ML22265A013: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:September 28, 2022 Mr. David P. Rhoades Senior Vice President Constellation Energy Generation, LLC President and Chief Nuclear Officer Constellation Nuclear 4300 Winfield Road Warrenville, IL 60555
{{#Wiki_filter:Mr. David P. Rhoades Senior Vice President Constellation Energy Generation, LLC President and Chief Nuclear Officer Constellation Nuclear 4300 Winfield Road Warrenville, IL 60555


==SUBJECT:==
==SUBJECT:==
Line 24: Line 24:


==Dear Mr. Rhoades,==
==Dear Mr. Rhoades,==
By {{letter dated|date=June 7, 2022|text=letter dated June 7, 2022}} (Agencywide Documents Access and Management System (ADAMS) Accession Number ML22158A294), Constellation Energy Generation, LLC (CEG),
By {{letter dated|date=June 7, 2022|text=letter dated June 7, 2022}} (Agencywide Documents Access and Management System (ADAMS) Accession Number ML22158A294), Constellation Energy Generation, LLC (CEG),
submitted to the U.S. Nuclear Regulatory Commission (NRC or staff) a response to Commitment 10 of the Braidwood Station, Unit 1 and Byron Station, Unit 1 license renewal.
submitted to the U.S. Nuclear Regulatory Commission (NRC or staff) a response to Commitment 10 of the Braidwood Station, Unit 1 and Byron Station, Unit 1 license renewal.
In December 2015, the NRC published the final Safety Evaluation Report Related to the License Renewal of Byron Station, Units 1 and 2, and Braidwood Station, Units 1 and 2, as NUREG-2190, Volume 1 (ML15350A038) and NUREG-2190, Volume 2 (ML15350A041).
In December 2015, the NRC published the final Safety Evaluation Report Related to the License Renewal of Byron Station, Units 1 and 2, and Braidwood Station, Units 1 and 2, as NUREG-2190, Volume 1 (ML15350A038) and NUREG-2190, Volume 2 (ML15350A041).
In NUREG-2190, Volume 2, Appendix A, Byron Station Units 1 and 2, and Braidwood Station, Units 1 and 2, License Renewal Commitments, Commitment 10 part 1 gave the stations three options to fulfill this commitment.
In NUREG-2190, Volume 2, Appendix A, Byron Station Units 1 and 2, and Braidwood Station, Units 1 and 2, License Renewal Commitments, Commitment 10 part 1 gave the stations three options to fulfill this commitment.
Braidwood Unit 1 and Byron Unit 1 have chosen Option 2: Analysis. This option requires Braidwood and Byron to:
Braidwood Unit 1 and Byron Unit 1 have chosen Option 2: Analysis. This option requires Braidwood and Byron to:  
        "Perform an analytical evaluation of the steam generator divider plate welds in order to establish a technical basis which concludes that the steam generator reactor coolant pressure boundary is adequately maintained with the presence of steam generator divider plate weld cracking. This analytical evaluation will be submitted to the NRC for review and approval two (2) years prior to entering the associated period of extended operation."
"Perform an analytical evaluation of the steam generator divider plate welds in order to establish a technical basis which concludes that the steam generator reactor coolant pressure boundary is adequately maintained with the presence of steam generator divider plate weld cracking. This analytical evaluation will be submitted to the NRC for review and approval two (2) years prior to entering the associated period of extended operation."September 28, 2022 Braidwood and Byron License Renewal Commitment 10 part 2 gave the stations three options to fulfill this commitment. Braidwood Unit 1 and Byron Unit 1 have chosen Option 2: Analysis -
 
