IR 05000413/2022010: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 30: Line 30:
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.


Sincerely, Signed by Baptist, James on 07/21/22 James B. Baptist, Chief Engineering Branch 1 Division of Reactor Safety Docket Nos. 05000413 and 05000414 License Nos. NPF-35 and NPF-52
Sincerely, James B. Baptist, Chief Engineering Branch 1 Division of Reactor Safety Docket Nos. 05000413 and 05000414 License Nos. NPF-35 and NPF-52


===Enclosure:===
===Enclosure:===
Line 36: Line 36:


==Inspection Report==
==Inspection Report==
Docket Numbers: 05000413 and 05000414 License Numbers: NPF-35 and NPF-52 Report Numbers: 05000413/2022010 and 05000414/2022010 Enterprise Identifier: I-2022-010-0038 Licensee: Duke Energy Carolinas, LLC Facility: Catawba Nuclear Station Location: York, SC Inspection Dates: May 23, 2022, to June 10, 2022 Inspectors: R. Fanner, Reactor Inspector N. Morgan, Intergovernmental Liaison Project Manager G. Ottenberg, Senior Reactor Inspector J. Zudans, Contractor Approved By: James B. Baptist, Chief Engineering Branch 1 Division of Reactor Safety Enclosure
Docket Numbers: 05000413 and 05000414
 
License Numbers: NPF-35 and NPF-52
 
Report Numbers: 05000413/2022010 and 05000414/2022010
 
Enterprise Identifier: I-2022-010-0038
 
Licensee: Duke Energy Carolinas, LLC
 
Facility: Catawba Nuclear Station
 
Location: York, SC
 
Inspection Dates: May 23, 2022, to June 10, 2022
 
Inspectors: R. Fanner, Reactor Inspector N. Morgan, Intergovernmental Liaison Project Manager G. Ottenberg, Senior Reactor Inspector J. Zudans, Contractor
 
Approved By: James B. Baptist, Chief Engineering Branch 1 Division of Reactor Safety
 
Enclosure


=SUMMARY=
=SUMMARY=
Line 42: Line 62:


===List of Findings and Violations===
===List of Findings and Violations===
No findings or violations of more than minor significance were identified.
No findings or violations of more than minor significance were identified.


Line 53: Line 72:


==REACTOR SAFETY==
==REACTOR SAFETY==
 
===71111.21N.02 - Design-Basis Capability of Power-Operated Valves Under 10 CFR 50.55a Requirements POV Review (IP Section 03)===
===71111.21N.02 - Design-Basis Capability of Power-Operated Valves Under 10 CFR 50.55a Requirements POV Review (IP Section 03) ===
{{IP sample|IP=IP 71111.21|count=8}}
{{IP sample|IP=IP 71111.21|count=8}}
The inspectors:
The inspectors:
a. Evaluated whether the sampled POVs are being tested and maintained in accordance with NRC regulations along with the licensees commitments and/or licensing bases.
a. Evaluated whether the sampled POVs are being tested and maintained in accordance with NRC regulations along with the licensees commitments and/or licensing bases.


