ML24199A170: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:August 2, 2024
{{#Wiki_filter:August 2, 2024 MEMORANDUM TO: Gerond A. George, Chief Licensing Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM:
 
James V. Delosreyes, Project Manager /RA/
MEMORANDUM TO: Gerond A. George, Chief Licensing Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Licensing Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation  
 
FROM: James V. Delosreyes, Project Manager /RA/
Licensing Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation


==SUBJECT:==
==SUBJECT:==
UPDATE TO THE ACCIDENT TOLERANT FUEL ROADMAP TO READINESS
UPDATE TO THE ACCIDENT TOLERANT FUEL ROADMAP TO READINESS The purpose of this memorandum is to transmit an update to the accident tolerant fuel (ATF)
 
Roadmap to Readiness graphic. As a complement to the ATF project plan (Agencywide Documents Access and Management System (ADAMS) Accession No. ML21243A298), it has provided: (1) a graphical representation of the project timeline; (2) project efficiency and reliability; (3) regulatory certainty of licensing near-term ATF, increased enrichment, and higher burnup technologies; and (4) a visual of critical milestones anticipated to maintain a mid-to-late 2020s batch loading deployment timeline for the entire suite of near-term ATF, increased enrichment, and higher burnup. This graphic has been updated to reflect critical milestones completed since the last revision was issued in January 2024.
The purpose of this memorandum is to transmit an update to the accident tolerant fuel (ATF)
The information presented does not supersede any regulations or guidance and the information presented should not be interpreted as new regulatory requirements or guidance. The future updates will be on an ongoing basis and evaluated biannually, through continued stakeholder engagements.  
Roadmap to Readiness graphic. As a comple ment to the ATF project plan (Agencywide Documents Access and Management System (A DAMS) Accession No. ML21243A298), it has provided: (1) a graphical representation of the project timeline; (2) project efficiency and reliability; (3) regulatory certainty of licensing near-term ATF, increased enrichment, and higher burnup technologies; and (4) a visual of critical milestones anticipated to maintain a mid-to-late 2020s batch loading deployment timeline for the entire suite of near-term ATF, increased enrichment, and higher burnup. This graphic has been updated to reflect critical milestones completed since the last revision was issued in January 2024.
 
The information presented does not supersede any regulations or guidance and the information presented should not be interpreted as new regulatory requirements or guidance. The future updates will be on an ongoing basis and evaluated biannually, through continued stakeholder engagements.


==Enclosures:==
==Enclosures:==
: 1. Change History
: 1. Change History
: 2. Accident Tolerant Fuel, Increased Enrichment, and Higher Burnup Roadmap to Readiness
: 2. Accident Tolerant Fuel, Increased Enrichment, and Higher Burnup Roadmap to Readiness CONTACT: James Delosreyes, NRR/DORL (301) 415-4141


CONTACT: James Delosreyes, NRR/DORL (301) 415-4141 Change History
Enclosure Change History Item Location Description Version 1.2 (July 2024)
 
