IR 05000400/2022011: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 48: Line 48:


==Inspection Report==
==Inspection Report==
Docket Number: 05000400
Docket Number:
 
05000400
License Number: NPF-63
License Number:
 
NPF-63
Report Number: 05000400/2022011
Report Number:
 
05000400/2022011
Enterprise Identifier: I-2022-011-0024
Enterprise Identifier:
 
I-2022-011-0024
Licensee: Duke Energy Progress, LLC
Licensee:
 
Duke Energy Progress, LLC
Facility: Shearon Harris Nuclear Power Plant
Facility:
 
Shearon Harris Nuclear Power Plant
Location: New Hill, NC 27562
Location:
 
New Hill, NC 27562
Inspection Dates: May 23, 2022 to June 10, 2022
Inspection Dates:
 
May 23, 2022 to June 10, 2022
Inspectors: S. Ninh, Senior Project Engineer W. Pursley, Health Physicist C. Smith, Resident Inspector R. Taylor, Senior Project Engineer A. Wilson, Senior Project Engineer (Team Lead)
Inspectors:
 
S. Ninh, Senior Project Engineer
Approved By: Matthew S. Fannon, Chief Reactor Projects Branch 4 Division of Reactor Projects
W. Pursley, Health Physicist
 
C. Smith, Resident Inspector
Enclosure
R. Taylor, Senior Project Engineer
A. Wilson, Senior Project Engineer (Team Lead)
Approved By:
Matthew S. Fannon, Chief
Reactor Projects Branch 4
Division of Reactor Projects


=SUMMARY=
=SUMMARY=
Line 133: Line 138:
=DOCUMENTS REVIEWED=
=DOCUMENTS REVIEWED=


Inspection Type Designation Description or Title Revision or
Inspection
Procedure Date
Procedure
71152B Corrective Action 2212531
Type
Documents 2222505
Designation
Description or Title
Revision or
Date
71152B
Corrective Action
Documents
212531
22505
23719
23719
24273
24273
Line 167: Line 180:
2348031
2348031
2349762
2349762
 
Inspection
Inspection Type Designation Description or Title Revision or
Procedure
Procedure Date
Type
Designation
Description or Title
Revision or
Date
2350357
2350357
2351619
2351619
Line 204: Line 221:
2379092
2379092
2379651
2379651
 
Inspection
Inspection Type Designation Description or Title Revision or
Procedure
Procedure Date
Type
Designation
Description or Title
Revision or
Date
2379780
2379780
2380375
2380375
Line 241: Line 262:
2409078
2409078
2409079
2409079
 
Inspection
Inspection Type Designation Description or Title Revision or
Procedure
Procedure Date
Type
Designation
Description or Title
Revision or
Date
2409314
2409314
2410990
2410990
Line 268: Line 293:
26647
26647
26973
26973
Corrective Action 2428530 Missed Maintenance Rule (a)(1) Evaluation
28530
Documents 2430708 NRC PI&R Inspection Observation
Missed Maintenance Rule (a)(1) Evaluation
Corrective Action
Documents
Resulting from
Resulting from
Inspection
Inspection
Engineering EC 419545 Acceptability of Valves Exceeding LLRT Admin Limits Exiting REVISION 0
2430708
Changes RFO-23
NRC PI&R Inspection Observation
Engineering ESR 9800571 Calculation HNP-C/STRS-1050, Evaluation of Permanent 12/23/1998
Engineering
Evaluations Lead Shielding Installed on RHR Pump 1A
Changes
ESR-9900169 Evaluation of Permanent Lead Shielding Installed on RHR 01/28/2000
EC 419545
Acceptability of Valves Exceeding LLRT Admin Limits Exiting
RFO-23
REVISION 0
ESR 9800571
Calculation HNP-C/STRS-1050, Evaluation of Permanent
Lead Shielding Installed on RHR Pump 1A
2/23/1998
Engineering
Evaluations
ESR-9900169
Evaluation of Permanent Lead Shielding Installed on RHR
Pump
Pump
 
