ML22342B260: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:EXAM ASSIGNMENT TICKLER Chief:            Clyde Osterholtz                            Facility:        GG              Date of Written Exam:                10/17/2022 U/I:                                                  Start of Op Test: 10/10/2022                        End of Op Test:            10/15/2022 Written Exam Developed By:            NRC    /  Facility                      Operating Test Developed By:          NRC    /  Facility Due Date                                Description                            Date Complete  Initials                          Notes For NRC prepared exams, arrangements made 2/7/2022  Examination administration date confirmed                            12/8/2021    cco      for the facility to submit reference materials 3/14/2022  NRC examiners and facility contact assigned                          12/8/2022    cco 3/14/2022  Facility contact briefed on security and other requirements          12/8/2022    cco 3/14/2022  Reference material due for NRC prepared exams                        N/A                    ES-201 Att-3 3/14/2022  Corporate Notification Letter sent                                  12/8/2022    cco      ES-201 Att-4 produced by CE 3/28/2022  NRC developed written examination outline sent to facility contact  12/8/2022    cco      ES-401-1/2 and ES-401-3 5/9/2022  Operating test outline(s) and other checklists due                  5/6/2022      cco      ES-201-2, 201-3, 301-1, 301-2, 301-5, D-1 Operating test outline(s) reviewed by NRC and feedback 5/23/2022 provided to facility licensee                                        5/19/2022    cco      ES-201-2 signed by CE & BC Proposed exams, outlines, supporting documentation, and                                      Exams prepared by the NRC are approved by 7/25/2022 reference materials due.                                            7/7/2022      cco      BC and forwarded for facility licensee review 8/1/2022  Peer review of written exam complete                                N/A          cco      Document review on ES-401-9 8/22/2022  Written exam and operating test reviews completed                    8/19/2022    cco      Document review on ES-401-9 9/5/2022  Feedback approved by Branch Chief                                    9/5/2022      cco Examination review results discussed between NRC and facility 9/5/2022 licensee                                                            9/5/2022      cco 9/12/2022  Preliminary license applications & waiver/excusal requests due      9/12/2022    cco      NRC Forms 398/396 9/12/2022  On-site validation & 10% audit of license applications              9/12/2022    cco 9/19/2022  Preliminary license applications and waivers reviewed                9/12/2022    cco 9/26/2022  Final license applications & waiver/excusal requests due            9/26/2022    cco      ES-201-4 prepared by LA 10/3/2022  Written exams and operating tests approved by Branch Chief          9/29/2022    cco 10/3/2022  Request facility licensee management feedback on the exam            9/29/2022    cco Final applications reviewed and audited; exam approval and                                  LA produces / BC signs Exam Approval Letter 10/3/2022 waiver/excusal letters sent                                          9/30/2022    cco      (ES-201 Att-5)
{{#Wiki_filter:EXAM ASSIGNMENT TICKLER
Proctoring/written exam administration guidelines reviewed with 10/3/2022 facility licensee                                                    9/30/2022    cco 10/3/2022  Approved scenarios and JPMs distributed to examiners                9/30/2022    cco 10/10/2022  Administer Operating Test                                            10/10/2022    cco 10/22/2022  Examiner's document op test results on ES 303's                      11/7/2022    cco 11/6/2022  Post exam comments and graded exams received                        11/7/2022    cco      ES-403-1 to BC Post exam written comments reviewed and incorporated and 11/14/2022 NRC grading completed                                                11/7/2022    cco Post exam operating test comments reviewed and ES-303-1 11/14/2022 updated                                                              11/7/2022    cco Chief examiner review of operating test and/or written exam 11/21/2022 grading completed                                                    11/8/2022    cco      Signed ES 303's to BC 11/28/2022  Branch Chief review of exam results completed                        12/6/2022    cco 12/5/2022  Waivers/deferrals reviewed for impact on licensing decision          12/6/2022    cco 12/5/2022  License/Proposed Denial letters mailed; Facility notified of results 12/6/2022    cco 12/5/2022  RPS/IP number of examinees updated                                  12/6/2022    cco      print Report-21 12/26/2022  Final Denial Letters mailed (if no request for informal review)      N/A                    21 days after proposed denial letters mailed.
1/2/2023  Examination Report Issued                                            by 1/5/2023  cco      produced by CE 1/9/2023  Ref Mat'l Returned after Final Resolution of Appeals                N/A 2/6/2023  SUNSI checklist complete and exam docs to ADAMS                      N/A                    SUNSI checklist to LA Replaces NUREG-1021, Revision 11, Forms ES-201-1 and ES-501-1 Rev. 9


password es1021 Y
Chief: Clyde Osterholtz Facility: GG 10/17/2022Date of Written Exam:
Y Y
U/I: Start of Op Test: 10/10/2022 10/15/2022End of Op Test:
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Clyde C. Osterholtz/ 5/18/2022 Clyde C. Osterholtz/   5/18/2022 Heather J. Gepford    5/19/22


Form 2.3-4 Written Examination Quality Checklist Facility: Grand Gulf Nuclear Station           Date of Exam: October 17, 2022 Exam Level:       RO       SRO (Y)es / (N)o Item Description a     b*   c#
Written Exam Developed By: NRC / Facility Operating Test Developed By: NRC / Facility Due Date Description Date Complete Initials Notes
: 1. Questions and answers are technically accurate and applicable to the facility. Each question includes a technical reference.                                                                         y i          y
 
: 2. a. All questions reference NRG knowledge and abilities(KIAs) requirements.
2/7/2022 12/8/2021 ccoExamination administration date confirmed For NRC prepared exams, arrangements made for the facility to submit reference materials
: b. Facility learning objectives are referenced as available.
 