FFRD PIRT Increased Enrichment and Higher Burnup Updated hyperlink FFRD PIRT to NUREG/CR-7307 Phenomena Identification and Ranking Tables on High Burnup Fuel Fragmentation, Relocation, Dispersal, and Its Consequences for Design-Basis Accidents in Pressurized-and Boiling-Water Reactors (ML24155A058)
Item Location Description Version 1.2 (July 2024)
FFRD PIRT Increased Updated hyperlink FFRD PIRT to NUREG/CR-7307 Enrichment Phenomena Identification and Ranking Tables on High Burnup and Higher Fuel Fragmentation, Relocation, Dispersal, and Its Burnup Consequences for Design-Basis Accidents in Pressurized-and Boiling-Water Reactors (ML24155A058)
Updated completion to Issued May 2024.
Updated completion to Issued May 2024.
IE Increased Updated completion for IE Rulemaking SRM-SECY-21-0109 Rulemaking Enrichment to Expected Fall 2026.
IE Rulemaking SRM-SECY-21-0109 Increased Enrichment and Higher Burnup Updated completion for IE Rulemaking SRM-SECY-21-0109 to Expected Fall 2026.
SRM-SECY-and Higher 21-0109 Burnup Version 1.1 (January 2024)
Version 1.1 (January 2024)
RG 1.183 Coated Updated hyperlink RG 1.183 Revision 0, Alternative Rev.1 Source Cladding, Radiological Source Terms for Term Doped Pellet, Evaluating Design Basis Accidents Increased at Nuclear Power Reactors (ML003716792) to RG 1.183 Enrichment, Revision 1 (ML23082A305).
RG 1.183 Rev.1 Source Term Coated
and Higher Updated completion for RG 1.183 Revision 1 to Issued Burnup October 2023.
: Cladding, Doped Pellet, Increased Enrichment, and Higher Burnup Updated hyperlink RG 1.183 Revision 0, Alternative Radiological Source Terms for Evaluating Design Basis Accidents at Nuclear Power Reactors (ML003716792) to RG 1.183 Revision 1 (ML23082A305).
Code Stakeholder Updated hyperlink to Development Engagement https://www.nrc.gov/reactors/power/atf/review/independent-confirm-calc.html Regulatory Stakeholder Updated hyperlink to Issue Engagement https://www.nrc.gov/reactors/power/atf/interactions/industry-Summary interact.html (RIS) Updated completion for Regulatory Issue Summary (RIS) to Issued November 2019 and June 2023 NUREG on Stakeholder Updated hyperlink to NUREG 2266, Environmental Environmental Engagement Evaluation of Accident Tolerant Fuels with Increased Evaluation of Enrichment and Higher Burnup Levels Draft Report for ATF with IE Comment (ML23240A756).
Updated completion for RG 1.183 Revision 1 to Issued October 2023.
and HBU IE Increased Updated hyperlink to Rulemaking Enrichment https://www.regulations.gov/docket/NRC-2020-0034 SRM-SECY-and Higher 21-0109 Burnup Batch Load Destination Updated timeline to be ~2030 for BWRs.
Code Development Stakeholder Engagement Updated hyperlink to https://www.nrc.gov/reactors/power/atf/review/independent-confirm-calc.html Regulatory Issue Summary (RIS)
Near-Term ATF Concepts New Fuels Footnote Removed hyperlink text, maintaining hyperlink to graphic Info Graphic (ML23135A021).
Stakeholder Engagement Updated hyperlink to https://www.nrc.gov/reactors/power/atf/interactions/industry-interact.html Updated completion for Regulatory Issue Summary (RIS) to Issued November 2019 and June 2023 NUREG on Environmental Evaluation of ATF with IE and HBU Stakeholder Engagement Updated hyperlink to NUREG 2266, Environmental Evaluation of Accident Tolerant Fuels with Increased Enrichment and Higher Burnup Levels Draft Report for Comment (ML23240A756).
 
IE Rulemaking SRM-SECY-21-0109 Increased Enrichment and Higher Burnup Updated hyperlink to https://www.regulations.gov/docket/NRC-2020-0034 Batch Load Near-Term ATF Concepts Destination Updated timeline to be ~2030 for BWRs.
Enclosure
New Fuels Info Graphic Footnote Removed hyperlink text, maintaining hyperlink to graphic (ML23135A021).  
 
Package: ML23317A200 Memo: ML24199A170 Slide: ML24204A011 OFFICE NRR/DORL/LLPB/PM NRR/DORL/LLPB/LA RES/DSA/FSCB/BC NRR/DSS/SFNB/BC
 
NAME JDelosreyes DHarrison HEsmaili SKrepel
 
DATE 7/22/2024 7/22/2024 7/29/2024 7/23/2024
 
OFFICE NMSS/REFS/RRPB/BC NRR/DORL/LLPB/BC NRR/DORL/LLPB/PM
 
NAME IBerrios GGeorge JDelosreyes


DATE 7/23/2024 7/30/2024 8/2/2024}}
Package: ML23317A200 Memo: ML24199A170 Slide: ML24204A011 OFFICE NRR/DORL/LLPB/PM NRR/DORL/LLPB/LA RES/DSA/FSCB/BC NRR/DSS/SFNB/BC NAME JDelosreyes DHarrison HEsmaili SKrepel DATE 7/22/2024 7/22/2024 7/29/2024 7/23/2024 OFFICE NMSS/REFS/RRPB/BC NRR/DORL/LLPB/BC NRR/DORL/LLPB/PM NAME IBerrios GGeorge JDelosreyes DATE 7/23/2024 7/30/2024 8/2/2024}}