01/28/2000
Inspection Type Designation Description or Title Revision or
Inspection
Procedure Date
Procedure
Type
Designation
Description or Title
Revision or
Date
EVAL-2020-HNP-
EVAL-2020-HNP-
1065-00002161
1065-00002161
Line 293: Line 336:
EVAL-2021-HNP-
EVAL-2021-HNP-
5175-00002173
5175-00002173
Miscellaneous Station Health Report - Emergency Diesel Generator and 12/31/2021
Station Health Report - Emergency Diesel Generator and
Auxiliaries
Auxiliaries
AD-EG-ALL-1207 Plant Health Process for Bridging Strategy for Refurbishment
2/31/2021
AD-EG-ALL-1207
Plant Health Process for Bridging Strategy for Refurbishment
of the Siemens, Model RLN, 480V Circuit Breakers
of the Siemens, Model RLN, 480V Circuit Breakers
CSD-AD-ALL-CORRECTIVE ACTION PROGRAM REVIEW MEETING REVISION 7
CSD-AD-ALL-
0004-01
0004-01
EVT-2085-2021-Maintenance Rule Manager Event
CORRECTIVE ACTION PROGRAM REVIEW MEETING
REVISION 7
EVT-2085-2021-
00075447
00075447
EVT-5145-2021-Maintenance Rule Manager Event
Maintenance Rule Manager Event
EVT-5145-2021-
00075253
00075253
EVT-5175-2021-Maintenance Rule Manager Event
Maintenance Rule Manager Event
EVT-5175-2021-
00075457
00075457
MTG-2021-Maintenance Rule Meeting Minutes
Maintenance Rule Manager Event
MTG-2021-
00000291
00000291
MTG-2022-Maintenance Rule Meeting Minutes
Maintenance Rule Meeting Minutes
MTG-2022-
00000323
00000323
MTG-2022-Maintenance Rule Meeting Minutes
Maintenance Rule Meeting Minutes
MTG-2022-
00000328
00000328
MTG-2022-Maintenance Rule Meeting Minutes
Maintenance Rule Meeting Minutes
MTG-2022-
00000336
00000336
MTG-2022-Maintenance Rule Meeting Minutes
Maintenance Rule Meeting Minutes
Miscellaneous
MTG-2022-
00000345
00000345
Inspection Type Designation Description or Title Revision or
Maintenance Rule Meeting Minutes
Procedure Date
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
TTC1018-N CAP
TTC1018-N CAP
Overview for New
Overview for New
Employees
Employees
Procedures AD-LS-ALL--0003 NRC AUDIT AND INSPECTION ACTIVITIES REVISION
AD-LS-ALL--0003
AD-MN-ALL-0017 HOUSEKEEPING, MATERIAL CONDITION, AND SEISMIC REVISION 1
NRC AUDIT AND INSPECTION ACTIVITIES
REVISION
AD-MN-ALL-0017
HOUSEKEEPING, MATERIAL CONDITION, AND SEISMIC
REQUIREMENTS FOR EQUIPMENT STORAGE
REQUIREMENTS FOR EQUIPMENT STORAGE
AD-PI-ALL-0400 OPERATING EXPERIENCE PROGRAM REVISION
REVISION 1
ADMINISTRATIVE CONDITION MONITORING OF STRUCTURES REVISION 1
AD-PI-ALL-0400
OPERATING EXPERIENCE PROGRAM
REVISION
ADMINISTRATIVE
PROCEDURE,
PROCEDURE,
AD-EG-ALL-1214
AD-EG-ALL-1214
ADMINISTRATIVE WORK REQUEST INITIATION, SCREENING, REVISION
CONDITION MONITORING OF STRUCTURES
PROCEDURE, PRIORITIZATION AND CLASSIFICATION. 15
REVISION 1
ADMINISTRATIVE
PROCEDURE,
AD-WC-ALL-0210
AD-WC-ALL-0210
ADMINISTRATIVE OBSOLESCENCE PROGRAM REVISION 5