Line 83: Line 102:
=DOCUMENTS REVIEWED=
=DOCUMENTS REVIEWED=


Inspection   Type         Designation     Description or Title                                   Revision or
Inspection Type Designation Description or Title Revision or
Procedure                                                                                         Date
Procedure Date
71111.21N.02 Calculations AD-EG-ALL-1117   U2, 6.9KV, 4.16KV, & 600V Auxiliary Power Systems     19
71111.21N.02 Calculations AD-EG-ALL-1117 U2, 6.9KV, 4.16KV, & 600V Auxiliary Power Systems 19
Safety-Related Voltage Analysis
Safety-Related Voltage Analysis
CNC -1205.19-00- Generic Letter 89-10 MOV Calculations, NC System; 1(2) 11
CNC -1205.19-00- Generic Letter 89-10 MOV Calculations, NC System; 1(2)11
28             NC033A, 035B, 1NC031B
28 NC033A, 035B, 1NC031B
CNC -1205.19-00- 89-10 Calculation for 1&2 CA038A, 42B, 46B, 50A, 54B, 14
CNC -1205.19-00- 89-10 Calculation for 1&2 CA038A, 42B, 46B, 50A, 54B, 14
29             58A, 62A, 66B
29 58A, 62A, 66B
CNC -1205.19-00- Generic Letter 89-10 Calculation For Valves 1 and     4
CNC -1205.19-00- Generic Letter 89-10 Calculation For Valves 1 and 4
0033             NI173A and NI178B
0033 NI173A and NI178B
CNC -1205.19-00- GL 89-10 Set- Up Calculation for Valves 1KC001A,       3
CNC -1205.19-00- GL 89-10 Set-Up Calculation for Valves 1KC001A, 3
0110             1KC002B, 1KC050A, 1KC053B, 2KC001A, AND
0110 1KC002B, 1KC050A, 1KC053B, 2KC001A, AND
2KC002B
2KC002B
CNC -1205.19-00- Required Thrust Calculation for 1(2)NC31B, 33A, 35B   000
CNC -1205.19-00- Required Thrust Calculation for 1(2)NC31B, 33A, 35B 000
0195             (AD/DD PPM); Item NO. 09J-363 & 364
0195 (AD/DD PPM); Item NO. 09J-363 & 364
CNC -1205.41-00- 1 (2) ND 26, 27, 60, and 61 Fisher Actuator and Margin 1
CNC -1205.41-00- 1 (2) ND 26, 27, 60, and 61 Fisher Actuator and Margin1
27             Capability Calculations
27 Capability Calculations
CNC -1206.02-80- KCC - Component Cooling Heat Exchangers 1 A & 1 B to   018
CNC -1206.02-80- KCC - Component Cooling Heat Exchangers 1 A & 1 B to 018
2019             the RHR Heat Exchangers 1A & 1 B. Also to the Inlet of
2019 the RHR Heat Exchangers 1A & 1 B. Also to the Inlet of
the Letdown & Fuel Pool Heat Exchangers
the Letdown & Fuel Pool Heat Exchangers
CNC -1223.11-00- Limiting 1ST Stroke Time for ND26, ND27, ND60 and     000
CNC -1223.11-00- Limiting 1ST Stroke Time for ND26, ND27, ND60 and 000
0055             ND6V
0055 ND6V
CNC -1381.05-00- U2, 6.9KV, 4.16KV, & 600V AUXILIARY POWER             19
CNC -1381.05-00- U2, 6.9KV, 4.16KV, & 600V AUXILIARY POWER 19
0199             SYSTEMS SAFETY-RELATED VOLTAGE ANALYSIS
0199 SYSTEMS SAFETY-RELATED VOLTAGE ANALYSIS
CNC 1205.41-00- 1 (2) NV 010A, 011A, and 013A Required Thrust         2
CNC 1205.41-00- 1 (2) NV 010A, 011A, and 013A Required Thrust 2
0018             Evaluation supporting Air Operated Valve (AOV) Program
0018 Evaluation supporting Air Operated Valve (AOV) Program
CNC-1205.41-00- Air Operated Valve (AOV) Program Scope Calculation     5
CNC-1205.41-00- Air Operated Valve (AOV) Program Scope Calculation 5
0001
0001
CNC-1205.41-00- FEEDWATER ISOLATION VALVES, 1(2)CF33, 42, 51,         05/03/2022
CNC-1205.41-00- FEEDWATER ISOLATION VALVES, 1(2)CF33, 42, 51, 05/03/2022
0005             AND
0005 AND
60, DESIGN BASIS SIZING CALCULATION
60, DESIGN BASIS SIZING CALCULATION
CNC-1205.41-00- Catawba Air-operated Valve (AOV) Risk Ranking         1
CNC-1205.41-00- Catawba Air-operated Valve (AOV) Risk Ranking 1
0016             Calculation
0016 Calculation
CNC-1205.41-00- 1 (2) NV 010A, 011A, and 013A Required Thrust         2
CNC-1205.41-00- 1 (2) NV 010A, 011A, and 013A Required Thrust 2
Inspection Type             Designation     Description or Title                                   Revision or
Inspection Type Designation Description or Title Revision or
Procedure                                                                                           Date
Procedure Date
0018           Evaluation supporting Air Operated Valve (AOV) Program
0018 Evaluation supporting Air Operated Valve (AOV) Program
CNC-1205.41-00- 1(2) CA-040, 044, 056, 060 and 1(2) CA-036, 048, 052, 1
CNC-1205.41-00- 1(2) CA-040, 044, 056, 060 and 1(2) CA-036, 048, 052, 1
22           064 Actuator Capability Evaluation Supporting Air
22 064 Actuator Capability Evaluation Supporting Air
Operated (AOV) Program
Operated (AOV) Program
CNC-1206.03-00- Doghouse Environmental Temperature Due to Main         Rev. 3
CNC-1206.03-00- Doghouse Environmental Temperature Due to Main Rev. 3
0181           Steam Line Break
0181 Steam Line Break
CNC-1223.02-00- Inservice Testing (IST) Valve Response Measurement     04/08/2011
CNC-1223.02-00- Inservice Testing (IST) Valve Response Measurement 04/08/2011
23           Uncertainty
23 Uncertainty
CNC-1223.12-00- Design Parameters for ND Header to Cold Leg           4
CNC-1223.12-00- Design Parameters for ND Header to Cold Leg 4
0045           Containment Isolation Valves 1 & 2 NI173A, NI178B
0045 Containment Isolation Valves 1 & 2 NI173A, NI178B
CNC-1552.08-00- Long-Term Containment Response - Manual NS Initiation 7
CNC-1552.08-00- Long-Term Containment Response - Manual NS Initiation 7
0390
0390
CNM 1205.00-   Design/Seismic Report (Weak Link) for 09J-2056, 2",   5
CNM 1205.00- Design/Seismic Report (Weak Link) for 09J-2056, 2", 5
2182.001       1500#, SS, Gate Valve
2182.001 1500#, SS, Gate Valve
CNM 1205.01-   Design & Seismic RPT 6J-339                           C
CNM 1205.01-Design & Seismic RPT 6J-339 C
0797.001
0797.001
Corrective Action ARs             02373087, 02294259, 01497427, 02407695, 02294259,
Corrective Action ARs 02373087, 02294259, 01497427, 02407695, 02294259,
Documents                         01497427, 02428219, 01898027, 02300922
Documents 01497427, 02428219, 01898027, 02300922
Corrective Action NCR 02318266   OP-CN-CF-CF lesson plan does not identify the safety   06/24/2022
Corrective Action NCR 02318266 OP-CN-CF-CF lesson plan does not identify the safety 06/24/2022
Documents                         related power supply for Feedwater Isolation Valve's
Documents related power supply for Feedwater Isolation Valve's
Resulting from   NCR 02429804   2022 NRC DBAI POV - 2NI173A Motor Brake Internals     06/02/2022
Resulting from NCR 02429804 2022 NRC DBAI POV - 2NI173A Motor Brake Internals 06/02/2022
Inspection       NCR 02430135   2022 NRC DBAI POV - 1KC-50A Maximum Transmitted       06/06/2022
Inspection NCR 02430135 2022 NRC DBAI POV - 1KC-50A Maximum Transmitted 06/06/2022
Torque
Torque
NCR 02430281   2022 NRC DBAI POV - Lesson Plans not revised post     06/07/2022
NCR 02430281 2022 NRC DBAI POV - Lesson Plans not revised post 06/07/2022
Mod
Mod
NCR 02430301   PT/1/A/4350/002 E enclosure 13.16 could not be located 06/07/2022
NCR 02430301 PT/1/A/4350/002 E enclosure 13.16 could not be located06/07/2022
NCR 02430342   2022 NRC POV DBAI - Incorrect Reference in Flowserve   06/07/2022
NCR 02430342 2022 NRC POV DBAI - Incorrect Reference in Flowserve 06/07/2022
Letter
Letter
NCR 02430464   Obstructions on 522' elevation floor drains           06/08/2022
NCR 02430464 Obstructions on 522' elevation floor drains 06/08/2022
