicle and Breaker | |||
Inspection and Cleaning for RHR Pump 1B-SB | Inspection and Cleaning for RHR Pump 1B-SB | ||
06/06/2014 | |||
}} | }} | ||
Latest revision as of 16:22, 27 November 2024
| ML22201A091 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 07/20/2022 |
| From: | Matthew Fannon NRC/RGN-II/DRP/RPB4 |
| To: | Haaf T Duke Energy Progress |
| References | |
| IR 2022011 | |
| Download: ML22201A091 (18) | |
Text
July 20, 2022
SUBJECT:
SHEARON HARRIS NUCLEAR POWER PLANT - BIENNIAL PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION REPORT 05000400/2022011
Dear Mr. Haaf:
On June 10, 2022, the U.S. Nuclear Regulatory Commission (NRC) completed a problem identification and resolution inspection at your Shearon Harris Nuclear Power Plant.
On June 9, 2022, the NRC inspectors discussed the results of this inspection with Ms. Kim Maza and other members of your staff. The results of this inspection are documented in the enclosed report.
The NRC inspection team reviewed the sites problem identification and resolution program and the stations implementation of the program to evaluate its effectiveness in identifying, prioritizing, evaluating, and correcting problems, and to confirm that the station was complying with NRC regulations and licensee standards for problem identification and resolution programs.
Based on the samples reviewed, the team determined that your staffs performance in each of these areas adequately supported nuclear safety.
The team also evaluated the stations processes for use of industry and NRC operating experience information and the effectiveness of the stations audits and self-assessments.
Based on the samples reviewed, the team determined that your staffs performance in each of these areas adequately supported nuclear safety.
Finally, the team reviewed the stations programs to establish and maintain a safety-conscious work environment, and interviewed station personnel to evaluate the effectiveness of these programs. Based on the teams observations and the results of these interviews the team found no evidence of challenges to your organizations safety-conscious work environment.
Your employees appeared willing to raise nuclear safety concerns through at least one of the several means available.
No findings or violations of more than minor significance were identified during this inspection. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Matthew S. Fannon, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket No. 05000400 License No. NPF-63
Enclosure:
As stated
Inspection Report
Docket Number:
05000400
License Number:
Report Number:
Enterprise Identifier:
I-2022-011-0024
Licensee:
Duke Energy Progress, LLC
Facility:
Shearon Harris Nuclear Power Plant
Location:
New Hill, NC 27562
Inspection Dates:
May 23, 2022 to June 10, 2022
Inspectors:
S. Ninh, Senior Project Engineer
W. Pursley, Health Physicist
C. Smith, Resident Inspector
R. Taylor, Senior Project Engineer
A. Wilson, Senior Project Engineer (Team Lead)
Approved By:
Matthew S. Fannon, Chief
Reactor Projects Branch 4
Division of Reactor Projects
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a biennial problem identification and resolution inspection at Shearon Harris Nuclear Power Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
OTHER ACTIVITIES - BASELINE
71152B - Problem Identification and Resolution Biennial Team Inspection (IP Section 03.04)
- (1) The inspectors performed a biennial assessment of the effectiveness of the licensees Problem Identification and Resolution program, use of operating experience, self-assessments and audits, and safety conscious work environment.
Problem Identification and Resolution Effectiveness: The inspectors assessed the effectiveness of the licensees Problem Identification and Resolution program in identifying, prioritizing, evaluating, and correcting problems. The inspectors also conducted a five-year review of equipment aging issues.
Operating Experience: The inspectors assessed the effectiveness of the licensees processes for use of operating experience.
Self-Assessments and Audits: The inspectors assessed the effectiveness of the licensees identification and correction of problems identified through audits and self-assessments.
Safety Conscious Work Environment: The inspectors assessed the effectiveness of the stations programs to establish and maintain a safety-conscious work environment.
INSPECTION RESULTS
Assessment 71152B
1. Corrective Action Program Effectiveness
Problem Identification: The inspectors determined that the licensee was effective in identifying problems and entering them into the corrective action program and there was a low threshold for entering issues into the corrective action program. This conclusion was based on a review of the requirements for initiating condition reports as described in licensee procedure AD-PI-ALL-0100, "Corrective Action Program," and managements expectation that employees were encouraged to initiate condition reports. Additionally, site management was actively involved in the corrective action program and focused appropriate attention on significant plant issues.
Problem Prioritization and Evaluation: Based on the review of condition reports, the inspectors concluded that problems were prioritized and evaluated in accordance with the condition report significance determination guidance in procedure AD-PI-ALL-0100. The inspectors determined that adequate consideration was given to system or component operability and associated plant risk. The inspectors determined that plant personnel had conducted cause evaluations in compliance with the licensees corrective action program procedures and cause determinations were appropriate, and considered the significance of the issues being evaluated.
