ML23243B054: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot change) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 19: | Line 19: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:Enclosure 2 SOUTHERN NUCLEAR OPERATING COMPANY, INC. | ||
SOUTHERN NUCLEAR OPERATING COMPANY, INC. | GEORGIA POWER COMPANY OGLETHORPE POWER CORPORATION MEAG POWER SPVM, LLC MEAG POWER SPVJ, LLC MEAG POWER SPVP, LLC CITY OF DALTON, GEORGIA VOGTLE ELECTRIC GENERATING PLANT, UNIT 4 DOCKET NO. 52-026 AMENDMENT TO FACILITY COMBINED LICENSE Amendment No. 193 License No. NPF-92 | ||
: 1. | |||
GEORGIA POWER COMPANY | The Nuclear Regulatory Commission (the Commission) has found that: | ||
A. | |||
OGLETHORPE POWER CORPORATION | The application for amendment by Southern Nuclear Operating Company, Inc., | ||
(SNC), dated January 3, 2023, and supplemented by letters dated June 13, 2023, and August 31, 2023, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commissions regulations set forth in 10 CFR Chapter I; B. | |||
MEAG POWER SPVM, LLC | The facility will be constructed and will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. | ||
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. | |||
MEAG POWER SPVJ, LLC | The issuance of this amendment will not be inimical to the common defense and security or the health and safety of the public; and E. | ||
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations, and all applicable requirements have been satisfied. | |||
MEAG POWER SPVP, LLC | : 2. | ||
Accordingly, the license is amended by changes to the Combined License Condition 2.D.(8) as well as Appendix A of the facility Combined License as indicated in the attachment to this license amendment. Paragraph 2.D(8) of facility Combined License No. NPF-92 is hereby amended to read as follows: | |||
CITY OF DALTON, GEORGIA | (8) Incorporation The Technical Specifications, Environmental Protection Plan, and ITAAC in Appendices A, B, and C, respectively of this license, as revised through Amendment No. 193, are hereby incorporated into this license. | ||
: 3. | |||
VOGTLE ELECTRIC GENERATING PLANT, UNIT 4 | This license amendment is effective as of the date of its issuance and shall be implemented within 30 days of issuance. | ||
FOR THE NUCLEAR REGULATORY COMMISSION | |||
DOCKET NO. 52-026 | /RA/ | ||
Lauren A. Nist, Director Vogtle Project Office Office of Nuclear Reactor Regulation Date of Issuance: December 19, 2023 Attachment(s): | |||
AMENDMENT TO FACILITY COMBINED LICENSE | |||
Amendment No. 193 License No. NPF-92 | |||
: 1. The Nuclear Regulatory Commission (the Commission) has found that: | |||
A. The application for amendment by Southern Nuclear Operating Company, Inc., | |||
(SNC), dated January 3, 2023, and supplemented by letters dated June 13, 2023, and August 31, 2023, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commissions regulations set forth in 10 CFR Chapter I; | |||
B. The facility will be constructed and will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; | |||
C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; | |||
D. The issuance of this amendment will not be inimical to the common defense and security or the health and safety of the public; and | |||
E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations, and all applicable requirements have been satisfied. | |||
: 2. Accordingly, the license is amended by changes to the Combined License Condition 2.D.(8) as well as Appendix A of the facility Combined License as indicated in the attachment to this license amendment. Paragraph 2.D(8) of facility Combined License No. NPF-92 is hereby amended to read as follows: | |||
(8) Incorporation | |||
The Technical Specifications, Environmental Protection Plan, and ITAAC in Appendices A, B, and C, respectively of this license, as revised through Amendment No. 193, are hereby incorporated into this license. | |||
: 3. This license amendment is effective as of the date of its issuance and shall be implemented within 30 days of issuance. | |||
FOR THE NUCLEAR REGULATORY COMMISSION | |||
Lauren A. Nist, Director Vogtle Project Office Office of Nuclear Reactor Regulation | |||
Date of Issuance: December 19, 2023 | |||
Attachment(s): | |||
Page 7 of the facility Combined License and affected pages of Appendix A of the facility Combined License}} | Page 7 of the facility Combined License and affected pages of Appendix A of the facility Combined License}} | ||
Latest revision as of 08:59, 25 November 2024
| ML23243B054 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 12/19/2023 |
| From: | NRC/NRR/VPOB |
| To: | Southern Nuclear Operating Co |
| Gleaves W | |
| Shared Package | |
| ML23243A956 | List: |
| References | |
| EPID L-2023-LLA-0002 | |
| Download: ML23243B054 (2) | |
Text
Enclosure 2 SOUTHERN NUCLEAR OPERATING COMPANY, INC.
GEORGIA POWER COMPANY OGLETHORPE POWER CORPORATION MEAG POWER SPVM, LLC MEAG POWER SPVJ, LLC MEAG POWER SPVP, LLC CITY OF DALTON, GEORGIA VOGTLE ELECTRIC GENERATING PLANT, UNIT 4 DOCKET NO.52-026 AMENDMENT TO FACILITY COMBINED LICENSE Amendment No. 193 License No. NPF-92
- 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Southern Nuclear Operating Company, Inc.,
(SNC), dated January 3, 2023, and supplemented by letters dated June 13, 2023, and August 31, 2023, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commissions regulations set forth in 10 CFR Chapter I; B.
The facility will be constructed and will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations, and all applicable requirements have been satisfied.
- 2.
Accordingly, the license is amended by changes to the Combined License Condition 2.D.(8) as well as Appendix A of the facility Combined License as indicated in the attachment to this license amendment. Paragraph 2.D(8) of facility Combined License No. NPF-92 is hereby amended to read as follows:
(8) Incorporation The Technical Specifications, Environmental Protection Plan, and ITAAC in Appendices A, B, and C, respectively of this license, as revised through Amendment No. 193, are hereby incorporated into this license.
- 3.
This license amendment is effective as of the date of its issuance and shall be implemented within 30 days of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
Lauren A. Nist, Director Vogtle Project Office Office of Nuclear Reactor Regulation Date of Issuance: December 19, 2023 Attachment(s):
Page 7 of the facility Combined License and affected pages of Appendix A of the facility Combined License