Susceptibility. This option requires Braidwood and Byron to:  
D. Rhoades                                    Braidwood and Byron License Renewal Commitment 10 part 2 gave the stations three options to fulfill this commitment. Braidwood Unit 1 and Byron Unit 1 have chosen Option 2: Analysis -
"Perform an analytical evaluation of the steam generator tube-to-tubesheet welds to determine that the welds are not susceptible to primary water stress corrosion cracking.
Susceptibility. This option requires Braidwood and Byron to:
          "Perform an analytical evaluation of the steam generator tube-to-tubesheet welds to determine that the welds are not susceptible to primary water stress corrosion cracking.
The evaluation for determining that the tube-to-tubesheet welds are not susceptible to primary water stress corrosion cracking will be submitted to the NRC for review and approval two (2) years prior to entering the associated period of extended operation."
The evaluation for determining that the tube-to-tubesheet welds are not susceptible to primary water stress corrosion cracking will be submitted to the NRC for review and approval two (2) years prior to entering the associated period of extended operation."
The NRC staff plans to conduct an audit specific to Braidwood, Unit 1 and Byron, Unit 1 License Renewal Commitment 10 from October 3 - November 10, 2022, in accordance with the enclosed audit plan.
The NRC staff plans to conduct an audit specific to Braidwood, Unit 1 and Byron, Unit 1 License Renewal Commitment 10 from October 3 - November 10, 2022, in accordance with the enclosed audit plan.
If you have any questions, please contact Christopher Tyree at Christopher.Tyree@nrc.gov or Angela Wu at Angela.Wu@nrc.gov.
If you have any questions, please contact Christopher Tyree at Christopher.Tyree@nrc.gov or Angela Wu at Angela.Wu@nrc.gov.
Sincerely, Signed by Gibson, Lauren on 09/28/22 Lauren K. Gibson, Chief License Renewal Projects Branch Division of New and Renewed Licenses Office of Nuclear Reactor Regulation Docket Nos. 50-456 and 50-454
Sincerely, Lauren K. Gibson, Chief License Renewal Projects Branch Division of New and Renewed Licenses Office of Nuclear Reactor Regulation Docket Nos. 50-456 and 50-454


==Enclosure:==
==Enclosure:==
Audit Plan cc w/encl: Listserv Signed by Gibson, Lauren on 09/28/22
ML22265A013 NRR-106 OFFICE PM:NLRP:DNRL PM:NLRP:DNRL NAME JHammock: CTyree for AWu DATE 9/27/2022 9/27/2022 OFFICE LA:NLRP:DNRL BC:NLRP:DNRL NAME YEdmonds LGibson DATE 0/28/2022
BRAIDWOOD STATION, UNIT 1 AND BYRON STATION, UNIT 1 - STEAM GENERATOR LICENSE RENEWAL RESPONSE TO COMMITMENT 10 -
AUDIT PLAN


Audit Plan cc w/encl: Listserv
October 3 - November 10, 2022


ML22265A013                                  NRR-106 OFFICE              PM:NLRP:DNRL              PM:NLRP:DNRL NAME                JHammock: CTyree for      AWu DATE                9/27/2022                  9/27/2022 OFFICE              LA:NLRP:DNRL              BC:NLRP:DNRL NAME                YEdmonds                  LGibson DATE                0/28/2022                  9/28/22 BRAIDWOOD STATION, UNIT 1 AND BYRON STATION, UNIT 1 - STEAM GENERATOR LICENSE RENEWAL RESPONSE TO COMMITMENT 10 -
Division of New and Renewed Licenses Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission
AUDIT PLAN October 3 - November 10, 2022 Division of New and Renewed Licenses Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Enclosure


BRAIDWOOD STATION, UNIT 1 AND BYRON STATION, UNIT 1 - STEAM GENERATOR LICENSE RENEWAL RESPONSE TO COMMITMENT 10 -
Enclosure BRAIDWOOD STATION, UNIT 1 AND BYRON STATION, UNIT 1 - STEAM GENERATOR LICENSE RENEWAL RESPONSE TO COMMITMENT 10 -
AUDIT PLAN
AUDIT PLAN
: 1.       Background By {{letter dated|date=June 7, 2022|text=letter dated June 7, 2022}} (Agencywide Documents Access and Management System (ADAMS) Accession Number ML22158A294), Constellation Energy Generation, LLC (CEG),
: 1. Background
 
