ML23307A077: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot change) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:Form 2.1-1 Examination Preparation Checklist | {{#Wiki_filter:Form 2.1-1 Examination Preparation Checklist Facility: ____McGuire__________________________ | ||
Date of Examination: _Jul/Aug2023___ | |||
Facility: | Developed by: Written: | ||
Facility x NRC | |||
Developed by: Written: Facility x NRC // Operating: Facility x NRC Target | // | ||
: 1. Examination administration date confirmed (A.1-5). For NRC-prepared examinations, | Operating: | ||
Facility x | |||
NRC Target Date* | |||
: 3. Facility licensee contact briefed on examination security and other requirements (D.4). As | Task Description Chief Examiners Initials | ||
-240 | |||
: 1. Examination administration date confirmed (A.1-5). For NRC-prepared examinations, arrangements are made for the facility licensee to submit reference materials (B.4, C.4.g and F). | |||
MB | |||
-210 | |||
: 2. NRC examiners and facility licensee contact assigned (B.1 and C.1-3). | |||
: 7. Operating test outlines and checklists due: Forms 1.3-1, 2.3-1, 3.2-1, 3.2-2, 3.3-1, and 3.4-1, as | MB | ||
-210 | |||
: 3. Facility licensee contact briefed on examination security and other requirements (D.4). As applicable, the facility licensee contact submits to the NRC any prescreened K/As for elimination from the written examination outline, with a description of the facility licensees prescreening process (ES-4.1 A.1.a and ES-4.1 B.2). | |||
MB | |||
: 10. Proposed examinations (written, JPMs, and scenarios, as applicable) and outline forms; | -210 | ||
: 4. Reference material due for NRC-prepared examinations (F). | |||
MB | |||
-210 | |||
: 5. Examination kick-off call held (C.4). The NRC sends the corporate notification letter (A.5). | |||
MB | |||
-195 | |||
: 6. Written examination outline developed by the NRC and sent to the facility licensee contact (must be on the examination security agreement) (B.2, ES-4.1 A.1.b and ES-4.1 A.2.a). | |||
MB | |||
-150 | |||
: 7. Operating test outlines and checklists due: Forms 1.3-1, 2.3-1, 3.2-1, 3.2-2, 3.3-1, and 3.4-1, as applicable (B.6). Facility licensee provides a draft operating test administration schedule to the NRC (B.18). | |||
MB | |||
-136 | |||
: 8. Operating test outlines reviewed by the NRC and feedback provided to the facility licensee (ES-2.3). | |||
MB | |||
-100 | |||
: 9. NRC-prepared examinations approved by the NRC supervisor and forwarded for facility licensee review (ES-2.3). | |||
MB | |||
-75 | |||
: 10. Proposed examinations (written, JPMs, and scenarios, as applicable) and outline forms; quality checklists and supporting documentation (including Forms 2.3-2 and 2.3-4 and any Form 2.3-1, 1.3-1, and 3.4-1 updates); and reference materials due. | |||
MB | |||
-60 | |||
: 11. Preliminary waiver/excusal requests due (ES-2.2 E.1). | |||
MB | |||
-50 | |||
: 12. Written examination and operating test reviews completed (ES-2.3). The NRC supervisors authorization to proceed with the facility review granted (ES-2.3 D). | |||
MB | |||
-50 | |||
: 13. Examination review results discussed between the NRC and the facility licensee (B.14). | |||
MB | |||
-35 | |||
: 14. Examination preparatory week conducted by the NRC and the facility licensee (I). | |||
MB | |||
-30 | |||
: 15. Preliminary license applications, including any waiver/excusal requests, due (ES-2-2 C.1). | |||
MB | |||
-14 | |||
: 16. Final license applications, including any waiver/excusal requests, due and Form 2.2-1 prepared (ES-2.2 C and E). | |||
MB | |||
-7 | |||
: 17. Written examinations and operating tests approved by the NRC supervisor (C.9) | |||
MB | |||
-7 | |||
: 18. Facility licensee management feedback on the examination requested by the NRC supervisor (C.10). | |||
MB | |||
-7 | |||
: 19. Final applications reviewed; 10% of applications audited to confirm qualifications/eligibility (ES-2.2 G); and examination approval letter (Letter 2.3-1) and waiver/excusal letters sent. | |||
MB | |||
-7 | |||