NCR 02430567   NRC DBAI POV- EOPs do not align with UFSAR             06/09/2022
NCR 02430567 NRC DBAI POV-EOPs do not align with UFSAR 06/09/2022
NCR 02430713   2022 NRC DBAI POV - 2NC35B - Actuator Fastener Bolt   06/09/2022
NCR 02430713 2022 NRC DBAI POV - 2NC35B - Actuator Fastener Bolt 06/09/2022
Preload
Preload
NCR 02431086   2022 NRC DBAI POV - UFSAR sec.6.2.4.1 incorrect       06/14/2022
NCR 02431086 2022 NRC DBAI POV - UFSAR sec.6.2.4.1 incorrect 06/14/2022
statement
statement
Inspection Type     Designation     Description or Title                                   Revision or
Inspection Type Designation Description or Title Revision or
Procedure                                                                                   Date
Procedure Date
NCR 2428952     2022 NRC DBAI POV - 2NC035B High Temp Torque           05/26/2022
NCR 2428952 2022 NRC DBAI POV - 2NC035B High Temp Torque 05/26/2022
Factor
Factor
NCR 2430567     NRC DBAI POV- EOPs do not align with UFSAR             06/09/2022
NCR 2430567 NRC DBAI POV-EOPs do not align with UFSAR 06/09/2022
Drawings 02-403-0012-3   Limitorque Valve Control                               DI
Drawings 02-403-0012-3 Limitorque Valve Control DI
40846-08         20- Class 150 Valve Assembly and Limitorque H2BC-     DE
40846-08 20- Class 150 Valve Assembly and Limitorque H2BC-DE
SMB-00-10
SMB-00-10
CN -1561-01.00   Flow Diagram of Residual Heat Removal System (ND)       34
CN -1561-01.00 Flow Diagram of Residual Heat Removal System (ND) 34
CN -2561-01.00   Flow Diagram of Residual Heat Removal System (ND)       38
CN -2561-01.00 Flow Diagram of Residual Heat Removal System (ND) 38
CN -2562-01.01   Flow Diagram, Safety Injection System (NI)             23
CN -2562-01.01 Flow Diagram, Safety Injection System (NI) 23
CN -2592-01.01   Flow Diagram Auxiliary Feedwater System (CA)           33
CN -2592-01.01 Flow Diagram Auxiliary Feedwater System (CA) 33
CN-1573-01.0     Flow Diagram of Component Cooling System (KC)           30
CN-1573-01.0 Flow Diagram of Component Cooling System (KC) 30
CN-2499-CA.07-   Instrument Detail Motor Driven Auxiliary Feedwater Pump 9
CN-2499-CA.07-Instrument Detail Motor Driven Auxiliary Feedwater Pump 9
to Steam Generator Flow Control
to Steam Generator Flow Control
CN-2553-01.01   Flow Diagram of Reactor Coolant System (NC)             20
CN-2553-01.01 Flow Diagram of Reactor Coolant System (NC) 20
CN-2562-01.03   Flow Diagram of Safety Injection System (NI)           28
CN-2562-01.03 Flow Diagram of Safety Injection System (NI) 28
CNEE-0247-04.12 Auxiliary Feedwater System (CA) CA Pump No. 2 Disch     4
CNEE-0247-04.12 Auxiliary Feedwater System (CA) CA Pump No. 2 Disch 4
to S/D 2C Isol. Vlv. 2CA050A
to S/D 2C Isol. Vlv. 2CA050A
CNEE-0247-       Auxiliary Feedwater System (CA) CA Pump No. 2 Disch     2
CNEE-0247-Auxiliary Feedwater System (CA) CA Pump No. 2 Disch 2
04.12-01         to S/D 2C Isol. Vlv. 2CA050A Controls
04.12-01 to S/D 2C Isol. Vlv. 2CA050A Controls
CNEE-0250-01.09 Reactor Coolant System (NC) Pzr Power Operated Relief   12
CNEE-0250-01.09 Reactor Coolant System (NC) Pzr Power Operated Relief 12
Isolation Valve 2NC035B
Isolation Valve 2NC035B
CNEE-0251-01.32 Elementary Diagram Safety Injection System (NI) ND     6
CNEE-0251-01.32 Elementary Diagram Safety Injection System (NI) ND 6
HDR to NC Cold Legs C and D Isolation Valve 2NI173A
HDR to NC Cold Legs C and D Isolation Valve 2NI173A
CNM 1205.00-     8"SS Motor Oper Gate Vlv Item 9J211                     16
CNM 1205.00- 8"SS Motor Oper Gate Vlv Item 9J211 16
0074.001
0074.001
CNM 1205.00-     O/L Drawing for 09J-2056, 2", 1500#, SS, Gate Valve     0
CNM 1205.00- O/L Drawing for 09J-2056, 2", 1500#, SS, Gate Valve 0
2181.001
2181.001
CNM 1205.01-     4" 1500LB CS EMO DP Gate Valve 6J- 339                 H
CNM 1205.01-4" 1500LB CS EMO DP Gate Valve 6J-339 H
0790.001
0790.001
CNM 1205.01-     4" 1500LB CS DP Gate Valve 6J-339                       J
CNM 1205.01-4" 1500LB CS DP Gate Valve 6J-339 J
0790.002
0790.002
CNM 1205.06-     O/L, C/S, B/M, OPR, W/D Control Valves 1&2/CA/40 , 44, J
CNM 1205.06-O/L, C/S, B/M, OPR, W/D Control Valves 1&2/CA/40, 44, J
20.001         56 & 60
20.001 56 & 60
W9223811, Sht. 1 3"- 1530 Weld Ends Stainless Steel Double Disc Gate     B
W9223811, Sht. 1 3"- 1530 Weld Ends Stainless Steel Double Disc Gate B
Inspection Type       Designation     Description or Title                                     Revision or
Inspection Type Designation Description or Title Revision or
Procedure                                                                                         Date
Procedure Date
Valve for SMB-00-15 Limitorque Actuator
Valve for SMB-00-15 Limitorque Actuator
W9223811, Sht. 2 3"- 1530 Weld Ends Stainless Steel Double Disc Gate       B
W9223811, Sht. 2 3"- 1530 Weld Ends Stainless Steel Double Disc Gate B
Valve for SMB-00-15 Limitorque Actuator
Valve for SMB-00-15 Limitorque Actuator
Engineering CN 20328         Modify control circuit wiring on 2NI-9A, 10B, 100B, 183B, 11/07/1988
Engineering CN 20328 Modify control circuit wiring on 2NI-9A, 10B, 100B, 183B, 11/07/1988
Changes                     162A, 173A, 178B, 184B, 185A, 2NV-89A, 91B, 188A,
Changes 162A, 173A, 178B, 184B, 185A, 2NV-89A, 91B, 188A,
189B, 252A, 253B, 312A, and 314B to provide "limit
189B, 252A, 253B, 312A, and 314B to provide "limit
actuated" torque switch bypass contacts which can be
actuated" torque switch bypass contacts which can be
adjusted independent of Indication or interlocks.
adjusted independent of Indication or interlocks.
CN 21319         Modify CA Control Valves to Prevent S/G Overfill During   08/11/1999
CN 21319 Modify CA Control Valves to Prevent S/G Overfill During 08/11/1999
SGTR
SGTR
EC 0000106724   Revise MOV Set-Up Sheets to Meet GL 96-05                 09/07/2012
EC 0000106724 Revise MOV Set-Up Sheets to Meet GL 96-05 09/07/2012
Requirements for 1KC001A, 002B, 050A
Requirements for 1KC001A, 002B, 050A
EC 0000402775   U-1 AND U-2 NW System Isolation to Specific CIVs         1
EC 0000402775 U-1 AND U-2 NW System Isolation to Specific CIVs 1
Engineering CNC -1205.19-00- EC420978 - Revise valve factor for 1(2)NI173A &           000
Engineering CNC -1205.19-00- EC420978 - Revise valve factor for 1(2)NI173A & 000
Evaluations 0176-ICC-0003   1(2)NI178B
Evaluations 0176-ICC-0003 1(2)NI178B
CNC -1205.19-00- Kalsi Engineering Report 2919C, GL96-05 Periodic         0
CNC -1205.19-00- Kalsi Engineering Report 2919C, GL96-05 Periodic 0
0179             Verification Program for Butterfly Valves with 316
0179 Verification Program for Butterfly Valves with 316
Microseal Bearings {JOG Class D)
Microseal Bearings {JOG Class D)
CNC -1381.05-00- U2, 6.9KV, 4.16KV, & 600V Auxiliary Power Systems         19
CNC -1381.05-00- U2, 6.9KV, 4.16KV, & 600V Auxiliary Power Systems 19
0199             Safety-Related Voltage Analysis
0199 Safety-Related Voltage Analysis
CNC-1205.00-00- GL 95-07 Pressure Locking and Thermal Binding Review     1
CNC-1205.00-00- GL 95-07 Pressure Locking and Thermal Binding Review 1
0048             of Valves Without an Active to Open Safety Function