WORK REQUEST INITIATION, SCREENING,
PRIORITIZATION AND CLASSIFICATION.
REVISION
ADMINISTRATIVE
PROCEDURE,
PROCEDURE,
AD-EG-ALL-1104
AD-EG-ALL-1104
ADMINISTRATIVE PREVENTIVE MAINTENANCE AND SURVEILLANCE REVISION
OBSOLESCENCE PROGRAM
PROCEDURE, TESTING ADMINISTRATION 11
REVISION 5
ADMINISTRATIVE
PROCEDURE,
AD-EG-ALL-1202,
AD-EG-ALL-1202,
ADMINISTRATIVE EQUIPMENT RELIABILITY CLASSIFICATION REVISION 6
PREVENTIVE MAINTENANCE AND SURVEILLANCE
TESTING ADMINISTRATION
REVISION
ADMINISTRATIVE
PROCEDURE,
PROCEDURE,
AD-EG-ALL-1206
AD-EG-ALL-1206
ADMINISTRATIVE MAINTENANCE RULE PROGRAM REVISION 2
EQUIPMENT RELIABILITY CLASSIFICATION
REVISION 6
ADMINISTRATIVE
PROCEDURE,
PROCEDURE,
AD-EG-ALL-1210
AD-EG-ALL-1210
ADMINISTRATIVE MAINTENANCE RULE PROGRAM REVISION 3
MAINTENANCE RULE PROGRAM
REVISION 2
ADMINISTRATIVE
PROCEDURE,
PROCEDURE,
AD-EG-ALL-1210
AD-EG-ALL-1210
ADMINISTRATIVE LICENSE RENEWAL AGING MANAGEMENT REVISION 4
MAINTENANCE RULE PROGRAM
REVISION 3
ADMINISTRATIVE
PROCEDURE,
PROCEDURE,
AD-EG-ALL-1650
AD-EG-ALL-1650
ADMINISTRATIVE BORIC ACID CORROSION CONTROL PROGRAM - REVISION 4.
LICENSE RENEWAL AGING MANAGEMENT
Inspection Type Designation Description or Title Revision or
REVISION 4
Procedure Date
Procedures
PROCEDURE, IMPLEMENTATION
ADMINISTRATIVE BORIC ACID CORROSION CONTROL PROGRAM -
REVISION 4.
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
PROCEDURE,
AD-EG-PWR-1611
AD-EG-PWR-1611
ADMINISTRATIVE OPERABILITY DETERMINATIONS REVISION 6
IMPLEMENTATION
ADMINISTRATIVE
PROCEDURE,
PROCEDURE,
AD-OP-ALL-0105
AD-OP-ALL-0105
ADMINISTRATIVE CORRECTIVE ACTION PROGRAM REVISION
OPERABILITY DETERMINATIONS
PROCEDURE, 27
REVISION 6
ADMINISTRATIVE
PROCEDURE,
AD-PI-ALL-0100
AD-PI-ALL-0100
ADMINISTRATIVE ROOT CAUSE EVALUATION REVISION 8
CORRECTIVE ACTION PROGRAM
REVISION
ADMINISTRATIVE
PROCEDURE,
PROCEDURE,
AD-PI-ALL-0101
AD-PI-ALL-0101
ADMINISTRATIVE CAUSE INVESTIGATION CHECKLISTS REVISION 7
ROOT CAUSE EVALUATION
REVISION 8
ADMINISTRATIVE
PROCEDURE,
PROCEDURE,
AD-PI-ALL-0106
AD-PI-ALL-0106
ADMINISTRATIVE PREPARATION AND SHIPMENT OF RADIOACTIVE REVISION 5
CAUSE INVESTIGATION CHECKLISTS
PROCEDURE, MATERIAL AND RADIOACTIVE WASTE
REVISION 7
ADMINISTRATIVE
PROCEDURE,
AD-RP-ALL-5000
AD-RP-ALL-5000
ADMINISTRATIVE WORK IMPLEMENTATION AND COMPLETION REVISION
PREPARATION AND SHIPMENT OF RADIOACTIVE
PROCEDURE, 14
MATERIAL AND RADIOACTIVE WASTE
REVISION 5
ADMINISTRATIVE
PROCEDURE,
AD-WC-ALL-0250
AD-WC-ALL-0250
AP-038 DEFICIENCY TAG PROCEDURE REVISION
WORK IMPLEMENTATION AND COMPLETION
ENGINEERING TYPE C LOCAL LEAK RATE TESTS REVISION
REVISION
SURVEILLANCE 63
AP-038
DEFICIENCY TAG PROCEDURE
REVISION
ENGINEERING
SURVEILLANCE
TEST, NUMBER:
TEST, NUMBER:
EST-212
EST-212
PM-E0044 480 VAC SIEMENS TYPE RLN(F) LOAD CENTER BREAKER REVISION