: c. All questions include an explanation of the correct answer explanation and a distractor analvsis.
3/14/2022 12/8/2022 ccoNRC examiners and facility contact assigned
y y          y
 
: 3. Senior reactor operator(SRO) questions test at the SRO license level.
3/14/2022 12/8/2022 ccoFacility contact briefed on security and other requirements
: 4. The sampling process was random and systematic. (If more than four reactor operator(RO) or two SRO questions were repeated from the last two NRG licensing exams, including full (100-question) retake examinations, consult the NRG Office of Nuclear Reactor Regulation               'I    1      y operator licensinq program office.)
 
: 5. Question duplication from the licensee screening/audit exam was controlled as indicated below (check the item that applies) and appears appropriate:
3/14/2022 N/AReference material due for NRC prepared exams ES-201 Att-3 3/14/2022 12/8/2022 ccoCorporate Notification Letter sent ES-201 Att-4 produced by CE
y y
 
_ The audit exam was systematically and randomly developed.
3/28/2022 12/8/2022 ccoNRC developed written examination outline sent to facility contact ES-401-1/2 and ES-401-3
_ The audit exam was completed before the license exam was started.                                           y
 
_ The examinations were developed independently.
5/9/2022 5/6/2022 ccoOperating test outline(s) and other checklists due ES-201-2, 201-3, 301-1, 301-2, 301-5, D-1 5/23/2022 5/19/2022 ccoOperating test outline(s) reviewed by NRC and feedback ES-201-2 signed by CE & BC provided to facility licensee 7/25/2022 7/7/2022 ccoProposed exams, outlines, supporting documentation, and Exams prepared by the NRC are approved by reference materials due. BC and forwarded for facility licensee review 8/1/2022 N/A ccoPeer review of written exam complete Document review on ES-401-9
 
8/22/2022 8/19/2022 ccoWritten exam and operating test reviews completedDocument review on ES-401-9
 
9/5/2022 9/5/2022 ccoFeedback approved by Branch Chief 9/5/2022 9/5/2022 ccoExamination review results discussed between NRC and facility licensee 9/12/2022 9/12/2022 ccoPreliminary license applications & waiver/excusal requests due NRC Forms 398/396
 
9/12/2022 9/12/2022 ccoOn-site validation & 10% audit of license applications
 
9/19/2022 9/12/2022 ccoPreliminary license applications and waivers reviewed
 
9/26/2022 9/26/2022 ccoFinal license applications & waiver/excusal requests due ES-201-4 prepared by LA 10/3/2022 9/29/2022 ccoWritten exams and operating tests approved by Branch Chief
 
10/3/2022 9/29/2022 ccoRequest facility licensee management feedback on the exam 10/3/2022 9/30/2022 ccoFinal applications reviewed and audited; exam approval and LA produces / BC signs Exam Approval Letter waiver/excusal letters sent (ES-201 Att-5) 10/3/2022 9/30/2022 ccoProctoring/written exam administration guidelines reviewed with facility licensee 10/3/2022 9/30/2022 ccoApproved scenarios and JPMs distributed to examiners 10/10/2022 10/10/2022 ccoAdminister Operating Test
 
10/22/2022 11/7/2022 ccoExaminer's document op test results on ES 303's
 
11/6/2022 11/7/2022 ccoPost exam comments and graded exams received ES-403-1 to BC 11/14/2022 11/7/2022 ccoPost exam written comments reviewed and incorporated and NRC grading completed 11/14/2022 11/7/2022 ccoPost exam operating test comments reviewed and ES-303-1 updated 11/21/2022 11/8/2022 ccoChief examiner review of operating test and/or written exam Signed ES 303's to BC grading completed 11/28/2022 12/6/2022 ccoBranch Chief review of exam results completed
 
12/5/2022 12/6/2022 ccoWaivers/deferrals reviewed for impact on licensing decision
 
12/5/2022 12/6/2022 ccoLicense/Proposed Denial letters mailed; Facility notified of results 12/5/2022 12/6/2022 ccoRPS/IP number of examinees updated print Report-21
 
12/26/2022 N/AFinal Denial Letters mailed (if no request for informal review)21 days after proposed denial letters mailed.
 