0048 of Valves Without an Active to Open Safety Function
CNC-1205.19-00- Operability Evaluation of Rotork Part 21 for Switch       1
CNC-1205.19-00- Operability Evaluation of Rotork Part 21 for Switch 1
0170             Mechanisms
0170 Mechanisms
CNM 1205.00-     ASME Section III Gate Valve Seismic Report               5
CNM 1205.00- ASME Section III Gate Valve Seismic Report 5
0549.001
0549.001
CNM 1205.00-     Design and Seismic Analysis Report for 3" EMO Gate       00C
CNM 1205.00- Design and Seismic Analysis Report for 3" EMO Gate 00C
2050.001         Valve, Item 9J-364
2050.001 Valve, Item 9J-364
CNM 1205.02-     Weak-Link Report for CNS BFV Item Number 05B-501         0
CNM 1205.02-Weak-Link Report for CNS BFV Item Number 05B-501 0
0766.001
0766.001
CNM 1205.19-     Stress Report for Westinghouse Class 1 Nuclear Valves-   D3
CNM 1205.19-Stress Report for Westinghouse Class 1 Nuclear Valves-D3
0094.001         Gate Valves
0094.001 Gate Valves
CNM 1205.19-     9J-211 Seismic and Weak Link Analysis Report for         0
CNM 1205.19-9J-211 Seismic and Weak Link Analysis Report for 0
099.011         Westinghouse Class 1 Nuclear Valve
099.011 Westinghouse Class 1 Nuclear Valve
Inspection Type         Designation     Description or Title                                   Revision or
Inspection Type Designation Description or Title Revision or
Procedure                                                                                         Date
Procedure Date
DPC 1205.41-00- Evaluation of AOV Issues Needed for Margin Calculations 2
DPC 1205.41-00- Evaluation of AOV Issues Needed for Margin Calculations2
0001
0001
DPC-1205.00-00- Microseal Bearing Test Report: Kalsi Engineering       0
DPC-1205.00-00- Microseal Bearing Test Report: Kalsi Engineering 0
0008             Document 2800C
0008 Document 2800C
Miscellaneous [N/A]           OAC Alarm Response Information for loss of SOV Power
Miscellaneous [N/A] OAC Alarm Response Information for loss of SOV Power
BACKGROUND       ES-1.3 Transfer to Cold Leg Recirculation HP-Rev. 3     03/31/2014
BACKGROUND ES-1.3 Transfer to Cold Leg Recirculation HP-Rev. 3 03/31/2014
INFORMATION
INFORMATION
FOR
FOR
Line 241: Line 260:
RESPONSE
RESPONSE
GUIDELINE
GUIDELINE
CDUK-1205.41-   Unit 1 and Unit 2 AOV Test Set Up Sheets               7
CDUK-1205.41-Unit 1 and Unit 2 AOV Test Set Up Sheets 7
0001.001
0001.001
CE 0000106724   Revise MOV Set-Up Sheets to Meet GL 96-05               09/17/2012
CE 0000106724 Revise MOV Set-Up Sheets to Meet GL 96-05 09/17/2012
Requirements for 1KC001A, 002B, 050A, AND 053B
Requirements for 1KC001A, 002B, 050A, AND 053B
CN 500404       Allow Replacement of Solenoid Valves w/ New Model       05/17/2005
CN 500404 Allow Replacement of Solenoid Valves w/ New Model 05/17/2005
CN-11413         De-energize the Hydraulic Solenoids on the Main         08/06/2001
CN-11413 De-energize the Hydraulic Solenoids on the Main 08/06/2001
Feedwater Isolation Valves
Feedwater Isolation Valves
CNC -1205.19-00- EC420956- Revise Valve Factor and Functions for CA     0
CNC -1205.19-00- EC420956-Revise Valve Factor and Functions for CA 0
0176-ICC-0004   MOVs
0176-ICC-0004 MOVs
CNM 1205.00-     l/B Manual M/0 Gate Valves & Swing Check Vlvs           D10
CNM 1205.00- l/B Manual M/0 Gate Valves & Swing Check Vlvs D10
22.001
22.001
CNM 1205.00-     EMO Torque Switch Setting Sheets                       90
CNM 1205.00- EMO Torque Switch Setting Sheets 90
1997.001
1997.001
CNM 1205.00-     EMO Torque Switch Setting Sheets                       90
CNM 1205.00- EMO Torque Switch Setting Sheets 90
1997.001
1997.001
CNM 1205.00-     Instruction Manual Number ET347 for 3" 1530 Class       10/01/1997
CNM 1205.00- Instruction Manual Number ET347 for 3" 1530 Class 10/01/1997
2049-001         Double Disc Gate Valves with Motor Actuators
2049-001 Double Disc Gate Valves with Motor Actuators
CNM 1205.02-     Posi-Seal Butterfly Valve Technical Bulletin Series     0
CNM 1205.02-Posi-Seal Butterfly Valve Technical Bulletin Series 0
0762.001
0762.001
CNM 1205.06-     I/M & Parts List for Control Valves and Regulators     42
CNM 1205.06-I/M & Parts List for Control Valves and Regulators 42
Inspection Type Designation     Description or Title                                     Revision or
Inspection Type Designation Description or Title Revision or
Procedure                                                                               Date
Procedure Date
268.001
268.001
CNM 1205.19-   Limitorque Nuclear Qualification Reports                 3
CNM 1205.19-Limitorque Nuclear Qualification Reports 3
0001.001
0001.001
CNM 1205.19-   Technical Repair Guide for Rotork Valve Actuators "NA"   9
CNM 1205.19-Technical Repair Guide for Rotork Valve Actuators "NA" 9
0083.001       Range Models
0083.001 Range Models
CNM 1205.19-   Rotork Motor Operator Bench Test Certificates           D7
CNM 1205.19-Rotork Motor Operator Bench Test Certificates D7
0114.001
0114.001
CNS-1205.00-00- ASME Section 3 Stainless Steel Gate Globe and Check     5
CNS-1205.00-00- ASME Section 3 Stainless Steel Gate Globe and Check 5
0008           Valves
0008 Valves
CNS-1205.06-00- Control Valves to ASME Section III                       17
CNS-1205.06-00- Control Valves to ASME Section III 17
0003
0003
CNS-1553.NC-00- Reactor Coolant System (NC) Design Basis Specification   50
CNS-1553.NC-00- Reactor Coolant System (NC) Design Basis Specification 50
0001
0001
CNS-1554.NV-00- Chemical and Volume Control System (NV) Design Basis     53
CNS-1554.NV-00- Chemical and Volume Control System (NV) Design Basis 53
0001           Specification
0001 Specification
CNS-1561.ND-00- Design Basis Specification for The Residual Heat         42
CNS-1561.ND-00- Design Basis Specification for The Residual Heat 42
0001           Removal (ND) System
0001 Removal (ND) System
CNS-1562.NI-00- Design Basis Specification For the Safety Injection (NI) 52
CNS-1562.NI-00- Design Basis Specification For the Safety Injection (NI) 52
0001           System
0001 System
CNS-1573.KC-00- Component Cooling System (KC) Design Basis               49
CNS-1573.KC-00- Component Cooling System (KC) Design Basis 49
0001           Specification
0001 Specification
CNS-1591.CF-00- Design Basis Specification for the Feedwater (CF)       Rev. 034
CNS-1591.CF-00- Design Basis Specification for the Feedwater (CF) Rev. 034
0001           System
0001 System
CNS-1592.CA-00- Auxiliary Feedwater System (CA) Design Basis             50
CNS-1592.CA-00- Auxiliary Feedwater System (CA) Design Basis 50
0001           Specification
0001 Specification
CNS-1592.CA-00- Auxiliary Feedwater System (CA) Design Basis             50
CNS-1592.CA-00- Auxiliary Feedwater System (CA) Design Basis 50
0001           Specification
0001 Specification
DPS 1205.00-00- Nuclear Safety Related Carbon and Stainless Steel       4
DPS 1205.00-00- Nuclear Safety Related Carbon and Stainless Steel 4
0002           Forged and Cast Electric Motor Operated Valves
0002 Forged and Cast Electric Motor Operated Valves
DPS-1205.19-00- Safety Related Rotork Motor Operators and Spare Parts   4
DPS-1205.19-00- Safety Related Rotork Motor Operators and Spare Parts 4
0004
0004