TYPE C LOCAL LEAK RATE TESTS
AND CUBICLE  
REVISION
: [[contact::P.M. 24]], 25
PM-E0044
Radiation Surveys HNP-M-Follow-up Survey in Chemistry Lab Following Dose Rate 05/05/2021
480 VAC SIEMENS TYPE RLN(F) LOAD CENTER BREAKER
210505-8 Alarm
AND CUBICLE P.M.
Self-Assessments 2020-FLEET-NUCLEAR OVERSIGHT - AUDIT FLEET PERFORMANCE
REVISION
CAP-01 IMPROVEMENT AND CORRECTIVE ACTION PROGRAM
24, 25
20-HNP-SEC-NUCLEAR OVERSIGHT - AUDIT HARRIS PHYSICAL
Radiation Surveys HNP-M-
210505-8
Follow-up Survey in Chemistry Lab Following Dose Rate
Alarm
05/05/2021
20-FLEET-
CAP-01
NUCLEAR OVERSIGHT - AUDIT FLEET PERFORMANCE
IMPROVEMENT AND CORRECTIVE ACTION PROGRAM
Self-Assessments
20-HNP-SEC-
NUCLEAR OVERSIGHT - AUDIT HARRIS PHYSICAL
SECURITY
SECURITY
Inspection Type Designation Description or Title Revision or
Inspection
Procedure Date
Procedure
21-HNP-ENG-NUCLEAR OVERSIGHT - AUDIT HARRIS ENGINEERING
Type
21-HNP-MNT-NUCLEAR OVERSIGHT - AUDIT HARRIS MAINTENANCE
Designation
Description or Title
Revision or
Date
21-HNP-ENG-
NUCLEAR OVERSIGHT - AUDIT HARRIS ENGINEERING
21-HNP-MNT-
NUCLEAR OVERSIGHT - AUDIT HARRIS MAINTENANCE
AND SPECIAL PROCESSES
AND SPECIAL PROCESSES
22-HNP-FIRE-NUCLEAR OVERSIGHT - AUDIT
22-HNP-FIRE-
NUCLEAR OVERSIGHT - AUDIT
HARRIS FIRE PROTECTION
HARRIS FIRE PROTECTION
22-HNP-OPT-NUCLEAR OVERSIGHT - AUDIT HARRIS OPERATIONS
22-HNP-OPT-
NUCLEAR OVERSIGHT - AUDIT HARRIS OPERATIONS
TRAINING
TRAINING
2340613-05 2020 CR Initiation Rate Analysis 07/22/2020
2340613-05
2363582-05 Operator Knowledge of Important Parameters and Control 08/17/2021
20 CR Initiation Rate Analysis
2370171-05 Operational Risk 03/04/2021
07/22/2020
2406757-05 HNP 2022 NRC PI&R Readiness Assessment 02/17/2022
2363582-05
RP Bench Harris Radiation Protection Technician Qualification Tracker05/22/2022
Operator Knowledge of Important Parameters and Control
Strength 5-2-22
08/17/2021
(1).xlxs (Excel
2370171-05
Operational Risk
03/04/2021
2406757-05
HNP 2022 NRC PI&R Readiness Assessment
2/17/2022
RP Bench
Strength 5-2-22  
(1).xlxs (Excel
Spreadsheet)
Spreadsheet)
Work Orders 02339383
Harris Radiation Protection Technician Qualification Tracker
05/22/2022
Work Orders
2339383
2340658
2340658
2359190
2359190
Line 420: Line 559:
2410990
2410990
2412354
2412354
Inspection Type Designation Description or Title Revision or
Inspection
Procedure Date
Procedure
Type
Designation
Description or Title
Revision or
Date
2413948
2413948
20459046
20459046
Line 427: Line 571:
20460102
20460102
203719
203719
W/O 98704-1 Perform PM E0044, Perform 480VAC Cubicle and Breaker 06/06/2014
W/O 98704-1
Perform PM E0044, Perform 480VAC Cubicle and Breaker
Inspection and Cleaning for RHR Pump 1B-SB
Inspection and Cleaning for RHR Pump 1B-SB
 