: 20. Written examination administration guidelines reviewed with the facility licensee (D.14). | |||
MB | |||
-7 | |||
: 21. Approved scenarios and job performance measures distributed to NRC examiners (D.12). | |||
MB | |||
* Target dates are based on facility licensee-prepared examinations and the examination date identified in the corporate notification letter. These dates are for planning purposes and may be adjusted in coordination with the facility licensee. | * Target dates are based on facility licensee-prepared examinations and the examination date identified in the corporate notification letter. These dates are for planning purposes and may be adjusted in coordination with the facility licensee. | ||
ML23307A077 | |||
Form 5.1-1 | Form 5.1-1 Postexamination Check Sheet Postexamination Check Sheet Facility: McGuire Dates of Examination: Jul/Aug 2023 Activity Description Date Complete | ||
: 1. *Received postexamination package from facility licensee and verified complete. (ES-4.4) 8/23/23 | |||
Postexamination Check Sheet | : 2. *Reviewed and incorporated any necessary facility and applicant written examination comments. NRC grading of written examination completed. (ES-4.4) 9/19/23 | ||
: 3. *Reviewed and incorporated any necessary facility and applicant operating test comments. NRC grading of operating test completed. | |||
Facility: McGuire Dates of Examination: Jul/Aug 2023 | (ES-3.6) 9/19/23 | ||
Activity Description Date Complete | |||
: 1. *Received | |||
: 2. *Reviewed and incorporated any necessary facility and applicant written examination comments. NRC grading of written examination | |||
: 3. *Reviewed and incorporated any necessary facility and applicant operating test comments. NRC grading of operating test completed. | |||
: 4. *Completed NRC chief examiner review of operating test and written examination grading. (ES-3.6 and ES-4.4) 9/19/23 | : 4. *Completed NRC chief examiner review of operating test and written examination grading. (ES-3.6 and ES-4.4) 9/19/23 | ||
: 5. Completed licensing official review. 9/20/23 | : 5. Completed licensing official review. | ||
: 6. Mailed licenses, preliminary results, and | 9/20/23 | ||
: 7. Notified facility licensee of results. 9/20/23 | : 6. Mailed licenses, preliminary results, and pass letters. | ||
: 8. Issued the examination report (refer to Operator Licensing Manual | 9/20/23 | ||
: 9. Returned reference material after final resolution of any informal | : 7. Notified facility licensee of results. | ||
: 10. Performed examination recordkeeping activities (refer to OLMC 520, Operator Licensing Examination Records and Documentation, and | 9/20/23 | ||
* Activity may not be applicable for a retake examination. If this activity does not apply, place an N/A in the Date Complete column. | : 8. Issued the examination report (refer to Operator Licensing Manual Chapter (OLMC) 510, Operator Licensing Examination Reports). | ||
9/20/23 | |||
: 9. Returned reference material after final resolution of any informal NRC staff reviews, hearing demands, or both. | |||
10/6/23 | |||
: 10. Performed examination recordkeeping activities (refer to OLMC 520, Operator Licensing Examination Records and Documentation, and Management Directive 3.53, NRC Records and Document Management Program). | |||
10/10/23 | |||
* Activity may not be applicable for a retake examination. If this activity does not apply, place an N/A in the Date Complete column. | |||
J_DUKE Edward R. Pigott Site Vice President McGuire Nuclear Station | |||
ENERGY Duke Energy MG01VP 112700 Hagers Ferry Road Huntersville, NC 28078 o: 980.875.4805 Edward.Pigott@duke-energy.com deleted RA-23-0220 August 23, 2023 Laura A. Dudes, Regional Administrator U.S. Nuclear Regulatory Commission, Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, GA 30303-1257 | |||
==SUBJECT:== | ==SUBJECT:== | ||
Duke Energy Carolinas, LLC (Duke Energy) | Duke Energy Carolinas, LLC (Duke Energy) | ||