By {{letter dated|date=June 7, 2022|text=letter dated June 7, 2022}} (Agencywide Documents Access and Management System (ADAMS) Accession Number ML22158A294), Constellation Energy Generation, LLC (CEG),
submitted to the U.S. Nuclear Regulatory Commission (NRC or staff) a response to Commitment 10 of the Braidwood Station (Braidwood), Unit 1 and Byron Station (Byron), Unit 1 license renewal.
submitted to the U.S. Nuclear Regulatory Commission (NRC or staff) a response to Commitment 10 of the Braidwood Station (Braidwood), Unit 1 and Byron Station (Byron), Unit 1 license renewal.
In accordance with the requirements of Title 10 of the Code of Federal Regulations (10 CFR)
In accordance with the requirements of Title 10 of the Code of Federal Regulations (10 CFR)
Part 54, Requirements for Renewal of Operating Licenses for Nuclear Power Plants, and NUREG-2190, Volume 2, Appendix A, Byron Station Units 1 and 2, and Braidwood Station, Units 1 and 2, License Renewal Commitments, the NRC staff will perform an audit to gain a better understanding of how CEGs Steam Generators program will 1) validate that primary water stress corrosion cracking of the divider plate welds to the primary head and tubesheet cladding is not occurring at Braidwood, Unit 1 and Byron, Unit 1, and 2) validate that primary water stress corrosion cracking of the tube-to-tubesheet welds at Braidwood, Unit 1 and Byron, Unit 1.
Part 54, Requirements for Renewal of Operating Licenses for Nuclear Power Plants, and NUREG-2190, Volume 2, Appendix A, Byron Station Units 1 and 2, and Braidwood Station, Units 1 and 2, License Renewal Commitments, the NRC staff will perform an audit to gain a better understanding of how CEGs Steam Generators program will 1) validate that primary water stress corrosion cracking of the divider plate welds to the primary head and tubesheet cladding is not occurring at Braidwood, Unit 1 and Byron, Unit 1, and 2) validate that primary water stress corrosion cracking of the tube-to-tubesheet welds at Braidwood, Unit 1 and Byron, Unit 1.
: 2.     Audit Bases License renewal requirements are specified in 10 CFR Part 54. In December 2015, the NRC published the final Safety Evaluation Report Related to the License Renewal of Byron Station, Units 1 and 2, and Braidwood Station, Units 1 and 2, as NUREG-2190, Volume 1 (ML15350A038) and NUREG-2190, Volume 2 (ML15350A041).
: 2. Audit Bases
 
License renewal requirements are specified in 10 CFR Part 54. In December 2015, the NRC published the final Safety Evaluation Report Related to the License Renewal of Byron Station, Units 1 and 2, and Braidwood Station, Units 1 and 2, as NUREG-2190, Volume 1 (ML15350A038) and NUREG-2190, Volume 2 (ML15350A041).
 
In NUREG-2190, Volume 2, Appendix A, Byron Station, Units 1 and 2, and Braidwood Station, Units 1 and 2, License Renewal Commitments, Commitment 10 part 1 gave the stations three options to fulfill this commitment.
In NUREG-2190, Volume 2, Appendix A, Byron Station, Units 1 and 2, and Braidwood Station, Units 1 and 2, License Renewal Commitments, Commitment 10 part 1 gave the stations three options to fulfill this commitment.
Braidwood Unit 1 and Byron Unit 1 have chosen Option 2: Analysis. This option requires Braidwood and Byron to:
Braidwood Unit 1 and Byron Unit 1 have chosen Option 2: Analysis. This option requires Braidwood and Byron to:
        "Perform an analytical evaluation of the steam generator divider plate welds in order to establish a technical basis which concludes that the steam generator reactor coolant pressure boundary is adequately maintained with the presence of steam generator divider plate weld cracking. This analytical evaluation will be submitted to the NRC for review and approval two (2) years prior to entering the associated period of extended operation."
 