1/2/2023 by 1/5/2023 ccoExamination Report Issuedproduced by CE
 
1/9/2023 N/ARef Mat'l Returned after Final Resolution of Appeals
 
2/6/2023 N/ASUNSI checklist complete and exam docs to ADAMS SUNSI checklist to LA
 
Replaces NUREG-1021, Revision 11, Forms ES-201-1 and ES-501-1
 
Rev. 9 password es1021
 
Form 2.3-4 Written Examination Quality Checklist Facility: Grand Gulf Nuclear Station Date of Exam: October 17, 2022 Exam Level: RO SRO Item Description (Y)es / (N)o a b* c#
: 1. Questions and answers are technically accurate and applicable to the facility. Each questiony i includes a technical reference.
: 2. a. All questions reference NRG knowledge and abilities (KIAs) requirements.y b. Facility learning objectives are referenced as available. y c. All questions include an explanation of the correct answer explanation and a distractor analvsis.
: 3. Senior reactor operator (SRO) questions test at the SRO license level.
4.The sampling process was random and systematic. (If more than four reactor operator (RO) or two SRO questions were repeated from the last two NRG licensing exams, including full 'I 1 (100-question) retake examinations, consult the NRG Office of Nuclear Reactor Regulation operator licensinq program office.)
5.Question duplication from the licensee screening/audit exam was controlled as indicated below (check the item that applies) and appears appropriate:
_ The audit exam was systematically and randomly developed. y _ The audit exam was completed before the license exam was started.y _ The examinations were developed independently.
{._ The licensee certifies that there is no duplication.
{._ The licensee certifies that there is no duplication.
Other (explain):
Other (explain):
Bank    Modified    New Bank use meets limits(no more than 75% from the bank, at least v
: 6. Bank use meets limits (no more than 75% from the bank, at least Bank Modified New 10% new (at the comprehension/analysis level), and the rest new 51v or modified); enter the actual RO/SRO-only question distribution >23/30. 6% y1 / 1.3% 68%
6.
: 7. Between 38 and 45 questions of the questions on the RO examMemory C/A and at least 13 of the questions on the SRO-only portion of the exam are written at the comprehension/analysis level; enter the33/ 44% 42/ 56%y y actual RO/SRO-only question distribution >
10% new(at the comprehension/analysis level), and the rest new                                   51 7.
8.References/handouts provided do not give away answers or aid in the elimination of distractors.'{ 'I
or modified); enter the actual RO/SRO-only question distribution >
: 9. Question content conforms to specific KIA statements in the previously approved examinationV y outline and is appropriate for the KIA statements' assiqned tier; deviations are justified.
Between 38 and 45 questions of the questions on the RO exam 23/30.6%
: 10. Question psychometric quality and format meet the instructions and guidelines in ES-4.2. '/ 'I 11.The exam contains the required number of one-point, multiple-choice items; the total is correcty 'I and agrees with the value on the cover sheet.
1/ 1.3%     68%
R..j Printed Name/t:;;;,,ure Date c,/p- /
y      y Memory          C/A and at least 13 of the questions on the SRO-only portion of the exam are written at the comprehension/analysis level; enter the actual RO/SRO-only question distribution >                                   33/ 44%        42/ 56%
z,2-a.Author le_ P..P,,o S /.LIL I) b.Facility Reviewer (*) *-1:*,.,,", W 1ta!,*AI lv '1/1.1/l 1.,
y y        y
c.NRG Reviewer(#)
: 8. References/handouts provided do not give away answers or aid in the elimination of distractors.
NRG Chief Examiner NRG Regional Supervisor
                                                                                                            '{     'I   y
* The facility licensee signature is not applicable for NRG-developed tests.  
: 9. Question content conforms to specific KIA statements in the previously approved examination outline and is appropriate for the KIA statements' assiqned tier; deviations are justified.           V y          y
: 10. Question psychometric quality and format meet the instructions and guidelines in ES-4.2.
                                                                                                              '/ 'I         y
: 11. The exam contains the required number of one-point, multiple-choice items; the total is correct and agrees with the value on the cover sheet.
Printed Name/       ure y
Date
                                                                                                                    'I      y t:;;;,,
R..j
                                                                                                                  /p-/
: a. Author                             le_ P..P,,oS /                         .LIL   I)                     c,      z,2-
: b. Facility Reviewer(*)         -1:*,.,,",,
* W 1ta!,*AI     lv                                           '1/1.1/l 1.
: c. NRG Reviewer(#)                 Clyde Osterholtz                                                            9/28/2022 NRG Chief Examiner Clyde Osterholtz                                                          9/28/2022 NRG Regional Supervisor               Heather Gepford                                                            9/30/22
* The facility licensee signature is not applicable for NRG-developed tests.
# An independent NRG reviewer performs steps in column c. This may be the NRG Chief Examiner if he/she did not develop the written examination under review.
# An independent NRG reviewer performs steps in column c. This may be the NRG Chief Examiner if he/she did not develop the written examination under review.
y y
y y
y y
y y
Line 75: Line 91:
y y
y y
y y
y y
y Clyde Osterholtz 9/28/2022 Clyde Osterholtz 9/28/2022 Heather Gepford 9/30/22
Clyde Osterholtz Clyde Osterholtz 9/28/2022 9/28/2022 Heather Gepford 9/30/22


