ML23342A097: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD, SUIT E 102 KING OF PRUSSIA, PA 19406-1415
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD, SUITE 102 KING OF PRUSSIA, PA 19406-1415 January 9, 2024 Rob Desmarais ISFSI Manager Connecticut Yankee Atomic Power Company 362 Injun Hollow Road East Hampton, Connecticut 06424-3099  
 
January 9, 2024
 
Rob Desmarais ISFSI Manager Connecticut Yankee Atomic Power Company 362 Injun Hollow Road East Hampton, Connecticut 06424-3099


==SUBJECT:==
==SUBJECT:==
CONNECTICUT YANKEE ATOMIC POWER COMPANY - INDEPENDENT SPENT FUEL STORAGE INSTALLATION SECURITY INSPECTION PLAN
CONNECTICUT YANKEE ATOMIC POWER COMPANY - INDEPENDENT SPENT FUEL STORAGE INSTALLATION SECURITY INSPECTION PLAN  


==Dear Rob Desmarais:==
==Dear Rob Desmarais:==
The enclosed inspection plan lists the security inspections scheduled through December 31, 2025. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well before our inspectors arrive on site.
The enclosed inspection plan lists the security inspections scheduled through December 31, 2025. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well before our inspectors arrive on site.
In accordance with Title 10 of the Code of Federal Regulations 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRCs Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
In accordance with Title 10 of the Code of Federal Regulations 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRCs Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (610) 337-5262 with any questions you may have regarding the inspection plan.
If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (610) 337-52 62 with any questions you may have regarding the inspection plan.
Sincerely, Daniel L. Schroeder, Chief Security, Emergency Preparedness and Incident Response Branch Division of Radiological Safety and Security Docket No. 07200039 License No. SFGL-21  
 
Sincerely,
 
Daniel L. Schroeder, Chief Security, Emergency Preparedness and Incident Response Branch Division of Radiological Safety and Security
 
Docket No. 072 00039 License No. SFGL -21


==Enclosure:==
==Enclosure:==
Connecticut Yankee Atomic Power Company - Independant Spent Fuel Storage Installation Security Inspection Plan
Connecticut Yankee Atomic Power Company - Independant Spent Fuel Storage Installation Security Inspection Plan Daniel L.
 
Schroeder Digitally signed by Daniel L. Schroeder Date: 2024.01.09 09:00:25 -05'00'
ML23342A097 n -Sensitive Publvlle SUNSI Review Sensitive n -Publiclyvlable
 
OFFICE /DRSS /DRSS /DRSS / DRSS ME Tk Jwas ADrdis / DScoed TE 12/ /2023 12/ /2023 01/03/2024 01/08/2024
 
Site Inspection Activity Plan 07200039 - Haddam Neck (ISFSI)
 
01/01/2024 - 12/31/2025
 
Unit Start End Activity CAC Title Staff Count
 
CY - ISFSI Security Inspection 2


8/18/2025 8/22/2025 IP 81311 001006 Physical Security Requirements for Independent Spent Fuel Storage Installations
ML23342A097 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRSS RI/DRSS RI/DRSS RI/ DRSS NAME TEck JEdwards ADimitriadis/ad DSchroeder DATE 12/18/2023 12/18/2023 01/03/2024 01/08/2024


Prepared on 11/6/2023 1:51:58 PM 1 of 1}}
Site Inspection Activity Plan 07200039 - Haddam Neck (ISFSI) 01/01/2024 - 12/31/2025 Unit Start End Activity CAC Title Staff Count CY - ISFSI Security Inspection 2
8/18/2025 8/22/2025 IP 81311 001006 Physical Security Requirements for Independent Spent Fuel Storage Installations Prepared on 11/6/2023 1:51:58 PM 1 of 1}}

Latest revision as of 07:34, 25 November 2024

Connecticut Yankee Atomic Power Company - Independent Spent Fuel Storage Installation Security Inspection Plan
ML23342A097
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 01/09/2024
From: Daniel Schroeder
NRC Region 1
To: Desmarais R
Connecticut Yankee Atomic Power Co
References
Download: ML23342A097 (1)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD, SUITE 102 KING OF PRUSSIA, PA 19406-1415 January 9, 2024 Rob Desmarais ISFSI Manager Connecticut Yankee Atomic Power Company 362 Injun Hollow Road East Hampton, Connecticut 06424-3099

SUBJECT:

CONNECTICUT YANKEE ATOMIC POWER COMPANY - INDEPENDENT SPENT FUEL STORAGE INSTALLATION SECURITY INSPECTION PLAN

Dear Rob Desmarais:

The enclosed inspection plan lists the security inspections scheduled through December 31, 2025. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well before our inspectors arrive on site.

In accordance with Title 10 of the Code of Federal Regulations 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRCs Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (610) 337-5262 with any questions you may have regarding the inspection plan.

Sincerely, Daniel L. Schroeder, Chief Security, Emergency Preparedness and Incident Response Branch Division of Radiological Safety and Security Docket No. 07200039 License No. SFGL-21

Enclosure:

Connecticut Yankee Atomic Power Company - Independant Spent Fuel Storage Installation Security Inspection Plan Daniel L.

Schroeder Digitally signed by Daniel L. Schroeder Date: 2024.01.09 09:00:25 -05'00'

ML23342A097 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRSS RI/DRSS RI/DRSS RI/ DRSS NAME TEck JEdwards ADimitriadis/ad DSchroeder DATE 12/18/2023 12/18/2023 01/03/2024 01/08/2024

Site Inspection Activity Plan 07200039 - Haddam Neck (ISFSI) 01/01/2024 - 12/31/2025 Unit Start End Activity CAC Title Staff Count CY - ISFSI Security Inspection 2

8/18/2025 8/22/2025 IP 81311 001006 Physical Security Requirements for Independent Spent Fuel Storage Installations Prepared on 11/6/2023 1:51:58 PM 1 of 1