"Perform an analytical evaluation of the steam generator divider plate welds in order to establish a technical basis which concludes that the steam generator reactor coolant pressure boundary is adequately maintained with the presence of steam generator divider plate weld cracking. This analytical evaluation will be submitted to the NRC for review and approval two (2) years prior to entering the associated period of extended operation."
 
Braidwood and Byron License Renewal Commitment Number 10 part 2 gave the stations three options to fulfill this commitment. Braidwood Unit 1 and Byron Unit 1 have chosen Option 2:
Braidwood and Byron License Renewal Commitment Number 10 part 2 gave the stations three options to fulfill this commitment. Braidwood Unit 1 and Byron Unit 1 have chosen Option 2:
Analysis - Susceptibility. This option requires Braidwood and Byron to:
Analysis - Susceptibility. This option requires Braidwood and Byron to:
        "Perform an analytical evaluation of the steam generator tube-to-tubesheet welds to determine that the welds are not susceptible to primary water stress corrosion cracking.
 
"Perform an analytical evaluation of the steam generator tube-to-tubesheet welds to determine that the welds are not susceptible to primary water stress corrosion cracking.
The evaluation for determining that the tube-to-tubesheet welds are not susceptible to primary water stress corrosion cracking will be submitted to the NRC for review and approval two (2) years prior to entering the associated period of extended operation."
The evaluation for determining that the tube-to-tubesheet welds are not susceptible to primary water stress corrosion cracking will be submitted to the NRC for review and approval two (2) years prior to entering the associated period of extended operation."
: 3.     Audit Scope of Review CEG performed an analytical evaluation specific to the Braidwood, Unit 1 and Byron, Unit 1 steam generators because it could not be determined if the steam generators were bounded by the industry analyses, EPRI Report 3002002850, Steam Generator Management Program:
: 3. Audit Scope of Review
 
CEG performed an analytical evaluation specific to the Braidwood, Unit 1 and Byron, Unit 1 steam generators because it could not be determined if the steam generators were bounded by the industry analyses, EPRI Report 3002002850, Steam Generator Management Program:
Investigation of Crack Initiation and Propagation in the Steam Generator Channel Head Assembly, that the staff accepted for the divider plate primary water stress corrosion cracking evaluation in LR-ISG-16-01, Changes to Aging Management Guidance for Various Steam Generator Components.
Investigation of Crack Initiation and Propagation in the Steam Generator Channel Head Assembly, that the staff accepted for the divider plate primary water stress corrosion cracking evaluation in LR-ISG-16-01, Changes to Aging Management Guidance for Various Steam Generator Components.
The staff is unable to determine from the information submitted whether the licensees analysis establishes an adequate technical basis for concluding that the steam generator reactor coolant boundary would be maintained in the presence of divider plate cracking. The audit team will view documentation and calculations the licensee referenced as technical support, focusing on the key assumptions, methodology, and inputs.
The staff is unable to determine from the information submitted whether the licensees analysis establishes an adequate technical basis for concluding that the steam generator reactor coolant boundary would be maintained in the presence of divider plate cracking. The audit team will view documentation and calculations the licensee referenced as technical support, focusing on the key assumptions, methodology, and inputs.
: 4.     Audit Activities For the audit, the technical staff will review the licensees submittal dated June 7, 2022 and documentation on the licensees electronic portal (ePortal). The staff will have the opportunity to have technical discussions with the licensee to gain context, clarity, and information on the documentation to support the staffs review. The audit is coordinated to support the development of the reviewers reasonable assurance for the safety findings to be documented in the safety evaluation.
: 4. Audit Activities
 
For the audit, the technical staff will review the licensees submittal dated June 7, 2022 and documentation on the licensees electronic portal (ePortal). The staff will have the opportunity to have technical discussions with the licensee to gain context, clarity, and information on the documentation to support the staffs review. The audit is coordinated to support the development of the reviewers reasonable assurance for the safety findings to be documented in the safety evaluation.
 