Form 2.3-2 Operating Test Quality Checklist
Form 2.3-2 Operating Test Quality Checklist
: a. Each job performance measure (JPM) includes the following, as applicable:
: a. Each job performance measure (JPM) includes the following, as applicable:
* task standard
* task standard* initial conditions* initiating cues* references and tools, including associated procedures* reasonable and validated time limits (average time allowed for completion) and specific designation if the facility licensee deems it to be time criticali 1* alternate path JPMs are labeled as "alternate path"* operationally important specific performance criteria that include the following:
* initial conditions
- detailed expected actions with exact criteria and nomenclature-system response and other examiner cues-statements describing important observations to be made by the applicant-criteria for successful completion of the JPM task standard - identification of critical steps and their associated performance standards - restrictions on the sequence of steps, if aoolicable
* initiating cues
: b. Ensure that any changes from the previously approved JPM outlines (Forms 3.2-1 and 3.2-2)y have not caused the test to deviate from any of the acceptance criteria (e.g., itemy distribution, bank use, repetition from the last two NRC examinations) specified on those forms.
* references and tools, including associated procedures i1 reasonable and validated time limits (average time allowed for completion) and specific designation if the facility licensee deems it to be time critical
Simulator Scenario Set Criteria for Scenario Numbers: 1 / 2 / 3 QUALITATIVE ATTRIBUTES
* alternate path JPMs are labeled as "alternate path"                                                     y
: 1. The initial conditions are realistic in that some equipment and/or instrumentation may be y 1out of service, but it does not cue the operators into expected events.
* operationally important specific performance criteria that include the following:
: 2. The scenarios consist mostly of related events. '( '/
      -     detailed expected actions with exact criteria and nomenclature
      -     system response and other examiner cues
      -     statements describing important observations to be made by the applicant
      -     criteria for successful completion of the JPM task standard identification of critical steps and their associated performance standards
      -     restrictions on the sequence of steps, if aoolicable
: b. Ensure that any changes from the previously approved JPM outlines (Forms 3.2-1 and 3.2-2) have not caused the test to deviate from any of the acceptance criteria (e.g., item distribution, bank use, repetition from the last two NRC examinations) specified on those forms.
yy            y Simulator Scenario Set Criteria for Scenario Numbers: 1 / 2 / 3 QUALITATIVE ATTRIBUTES
: 1. The initial conditions are realistic in that some equipment and/or instrumentation may be out of service, but it does not cue the operators into expected events.                   y 1          y
: 2. The scenarios consist mostly of related events.                                           '( '/         y
: 3. Each event description consists of the following:
: 3. Each event description consists of the following:
f 1 the point in the scenario when it is to be initiated
* the point in the scenario when it is to be initiatedf 1* the malfunction(s) or conditions that are entered to initiate the event* the symptoms/cues that will be visible to the crew* the expected operator actions (by shift position)* the event termination point (if applicable)
* the malfunction(s) or conditions that are entered to initiate the event                           y
QUALITATIVE ATTRIBUTES (continued) a (Y)es / (N)o b* c#
* the symptoms/cues that will be visible to the crew
: 4. The events are valid with regard to physics and thermodynamics. y '/
* the expected operator actions (by shift position)
: 5. The sequencing and timing of events is reasonable and allows the examination team toy y observe and evaluate applicant performance.
* the event termination point (if applicable)
(Y)es / (N)o QUALITATIVE ATTRIBUTES (continued) a    b*   c#
: 4. The events are valid with regard to physics and thermodynamics.                           y '/         y
: 5. The sequencing and timing of events is reasonable and allows the examination team to observe and evaluate applicant performance.                                               y y          y
: 6. If time compression techniques are used, the scenario summary clearly so indicates.
: 6. If time compression techniques are used, the scenario summary clearly so indicates.
Operators have sufficient time to carry out expected activities without undue time constraints. Cues are given.
f Operators have sufficient time to carry out expected activities without undue timey constraints. Cues are given.
f y          y
: 7. The simulator modeling is not altered. '-I y
: 7. The simulator modeling is not altered.                                                   '-I y        y
: 8. The scenarios have been validated. Pursuant to 10 CFR 55.46(d}, any open simulatoryperformance deficiencies or deviations from the referenced plant have been evaluated to ensure that functional fidelity is maintained while running the planned scenarios.
: 8. The scenarios have been validated. Pursuant to 10 CFR 55.46(d}, any open simulator performance deficiencies or deviations from the referenced plant have been evaluated to   y          y ensure that functional fidelity is maintained while running the planned scenarios.
: 9. Scenarios are new or significantly modified in accordance with ES-3.4. '( y y
: 9. Scenarios are new or significantly modified in accordance with ES-3.4.                   '(   y     y
y y
 
y y
y y
y y
y y
y y
y y
y y
y y
y Clyde Osterholtz 9/29/2022 Clyde Osterholtz  9/29/2022 Heather Gepford  9/30/22


