{{#Wiki_filter:GRAND GULF NUCLEAR GENERATING STATION Updated Final Safety Analysis Report (UFSAR) | {{#Wiki_filter:GRAND GULF NUCLEAR GENERATING STATION Updated Final Safety Analysis Report (UFSAR) | ||
TABLE OF CONTENTS CHAPTER 17 QUALITY ASSURANCE 17.1 QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTION..... 17.1-1 17.2 QUALITY ASSURANCE DURING THE OPERATING PHASE....... 17.1-1 17-i Revision 2016-00 | |||
GRAND GULF NUCLEAR GENERATING STATION Updated Final Safety Analysis Report (UFSAR) 17.0 QUALITY ASSURANCE 17.1 QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTION This section, as it relates to GGNS, is covered in the PSAR. | |||
17.2 QUALITY ASSURANCE DURING THE OPERATING PHASE This section was covered in a separate topical report (GGNS-TOP-1A), but has been replaced by a Corporate QA manual. | |||
17.0 QUALITY ASSURANCE | |||
17.1 QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTION | |||
This section, as it relates to GGNS, is covered in the PSAR. | |||
17.2 QUALITY ASSURANCE DURING THE OPERATING PHASE | |||
This section was covered in a separate topical report (GGNS-TOP-1A), but has been replaced by a Corporate QA manual. | |||
17.1-1 Revision 2016-00}} | 17.1-1 Revision 2016-00}} | ||
Latest revision as of 15:47, 27 November 2024
| ML22257A032 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 09/08/2022 |
| From: | Entergy Operations |
| To: | Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML22257A024 | List:
|
| References | |
| GNRO2022-00027 | |
| Download: ML22257A032 (2) | |
Text
GRAND GULF NUCLEAR GENERATING STATION Updated Final Safety Analysis Report (UFSAR)
TABLE OF CONTENTS CHAPTER 17 QUALITY ASSURANCE 17.1 QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTION..... 17.1-1 17.2 QUALITY ASSURANCE DURING THE OPERATING PHASE....... 17.1-1 17-i Revision 2016-00
GRAND GULF NUCLEAR GENERATING STATION Updated Final Safety Analysis Report (UFSAR) 17.0 QUALITY ASSURANCE 17.1 QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTION This section, as it relates to GGNS, is covered in the PSAR.
17.2 QUALITY ASSURANCE DURING THE OPERATING PHASE This section was covered in a separate topical report (GGNS-TOP-1A), but has been replaced by a Corporate QA manual.
17.1-1 Revision 2016-00