06/06/2014
15
}}
}}

Latest revision as of 16:22, 27 November 2024

Biennial Problem Identification and Resolution Inspection Report 05000400 2022011
ML22201A091
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 07/20/2022
From: Matthew Fannon
NRC/RGN-II/DRP/RPB4
To: Haaf T
Duke Energy Progress
References
IR 2022011
Download: ML22201A091 (18)


Text

July 20, 2022

SUBJECT:

SHEARON HARRIS NUCLEAR POWER PLANT - BIENNIAL PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION REPORT 05000400/2022011

Dear Mr. Haaf:

On June 10, 2022, the U.S. Nuclear Regulatory Commission (NRC) completed a problem identification and resolution inspection at your Shearon Harris Nuclear Power Plant.

On June 9, 2022, the NRC inspectors discussed the results of this inspection with Ms. Kim Maza and other members of your staff. The results of this inspection are documented in the enclosed report.

The NRC inspection team reviewed the sites problem identification and resolution program and the stations implementation of the program to evaluate its effectiveness in identifying, prioritizing, evaluating, and correcting problems, and to confirm that the station was complying with NRC regulations and licensee standards for problem identification and resolution programs.

Based on the samples reviewed, the team determined that your staffs performance in each of these areas adequately supported nuclear safety.

The team also evaluated the stations processes for use of industry and NRC operating experience information and the effectiveness of the stations audits and self-assessments.

Based on the samples reviewed, the team determined that your staffs performance in each of these areas adequately supported nuclear safety.

Finally, the team reviewed the stations programs to establish and maintain a safety-conscious work environment, and interviewed station personnel to evaluate the effectiveness of these programs. Based on the teams observations and the results of these interviews the team found no evidence of challenges to your organizations safety-conscious work environment.

Your employees appeared willing to raise nuclear safety concerns through at least one of the several means available.

No findings or violations of more than minor significance were identified during this inspection. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Matthew S. Fannon, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket No. 05000400 License No. NPF-63

Enclosure:

As stated

Inspection Report

Docket Number:

05000400

License Number:

NPF-63

Report Number:

05000400/2022011

Enterprise Identifier:

I-2022-011-0024

Licensee:

Duke Energy Progress, LLC

Facility:

Shearon Harris Nuclear Power Plant

Location:

New Hill, NC 27562

Inspection Dates:

May 23, 2022 to June 10, 2022

Inspectors:

S. Ninh, Senior Project Engineer

W. Pursley, Health Physicist

C. Smith, Resident Inspector

R. Taylor, Senior Project Engineer

A. Wilson, Senior Project Engineer (Team Lead)

Approved By:

Matthew S. Fannon, Chief

Reactor Projects Branch 4

Division of Reactor Projects

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a biennial problem identification and resolution inspection at Shearon Harris Nuclear Power Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

OTHER ACTIVITIES - BASELINE

71152B - Problem Identification and Resolution Biennial Team Inspection (IP Section 03.04)

(1) The inspectors performed a biennial assessment of the effectiveness of the licensees Problem Identification and Resolution program, use of operating experience, self-assessments and audits, and safety conscious work environment.

Problem Identification and Resolution Effectiveness: The inspectors assessed the effectiveness of the licensees Problem Identification and Resolution program in identifying, prioritizing, evaluating, and correcting problems. The inspectors also conducted a five-year review of equipment aging issues.

Operating Experience: The inspectors assessed the effectiveness of the licensees processes for use of operating experience.

Self-Assessments and Audits: The inspectors assessed the effectiveness of the licensees identification and correction of problems identified through audits and self-assessments.

Safety Conscious Work Environment: The inspectors assessed the effectiveness of the stations programs to establish and maintain a safety-conscious work environment.

INSPECTION RESULTS

Assessment 71152B

1. Corrective Action Program Effectiveness

Problem Identification: The inspectors determined that the licensee was effective in identifying problems and entering them into the corrective action program and there was a low threshold for entering issues into the corrective action program. This conclusion was based on a review of the requirements for initiating condition reports as described in licensee procedure AD-PI-ALL-0100, "Corrective Action Program," and managements expectation that employees were encouraged to initiate condition reports. Additionally, site management was actively involved in the corrective action program and focused appropriate attention on significant plant issues.

Problem Prioritization and Evaluation: Based on the review of condition reports, the inspectors concluded that problems were prioritized and evaluated in accordance with the condition report significance determination guidance in procedure AD-PI-ALL-0100. The inspectors determined that adequate consideration was given to system or component operability and associated plant risk. The inspectors determined that plant personnel had conducted cause evaluations in compliance with the licensees corrective action program procedures and cause determinations were appropriate, and considered the significance of the issues being evaluated.

Corrective Actions: Based on a review of corrective action documents, interviews with licensee staff, and verification of completed corrective actions, the inspectors determined that corrective actions were timely, commensurate with the safety significance of the issues, and effective, in that conditions adverse to quality were corrected. For significant conditions adverse to quality, the corrective actions directly addressed the cause and effectively prevented recurrence. The inspectors reviewed effectiveness reviews to ensure corrective actions were properly implemented and were effective.

Based on the samples reviewed, the team determined that the licensees corrective action program complied with regulatory requirements and self-imposed standards. The licensees implementation of the corrective action program adequately supported nuclear safety.