Form 3.4-1 Events and Evolutions Checklist Facility: GRAND GULF NUCLEAR         Date of Exam: 10/10/2022   Operating Test No.:GGNS-2022 E                                     Scenarios A           V                                                                         M P           E                                                                         I P           N         1             2                 3           4           T     N L         T                                                                   O     I I                                                                             T     M C           T       POSITION     POSITION         POSITION     POSITION       A U
Form 3.4-1 Events and Evolutions Checklist
A           Y                                                                   L S     A   B S   A     B     S     A     B S   A     B           M*
 
N           P     R     T   O R   T     O     R     T     O R   T     O T         E     O     C   P O   C     P     O     C     P O   C     P RO   I U RO         RX                                             1                       1   1   1 0 NOR                 1                         1                       2   1   1 1 SRO-I I/C                 3                         3                       6   4   4 2 SRO-U     MAJ                 2                         1                       3   2   2 1 Man. Ctrl            2                         1                       3   1   1 0 TS                                                                           0   2 2 RX             1                                                       1   1   1 0 RO         NOR             1                                   1                 2   1   1 1 SRO-I     I/C             3                                   3                 6   4   4 2 MAJ             2                                   1                 3   2   2 1 SRO-U Man. Ctrl      1                                   2                 3   1   1 0 TS                                                                           0   2 2 RO         RX       1                                   1                       2   1   1 0 NOR       2                                   1                       3   1   1 1 SRO-I I/C       6                                   3                       9   4   4 2 SRO-U     MAJ       2                                   1                       3   2   2 1 Man. Ctrl 3                                   1                       4   1   1 0 TS       2                                                             2   0   2 2 RO         RX       1                                                             1   1   1 0 NOR       2                                         1                 3   1   1 1 SRO-I I/C       6                                         3                 9   4   4 2 SRO-U     MAJ       2                                         1                 3   2   2 1 Man. Ctrl 3                                         2                 5   1   1 0 TS       2                                                             2   0   2 2 RO         RX       1                                                             1   1   1 0 NOR       2                                                             2   1   1 1 SRO-I I/C       6                                                             6   4   4 2 SRO-U     MAJ       2                                                             2   2   2 1 Man. Ctrl 3                                                             3   1   1 0 TS       2                                                             2   0   2 2
Facility: GRAND GULF NUCLEAR Date of Exam: 10/10/2022 Operating Test No.:GGNS-2022 E Scenarios A V M P E I P N 1 2 3 4 T N L T O I I T M C T POSITION POSITION POSITION POSITION A U A Y S A B S A B S A B S A B L M*
N P R T O R T O R T O R T O T E O C P O C P O C P O C P RO I U RO RX 1 1 1 1 0
 
NOR 1 1 2 1 1 1 SRO-I I/C 3 3 6 4 4 2
 
SRO-U MAJ 2 1 3 2 2 1
 
Man. C trl 2 1 3 1 1 0
 
TS 0 2 2
 
RX 1 1 1 1 0 RO NOR 1 1 2 1 1 1
 
SRO -I I/C 3 3 6 4 4 2
 
MAJ 2 1 3 2 2 1 SRO -U Man. C trl 1 2 3 1 1 0
 
TS 0 2 2 RO RX 1 1 2 1 1 0
 
NOR 2 1 3 1 1 1 SRO -I I/C 6 3 9 4 4 2
 
SRO -U MAJ 2 1 3 2 2 1 Man. C trl 3 1 4 1 1 0
 
TS 2 2 0 2 2
 
RO RX 1 1 1 1 0
 
NOR 2 1 3 1 1 1 SRO -I I/C 6 3 9 4 4 2
 
SRO -U MAJ 2 1 3 2 2 1 Man. C trl 3 2 5 1 1 0
 
TS 2 2 0 2 2
 
RO RX 1 1 1 1 0
 
NOR 2 2 1 1 1 SRO -I I/C 6 6 4 4 2
 
SRO -U MAJ 2 2 2 2 1
 
Man. C trl 3 3 1 1 0
 
TS 2 2 0 2 2
 
Form 3.4-1 Events and Evolutions Checklist
 
Facility: GRAND GULF NUCLEAR Date of Exam: 10/10/2022 Operating Test No.:GGNS-2022 E Scenarios A V M P E I P N 1 2 3 4 T N L T O I I T M C T POSITION POSITION POSITION POSITION A U A Y S A B S A B S A B S A B L M*
N P R T O R T O R T O R T O T E O C P O C P O C P O C P RO I U RO RX 1 1 1 1 0
 