The License Renewal Projects Branch (NLRP) safety project manager will coordinate all communications with the licensee. Staff requests for communication with the licensee will require approval of their respective technical branch chief and the NLRP branch chief.
The License Renewal Projects Branch (NLRP) safety project manager will coordinate all communications with the licensee. Staff requests for communication with the licensee will require approval of their respective technical branch chief and the NLRP branch chief.
Following completion of the audit, an audit report will be issued.
Following completion of the audit, an audit report will be issued.
: 5.     Information and Other Material Necessary for the Audit Throughout the audit, the staff will review the supporting documents as appropriate and requested, on the ePortal. The staff may request additional documents to be added to the ePortal over the course of the audit. The staff requests for ePortal additions shall be made, as needed, to the NLRP safety project manager, who will provide the requests to the licensee.
: 5. Information and Other Material Necessary for the Audit
: 6.     Team Assignments Team Member         Branch/Division David Rudland       Division of New and Renewed Licenses (DNRL)
 
Andrew Johnson       Corrosion and Steam Generators Branch (NCSG)/DNRL Leslie Terry         NCSG/DNRL Gregory Makar       NCSG/DNRL Paul Klein           NCSG/DNRL Christopher Tyree   License Renewal Projects Branch (NLRP)/DNRL Angela Wu           NLRP/DNRL Jessica Hammock     NLRP/DNRL
Throughout the audit, the staff will review the supporting documents as appropriate and requested, on the ePortal. The staff may request additional documents to be added to the ePortal over the course of the audit. The staff requests for ePortal additions shall be made, as needed, to the NLRP safety project manager, who will provide the requests to the licensee.
: 7.       Logistics The audit will be conducted using telecommunications from October 3 - November 10, 2022.
: 6. Team Assignments
 
Team Member Branch/Division David Rudland Division of New and Renewed Licenses (DNRL)
Andrew Johnson Corrosion and Steam Generators Branch (NCSG)/DNRL Leslie Terry NCSG/DNRL Gregory Makar NCSG/DNRL Paul Klein NCSG/DNRL Christopher Tyree License Renewal Projects Branch (NLRP)/DNRL Angela Wu NLRP/DNRL Jessica Hammock NLRP/DNRL
: 7. Logistics
 
The audit will be conducted using telecommunications from October 3 - November 10, 2022.
Entrance and exit briefings will be held at the beginning and end of the audit.
Entrance and exit briefings will be held at the beginning and end of the audit.
: 8.     Deliverables An audit report should be issued to the licensee within 90 days from the end of the audit.
: 8. Deliverables
                                                }}
 
An audit report should be issued to the licensee within 90 days from the end of the audit.
 
}}

Revision as of 03:49, 16 November 2024

Steam Generator License Renewal Response to Commitment 10 - Audit Plan
ML22265A013
Person / Time
Site: Byron, Braidwood  Constellation icon.png
Issue date: 09/28/2022
From: Lauren Gibson
NRC/NRR/DNRL/NLRP
To: Rhoades D
Constellation Energy Generation, Constellation Nuclear
Tyree C, 301-415-3754
References
Download: ML22265A013 (7)


Text

Mr. David P. Rhoades Senior Vice President Constellation Energy Generation, LLC President and Chief Nuclear Officer Constellation Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

BRAIDWOOD STATION, UNIT 1 AND BYRON STATION, UNIT 1 - STEAM GENERATOR LICENSE RENEWAL RESPONSE TO COMMITMENT 10 -

AUDIT PLAN

Dear Mr. Rhoades,

By letter dated June 7, 2022 (Agencywide Documents Access and Management System (ADAMS) Accession Number ML22158A294), Constellation Energy Generation, LLC (CEG),

submitted to the U.S. Nuclear Regulatory Commission (NRC or staff) a response to Commitment 10 of the Braidwood Station, Unit 1 and Byron Station, Unit 1 license renewal.

In December 2015, the NRC published the final Safety Evaluation Report Related to the License Renewal of Byron Station, Units 1 and 2, and Braidwood Station, Units 1 and 2, as NUREG-2190, Volume 1 (ML15350A038) and NUREG-2190, Volume 2 (ML15350A041).

