Inspection Document Request for NRC Inspection at Framatome Inc. | INSPECTION DOCUMENT REQUEST | ||
INSPECTION PROCEDURE 88072 - | |||
Licensee: Framatome Inc. | |||
Facility: Framatome - Richland, WA | |||
Docket Number: 07001257 | |||
License Number: SNM-1227 | |||
Inspection Report 2022-003 Number: | |||
Enterprise Number: EPID: I-2022-003-0062 | |||
Inspection Dates: July 25-29, 2022 | |||
Inspection IP 88072 - Plant Modifications (Triennial), Rev. 08/21/2018 Procedure(s): | |||
Inspector(s): Lindsey Cooke (Team Le ader) P: 404-997-4836 Fuel Facility Inspector E : Lindsey.Cooke@ n r c. g o v U.S. Nuclear Regulatory Commission (NRC) | |||
Region-II Office | |||
Cynthia Taylor P: 404-997-4480 Sr. Fuel Facility Inspector E: Cynthia.Taylor@nrc.gov U.S. NRC Region-II Office | |||
Gregory Goff P: 404-997-4744 Fuel Facility Inspector E: Gregory.Goff@nrc.gov U.S. NRC Region-II Office Inspection Document Request for NRC Inspection at Framatome Inc. | |||
INSPECTION PROCEDURE 88072 - PLAN T MODIFICATONS (Triennial) | |||
: 1. Information Requested for In-Office Preparation | : 1. Information Requested for In-Office Preparation | ||
: a. Engineering/Configuration Management organization chart | : a. Engineering/Configuration Management organization chart | ||
: b. List of system engineers and assigned systems for the UO2 | : b. List of system engineers and assigned systems for the UO2 bu ilding focusing on recovery and powder (systems 130 through 360) | ||
: a. Conversion of UO2 pellets to U3O8 powder system 130 | : a. Conversion of UO2 pellets to U3O8 powder system 130 | ||
: b. Miscellaneous uranium recovery system 140 | : b. Miscellaneous uranium recovery system 140 | ||
: c. UO2 pellet dissolution system 190 | : c. UO2 pellet dissolution system 190 | ||
: d. NFI NI-IX inner powder containers filling, storage, and on | : d. NFI NI-IX inner powder containers filling, storage, and on p lant movement system 335 | ||
: e. UO2 powder download operation system 322 | : e. UO2 powder download operation system 322 | ||
: f. Powder drum warehouse system 350 | : f. Powder drum warehouse system 350 | ||
: g. Lube blend press feed system 360 | : g. Lube blend press feed system 360 | ||
: c. An index/list of Plant modifications (PM) program-related | : c. An index/list of Plant modifications (PM) program-related pr ocedures including post-mod testing | ||
: d. The focus of the inspection will be on mods completed in the UO2 building focusing on recovery and powder (systems 130 through 360) between startup | : d. The focus of the inspection will be on mods completed in the UO2 building focusing on recovery and powder (systems 130 through 360) between startup u ntil 2022. Please provide a list of mods in the area that covers the time from fa cility startup until 2022. | ||
NOTE: Please provide this list ASAP so that we can provide you with the specific mods that will be requested for on-site review. IF this list | NOTE: Please provide this list ASAP so that we can provide you with the specific mods that will be requested for on-site review. IF this list t oo extensive, you may limit the list to significant modifications including ones that impacted the ISA or safety bases. | ||
: e. List of current outstanding design issues (including open/ | : e. List of current outstanding design issues (including open/de ferred or canceled engineering action items), temporary modifications, and operato r workarounds for the UO2 process focusing on powder and recovery | ||
: f. List of active corrective maintenance work requests/orders | : f. List of active corrective maintenance work requests/orders f or the UO2 building focusing on recovery and powder (systems 130 through 360) | ||
: 2. Information Requested for On-site Review | : 2. Information Requested for On-site Review | ||
: a. Provide the following documents for the UO2 building | : a. Provide the following documents for the UO2 building focusin g on recovery and powder (systems 130 through 360): | ||
: a. Piping and Instrument diagrams | : a. Piping and Instrument diagrams | ||
: b. Electrical single line diagrams | : b. Electrical single line diagrams | ||
| Line 49: | Line 67: | ||
: e. Operations procedures | : e. Operations procedures | ||
: f. ISA Summary (various revisions upon request) | : f. ISA Summary (various revisions upon request) | ||
: b. List of condition reports for last 12 months (or since the | : b. List of condition reports for last 12 months (or since the l ast inspection) pertaining to PM/engineering program activities for the identified systems 13 0 through 360. | ||
: c. List of open condition reports associated with the UO2 | : c. List of open condition reports associated with the UO2 build ing focusing on powder and recovery | ||
: 1. Request for a tour of the UO2 building following the | |||
: 2. Meeting with the UO2 engineer and appropriate personnel to | Miscellaneous Requests | ||
: 1. Request for a tour of the UO2 building following the entranc e meeting 2 | |||
: 2. Meeting with the UO2 engineer and appropriate personnel to d iscuss major changes (physical and ISA related) to UO2 since commissioning (including ECR numb ers) | |||
: 3. Provide NRC access to the Framatome REDS system | : 3. Provide NRC access to the Framatome REDS system | ||
: 4. Request licensing provide NRC inspectors brief tutorial on | : 4. Request licensing provide NRC inspectors brief tutorial on h ow to navigate the REDS system, schedule meeting via TEAMS prior to arrival on site. | ||
This letter contains voluntary (mandatory) information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The Office of Management and Budget (OMB) approved these information collections (approval number 3150-0009). The burden to the public for these information collections is estimated to average one hour(s) per response. Send comments regarding this information collection to the FOIA, Library and Information Collection Branch, Office of the Chief Information Officer, Mail Stop: T6-A10M, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by email to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0009) OMB, Washington, DC 20503. | This letter contains voluntary (mandatory) information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The Office of Management and Budget (OMB) approved these information collections (approval number 3150-0009). The burden to the public for these information collections is estimated to average one hour(s) per response. Send comments regarding this information collection to the FOIA, Library and Information Collection Branch, Office of the Chief Information Officer, Mail Stop: T6-A10M, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by email to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0009) OMB, Washington, DC 20503. | ||
3}} | 3}} | ||
Revision as of 10:23, 16 November 2024
| ML22187A039 | |
| Person / Time | |
|---|---|
| Site: | Framatome ANP Richland |
| Issue date: | 06/28/2022 |
| From: | Lindsey Cooke, Gregory Goff, Chutima Taylor NRC/RGN-II/DFFI |
| To: | Framatome |
| References | |
| EPID I-2022-003-0062 IR 2022003 | |
| Download: ML22187A039 (3) | |
Text
June 28, 2022
INSPECTION DOCUMENT REQUEST
Licensee: Framatome Inc.