EQMM-1393.01-   Environmental Qualification Maintenance Manual           15
EQMM-1393.01-Environmental Qualification Maintenance Manual 15
Q03-01         Equipment Type: Solenoid Valve Manufacturer: Valcor
Q03-01 Equipment Type: Solenoid Valve Manufacturer: Valcor
Engineering Corporation Model/Series: V70900-65 Series
Engineering Corporation Model/Series: V70900-65 Series
Inspection Type       Designation       Description or Title                                 Revision or
Inspection Type Designation Description or Title Revision or
Procedure                                                                                     Date
Procedure Date
Valves
Valves
OEDB Number:     LIMITORQUE TECHNICAL UPDATE #92-O1 Kalsi             01/06/1992
OEDB Number: LIMITORQUE TECHNICAL UPDATE #92-O1 Kalsi 01/06/1992
2-12415         Engineering Document #17O7-C, Rev. o (11- 25-91)
2-12415 Engineering Document #17O7-C, Rev. o (11-25-91)
Thrust Rating Increase SMB-OOO, SMB-OO, SMB-O &
Thrust Rating Increase SMB-OOO, SMB-OO, SMB-O &
SMB-1 Actuators
SMB-1 Actuators
OP-CN-CF-CF       Feedwater System Lesson Plan                         04/07/2014
OP-CN-CF-CF Feedwater System Lesson Plan 04/07/2014
OP-CN-EP-INTRO   Emergency Procedures Intro Lesson Plan CNOB50         11
OP-CN-EP-INTRO Emergency Procedures Intro Lesson Plan CNOB50 11
System Health     KC - Component Cooling System                         04/19/2022
System Health KC - Component Cooling System 04/19/2022
Report
Report
System Health     ND - Residual Heat Removal System                     04/19/2022
System Health ND - Residual Heat Removal System 04/19/2022
Report
Report
System Health     CA - CNS l Unit 2 l CA - Auxiliary Feedwater System   04/19/2022
System Health CA - CNS l Unit 2 l CA - Auxiliary Feedwater System 04/19/2022
Report
Report
Torque and       As Left C1R26                                         10/23/2021
Torque and As Left C1R26 10/23/2021
Margin for 1ND27
Margin for 1ND27
Westinghouse     ES-1.3 Transfer to Cold Leg Recirculation HP-Rev 3   03/31/2014
Westinghouse ES-1.3 Transfer to Cold Leg Recirculation HP-Rev 3 03/31/2014
Guideline
Guideline
Document
Document
Procedures AD-EG-ALL-1432   Air Operated Valve Design Basis Review               1
Procedures AD-EG-ALL-1432 Air Operated Valve Design Basis Review 1
AD-EG-ALL-1433   Air Operated Valve Testing Requirements               2
AD-EG-ALL-1433 Air Operated Valve Testing Requirements 2
AD-OP-ALL-0105   Operability Determinations                           6
AD-OP-ALL-0105 Operability Determinations 6
AD-OP-ALL-0205   Time Critical Actions/Time Sensitive Actions         2
AD-OP-ALL-0205 Time Critical Actions/Time Sensitive Actions 2
CNC-1205.19-00-   JOG Classification of Catawbas GL96-05 MOV           9
CNC-1205.19-00- JOG Classification of Catawbas GL96-05 MOV 9
0176             Population
0176 Population
DPS-1205.19-00-   Guideline for Performing Motor Operated Valve Reviews 4
DPS-1205.19-00- Guideline for Performing Motor Operated Valve Reviews 4
0002             and Calculations (For Engineering use only)
0002 and Calculations (For Engineering use only)
EP/2/A/5000/E-3   CNS Steam Generator Tube Rupture                     41
EP/2/A/5000/E-3 CNS Steam Generator Tube Rupture 41
EP/2/A/5000/ES-   Transfer to Cold Leg Recirculation                   31
EP/2/A/5000/ES-Transfer to Cold Leg Recirculation 31
1.3
1.3
IP/0/A/3820/004 Q MOV Diagnostic Testing                               13
IP/0/A/3820/004 Q MOV Diagnostic Testing 13
IP/0/A/3820/004 Q MOV Diagnostic Testing                               13
IP/0/A/3820/004 Q MOV Diagnostic Testing 13
IP/0/A/3820/034   Removal/Restoration of Interferences and Packing Re- 43
IP/0/A/3820/034 Removal/Restoration of Interferences and Packing Re-43
Torque on Air Operated Valves (AOVs)
Torque on Air Operated Valves (AOVs)
IP/0/A/3820/047   AOV Diagnostic Testing using the QUIKLOOK3 System     5
IP/0/A/3820/047 AOV Diagnostic Testing using the QUIKLOOK3 System 5
Inspection Type       Designation       Description or Title                                   Revision or
Inspection Type Designation Description or Title Revision or
Procedure                                                                                       Date
Procedure Date
OP/1/A/6100/010K Annunciator Response for Panel 1AD-10                 21
OP/1/A/6100/010K Annunciator Response for Panel 1AD-10 21
OP/1/B/6100/010   Annunciator Response for Radiation Monitoring Panel   67
OP/1/B/6100/010 Annunciator Response for Radiation Monitoring Panel 67
X                 1RAD-1
X 1RAD-1
OP/1/B/6100/010   Annunciator Response for Radiation Monitoring Panel   25
OP/1/B/6100/010 Annunciator Response for Radiation Monitoring Panel 25
Z                 1RAD-3
Z 1RAD-3
PD-EG-ALL-1430   Air Operated Valve Program                             2
PD-EG-ALL-1430 Air Operated Valve Program 2
PT/0/A/4700/061   Time Critical Actions/ Time Sensitive Actions         9
PT/0/A/4700/061 Time Critical Actions/ Time Sensitive Actions 9
PT/1/A/4200/021   KC Valve Inservice Test (QU)                           79
PT/1/A/4200/021 KC Valve Inservice Test (QU) 79
A
A
PT/2/4/4200/013   NI Valve Inservice Test (UNK)                         41,
PT/2/4/4200/013 NI Valve Inservice Test (UNK) 41,
G                                                                       completed
G completed
04/11/2021
04/11/2021
PT/2/A/4200/0     CA Valve Inservice Test (QU)                           13E
PT/2/A/4200/0 CA Valve Inservice Test (QU) 13E
PT/2/A/4200/013   CA Valve Inservice Test (QU)                           66
PT/2/A/4200/013 CA Valve Inservice Test (QU) 66
E
E
PT/2/A/4200/023   NC Valve Inservice Test (QU)                           21,
PT/2/A/4200/023 NC Valve Inservice Test (QU) 21,
completed
completed
03/22/2022
03/22/2022
PT/2/A/4200/079   Auxiliary Feedwater Flow Control Valve Air Accumulator 11
PT/2/A/4200/079 Auxiliary Feedwater Flow Control Valve Air Accumulator 11
Leakage Test
Leakage Test
PT/l/A/4200/001 T Containment Penetration Valve Injection Water System   76
PT/l/A/4200/001 T Containment Penetration Valve Injection Water System 76
Performance Test
Performance Test
PT/l/A/4200/013 I NV Valve Inservice Test                               49
PT/l/A/4200/013 I NV Valve Inservice Test 49
SI/0/A/5200/006   MOV Actuator Lubrication and Inspection               33
SI/0/A/5200/006 MOV Actuator Lubrication and Inspection 33
Work Orders WO 1899772       ASSIST THE C.C.I. TECH IN REASSEMBLING THE             12/16/2009
Work Orders WO 1899772 ASSIST THE C.C.I. TECH IN REASSEMBLING THE 12/16/2009
C.F.I.V. VALVES
C.F.I.V. VALVES
WO 20338520 01   1. Duke_WorkOrderPackage_Rpt_B 1CF - REPLACE           05/17/2020
WO 20338520 01 1. Duke_WorkOrderPackage_Rpt_B 1CF - REPLACE 05/17/2020
HYDRAULIC FLUID/INSPECT DESICCANT FOR CFIV 2.
HYDRAULIC FLUID/INSPECT DESICCANT FOR CFIV 2.
IP/0/A/3010/024 MAIN FEEDWATER (CF) SYSTEM
IP/0/A/3010/024 MAIN FEEDWATER (CF) SYSTEM
FEEDWATER ISOLATION
FEEDWATER ISOLATION
WOs               02050985, 20341710 01, 20436333 01, 20444997 02,
WOs 02050985, 20341710 01, 20436333 01, 20444997 02,
204646 01, 02119855 01, 20407902 01, 20380724 01
204646 01, 02119855 01, 20407902 01, 20380724 01
11
11
}}
}}