2. Operating Experience

The inspectors determined that the station's processes for the use of industry and NRC operating experience information were effective and complied with all regulatory requirements and licensee standards. The implementation of these programs adequately supported nuclear safety. The inspectors concluded that operating experience was adequately evaluated for applicability and that appropriate actions were implemented to address lessons learned as needed.

3. Self-Assessments and Audits

The inspectors determined that the licensee effectively performed self-assessments and audits to identify issues at a low level, properly evaluate those issues, and resolve them commensurate with their safety significance. Self-assessments were generally detailed and critical. The inspectors verified that corrective action documents were initiated to document areas for improvement and findings resulting from self-assessments and verified that actions had been completed consistent with those recommendations. Quality assurance program audits appropriately assessed performance and identified areas for improvement.

4. Safety Conscious Work Environment

Based on safety culture interviews with plant personnel, reviews of the latest safety culture survey results, and interviews with employee concerns program personnel, the inspectors found no evidence of challenges to the safety conscious work environment. Employees appeared willing to raise nuclear safety concerns through at least one of the several means available.

Minor Violation 71152B Minor Violation: During the inspectors' review of the maintenance rule program implementation, specifically the documentation of local leak rate test (LLRT) 1SP-40 Pressurizer Liquid Space Sample Valve (IRC), 1SP-41 Pressurizer Liquid Space Sample Valve (ORC), 1SP-84 Safety Injection System Accumulator C Sample Valve (IRC), and 1SP-85 Safety Injection System Accumulator "C" Sample Valve (ORC), the maintenance rule evaluations concluded that a functional failure had occurred for each penetration. The licensees evaluation concluded that the failures were representative of a Repetitive Maintenance Rule Functional Failure (MRFF). In accordance with procedure AD-EG-ALL-1210, Maintenance Rule Program, Rev. 2, step 5.6.2.4.b, a Maintenance Rule (a)(1)evaluation was required for a Repetitive MRFF. Contrary to this procedure requirement, the inspectors found that no Maintenance Rule (a)(1) evaluation was completed. AD-EG-ALL-1210 is used to establish a program for implementing and maintaining the NRC Maintenance Rule as required by Title 10 of the Code of Federal Regulations (10 CFR) 50.65, Requirements for monitoring the effectiveness of maintenance at nuclear power plants. The inspectors determined the failure to accomplish step 5.6.2.4.b of AD-EG-ALL-1210 represents a violation of 10 CFR Part 50, Appendix B, Criterion V, Instructions, Procedures, and Drawings.

Screening: The inspectors determined the performance deficiency was minor. This performance deficiency was screened in accordance with Inspection Manual Chapter (IMC)0612 Appendix B, Issue Screening Directions, dated October 1, 2021, and was determined to be of minor significance because when the Maintenance Rule (a)(1) evaluation was completed for the repetitive MRFF, it was concluded that the initial maintenance rule evaluations failed to take into account the LLRT leakage test failures of each penetration were not in excess of the administrative limits as defined in EST-212, Type C Local Leak Rate Test, and were evaluated as acceptable in Engineering Change 419545. Therefore, the licensee ultimately concluded that the LLRT failures should not be considered functional failures, and thus no unacceptable performance occurred, and the barrier integrity cornerstone objectives were not adversely affected.

Enforcement:

This failure to comply with 10 CFR Part 50, Appendix B, Criterion V, constitutes a minor violation that is not subject to enforcement action in accordance with the NRCs Enforcement Policy.

Observation: Residual Heat Removal (RHR) Breaker Failure Observation 71152B The inspectors reviewed Nuclear Condition Report (NCR) 02376252, originated on March 29, 2021, which documented a failure of the B RHR pump breaker during testing due to a termination that became loose over time and disconnected due to vibrations experienced during breaker cycling. The licensee had experienced a similar breaker failure in 2001, documented in NCR 29022, and recognized that the spade type connections had the potential of coming loose. Actions were initiated in 2001 due to the loose connection and a corrective action was implemented in PM-E0044, "480 VAC Siemens Type RLN(F) Load Center Breaker and Cubicle PM," that required the installation of Ty-Wraps near the connection point to reduce the probability of the connection from coming loose. The inspectors observed that the corrective actions implemented in 2001 did not prevent the failure of the RHR breaker in 2021. NCR 02376252 determined that PM-E0044 could be enhanced by directing the staff to ensure that spade type connections are confirmed to be tight to prevent slip on the connector. Additionally, a revision to PM-E0044 clarified that where the breaker frame is inaccessible Ty-Wraps are to be installed to fasten to adjacent wiring. The inspectors observed that NCR 02376252 did not clarify the as-found configuration of the Ty-Wraps installed on the RHR breaker connection that came loose. The inspectors observed that no similar failures have occurred since PM-E0044 has been revised with the updated guidance, however, the vendor design using slip on spade type connections is not optimum and that a design weakness still remains.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On June 9, 2022, the inspectors presented the biennial problem identification and resolution inspection results to Ms. Kim Maza and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71152B