Facility: Framatome - Richland, WA
Docket Number: 07001257
License Number: SNM-1227
Inspection Report 2022-003 Number:
Enterprise Number: EPID: I-2022-003-0062
Inspection Dates: July 25-29, 2022
Inspection IP 88072 - Plant Modifications (Triennial), Rev. 08/21/2018 Procedure(s):
Inspector(s): Lindsey Cooke (Team Le ader) P: 404-997-4836 Fuel Facility Inspector E : Lindsey.Cooke@ n r c. g o v U.S. Nuclear Regulatory Commission (NRC)
Region-II Office
Cynthia Taylor P: 404-997-4480 Sr. Fuel Facility Inspector E: Cynthia.Taylor@nrc.gov U.S. NRC Region-II Office
Gregory Goff P: 404-997-4744 Fuel Facility Inspector E: Gregory.Goff@nrc.gov U.S. NRC Region-II Office Inspection Document Request for NRC Inspection at Framatome Inc.
INSPECTION PROCEDURE 88072 - PLAN T MODIFICATONS (Triennial)
- 1. Information Requested for In-Office Preparation
- a. Engineering/Configuration Management organization chart
- b. List of system engineers and assigned systems for the UO2 bu ilding focusing on recovery and powder (systems 130 through 360)
- a. Conversion of UO2 pellets to U3O8 powder system 130
- b. Miscellaneous uranium recovery system 140
- c. UO2 pellet dissolution system 190
- d. NFI NI-IX inner powder containers filling, storage, and on p lant movement system 335
- e. UO2 powder download operation system 322
- f. Powder drum warehouse system 350
- g. Lube blend press feed system 360
- c. An index/list of Plant modifications (PM) program-related pr ocedures including post-mod testing
- d. The focus of the inspection will be on mods completed in the UO2 building focusing on recovery and powder (systems 130 through 360) between startup u ntil 2022. Please provide a list of mods in the area that covers the time from fa cility startup until 2022.
NOTE: Please provide this list ASAP so that we can provide you with the specific mods that will be requested for on-site review. IF this list t oo extensive, you may limit the list to significant modifications including ones that impacted the ISA or safety bases.
- e. List of current outstanding design issues (including open/de ferred or canceled engineering action items), temporary modifications, and operato r workarounds for the UO2 process focusing on powder and recovery
- f. List of active corrective maintenance work requests/orders f or the UO2 building focusing on recovery and powder (systems 130 through 360)
- 2. Information Requested for On-site Review
- a. Provide the following documents for the UO2 building focusin g on recovery and powder (systems 130 through 360):
- a. Piping and Instrument diagrams
- b. Electrical single line diagrams
- c. Process Hazards Analysis (PHA)
- d. System descriptions
- e. Operations procedures
- f. ISA Summary (various revisions upon request)
- b. List of condition reports for last 12 months (or since the l ast inspection) pertaining to PM/engineering program activities for the identified systems 13 0 through 360.
- c. List of open condition reports associated with the UO2 build ing focusing on powder and recovery
Miscellaneous Requests
- 1. Request for a tour of the UO2 building following the entranc e meeting 2
- 2. Meeting with the UO2 engineer and appropriate personnel to d iscuss major changes (physical and ISA related) to UO2 since commissioning (including ECR numb ers)
- 3. Provide NRC access to the Framatome REDS system
- 4. Request licensing provide NRC inspectors brief tutorial on h ow to navigate the REDS system, schedule meeting via TEAMS prior to arrival on site.
This letter contains voluntary (mandatory) information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The Office of Management and Budget (OMB) approved these information collections (approval number 3150-0009). The burden to the public for these information collections is estimated to average one hour(s) per response. Send comments regarding this information collection to the FOIA, Library and Information Collection Branch, Office of the Chief Information Officer, Mail Stop: T6-A10M, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by email to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0009) OMB, Washington, DC 20503.
3