NOR 1 2 3 1 1 1 SRO-I I/C 3 6 9 4 4 2
 
SRO-U MAJ 2 1 3 2 2 1 Man. Ctrl 2 3 5 1 1 0
 
TS 2 2 0 2 2
 
RX 1 1 2 1 1 0 RO NOR 1 2 3 1 1 1
 
SRO -I I/C 3 6 9 4 4 2
 
MAJ 2 1 3 2 2 1 SRO -U Man. Ctrl 1 3 4 1 1 0 TS 2 2 0 2 2
 
IP 21 Operator Licensing Exam Schedule
 
From 01/01/2022 to 12/31/2022
 
Phase Code: 2 - Construction, 5 - Operational
 
Region: 4
 
# Candidates Exam Site / Docket # / Insp Rpt # RO LSRO SROI SROU Type Exam Author Chief Examiner Examiners Assigned Week 09/11/2022 Grand Gulf / 05000416 / 2022301 FB-OR-Osterholtz, Clyde Hernandez,Nick CAC #: 000956 ONSITE Kirkland,John VALIDATI Murphy,Kevin ON OF Osterholtz,Clyde INITIAL You,David LICENSE EXAMIN ATION (OV) 10/09/2022 Grand Gulf / 05000416 / 2022301 4 0 7 1 FB-OR-NFF Osterholtz, Clyde Hernandez,Nick CAC #: 000500 INITIAL Kirkland,John LICENSE Murphy,Kevin EXAM Osterholtz,Clyde ADMINIS You,David TRATION (EXAD)
 
Sites: GG
 
Orgs: ALL
 
Exam Author: ALL
 
Activity Codes: EXAD, NEXAD, NOV, OV
 
11/16/2022 1:14:50 PM Page 1 of 4 IP 21 Operator Licensing Exam Schedule
 
From 01/01/2022 to 12/31/2022
 
Phase Code: 2 - Construction, 5 - Operational
 
Region: 4
 
Summary by Date RO SROI SROU LSRO Total 10/2022 4 7 1 0 12
 
Sites: GG
 
Orgs: ALL
 
Exam Author: ALL
 
Activity Codes: EXAD, NEXAD, NOV, OV
 
11/16/2022 1:14:50 PM Page 2 of 4 IP 21 Operator Licensing Exam Schedule
 
From 01/01/2022 to 12/31/2022
 
Phase Code: 2 - Construction, 5 - Operational
 
Region: 4
 
Summary by Site RO SROI SROU LSRO Total Grand Gulf 4 7 1 0 12
 
Sites: GG
 
Orgs: ALL
 
Exam Author: ALL
 
Activity Codes: EXAD, NEXAD, NOV, OV
 
11/16/2022 1:14:50 PM Page 3 of 4 IP 21 Operator Licensing Exam Schedule
 
From 01/01/2022 to 12/31/2022
 
Phase Code: 2 - Construction, 5 - Operational
 
Region: 4
 
Summary by Region RO SROI SROU LSRO Total Region 4 4 7 1 0 12


Form 3.4-1 Events and Evolutions Checklist Facility: GRAND GULF NUCLEAR        Date of Exam: 10/10/2022    Operating Test No.:GGNS-2022 E                                    Scenarios A          V                                                                        M P          E                                                                        I P          N        1            2                3            4          T      N L          T                                                                  O      I I                                                                            T      M C          T      POSITION    POSITION          POSITION      POSITION      A U
Sites: GG
A          Y                                                                  L S    A    B S    A      B    S    A    B S    A      B          M*
N          P    R    T    O R    T      O    R    T    O R    T    O T          E    O    C    P O    C      P    O    C    P O    C      P RO  I U RO        RX                                      1                              1    1  1 0 NOR                1                  2                              3    1  1 1 SRO-I I/C                3                  6                              9    4  4 2 SRO-U      MAJ                2                  1                              3    2  2 1 Man. Ctrl          2                  3                              5    1  1 0 TS                                      2                              2    0  2 2 RX            1                        1                              2    1  1 0 RO        NOR            1                        2                              3    1  1 1 SRO-I      I/C            3                        6                              9    4  4 2 MAJ            2                        1                              3    2  2 1 SRO-U Man. Ctrl      1                        3                              4    1  1 0 TS                                      2                              2    0  2 2


IP 21 Operator Licensing Exam Schedule From 01/01/2022 to 12/31/2022 Phase Code: 2 - Construction, 5 - Operational Region: 4
Orgs: ALL
                                                          # Candidates Exam          Site / Docket # / Insp Rpt #            RO LSRO SROI SROU    Type  Exam Author Chief Examiner    Examiners Assigned Week 09/11/2022    Grand Gulf / 05000416 / 2022301                            FB-OR-              Osterholtz, Clyde Hernandez,Nick CAC #: 000956                                              ONSITE                                Kirkland,John VALIDATI                              Murphy,Kevin ON OF                                  Osterholtz,Clyde INITIAL                                You,David LICENSE EXAMIN ATION (OV) 10/09/2022    Grand Gulf / 05000416 / 2022301          4    0    7    1 FB-OR-      NFF    Osterholtz, Clyde Hernandez,Nick CAC #: 000500                                              INITIAL                                Kirkland,John LICENSE                                Murphy,Kevin EXAM                                  Osterholtz,Clyde ADMINIS                                You,David TRATION (EXAD)
Sites: GG Orgs: ALL Exam Author: ALL Activity Codes: EXAD, NEXAD, NOV, OV 11/16/2022 1:14:50 PM                                                                                                            Page 1 of 4