Revision as of 07:53, 16 November 2024

Design Basis Assurance Inspection (Programs) Inspection Report 05000413/2022010 and 05000414/2022010
ML22202A530
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 07/21/2022
From: James Baptist
NRC/RGN-II/DRS/EB1
To: Simril T
Duke Energy Carolinas
References
IR 2022010
Download: ML22202A530 (13)


Text

July 21, 2022

SUBJECT:

CATAWBA NUCLEAR STATION - DESIGN BASIS ASSURANCE INSPECTION (PROGRAMS) INSPECTION REPORT 05000413/2022010 AND 05000414/2022010

Dear Mr. Simril:

On June 10, 2022, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Catawba Nuclear Station and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, James B. Baptist, Chief Engineering Branch 1 Division of Reactor Safety Docket Nos. 05000413 and 05000414 License Nos. NPF-35 and NPF-52

Enclosure:

As stated

Inspection Report

Docket Numbers: 05000413 and 05000414

License Numbers: NPF-35 and NPF-52

Report Numbers: 05000413/2022010 and 05000414/2022010

Enterprise Identifier: I-2022-010-0038

Licensee: Duke Energy Carolinas, LLC

Facility: Catawba Nuclear Station

Location: York, SC

Inspection Dates: May 23, 2022, to June 10, 2022

Inspectors: R. Fanner, Reactor Inspector N. Morgan, Intergovernmental Liaison Project Manager G. Ottenberg, Senior Reactor Inspector J. Zudans, Contractor

Approved By: James B. Baptist, Chief Engineering Branch 1 Division of Reactor Safety

Enclosure

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a design basis assurance inspection (programs) inspection at Catawba Nuclear Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.21N.02 - Design-Basis Capability of Power-Operated Valves Under 10 CFR 50.55a Requirements POV Review (IP Section 03)

The inspectors:

a. Evaluated whether the sampled POVs are being tested and maintained in accordance with NRC regulations along with the licensees commitments and/or licensing bases.

Specific Guidance b. Evaluated whether the sampled POVs are capable of performing their design-basis functions.

c. Evaluated whether testing of the sampled POVs is adequate to demonstrate the capability of the POVs to perform their safety functions under design-basis conditions.

d. Evaluated maintenance activities including a walkdown of the sampled POVs (if accessible).

(1) 1KC050A, Auxiliary Building Non-Essential Header Isolation
(2) 1ND027, 1A Residual Heat Removal (ND) Heat Exchanger Bypass Control
(3) 2CA050A, Auxiliary Feedwater (CA) Pump 2 Discharge to Steam Generator 2C Isolation
(4) 1NV010A, Letdown Orifice 1B Outlet Containment Isolation
(5) 2CA056, CA Pump 2A Flow to Steam Generator 2B
(6) 2NC035B, Pressurizer Power Operated Relief Valve Isolation
(7) 2NI173A, ND Header 2A to Cold Legs C & D
(8) 1CF033, 1A Steam Generator Feedwater Containment Isolation

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On June 10, 2022, the inspectors presented the design basis assurance inspection (programs) inspection results to Tom Simril and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection Type Designation Description or Title Revision or

Procedure Date

71111.21N.02 Calculations AD-EG-ALL-1117 U2, 6.9KV, 4.16KV, & 600V Auxiliary Power Systems 19

Safety-Related Voltage Analysis

CNC -1205.19-00- Generic Letter 89-10 MOV Calculations, NC System; 1(2)11

28 NC033A, 035B, 1NC031B

CNC -1205.19-00- 89-10 Calculation for 1&2 CA038A, 42B, 46B, 50A, 54B, 14

29 58A, 62A, 66B

CNC -1205.19-00- Generic Letter 89-10 Calculation For Valves 1 and 4

0033 NI173A and NI178B

CNC -1205.19-00- GL 89-10 Set-Up Calculation for Valves 1KC001A, 3

0110 1KC002B, 1KC050A, 1KC053B, 2KC001A, AND

2KC002B

CNC -1205.19-00- Required Thrust Calculation for 1(2)NC31B, 33A, 35B 000

0195 (AD/DD PPM); Item NO. 09J-363 & 364

CNC -1205.41-00- 1 (2) ND 26, 27, 60, and 61 Fisher Actuator and Margin1

27 Capability Calculations

CNC -1206.02-80- KCC - Component Cooling Heat Exchangers 1 A & 1 B to 018

2019 the RHR Heat Exchangers 1A & 1 B. Also to the Inlet of

the Letdown & Fuel Pool Heat Exchangers

CNC -1223.11-00- Limiting 1ST Stroke Time for ND26, ND27, ND60 and 000

0055 ND6V

CNC -1381.05-00- U2, 6.9KV, 4.16KV, & 600V AUXILIARY POWER 19

0199 SYSTEMS SAFETY-RELATED VOLTAGE ANALYSIS

CNC 1205.41-00- 1 (2) NV 010A, 011A, and 013A Required Thrust 2

0018 Evaluation supporting Air Operated Valve (AOV) Program

CNC-1205.41-00- Air Operated Valve (AOV) Program Scope Calculation 5

0001

CNC-1205.41-00- FEEDWATER ISOLATION VALVES, 1(2)CF33, 42, 51, 05/03/2022

0005 AND

60, DESIGN BASIS SIZING CALCULATION

CNC-1205.41-00- Catawba Air-operated Valve (AOV) Risk Ranking 1

0016 Calculation

CNC-1205.41-00- 1 (2) NV 010A, 011A, and 013A Required Thrust 2

Inspection Type Designation Description or Title Revision or

Procedure Date

0018 Evaluation supporting Air Operated Valve (AOV) Program

CNC-1205.41-00- 1(2) CA-040, 044, 056, 060 and 1(2) CA-036, 048, 052, 1

22 064 Actuator Capability Evaluation Supporting Air

Operated (AOV) Program

CNC-1206.03-00- Doghouse Environmental Temperature Due to Main Rev. 3

0181 Steam Line Break

CNC-1223.02-00- Inservice Testing (IST) Valve Response Measurement 04/08/2011

23 Uncertainty

CNC-1223.12-00- Design Parameters for ND Header to Cold Leg 4

0045 Containment Isolation Valves 1 & 2 NI173A, NI178B

CNC-1552.08-00- Long-Term Containment Response - Manual NS Initiation 7

0390

CNM 1205.00- Design/Seismic Report (Weak Link) for 09J-2056, 2", 5

2182.001 1500#, SS, Gate Valve

CNM 1205.01-Design & Seismic RPT 6J-339 C

0797.001

Corrective Action ARs 02373087, 02294259, 01497427, 02407695, 02294259,

Documents 01497427, 02428219, 01898027, 02300922

Corrective Action NCR 02318266 OP-CN-CF-CF lesson plan does not identify the safety 06/24/2022