McGuire Nuclear Station (MNS), Units 1 and 2 Docket Numbers: 50-369, 50-370 Reactor and Senior Reactor Operator Initial Examination 05000369/2023301 and 05000370/2023301 10 CFR 55.5 Pursuant to the requirements of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Duke Energy hereby provides submission of post-examination documentation for the McGuire licensed operator examination administered July/August, 2023. | McGuire Nuclear Station (MNS), Units 1 and 2 Docket Numbers: 50-369, 50-370 Reactor and Senior Reactor Operator Initial Examination 05000369/2023301 and 05000370/2023301 10 CFR 55.5 Pursuant to the requirements of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Duke Energy hereby provides submission of post-examination documentation for the McGuire licensed operator examination administered July/August, 2023. | ||
Specific items attached include: | Specific items attached include: | ||
Student answer sheets and Exam cover pages Master copy of the RO and SRO examinations and answer keys Student questions/proctor responses during the written examination Student Seating Chart ES-1.3-1, Examination Security Agreement Post Exam Comments Questions or comments should be directed to Steven Mosteller at (980) 875-5981 or Jeff Thomas at (980) 875-4499. | |||
Sincerely, Edward R. Pigott Duke Energy McGuire Nuclear Station Site Vice President | |||
U.S. Nuclear Regulatory Commission RA-23-0220 Page2 Attachment cc: | |||
Mr. Thomas A Stephen, Chief Operations Branch 1 U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 Mr. Mark Bates U. S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001}} | |||
Sincerely, Edward R. Pigott Duke Energy McGuire Nuclear Station Site Vice President}} | |||
Latest revision as of 07:57, 25 November 2024
| ML23307A077 | |
| Person / Time | |
|---|---|
| Site: | McGuire, Mcguire |
| Issue date: | 11/03/2023 |
| From: | NRC/RGN-II |
| To: | |
| References | |
| 50-369/23-301, 50-370/23-301 50-369/OL-23, 50-370/OL-23 | |
| Download: ML23307A077 (1) | |
Text
Form 2.1-1 Examination Preparation Checklist Facility: ____McGuire__________________________
Date of Examination: _Jul/Aug2023___
Developed by: Written:
Facility x NRC
//
Operating:
Facility x
NRC Target Date*
Task Description Chief Examiners Initials
-240
- 1. Examination administration date confirmed (A.1-5). For NRC-prepared examinations, arrangements are made for the facility licensee to submit reference materials (B.4, C.4.g and F).
MB
-210
- 2. NRC examiners and facility licensee contact assigned (B.1 and C.1-3).
MB
-210
- 3. Facility licensee contact briefed on examination security and other requirements (D.4). As applicable, the facility licensee contact submits to the NRC any prescreened K/As for elimination from the written examination outline, with a description of the facility licensees prescreening process (ES-4.1 A.1.a and ES-4.1 B.2).
MB
-210
- 4. Reference material due for NRC-prepared examinations (F).
MB
-210
- 5. Examination kick-off call held (C.4). The NRC sends the corporate notification letter (A.5).
MB
-195
- 6. Written examination outline developed by the NRC and sent to the facility licensee contact (must be on the examination security agreement) (B.2, ES-4.1 A.1.b and ES-4.1 A.2.a).
MB
-150
- 7. Operating test outlines and checklists due: Forms 1.3-1, 2.3-1, 3.2-1, 3.2-2, 3.3-1, and 3.4-1, as applicable (B.6). Facility licensee provides a draft operating test administration schedule to the NRC (B.18).
MB
-136
- 8. Operating test outlines reviewed by the NRC and feedback provided to the facility licensee (ES-2.3).
MB
-100
- 9. NRC-prepared examinations approved by the NRC supervisor and forwarded for facility licensee review (ES-2.3).
MB
-75
- 10. Proposed examinations (written, JPMs, and scenarios, as applicable) and outline forms; quality checklists and supporting documentation (including Forms 2.3-2 and 2.3-4 and any Form 2.3-1, 1.3-1, and 3.4-1 updates); and reference materials due.
MB
-60
- 11. Preliminary waiver/excusal requests due (ES-2.2 E.1).
MB
-50
- 12. Written examination and operating test reviews completed (ES-2.3). The NRC supervisors authorization to proceed with the facility review granted (ES-2.3 D).