IP 21 Operator Licensing Exam Schedule From 01/01/2022 to 12/31/2022 Phase Code: 2 - Construction, 5 - Operational Region: 4 Summary by Date                                  RO  SROI SROU LSRO  Total 10/2022                                            4    7    1    0    12 Sites: GG Orgs: ALL Exam Author: ALL Activity Codes: EXAD, NEXAD, NOV, OV 11/16/2022 1:14:50 PM                                                                  Page 2 of 4
Exam Author: ALL


IP 21 Operator Licensing Exam Schedule From 01/01/2022 to 12/31/2022 Phase Code: 2 - Construction, 5 - Operational Region: 4 Summary by Site                                  RO  SROI SROU LSRO  Total Grand Gulf                                          4    7    1    0    12 Sites: GG Orgs: ALL Exam Author: ALL Activity Codes: EXAD, NEXAD, NOV, OV 11/16/2022 1:14:50 PM                                                                  Page 3 of 4
Activity Codes: EXAD, NEXAD, NOV, OV


IP 21 Operator Licensing Exam Schedule From 01/01/2022 to 12/31/2022 Phase Code: 2 - Construction, 5 - Operational Region: 4 Summary by Region                                RO  SROI SROU LSRO  Total Region 4                                            4    7    1    0    12 Sites: GG Orgs: ALL Exam Author: ALL Activity Codes: EXAD, NEXAD, NOV, OV 11/16/2022 1:14:50 PM                                                                 Page 4 of 4}}
11/16/2022 1:14:50 PM Page 4 of 4}}

Revision as of 15:33, 15 November 2024

10 Public Forms
ML22342B260
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 10/14/2022
From: Heather Gepford
Operations Branch IV
To:
Entergy Operations
References
Download: ML22342B260 (1)


Text

EXAM ASSIGNMENT TICKLER

Chief: Clyde Osterholtz Facility: GG 10/17/2022Date of Written Exam:

U/I: Start of Op Test: 10/10/2022 10/15/2022End of Op Test:

Written Exam Developed By: NRC / Facility Operating Test Developed By: NRC / Facility Due Date Description Date Complete Initials Notes

2/7/2022 12/8/2021 ccoExamination administration date confirmed For NRC prepared exams, arrangements made for the facility to submit reference materials

3/14/2022 12/8/2022 ccoNRC examiners and facility contact assigned

3/14/2022 12/8/2022 ccoFacility contact briefed on security and other requirements

3/14/2022 N/AReference material due for NRC prepared exams ES-201 Att-3 3/14/2022 12/8/2022 ccoCorporate Notification Letter sent ES-201 Att-4 produced by CE

3/28/2022 12/8/2022 ccoNRC developed written examination outline sent to facility contact ES-401-1/2 and ES-401-3

5/9/2022 5/6/2022 ccoOperating test outline(s) and other checklists due ES-201-2, 201-3, 301-1, 301-2, 301-5, D-1 5/23/2022 5/19/2022 ccoOperating test outline(s) reviewed by NRC and feedback ES-201-2 signed by CE & BC provided to facility licensee 7/25/2022 7/7/2022 ccoProposed exams, outlines, supporting documentation, and Exams prepared by the NRC are approved by reference materials due. BC and forwarded for facility licensee review 8/1/2022 N/A ccoPeer review of written exam complete Document review on ES-401-9

8/22/2022 8/19/2022 ccoWritten exam and operating test reviews completedDocument review on ES-401-9

9/5/2022 9/5/2022 ccoFeedback approved by Branch Chief 9/5/2022 9/5/2022 ccoExamination review results discussed between NRC and facility licensee 9/12/2022 9/12/2022 ccoPreliminary license applications & waiver/excusal requests due NRC Forms 398/396

9/12/2022 9/12/2022 ccoOn-site validation & 10% audit of license applications

9/19/2022 9/12/2022 ccoPreliminary license applications and waivers reviewed

9/26/2022 9/26/2022 ccoFinal license applications & waiver/excusal requests due ES-201-4 prepared by LA 10/3/2022 9/29/2022 ccoWritten exams and operating tests approved by Branch Chief

10/3/2022 9/29/2022 ccoRequest facility licensee management feedback on the exam 10/3/2022 9/30/2022 ccoFinal applications reviewed and audited; exam approval and LA produces / BC signs Exam Approval Letter waiver/excusal letters sent (ES-201 Att-5) 10/3/2022 9/30/2022 ccoProctoring/written exam administration guidelines reviewed with facility licensee 10/3/2022 9/30/2022 ccoApproved scenarios and JPMs distributed to examiners 10/10/2022 10/10/2022 ccoAdminister Operating Test

10/22/2022 11/7/2022 ccoExaminer's document op test results on ES 303's

11/6/2022 11/7/2022 ccoPost exam comments and graded exams received ES-403-1 to BC 11/14/2022 11/7/2022 ccoPost exam written comments reviewed and incorporated and NRC grading completed 11/14/2022 11/7/2022 ccoPost exam operating test comments reviewed and ES-303-1 updated 11/21/2022 11/8/2022 ccoChief examiner review of operating test and/or written exam Signed ES 303's to BC grading completed 11/28/2022 12/6/2022 ccoBranch Chief review of exam results completed

12/5/2022 12/6/2022 ccoWaivers/deferrals reviewed for impact on licensing decision

12/5/2022 12/6/2022 ccoLicense/Proposed Denial letters mailed; Facility notified of results 12/5/2022 12/6/2022 ccoRPS/IP number of examinees updated print Report-21

12/26/2022 N/AFinal Denial Letters mailed (if no request for informal review)21 days after proposed denial letters mailed.