Documents related power supply for Feedwater Isolation Valve's

Resulting from NCR 02429804 2022 NRC DBAI POV - 2NI173A Motor Brake Internals 06/02/2022

Inspection NCR 02430135 2022 NRC DBAI POV - 1KC-50A Maximum Transmitted 06/06/2022

Torque

NCR 02430281 2022 NRC DBAI POV - Lesson Plans not revised post 06/07/2022

Mod

NCR 02430301 PT/1/A/4350/002 E enclosure 13.16 could not be located06/07/2022

NCR 02430342 2022 NRC POV DBAI - Incorrect Reference in Flowserve 06/07/2022

Letter

NCR 02430464 Obstructions on 522' elevation floor drains 06/08/2022

NCR 02430567 NRC DBAI POV-EOPs do not align with UFSAR 06/09/2022

NCR 02430713 2022 NRC DBAI POV - 2NC35B - Actuator Fastener Bolt 06/09/2022

Preload

NCR 02431086 2022 NRC DBAI POV - UFSAR sec.6.2.4.1 incorrect 06/14/2022

statement

Inspection Type Designation Description or Title Revision or

Procedure Date

NCR 2428952 2022 NRC DBAI POV - 2NC035B High Temp Torque 05/26/2022

Factor

NCR 2430567 NRC DBAI POV-EOPs do not align with UFSAR 06/09/2022

Drawings 02-403-0012-3 Limitorque Valve Control DI

40846-08 20- Class 150 Valve Assembly and Limitorque H2BC-DE

SMB-00-10

CN -1561-01.00 Flow Diagram of Residual Heat Removal System (ND) 34

CN -2561-01.00 Flow Diagram of Residual Heat Removal System (ND) 38

CN -2562-01.01 Flow Diagram, Safety Injection System (NI) 23

CN -2592-01.01 Flow Diagram Auxiliary Feedwater System (CA) 33

CN-1573-01.0 Flow Diagram of Component Cooling System (KC) 30

CN-2499-CA.07-Instrument Detail Motor Driven Auxiliary Feedwater Pump 9

to Steam Generator Flow Control

CN-2553-01.01 Flow Diagram of Reactor Coolant System (NC) 20

CN-2562-01.03 Flow Diagram of Safety Injection System (NI) 28

CNEE-0247-04.12 Auxiliary Feedwater System (CA) CA Pump No. 2 Disch 4

to S/D 2C Isol. Vlv. 2CA050A

CNEE-0247-Auxiliary Feedwater System (CA) CA Pump No. 2 Disch 2

04.12-01 to S/D 2C Isol. Vlv. 2CA050A Controls

CNEE-0250-01.09 Reactor Coolant System (NC) Pzr Power Operated Relief 12

Isolation Valve 2NC035B

CNEE-0251-01.32 Elementary Diagram Safety Injection System (NI) ND 6

HDR to NC Cold Legs C and D Isolation Valve 2NI173A

CNM 1205.00- 8"SS Motor Oper Gate Vlv Item 9J211 16

0074.001

CNM 1205.00- O/L Drawing for 09J-2056, 2", 1500#, SS, Gate Valve 0

2181.001

CNM 1205.01-4" 1500LB CS EMO DP Gate Valve 6J-339 H

0790.001

CNM 1205.01-4" 1500LB CS DP Gate Valve 6J-339 J

0790.002

CNM 1205.06-O/L, C/S, B/M, OPR, W/D Control Valves 1&2/CA/40, 44, J

20.001 56 & 60

W9223811, Sht. 1 3"- 1530 Weld Ends Stainless Steel Double Disc Gate B

Inspection Type Designation Description or Title Revision or

Procedure Date

Valve for SMB-00-15 Limitorque Actuator

W9223811, Sht. 2 3"- 1530 Weld Ends Stainless Steel Double Disc Gate B

Valve for SMB-00-15 Limitorque Actuator

Engineering CN 20328 Modify control circuit wiring on 2NI-9A, 10B, 100B, 183B, 11/07/1988

Changes 162A, 173A, 178B, 184B, 185A, 2NV-89A, 91B, 188A,

189B, 252A, 253B, 312A, and 314B to provide "limit

actuated" torque switch bypass contacts which can be

adjusted independent of Indication or interlocks.

CN 21319 Modify CA Control Valves to Prevent S/G Overfill During 08/11/1999

SGTR

EC 0000106724 Revise MOV Set-Up Sheets to Meet GL 96-05 09/07/2012

Requirements for 1KC001A, 002B, 050A

EC 0000402775 U-1 AND U-2 NW System Isolation to Specific CIVs 1

Engineering CNC -1205.19-00- EC420978 - Revise valve factor for 1(2)NI173A & 000

Evaluations 0176-ICC-0003 1(2)NI178B

CNC -1205.19-00- Kalsi Engineering Report 2919C, GL96-05 Periodic 0

0179 Verification Program for Butterfly Valves with 316

Microseal Bearings {JOG Class D)