Corrective Action

Documents

212531

22505

23719

24273

232409

235891

258970

259418

263709

276765

288171

297861

297958

2300449

2311457

20227

21895

26566

2330396

2335154

2337926

2339383

2339968

2339978

2340658

2342424

2342816

2344303

2347273

2347492

2348031

2349762

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

2350357

2351619

2353159

2353624

2354050

2354786

2355203

2355227

2356217

2356329

2359102

2359190

2359398

2359532

2360087

2360325

2360875

2361456

2361630

2362309

2363024

2363089

2364175

2366039

2366635

2369515

2369538

2372140

2372270

2374367

2374915

2376252

2379092

2379651

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

2379780

2380375

2380478

2380481

2380777

2380884

2381326

2381331

2381665

2381927

2385454

2387102

2387573

2389593

2390237

2390439

2390732

2392028

2392806

2393021

2395124

2395876

2397219

2398689

2400230

2403501

2403733

2405601

2405765

2406828

2408631

2408989

2409078

2409079

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

2409314

2410990

2411360

2411682

2411730

2412354

2413545

2413628

2413948

2417230

2417987

2418968

2419412

20239

20406

21858

22025

22807

22808

23085

23332

24516

26647

26973

28530

Missed Maintenance Rule (a)(1) Evaluation

Corrective Action

Documents

Resulting from

Inspection

2430708

NRC PI&R Inspection Observation

Engineering

Changes

EC 419545

Acceptability of Valves Exceeding LLRT Admin Limits Exiting

RFO-23

REVISION 0

ESR 9800571

Calculation HNP-C/STRS-1050, Evaluation of Permanent

Lead Shielding Installed on RHR Pump 1A

2/23/1998

Engineering

Evaluations

ESR-9900169

Evaluation of Permanent Lead Shielding Installed on RHR

Pump

01/28/2000

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

EVAL-2020-HNP-

1065-00002161

EVAL-2020-HNP-

4085-00002154

EVAL-2020-HNP-

5015-00002157

EVAL-2021-HNP-

2085-00002177

EVAL-2021-HNP-

5145-00002175

EVAL-2021-HNP-

5175-00002173

Station Health Report - Emergency Diesel Generator and

Auxiliaries

2/31/2021

AD-EG-ALL-1207

Plant Health Process for Bridging Strategy for Refurbishment

of the Siemens, Model RLN, 480V Circuit Breakers

CSD-AD-ALL-

0004-01

CORRECTIVE ACTION PROGRAM REVIEW MEETING

REVISION 7

EVT-2085-2021-

00075447

Maintenance Rule Manager Event

EVT-5145-2021-

00075253

Maintenance Rule Manager Event

EVT-5175-2021-

00075457

Maintenance Rule Manager Event

MTG-2021-

00000291

Maintenance Rule Meeting Minutes

MTG-2022-

00000323

Maintenance Rule Meeting Minutes

MTG-2022-

00000328

Maintenance Rule Meeting Minutes

MTG-2022-

00000336

Maintenance Rule Meeting Minutes

Miscellaneous

MTG-2022-

00000345

Maintenance Rule Meeting Minutes

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

TTC1018-N CAP

Overview for New

Employees

AD-LS-ALL--0003

NRC AUDIT AND INSPECTION ACTIVITIES

REVISION

AD-MN-ALL-0017

HOUSEKEEPING, MATERIAL CONDITION, AND SEISMIC

REQUIREMENTS FOR EQUIPMENT STORAGE

REVISION 1

AD-PI-ALL-0400

OPERATING EXPERIENCE PROGRAM

REVISION

ADMINISTRATIVE

PROCEDURE,

AD-EG-ALL-1214

CONDITION MONITORING OF STRUCTURES

REVISION 1

ADMINISTRATIVE

PROCEDURE,

AD-WC-ALL-0210

WORK REQUEST INITIATION, SCREENING,

PRIORITIZATION AND CLASSIFICATION.