In NUREG-2190, Volume 2, Appendix A, Byron Station Units 1 and 2, and Braidwood Station, Units 1 and 2, License Renewal Commitments, Commitment 10 part 1 gave the stations three options to fulfill this commitment.

Braidwood Unit 1 and Byron Unit 1 have chosen Option 2: Analysis. This option requires Braidwood and Byron to:

"Perform an analytical evaluation of the steam generator divider plate welds in order to establish a technical basis which concludes that the steam generator reactor coolant pressure boundary is adequately maintained with the presence of steam generator divider plate weld cracking. This analytical evaluation will be submitted to the NRC for review and approval two (2) years prior to entering the associated period of extended operation."September 28, 2022 Braidwood and Byron License Renewal Commitment 10 part 2 gave the stations three options to fulfill this commitment. Braidwood Unit 1 and Byron Unit 1 have chosen Option 2: Analysis -

Susceptibility. This option requires Braidwood and Byron to:

"Perform an analytical evaluation of the steam generator tube-to-tubesheet welds to determine that the welds are not susceptible to primary water stress corrosion cracking.

The evaluation for determining that the tube-to-tubesheet welds are not susceptible to primary water stress corrosion cracking will be submitted to the NRC for review and approval two (2) years prior to entering the associated period of extended operation."

The NRC staff plans to conduct an audit specific to Braidwood, Unit 1 and Byron, Unit 1 License Renewal Commitment 10 from October 3 - November 10, 2022, in accordance with the enclosed audit plan.

If you have any questions, please contact Christopher Tyree at Christopher.Tyree@nrc.gov or Angela Wu at Angela.Wu@nrc.gov.

Sincerely, Lauren K. Gibson, Chief License Renewal Projects Branch Division of New and Renewed Licenses Office of Nuclear Reactor Regulation Docket Nos. 50-456 and 50-454

Enclosure:

Audit Plan cc w/encl: Listserv Signed by Gibson, Lauren on 09/28/22

ML22265A013 NRR-106 OFFICE PM:NLRP:DNRL PM:NLRP:DNRL NAME JHammock: CTyree for AWu DATE 9/27/2022 9/27/2022 OFFICE LA:NLRP:DNRL BC:NLRP:DNRL NAME YEdmonds LGibson DATE 0/28/2022

BRAIDWOOD STATION, UNIT 1 AND BYRON STATION, UNIT 1 - STEAM GENERATOR LICENSE RENEWAL RESPONSE TO COMMITMENT 10 -

AUDIT PLAN

October 3 - November 10, 2022

Division of New and Renewed Licenses Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission

Enclosure BRAIDWOOD STATION, UNIT 1 AND BYRON STATION, UNIT 1 - STEAM GENERATOR LICENSE RENEWAL RESPONSE TO COMMITMENT 10 -

AUDIT PLAN

1. Background

By letter dated June 7, 2022 (Agencywide Documents Access and Management System (ADAMS) Accession Number ML22158A294), Constellation Energy Generation, LLC (CEG),

submitted to the U.S. Nuclear Regulatory Commission (NRC or staff) a response to Commitment 10 of the Braidwood Station (Braidwood), Unit 1 and Byron Station (Byron), Unit 1 license renewal.

In accordance with the requirements of Title 10 of the Code of Federal Regulations (10 CFR)

Part 54, Requirements for Renewal of Operating Licenses for Nuclear Power Plants, and NUREG-2190, Volume 2, Appendix A, Byron Station Units 1 and 2, and Braidwood Station, Units 1 and 2, License Renewal Commitments, the NRC staff will perform an audit to gain a better understanding of how CEGs Steam Generators program will 1) validate that primary water stress corrosion cracking of the divider plate welds to the primary head and tubesheet cladding is not occurring at Braidwood, Unit 1 and Byron, Unit 1, and 2) validate that primary water stress corrosion cracking of the tube-to-tubesheet welds at Braidwood, Unit 1 and Byron, Unit 1.

