ML22048B181: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:PRE-APPLICATION MEETING FOR PRAIRIE ISLAND TS 5.6.6, PTLR, LAR February 18, 2022
{{#Wiki_filter:}}
© 2022 Xcel Energy                                    1
 
Agenda Purpose
 
===Background===
LAR Details Schedule
© 2022 Xcel Energy 2
 
Purpose Discuss proposed license amendments to adopt approved methods in Technical Specifications (TS) 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR).
© 2022 Xcel Energy                                                                3
 
===
Background===
* NSPM pulled surveillance capsules from the reactor vessel in the most recent Unit 1 (2020) and Unit 2 (2021) refueling outages.
* Review of Westinghouse draft report for the analysis of the Unit 1 surveillance capsule identified that there was a legacy error in calculations with respect to the location of weld W2.
© 2022 Xcel Energy                                                                            4
 
LAR Details
* The proposed amendments would revise PINGP TS 5.6.6 to include more recent analytical methods that have been found acceptable by the NRC.
o Update the approved analytical method to determine RCS pressure and temperature limits and over-pressure protection system (OPPS) setpoints from WCAP-14040-NP-A, Rev 2, to that in WCAP-14040-NP-A, Rev 4.
o Update the approved analytical method for calculating neutron fluence to the Westinghouse methodology provided in WCAP-18124-NP-A, Rev 0, to allow this method as an alternative to section 2.2 of WCAP-14040, Rev 4.
* NSPM plans to include with the LAR the revised Unit 1 heatup and cooldown curves using the proposed methods.
o NSPM expects the Unit 2 heatup and cooldown curves will be bounded by the Unit 1 curves.
© 2022 Xcel Energy                                                                                          5
 
LAR Details (continued)
Technical Specification Markups
© 2022 Xcel Energy              6
 
LAR Details (continued)
* Precedent: Beaver Valley Units 1 and 2 amendments 313 and 203 o Comments on extended beltline comparing PINGP to Beaver Valley.
Supplement 1 to WCAP-18124, Rev 0, addresses extended beltline generically and is currently in NRC review and expected before the new Unit 1 heatup and cooldown curves are completed.
The Beaver Valley fluence calculation resulted in more material in the extended beltline. PINGP will not have new material within the extended beltline.
© 2022 Xcel Energy                                                                                                                7
 
Schedule
* March 2022 - Submit Unit 1 Capsule Report
* August 2022 - Submit PTLR LAR
* March 2023 - Submit Unit 2 Capsule Report
* July 2023 - Submit Unit 2 heatup and cooldown curves
* September 2023 - Submit PTLR revision
© 2022 Xcel Energy                                          8
 
© 2022 Xcel Energy 9}}

Revision as of 17:59, 18 November 2024

Pre-Application Meeting for Prairie Island TS 5.6.6, PTLR, LAR
ML22048B181
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 02/18/2022
From:
Northern States Power Co, Xcel Energy
To: Robert Kuntz
NRC/NRR/DORL/LPL3
Kuntz R
References
EPID L-2022-LRM-0011
Download: ML22048B181 (9)


Text