Corrective Actions: Based on a review of corrective action documents, interviews with licensee staff, and verification of completed corrective actions, the inspectors determined that corrective actions were timely, commensurate with the safety significance of the issues, and effective, in that conditions adverse to quality were corrected. For significant conditions adverse to quality, the corrective actions directly addressed the cause and effectively prevented recurrence. The inspectors reviewed effectiveness reviews to ensure corrective actions were properly implemented and were effective.
Based on the samples reviewed, the team determined that the licensees corrective action program complied with regulatory requirements and self-imposed standards. The licensees implementation of the corrective action program adequately supported nuclear safety.
2. Operating Experience
The inspectors determined that the station's processes for the use of industry and NRC operating experience information were effective and complied with all regulatory requirements and licensee standards. The implementation of these programs adequately supported nuclear safety. The inspectors concluded that operating experience was adequately evaluated for applicability and that appropriate actions were implemented to address lessons learned as needed.
3. Self-Assessments and Audits
The inspectors determined that the licensee effectively performed self-assessments and audits to identify issues at a low level, properly evaluate those issues, and resolve them commensurate with their safety significance. Self-assessments were generally detailed and critical. The inspectors verified that corrective action documents were initiated to document areas for improvement and findings resulting from self-assessments and verified that actions had been completed consistent with those recommendations. Quality assurance program audits appropriately assessed performance and identified areas for improvement.
4. Safety Conscious Work Environment
Based on safety culture interviews with plant personnel, reviews of the latest safety culture survey results, and interviews with employee concerns program personnel, the inspectors found no evidence of challenges to the safety conscious work environment. Employees appeared willing to raise nuclear safety concerns through at least one of the several means available.
Minor Violation 71152B Minor Violation: During the inspectors' review of the maintenance rule program implementation, specifically the documentation of local leak rate test (LLRT) 1SP-40 Pressurizer Liquid Space Sample Valve (IRC), 1SP-41 Pressurizer Liquid Space Sample Valve (ORC), 1SP-84 Safety Injection System Accumulator C Sample Valve (IRC), and 1SP-85 Safety Injection System Accumulator "C" Sample Valve (ORC), the maintenance rule evaluations concluded that a functional failure had occurred for each penetration. The licensees evaluation concluded that the failures were representative of a Repetitive Maintenance Rule Functional Failure (MRFF). In accordance with procedure AD-EG-ALL-1210, Maintenance Rule Program, Rev. 2, step 5.6.2.4.b, a Maintenance Rule (a)(1)evaluation was required for a Repetitive MRFF. Contrary to this procedure requirement, the inspectors found that no Maintenance Rule (a)(1) evaluation was completed. AD-EG-ALL-1210 is used to establish a program for implementing and maintaining the NRC Maintenance Rule as required by Title 10 of the Code of Federal Regulations (10 CFR) 50.65, Requirements for monitoring the effectiveness of maintenance at nuclear power plants. The inspectors determined the failure to accomplish step 5.6.2.4.b of AD-EG-ALL-1210 represents a violation of 10 CFR Part 50, Appendix B, Criterion V, Instructions, Procedures, and Drawings.
Screening: The inspectors determined the performance deficiency was minor. This performance deficiency was screened in accordance with Inspection Manual Chapter (IMC)0612 Appendix B, Issue Screening Directions, dated October 1, 2021, and was determined to be of minor significance because when the Maintenance Rule (a)(1) evaluation was completed for the repetitive MRFF, it was concluded that the initial maintenance rule evaluations failed to take into account the LLRT leakage test failures of each penetration were not in excess of the administrative limits as defined in EST-212, Type C Local Leak Rate Test, and were evaluated as acceptable in Engineering Change 419545. Therefore, the licensee ultimately concluded that the LLRT failures should not be considered functional failures, and thus no unacceptable performance occurred, and the barrier integrity cornerstone objectives were not adversely affected.
Enforcement:
This failure to comply with 10 CFR Part 50, Appendix B, Criterion V, constitutes a minor violation that is not subject to enforcement action in accordance with the NRCs Enforcement Policy.