2. Audit Bases

License renewal requirements are specified in 10 CFR Part 54. In December 2015, the NRC published the final Safety Evaluation Report Related to the License Renewal of Byron Station, Units 1 and 2, and Braidwood Station, Units 1 and 2, as NUREG-2190, Volume 1 (ML15350A038) and NUREG-2190, Volume 2 (ML15350A041).

In NUREG-2190, Volume 2, Appendix A, Byron Station, Units 1 and 2, and Braidwood Station, Units 1 and 2, License Renewal Commitments, Commitment 10 part 1 gave the stations three options to fulfill this commitment.

Braidwood Unit 1 and Byron Unit 1 have chosen Option 2: Analysis. This option requires Braidwood and Byron to:

"Perform an analytical evaluation of the steam generator divider plate welds in order to establish a technical basis which concludes that the steam generator reactor coolant pressure boundary is adequately maintained with the presence of steam generator divider plate weld cracking. This analytical evaluation will be submitted to the NRC for review and approval two (2) years prior to entering the associated period of extended operation."

Braidwood and Byron License Renewal Commitment Number 10 part 2 gave the stations three options to fulfill this commitment. Braidwood Unit 1 and Byron Unit 1 have chosen Option 2:

Analysis - Susceptibility. This option requires Braidwood and Byron to:

"Perform an analytical evaluation of the steam generator tube-to-tubesheet welds to determine that the welds are not susceptible to primary water stress corrosion cracking.

The evaluation for determining that the tube-to-tubesheet welds are not susceptible to primary water stress corrosion cracking will be submitted to the NRC for review and approval two (2) years prior to entering the associated period of extended operation."

3. Audit Scope of Review

CEG performed an analytical evaluation specific to the Braidwood, Unit 1 and Byron, Unit 1 steam generators because it could not be determined if the steam generators were bounded by the industry analyses, EPRI Report 3002002850, Steam Generator Management Program:

Investigation of Crack Initiation and Propagation in the Steam Generator Channel Head Assembly, that the staff accepted for the divider plate primary water stress corrosion cracking evaluation in LR-ISG-16-01, Changes to Aging Management Guidance for Various Steam Generator Components.

The staff is unable to determine from the information submitted whether the licensees analysis establishes an adequate technical basis for concluding that the steam generator reactor coolant boundary would be maintained in the presence of divider plate cracking. The audit team will view documentation and calculations the licensee referenced as technical support, focusing on the key assumptions, methodology, and inputs.

4. Audit Activities

For the audit, the technical staff will review the licensees submittal dated June 7, 2022 and documentation on the licensees electronic portal (ePortal). The staff will have the opportunity to have technical discussions with the licensee to gain context, clarity, and information on the documentation to support the staffs review. The audit is coordinated to support the development of the reviewers reasonable assurance for the safety findings to be documented in the safety evaluation.

The License Renewal Projects Branch (NLRP) safety project manager will coordinate all communications with the licensee. Staff requests for communication with the licensee will require approval of their respective technical branch chief and the NLRP branch chief.

Following completion of the audit, an audit report will be issued.

5. Information and Other Material Necessary for the Audit

Throughout the audit, the staff will review the supporting documents as appropriate and requested, on the ePortal. The staff may request additional documents to be added to the ePortal over the course of the audit. The staff requests for ePortal additions shall be made, as needed, to the NLRP safety project manager, who will provide the requests to the licensee.

6. Team Assignments

Team Member Branch/Division David Rudland Division of New and Renewed Licenses (DNRL)

Andrew Johnson Corrosion and Steam Generators Branch (NCSG)/DNRL Leslie Terry NCSG/DNRL Gregory Makar NCSG/DNRL Paul Klein NCSG/DNRL Christopher Tyree License Renewal Projects Branch (NLRP)/DNRL Angela Wu NLRP/DNRL Jessica Hammock NLRP/DNRL

7. Logistics

The audit will be conducted using telecommunications from October 3 - November 10, 2022.

Entrance and exit briefings will be held at the beginning and end of the audit.

8. Deliverables

An audit report should be issued to the licensee within 90 days from the end of the audit.