ML24149A115: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:Form 5.1-1 Post examination Check Sheet
{{#Wiki_filter:Form 5.1-1 Post examination Check Sheet Post examination Check Sheet Facility: Fermi, Unit 2 Dates of Examination: 2/26/24 - 3/1/2024 Activity Description Date Complete
 
: 1. *Received post examination package from facility licensee and verified complete. (ES-4.4) 03/11/2024
Post examination Check Sheet
: 2. *Reviewed and incorporated any necessary facility and applicant written examination comments. NRC grading of written examination completed. (ES-4.4)
 
N/A
Facility: Fermi, Unit 2 Dates of Examination: 2/26/24 - 3/1/2024
: 3. *Reviewed and incorporated any necessary facility and applicant operating test comments. NRC grading of operating test completed.
 
Activity Description Date Complete
: 1. *Received post examination package from facility licensee and03/11/2024 verified complete. (ES-4.4)
: 2. *Reviewed and incorporated any necessary facility and applicant N/A written examination comments. NRC grading of written examination completed. (ES-4.4)
: 3. *Reviewed and incorporated any necessary facility and applicant N/A operating test comments. NRC grading of operating test completed.
(ES-3.6)
(ES-3.6)
: 4. *Completed NRC chief examiner review of operating test and written 03/21/2024 examination grading. (ES-3.6 and ES-4.4)
N/A
: 5. Completed licensing official review. 03/21/2024
: 4. *Completed NRC chief examiner review of operating test and written examination grading. (ES-3.6 and ES-4.4) 03/21/2024
: 6. Mailed licenses, preliminary results, and pass letters. 03/21/2024
: 5. Completed licensing official review.
: 7. Notified facility licensee of results. 03/21/2024
03/21/2024
: 8. Issued the examination report (refer to Operator Licensing Manual 04/01/2024 Chapter (OLMC) 510, Operator Licensing Examination Reports).
: 6. Mailed licenses, preliminary results, and pass letters.
: 9. Returned reference material after final resolution of any informal N/A NRC staff reviews, hearing demands, or both.
03/21/2024
: 10. Performed examination recordkeeping activities (refer to OLMC 520, 05/28/2024 Operator Licensing Examination Records and Documentation, and Management Directive 3.53, NRC Records and Document Management Program).
: 7. Notified facility licensee of results.
03/21/2024
: 8. Issued the examination report (refer to Operator Licensing Manual Chapter (OLMC) 510, Operator Licensing Examination Reports).
04/01/2024
: 9. Returned reference material after final resolution of any informal NRC staff reviews, hearing demands, or both.
N/A
: 10. Performed examination recordkeeping activities (refer to OLMC 520, Operator Licensing Examination Records and Documentation, and Management Directive 3.53, NRC Records and Document Management Program).
05/28/2024
* Activity may not be applicable for a retake examination. If this activity does not apply, place an N/A in the Date Complete column.}}
* Activity may not be applicable for a retake examination. If this activity does not apply, place an N/A in the Date Complete column.}}

Latest revision as of 18:11, 24 November 2024

Form 5.1-1 Post Examination Check Sheet (Fermi 2024)
ML24149A115
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 03/13/2024
From:
NRC/RGN-III/DORS/OB
To:
Travis Iskierka-Boggs
Shared Package
ML22251A163 List:
References
NRC-24-0023
Download: ML24149A115 (1)


Text

Form 5.1-1 Post examination Check Sheet Post examination Check Sheet Facility: Fermi, Unit 2 Dates of Examination: 2/26/24 - 3/1/2024 Activity Description Date Complete

1. *Received post examination package from facility licensee and verified complete. (ES-4.4) 03/11/2024
2. *Reviewed and incorporated any necessary facility and applicant written examination comments. NRC grading of written examination completed. (ES-4.4)

N/A

3. *Reviewed and incorporated any necessary facility and applicant operating test comments. NRC grading of operating test completed.

(ES-3.6)

N/A

4. *Completed NRC chief examiner review of operating test and written examination grading. (ES-3.6 and ES-4.4) 03/21/2024
5. Completed licensing official review.

03/21/2024

6. Mailed licenses, preliminary results, and pass letters.

03/21/2024

7. Notified facility licensee of results.

03/21/2024

8. Issued the examination report (refer to Operator Licensing Manual Chapter (OLMC) 510, Operator Licensing Examination Reports).

04/01/2024

9. Returned reference material after final resolution of any informal NRC staff reviews, hearing demands, or both.

N/A

10. Performed examination recordkeeping activities (refer to OLMC 520, Operator Licensing Examination Records and Documentation, and Management Directive 3.53, NRC Records and Document Management Program).

05/28/2024

  • Activity may not be applicable for a retake examination. If this activity does not apply, place an N/A in the Date Complete column.