Latest revision as of 17:28, 24 November 2024

Update to the Accident Tolerant Fuel Roadmap to Readiness V 1.2
ML24199A170
Person / Time
Issue date: 08/02/2024
From: Delosreyes J
Licensing Processes Branch
To: Gerond George
Licensing Processes Branch
Shared Package
ML23317A200 List:
References
Download: ML24199A170 (1)


Text

August 2, 2024 MEMORANDUM TO: Gerond A. George, Chief Licensing Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM:

James V. Delosreyes, Project Manager /RA/

Licensing Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

SUBJECT:

UPDATE TO THE ACCIDENT TOLERANT FUEL ROADMAP TO READINESS The purpose of this memorandum is to transmit an update to the accident tolerant fuel (ATF)

Roadmap to Readiness graphic. As a complement to the ATF project plan (Agencywide Documents Access and Management System (ADAMS) Accession No. ML21243A298), it has provided: (1) a graphical representation of the project timeline; (2) project efficiency and reliability; (3) regulatory certainty of licensing near-term ATF, increased enrichment, and higher burnup technologies; and (4) a visual of critical milestones anticipated to maintain a mid-to-late 2020s batch loading deployment timeline for the entire suite of near-term ATF, increased enrichment, and higher burnup. This graphic has been updated to reflect critical milestones completed since the last revision was issued in January 2024.

The information presented does not supersede any regulations or guidance and the information presented should not be interpreted as new regulatory requirements or guidance. The future updates will be on an ongoing basis and evaluated biannually, through continued stakeholder engagements.

Enclosures:

1. Change History
2. Accident Tolerant Fuel, Increased Enrichment, and Higher Burnup Roadmap to Readiness CONTACT: James Delosreyes, NRR/DORL (301) 415-4141

Enclosure Change History Item Location Description Version 1.2 (July 2024)

FFRD PIRT Increased Enrichment and Higher Burnup Updated hyperlink FFRD PIRT to NUREG/CR-7307 Phenomena Identification and Ranking Tables on High Burnup Fuel Fragmentation, Relocation, Dispersal, and Its Consequences for Design-Basis Accidents in Pressurized-and Boiling-Water Reactors (ML24155A058)

Updated completion to Issued May 2024.

IE Rulemaking SRM-SECY-21-0109 Increased Enrichment and Higher Burnup Updated completion for IE Rulemaking SRM-SECY-21-0109 to Expected Fall 2026.

Version 1.1 (January 2024)

RG 1.183 Rev.1 Source Term Coated

Cladding, Doped Pellet, Increased Enrichment, and Higher Burnup Updated hyperlink RG 1.183 Revision 0, Alternative Radiological Source Terms for Evaluating Design Basis Accidents at Nuclear Power Reactors (ML003716792) to RG 1.183 Revision 1 (ML23082A305).

Updated completion for RG 1.183 Revision 1 to Issued October 2023.

Code Development Stakeholder Engagement Updated hyperlink to https://www.nrc.gov/reactors/power/atf/review/independent-confirm-calc.html Regulatory Issue Summary (RIS)

Stakeholder Engagement Updated hyperlink to https://www.nrc.gov/reactors/power/atf/interactions/industry-interact.html Updated completion for Regulatory Issue Summary (RIS) to Issued November 2019 and June 2023 NUREG on Environmental Evaluation of ATF with IE and HBU Stakeholder Engagement Updated hyperlink to NUREG 2266, Environmental Evaluation of Accident Tolerant Fuels with Increased Enrichment and Higher Burnup Levels Draft Report for Comment (ML23240A756).

IE Rulemaking SRM-SECY-21-0109 Increased Enrichment and Higher Burnup Updated hyperlink to https://www.regulations.gov/docket/NRC-2020-0034 Batch Load Near-Term ATF Concepts Destination Updated timeline to be ~2030 for BWRs.

New Fuels Info Graphic Footnote Removed hyperlink text, maintaining hyperlink to graphic (ML23135A021).

Package: ML23317A200 Memo: ML24199A170 Slide: ML24204A011 OFFICE NRR/DORL/LLPB/PM NRR/DORL/LLPB/LA RES/DSA/FSCB/BC NRR/DSS/SFNB/BC NAME JDelosreyes DHarrison HEsmaili SKrepel DATE 7/22/2024 7/22/2024 7/29/2024 7/23/2024 OFFICE NMSS/REFS/RRPB/BC NRR/DORL/LLPB/BC NRR/DORL/LLPB/PM NAME IBerrios GGeorge JDelosreyes DATE 7/23/2024 7/30/2024 8/2/2024