REVISION

ADMINISTRATIVE

PROCEDURE,

AD-EG-ALL-1104

OBSOLESCENCE PROGRAM

REVISION 5

ADMINISTRATIVE

PROCEDURE,

AD-EG-ALL-1202,

PREVENTIVE MAINTENANCE AND SURVEILLANCE

TESTING ADMINISTRATION

REVISION

ADMINISTRATIVE

PROCEDURE,

AD-EG-ALL-1206

EQUIPMENT RELIABILITY CLASSIFICATION

REVISION 6

ADMINISTRATIVE

PROCEDURE,

AD-EG-ALL-1210

MAINTENANCE RULE PROGRAM

REVISION 2

ADMINISTRATIVE

PROCEDURE,

AD-EG-ALL-1210

MAINTENANCE RULE PROGRAM

REVISION 3

ADMINISTRATIVE

PROCEDURE,

AD-EG-ALL-1650

LICENSE RENEWAL AGING MANAGEMENT

REVISION 4

Procedures

ADMINISTRATIVE BORIC ACID CORROSION CONTROL PROGRAM -

REVISION 4.

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

PROCEDURE,

AD-EG-PWR-1611

IMPLEMENTATION

ADMINISTRATIVE

PROCEDURE,

AD-OP-ALL-0105

OPERABILITY DETERMINATIONS

REVISION 6

ADMINISTRATIVE

PROCEDURE,

AD-PI-ALL-0100

CORRECTIVE ACTION PROGRAM

REVISION

ADMINISTRATIVE

PROCEDURE,

AD-PI-ALL-0101

ROOT CAUSE EVALUATION

REVISION 8

ADMINISTRATIVE

PROCEDURE,

AD-PI-ALL-0106

CAUSE INVESTIGATION CHECKLISTS

REVISION 7

ADMINISTRATIVE

PROCEDURE,

AD-RP-ALL-5000

PREPARATION AND SHIPMENT OF RADIOACTIVE

MATERIAL AND RADIOACTIVE WASTE

REVISION 5

ADMINISTRATIVE

PROCEDURE,

AD-WC-ALL-0250

WORK IMPLEMENTATION AND COMPLETION

REVISION

AP-038

DEFICIENCY TAG PROCEDURE

REVISION

ENGINEERING

SURVEILLANCE

TEST, NUMBER:

EST-212

TYPE C LOCAL LEAK RATE TESTS

REVISION

PM-E0044

480 VAC SIEMENS TYPE RLN(F) LOAD CENTER BREAKER

AND CUBICLE P.M.

REVISION

24, 25

Radiation Surveys HNP-M-

210505-8

Follow-up Survey in Chemistry Lab Following Dose Rate

Alarm

05/05/2021

20-FLEET-

CAP-01

NUCLEAR OVERSIGHT - AUDIT FLEET PERFORMANCE

IMPROVEMENT AND CORRECTIVE ACTION PROGRAM

Self-Assessments

20-HNP-SEC-

NUCLEAR OVERSIGHT - AUDIT HARRIS PHYSICAL

SECURITY

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

21-HNP-ENG-

NUCLEAR OVERSIGHT - AUDIT HARRIS ENGINEERING

21-HNP-MNT-

NUCLEAR OVERSIGHT - AUDIT HARRIS MAINTENANCE

AND SPECIAL PROCESSES

22-HNP-FIRE-

NUCLEAR OVERSIGHT - AUDIT

HARRIS FIRE PROTECTION

22-HNP-OPT-

NUCLEAR OVERSIGHT - AUDIT HARRIS OPERATIONS

TRAINING

2340613-05

20 CR Initiation Rate Analysis

07/22/2020

2363582-05

Operator Knowledge of Important Parameters and Control

08/17/2021

2370171-05

Operational Risk

03/04/2021

2406757-05

HNP 2022 NRC PI&R Readiness Assessment

2/17/2022

RP Bench

Strength 5-2-22

(1).xlxs (Excel

Spreadsheet)

Harris Radiation Protection Technician Qualification Tracker

05/22/2022

Work Orders

2339383

2340658

2359190

2361630

2372270

2380375

2380478

2380884

2389593

2390237

2392028

2392806

2395124

2398689

2409078

2409079

2410990

2412354

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

2413948

20459046

20445753

20460102

203719

W/O 98704-1

Perform PM E0044, Perform 480VAC Cubicle and Breaker

Inspection and Cleaning for RHR Pump 1B-SB

06/06/2014