Observation: Residual Heat Removal (RHR) Breaker Failure Observation 71152B The inspectors reviewed Nuclear Condition Report (NCR) 02376252, originated on March 29, 2021, which documented a failure of the B RHR pump breaker during testing due to a termination that became loose over time and disconnected due to vibrations experienced during breaker cycling. The licensee had experienced a similar breaker failure in 2001, documented in NCR 29022, and recognized that the spade type connections had the potential of coming loose. Actions were initiated in 2001 due to the loose connection and a corrective action was implemented in PM-E0044, "480 VAC Siemens Type RLN(F) Load Center Breaker and Cubicle PM," that required the installation of Ty-Wraps near the connection point to reduce the probability of the connection from coming loose. The inspectors observed that the corrective actions implemented in 2001 did not prevent the failure of the RHR breaker in 2021. NCR 02376252 determined that PM-E0044 could be enhanced by directing the staff to ensure that spade type connections are confirmed to be tight to prevent slip on the connector. Additionally, a revision to PM-E0044 clarified that where the breaker frame is inaccessible Ty-Wraps are to be installed to fasten to adjacent wiring. The inspectors observed that NCR 02376252 did not clarify the as-found configuration of the Ty-Wraps installed on the RHR breaker connection that came loose. The inspectors observed that no similar failures have occurred since PM-E0044 has been revised with the updated guidance, however, the vendor design using slip on spade type connections is not optimum and that a design weakness still remains.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
On June 9, 2022, the inspectors presented the biennial problem identification and resolution inspection results to Ms. Kim Maza and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Corrective Action
Documents
212531
22505
23719
24273
232409
235891
258970
259418
263709
276765
288171
297861
297958
2300449
2311457
20227
21895
26566
2330396
2335154
2337926
2339383
2339968
2339978
2340658
2342424
2342816
2344303
2347273
2347492
2348031
2349762
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
2350357
2351619
2353159
2353624
2354050
2354786
2355203
2355227
2356217
2356329
2359102
2359190
2359398
2359532
2360087
2360325
2360875
2361456
2361630
2362309
2363024
2363089
2364175
2366039
2366635
2369515
2369538
2372140
2372270
2374367
2374915
2376252
2379092
2379651
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
2379780
2380375
2380478
2380481
2380777
2380884
2381326
2381331
2381665
2381927
2385454
2387102
2387573
2389593
2390237
2390439
2390732
2392028
2392806
2393021
2395124
2395876
2397219
2398689
2400230
2403501
2403733
2405601
2405765
2406828
2408631
2408989
2409078
2409079
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
2409314
2410990
2411360
2411682
2411730
2412354
2413545
2413628
2413948
2417230
2417987
2418968
2419412
20239
20406
21858
22025
22807
22808
23085
23332
24516
26647
26973
28530
Missed Maintenance Rule (a)(1) Evaluation
Corrective Action
Documents
Resulting from
Inspection
2430708
NRC PI&R Inspection Observation
Engineering
Changes
Acceptability of Valves Exceeding LLRT Admin Limits Exiting
RFO-23
REVISION 0
ESR 9800571
Calculation HNP-C/STRS-1050, Evaluation of Permanent
Lead Shielding Installed on RHR Pump 1A
2/23/1998
Engineering
Evaluations
ESR-9900169
Evaluation of Permanent Lead Shielding Installed on RHR
Pump
01/28/2000
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
EVAL-2020-HNP-
1065-00002161
EVAL-2020-HNP-
4085-00002154
EVAL-2020-HNP-
5015-00002157
EVAL-2021-HNP-
2085-00002177
EVAL-2021-HNP-
5145-00002175
EVAL-2021-HNP-
5175-00002173
Station Health Report - Emergency Diesel Generator and
Auxiliaries
2/31/2021
AD-EG-ALL-1207
Plant Health Process for Bridging Strategy for Refurbishment
of the Siemens, Model RLN, 480V Circuit Breakers
CSD-AD-ALL-
0004-01
CORRECTIVE ACTION PROGRAM REVIEW MEETING
REVISION 7
EVT-2085-2021-
00075447
Maintenance Rule Manager Event
EVT-5145-2021-
00075253
Maintenance Rule Manager Event
EVT-5175-2021-
00075457
Maintenance Rule Manager Event
MTG-2021-
00000291
Maintenance Rule Meeting Minutes
MTG-2022-
00000323
Maintenance Rule Meeting Minutes
MTG-2022-
00000328
Maintenance Rule Meeting Minutes
MTG-2022-
00000336
Maintenance Rule Meeting Minutes
Miscellaneous
MTG-2022-
00000345
Maintenance Rule Meeting Minutes
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
TTC1018-N CAP
Overview for New
Employees
AD-LS-ALL--0003
NRC AUDIT AND INSPECTION ACTIVITIES
REVISION
AD-MN-ALL-0017
HOUSEKEEPING, MATERIAL CONDITION, AND SEISMIC
REQUIREMENTS FOR EQUIPMENT STORAGE
REVISION 1
AD-PI-ALL-0400
OPERATING EXPERIENCE PROGRAM
REVISION
ADMINISTRATIVE
PROCEDURE,
AD-EG-ALL-1214
CONDITION MONITORING OF STRUCTURES
REVISION 1
ADMINISTRATIVE
PROCEDURE,
AD-WC-ALL-0210
WORK REQUEST INITIATION, SCREENING,
PRIORITIZATION AND CLASSIFICATION.