MB
-50
- 13. Examination review results discussed between the NRC and the facility licensee (B.14).
MB
-35
- 14. Examination preparatory week conducted by the NRC and the facility licensee (I).
MB
-30
- 15. Preliminary license applications, including any waiver/excusal requests, due (ES-2-2 C.1).
MB
-14
- 16. Final license applications, including any waiver/excusal requests, due and Form 2.2-1 prepared (ES-2.2 C and E).
MB
-7
- 17. Written examinations and operating tests approved by the NRC supervisor (C.9)
MB
-7
- 18. Facility licensee management feedback on the examination requested by the NRC supervisor (C.10).
MB
-7
- 19. Final applications reviewed; 10% of applications audited to confirm qualifications/eligibility (ES-2.2 G); and examination approval letter (Letter 2.3-1) and waiver/excusal letters sent.
MB
-7
- 20. Written examination administration guidelines reviewed with the facility licensee (D.14).
MB
-7
- 21. Approved scenarios and job performance measures distributed to NRC examiners (D.12).
MB
- Target dates are based on facility licensee-prepared examinations and the examination date identified in the corporate notification letter. These dates are for planning purposes and may be adjusted in coordination with the facility licensee.
Form 5.1-1 Postexamination Check Sheet Postexamination Check Sheet Facility: McGuire Dates of Examination: Jul/Aug 2023 Activity Description Date Complete
- 1. *Received postexamination package from facility licensee and verified complete. (ES-4.4) 8/23/23
- 2. *Reviewed and incorporated any necessary facility and applicant written examination comments. NRC grading of written examination completed. (ES-4.4) 9/19/23
- 3. *Reviewed and incorporated any necessary facility and applicant operating test comments. NRC grading of operating test completed.
(ES-3.6) 9/19/23
- 4. *Completed NRC chief examiner review of operating test and written examination grading. (ES-3.6 and ES-4.4) 9/19/23
- 5. Completed licensing official review.
9/20/23
- 6. Mailed licenses, preliminary results, and pass letters.
9/20/23
- 7. Notified facility licensee of results.
9/20/23
- 8. Issued the examination report (refer to Operator Licensing Manual Chapter (OLMC) 510, Operator Licensing Examination Reports).
9/20/23
- 9. Returned reference material after final resolution of any informal NRC staff reviews, hearing demands, or both.
10/6/23
- 10. Performed examination recordkeeping activities (refer to OLMC 520, Operator Licensing Examination Records and Documentation, and Management Directive 3.53, NRC Records and Document Management Program).
10/10/23
- Activity may not be applicable for a retake examination. If this activity does not apply, place an N/A in the Date Complete column.
J_DUKE Edward R. Pigott Site Vice President McGuire Nuclear Station
ENERGY Duke Energy MG01VP 112700 Hagers Ferry Road Huntersville, NC 28078 o: 980.875.4805 Edward.Pigott@duke-energy.com deleted RA-23-0220 August 23, 2023 Laura A. Dudes, Regional Administrator U.S. Nuclear Regulatory Commission, Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, GA 30303-1257
SUBJECT:
Duke Energy Carolinas, LLC (Duke Energy)
McGuire Nuclear Station (MNS), Units 1 and 2 Docket Numbers: 50-369, 50-370 Reactor and Senior Reactor Operator Initial Examination 05000369/2023301 and 05000370/2023301 10 CFR 55.5 Pursuant to the requirements of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Duke Energy hereby provides submission of post-examination documentation for the McGuire licensed operator examination administered July/August, 2023.
Specific items attached include:
Student answer sheets and Exam cover pages Master copy of the RO and SRO examinations and answer keys Student questions/proctor responses during the written examination Student Seating Chart ES-1.3-1, Examination Security Agreement Post Exam Comments Questions or comments should be directed to Steven Mosteller at (980) 875-5981 or Jeff Thomas at (980) 875-4499.
Sincerely, Edward R. Pigott Duke Energy McGuire Nuclear Station Site Vice President
U.S. Nuclear Regulatory Commission RA-23-0220 Page2 Attachment cc:
Mr. Thomas A Stephen, Chief Operations Branch 1 U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 Mr. Mark Bates U. S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001