CNC -1381.05-00- U2, 6.9KV, 4.16KV, & 600V Auxiliary Power Systems 19

0199 Safety-Related Voltage Analysis

CNC-1205.00-00- GL 95-07 Pressure Locking and Thermal Binding Review 1

0048 of Valves Without an Active to Open Safety Function

CNC-1205.19-00- Operability Evaluation of Rotork Part 21 for Switch 1

0170 Mechanisms

CNM 1205.00- ASME Section III Gate Valve Seismic Report 5

0549.001

CNM 1205.00- Design and Seismic Analysis Report for 3" EMO Gate 00C

2050.001 Valve, Item 9J-364

CNM 1205.02-Weak-Link Report for CNS BFV Item Number 05B-501 0

0766.001

CNM 1205.19-Stress Report for Westinghouse Class 1 Nuclear Valves-D3

0094.001 Gate Valves

CNM 1205.19-9J-211 Seismic and Weak Link Analysis Report for 0

099.011 Westinghouse Class 1 Nuclear Valve

Inspection Type Designation Description or Title Revision or

Procedure Date

DPC 1205.41-00- Evaluation of AOV Issues Needed for Margin Calculations2

0001

DPC-1205.00-00- Microseal Bearing Test Report: Kalsi Engineering 0

0008 Document 2800C

Miscellaneous [N/A] OAC Alarm Response Information for loss of SOV Power

BACKGROUND ES-1.3 Transfer to Cold Leg Recirculation HP-Rev. 3 03/31/2014

INFORMATION

FOR

WESTINGHOUSE

OWNERS

GROUP

EMERGENCY

RESPONSE

GUIDELINE

CDUK-1205.41-Unit 1 and Unit 2 AOV Test Set Up Sheets 7

0001.001

CE 0000106724 Revise MOV Set-Up Sheets to Meet GL 96-05 09/17/2012

Requirements for 1KC001A, 002B, 050A, AND 053B

CN 500404 Allow Replacement of Solenoid Valves w/ New Model 05/17/2005

CN-11413 De-energize the Hydraulic Solenoids on the Main 08/06/2001

Feedwater Isolation Valves

CNC -1205.19-00- EC420956-Revise Valve Factor and Functions for CA 0

0176-ICC-0004 MOVs

CNM 1205.00- l/B Manual M/0 Gate Valves & Swing Check Vlvs D10

22.001

CNM 1205.00- EMO Torque Switch Setting Sheets 90

1997.001

CNM 1205.00- EMO Torque Switch Setting Sheets 90

1997.001

CNM 1205.00- Instruction Manual Number ET347 for 3" 1530 Class 10/01/1997

2049-001 Double Disc Gate Valves with Motor Actuators

CNM 1205.02-Posi-Seal Butterfly Valve Technical Bulletin Series 0

0762.001

CNM 1205.06-I/M & Parts List for Control Valves and Regulators 42

Inspection Type Designation Description or Title Revision or

Procedure Date

268.001

CNM 1205.19-Limitorque Nuclear Qualification Reports 3

0001.001

CNM 1205.19-Technical Repair Guide for Rotork Valve Actuators "NA" 9

0083.001 Range Models

CNM 1205.19-Rotork Motor Operator Bench Test Certificates D7

0114.001

CNS-1205.00-00- ASME Section 3 Stainless Steel Gate Globe and Check 5

0008 Valves

CNS-1205.06-00- Control Valves to ASME Section III 17

0003

CNS-1553.NC-00- Reactor Coolant System (NC) Design Basis Specification 50

0001

CNS-1554.NV-00- Chemical and Volume Control System (NV) Design Basis 53

0001 Specification

CNS-1561.ND-00- Design Basis Specification for The Residual Heat 42

0001 Removal (ND) System

CNS-1562.NI-00- Design Basis Specification For the Safety Injection (NI) 52

0001 System

CNS-1573.KC-00- Component Cooling System (KC) Design Basis 49

0001 Specification

CNS-1591.CF-00- Design Basis Specification for the Feedwater (CF) Rev. 034

0001 System

CNS-1592.CA-00- Auxiliary Feedwater System (CA) Design Basis 50

0001 Specification

CNS-1592.CA-00- Auxiliary Feedwater System (CA) Design Basis 50

0001 Specification

DPS 1205.00-00- Nuclear Safety Related Carbon and Stainless Steel 4

0002 Forged and Cast Electric Motor Operated Valves

DPS-1205.19-00- Safety Related Rotork Motor Operators and Spare Parts 4

0004

EQMM-1393.01-Environmental Qualification Maintenance Manual 15

Q03-01 Equipment Type: Solenoid Valve Manufacturer: Valcor

Engineering Corporation Model/Series: V70900-65 Series

Inspection Type Designation Description or Title Revision or

Procedure Date

Valves

OEDB Number: LIMITORQUE TECHNICAL UPDATE #92-O1 Kalsi 01/06/1992

2-12415 Engineering Document #17O7-C, Rev. o (11-25-91)

Thrust Rating Increase SMB-OOO, SMB-OO, SMB-O &

SMB-1 Actuators

OP-CN-CF-CF Feedwater System Lesson Plan 04/07/2014

OP-CN-EP-INTRO Emergency Procedures Intro Lesson Plan CNOB50 11

System Health KC - Component Cooling System 04/19/2022

Report

System Health ND - Residual Heat Removal System 04/19/2022

Report

System Health CA - CNS l Unit 2 l CA - Auxiliary Feedwater System 04/19/2022

Report

Torque and As Left C1R26 10/23/2021

Margin for 1ND27

Westinghouse ES-1.3 Transfer to Cold Leg Recirculation HP-Rev 3 03/31/2014

Guideline

Document

Procedures AD-EG-ALL-1432 Air Operated Valve Design Basis Review 1

AD-EG-ALL-1433 Air Operated Valve Testing Requirements 2

AD-OP-ALL-0105 Operability Determinations 6

AD-OP-ALL-0205 Time Critical Actions/Time Sensitive Actions 2

CNC-1205.19-00- JOG Classification of Catawbas GL96-05 MOV 9

0176 Population

DPS-1205.19-00- Guideline for Performing Motor Operated Valve Reviews 4

0002 and Calculations (For Engineering use only)

EP/2/A/5000/E-3 CNS Steam Generator Tube Rupture 41

EP/2/A/5000/ES-Transfer to Cold Leg Recirculation 31

1.3

IP/0/A/3820/004 Q MOV Diagnostic Testing 13

IP/0/A/3820/004 Q MOV Diagnostic Testing 13

IP/0/A/3820/034 Removal/Restoration of Interferences and Packing Re-43

Torque on Air Operated Valves (AOVs)

IP/0/A/3820/047 AOV Diagnostic Testing using the QUIKLOOK3 System 5

Inspection Type Designation Description or Title Revision or

Procedure Date

OP/1/A/6100/010K Annunciator Response for Panel 1AD-10 21

OP/1/B/6100/010 Annunciator Response for Radiation Monitoring Panel 67

X 1RAD-1

OP/1/B/6100/010 Annunciator Response for Radiation Monitoring Panel 25

Z 1RAD-3

PD-EG-ALL-1430 Air Operated Valve Program 2

PT/0/A/4700/061 Time Critical Actions/ Time Sensitive Actions 9

PT/1/A/4200/021 KC Valve Inservice Test (QU) 79

A

PT/2/4/4200/013 NI Valve Inservice Test (UNK) 41,

G completed

04/11/2021

PT/2/A/4200/0 CA Valve Inservice Test (QU) 13E

PT/2/A/4200/013 CA Valve Inservice Test (QU) 66

E

PT/2/A/4200/023 NC Valve Inservice Test (QU) 21,

completed

03/22/2022

PT/2/A/4200/079 Auxiliary Feedwater Flow Control Valve Air Accumulator 11

Leakage Test

PT/l/A/4200/001 T Containment Penetration Valve Injection Water System 76

Performance Test

PT/l/A/4200/013 I NV Valve Inservice Test 49

SI/0/A/5200/006 MOV Actuator Lubrication and Inspection 33

Work Orders WO 1899772 ASSIST THE C.C.I. TECH IN REASSEMBLING THE 12/16/2009

C.F.I.V. VALVES

WO 20338520 01 1. Duke_WorkOrderPackage_Rpt_B 1CF - REPLACE 05/17/2020

HYDRAULIC FLUID/INSPECT DESICCANT FOR CFIV 2.

IP/0/A/3010/024 MAIN FEEDWATER (CF) SYSTEM

FEEDWATER ISOLATION

WOs 02050985, 20341710 01, 20436333 01, 20444997 02,

204646 01, 02119855 01, 20407902 01, 20380724 01

11