REVISION
ADMINISTRATIVE
PROCEDURE,
AD-EG-ALL-1104
OBSOLESCENCE PROGRAM
REVISION 5
ADMINISTRATIVE
PROCEDURE,
AD-EG-ALL-1202,
PREVENTIVE MAINTENANCE AND SURVEILLANCE
TESTING ADMINISTRATION
REVISION
ADMINISTRATIVE
PROCEDURE,
AD-EG-ALL-1206
EQUIPMENT RELIABILITY CLASSIFICATION
REVISION 6
ADMINISTRATIVE
PROCEDURE,
AD-EG-ALL-1210
REVISION 2
ADMINISTRATIVE
PROCEDURE,
AD-EG-ALL-1210
REVISION 3
ADMINISTRATIVE
PROCEDURE,
AD-EG-ALL-1650
LICENSE RENEWAL AGING MANAGEMENT
REVISION 4
Procedures
ADMINISTRATIVE BORIC ACID CORROSION CONTROL PROGRAM -
REVISION 4.
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
PROCEDURE,
AD-EG-PWR-1611
IMPLEMENTATION
ADMINISTRATIVE
PROCEDURE,
AD-OP-ALL-0105
REVISION 6
ADMINISTRATIVE
PROCEDURE,
AD-PI-ALL-0100
CORRECTIVE ACTION PROGRAM
REVISION
ADMINISTRATIVE
PROCEDURE,
AD-PI-ALL-0101
ROOT CAUSE EVALUATION
REVISION 8
ADMINISTRATIVE
PROCEDURE,
AD-PI-ALL-0106
CAUSE INVESTIGATION CHECKLISTS
REVISION 7
ADMINISTRATIVE
PROCEDURE,
AD-RP-ALL-5000
PREPARATION AND SHIPMENT OF RADIOACTIVE
MATERIAL AND RADIOACTIVE WASTE
REVISION 5
ADMINISTRATIVE
PROCEDURE,
AD-WC-ALL-0250
WORK IMPLEMENTATION AND COMPLETION
REVISION
AP-038
DEFICIENCY TAG PROCEDURE
REVISION
ENGINEERING
SURVEILLANCE
TEST, NUMBER:
EST-212
TYPE C LOCAL LEAK RATE TESTS
REVISION
PM-E0044
480 VAC SIEMENS TYPE RLN(F) LOAD CENTER BREAKER
AND CUBICLE P.M.
REVISION
24, 25
Radiation Surveys HNP-M-
210505-8
Follow-up Survey in Chemistry Lab Following Dose Rate
Alarm
05/05/2021
20-FLEET-
CAP-01
NUCLEAR OVERSIGHT - AUDIT FLEET PERFORMANCE
IMPROVEMENT AND CORRECTIVE ACTION PROGRAM
Self-Assessments
20-HNP-SEC-
NUCLEAR OVERSIGHT - AUDIT HARRIS PHYSICAL
SECURITY
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
21-HNP-ENG-
NUCLEAR OVERSIGHT - AUDIT HARRIS ENGINEERING
21-HNP-MNT-
NUCLEAR OVERSIGHT - AUDIT HARRIS MAINTENANCE
AND SPECIAL PROCESSES
22-HNP-FIRE-
NUCLEAR OVERSIGHT - AUDIT
HARRIS FIRE PROTECTION
22-HNP-OPT-
NUCLEAR OVERSIGHT - AUDIT HARRIS OPERATIONS
TRAINING
2340613-05
20 CR Initiation Rate Analysis
07/22/2020
2363582-05
Operator Knowledge of Important Parameters and Control
08/17/2021
2370171-05
Operational Risk
03/04/2021
2406757-05
HNP 2022 NRC PI&R Readiness Assessment
2/17/2022
RP Bench
Strength 5-2-22
(1).xlxs (Excel
Spreadsheet)
Harris Radiation Protection Technician Qualification Tracker
05/22/2022
Work Orders
2339383
2340658
2359190
2361630
2372270
2380375
2380478
2380884
2389593
2390237
2392028
2392806
2395124
2398689
2409078
2409079
2410990
2412354
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
2413948
20459046
20445753
20460102
203719
W/O 98704-1
Perform PM E0044, Perform 480VAC Cubicle and Breaker
Inspection and Cleaning for RHR Pump 1B-SB
06/06/2014