ML22103A068: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 20: | Line 20: | ||
=Text= | =Text= | ||
{{#Wiki_filter:TRUPACT-II and HalfPACT Review: Follow up Questions Date: 12/8/2021 | {{#Wiki_filter:TRUPACT-II and HalfPACT Review: Follow up Questions Date: 12/8/2021 | ||
: 1. Update the following information in TRUPACT-II SAR tables 5.4-12, 5.4-13 and 5.4-15 based upon the results of SCA-CAL-0005 (ADAMS Accession No. | : 1. Update the following information in TRUPACT-II SAR tables 5. 4-12, 5.4-13 and 5.4-15 based upon the results of SCA-CAL-0005 (ADAMS Accession No. ML2 1279A188) to demonstrate compliance with the applicable regulatory limits in 10 CFR Part 71: | ||
: a. calculated dose rate (mrem/hr) | : a. calculated dose rate (mrem/hr) | ||
: b. tally error | : b. tally error | ||
: c. allowable activity (par/s) and | : c. allowable activity (par/s) and | ||
: d. allowable activity (Ci) | : d. allowable activity (Ci) | ||
: 2. Update the following information in TRUPACT-II SAR tables 5.5-16, 5.5-18 and 5.5-22 based upon the results of SCA-CAL-0005 (ADAMS Accession No. | : 2. Update the following information in TRUPACT-II SAR tables 5. 5-16, 5.5-18 and 5.5-22 based upon the results of SCA-CAL-0005 (ADAMS Accession No. ML2 1279A188) to demonstrate compliance with the applicable regulatory limits in 10 CFR Part 71: | ||
: a. calculated dose rate (mrem/hr) | : a. calculated dose rate (mrem/hr) | ||
: b. tally error and | : b. tally error and | ||
: c. allowable activity (/s) | : c. allowable activity (/s) | ||
: 3. Is the gamma scan performed on an assembled container or | : 3. Is the gamma scan performed on an assembled container or onl y on individual components? | ||
: 4. Explain how the gamma scan will be used to measure the | : 4. Explain how the gamma scan will be used to measure the thick ness of the lead shield in the corners of the shielded container. If the gamma scan is no t used, explain how you ensure that the thickness of the lead in the corners of the shi elded container are within the values shown in the licensing drawings. | ||
: 5. Provide the maximum amount of the proposed content that can be shipped a single shielded container and per shipment considering the applicable regulatory limits in 10 CFR Part 71. Also, provide the calculation a as part of your | : 5. Provide the maximum amount of the proposed content that can be shipped a single shielded container and per shipment considering the applicable regulatory limits in 10 CFR Part 71. Also, provide the calculation a as part of your r esponse. | ||
: 6. During the phone call last week, the applicant mentioned | : 6. During the phone call last week, the applicant mentioned tha t they performed a calculation assuming a 1/2 -in. gap of the lead shield. Using the 1/2 -in. gap of the lead shield, provide the allowable activity calculation using the ap plicable 10 CFR Part 71 dose\\dose rate limit.}} | ||
Revision as of 06:56, 18 November 2024
| ML22103A068 | |
| Person / Time | |
|---|---|
| Site: | 07109218, 07109279 |
| Issue date: | 12/09/2021 |
| From: | Stephen Burns Nuclear Waste Partnership |
| To: | Garcia-Santos N Storage and Transportation Licensing Branch |
| Garcia-Santos N | |
| Shared Package | |
| ML22103A064 | List: |
| References | |
| EPID L-2021-LLA-0033, EPID L-2021-LLA-0034 | |
| Download: ML22103A068 (1) | |
Text
TRUPACT-II and HalfPACT Review: Follow up Questions Date: 12/8/2021
- 1. Update the following information in TRUPACT-II SAR tables 5. 4-12, 5.4-13 and 5.4-15 based upon the results of SCA-CAL-0005 (ADAMS Accession No. ML2 1279A188) to demonstrate compliance with the applicable regulatory limits in 10 CFR Part 71:
- a. calculated dose rate (mrem/hr)
- b. tally error
- c. allowable activity (par/s) and
- d. allowable activity (Ci)
- 2. Update the following information in TRUPACT-II SAR tables 5. 5-16, 5.5-18 and 5.5-22 based upon the results of SCA-CAL-0005 (ADAMS Accession No. ML2 1279A188) to demonstrate compliance with the applicable regulatory limits in 10 CFR Part 71:
- a. calculated dose rate (mrem/hr)
- b. tally error and
- c. allowable activity (/s)
- 3. Is the gamma scan performed on an assembled container or onl y on individual components?
- 4. Explain how the gamma scan will be used to measure the thick ness of the lead shield in the corners of the shielded container. If the gamma scan is no t used, explain how you ensure that the thickness of the lead in the corners of the shi elded container are within the values shown in the licensing drawings.
- 5. Provide the maximum amount of the proposed content that can be shipped a single shielded container and per shipment considering the applicable regulatory limits in 10 CFR Part 71. Also, provide the calculation a as part of your r esponse.
- 6. During the phone call last week, the applicant mentioned tha t they performed a calculation assuming a 1/2 -in. gap of the lead shield. Using the 1/2 -in. gap of the lead shield, provide the allowable activity calculation using the ap plicable 10 CFR Part 71 dose\\dose rate limit.