1/2/2023 by 1/5/2023 ccoExamination Report Issuedproduced by CE

1/9/2023 N/ARef Mat'l Returned after Final Resolution of Appeals

2/6/2023 N/ASUNSI checklist complete and exam docs to ADAMS SUNSI checklist to LA

Replaces NUREG-1021, Revision 11, Forms ES-201-1 and ES-501-1

Rev. 9 password es1021

Form 2.3-4 Written Examination Quality Checklist Facility: Grand Gulf Nuclear Station Date of Exam: October 17, 2022 Exam Level: RO SRO Item Description (Y)es / (N)o a b* c#

1. Questions and answers are technically accurate and applicable to the facility. Each questiony i includes a technical reference.
2. a. All questions reference NRG knowledge and abilities (KIAs) requirements.y b. Facility learning objectives are referenced as available. y c. All questions include an explanation of the correct answer explanation and a distractor analvsis.
3. Senior reactor operator (SRO) questions test at the SRO license level.

4.The sampling process was random and systematic. (If more than four reactor operator (RO) or two SRO questions were repeated from the last two NRG licensing exams, including full 'I 1 (100-question) retake examinations, consult the NRG Office of Nuclear Reactor Regulation operator licensinq program office.)

5.Question duplication from the licensee screening/audit exam was controlled as indicated below (check the item that applies) and appears appropriate:

_ The audit exam was systematically and randomly developed. y _ The audit exam was completed before the license exam was started.y _ The examinations were developed independently.

{._ The licensee certifies that there is no duplication.

Other (explain):

6. Bank use meets limits (no more than 75% from the bank, at least Bank Modified New 10% new (at the comprehension/analysis level), and the rest new 51v or modified); enter the actual RO/SRO-only question distribution >23/30. 6% y1 / 1.3% 68%
7. Between 38 and 45 questions of the questions on the RO examMemory C/A and at least 13 of the questions on the SRO-only portion of the exam are written at the comprehension/analysis level; enter the33/ 44% 42/ 56%y y actual RO/SRO-only question distribution >

8.References/handouts provided do not give away answers or aid in the elimination of distractors.'{ 'I

9. Question content conforms to specific KIA statements in the previously approved examinationV y outline and is appropriate for the KIA statements' assiqned tier; deviations are justified.
10. Question psychometric quality and format meet the instructions and guidelines in ES-4.2. '/ 'I 11.The exam contains the required number of one-point, multiple-choice items; the total is correcty 'I and agrees with the value on the cover sheet.

R..j Printed Name/t:;;;,,ure Date c,/p- /

z,2-a.Author le_ P..P,,o S /.LIL I) b.Facility Reviewer (*) *-1:*,.,,", W 1ta!,*AI lv '1/1.1/l 1.,

c.NRG Reviewer(#)

NRG Chief Examiner NRG Regional Supervisor

  • The facility licensee signature is not applicable for NRG-developed tests.
  1. An independent NRG reviewer performs steps in column c. This may be the NRG Chief Examiner if he/she did not develop the written examination under review.

y y

y y

y y

y y

y y

Clyde Osterholtz Clyde Osterholtz 9/28/2022 9/28/2022 Heather Gepford 9/30/22

Form 2.3-2 Operating Test Quality Checklist

a. Each job performance measure (JPM) includes the following, as applicable:
  • task standard* initial conditions* initiating cues* references and tools, including associated procedures* reasonable and validated time limits (average time allowed for completion) and specific designation if the facility licensee deems it to be time criticali 1* alternate path JPMs are labeled as "alternate path"* operationally important specific performance criteria that include the following:

- detailed expected actions with exact criteria and nomenclature-system response and other examiner cues-statements describing important observations to be made by the applicant-criteria for successful completion of the JPM task standard - identification of critical steps and their associated performance standards - restrictions on the sequence of steps, if aoolicable

b. Ensure that any changes from the previously approved JPM outlines (Forms 3.2-1 and 3.2-2)y have not caused the test to deviate from any of the acceptance criteria (e.g., itemy distribution, bank use, repetition from the last two NRC examinations) specified on those forms.

Simulator Scenario Set Criteria for Scenario Numbers: 1 / 2 / 3 QUALITATIVE ATTRIBUTES

1. The initial conditions are realistic in that some equipment and/or instrumentation may be y 1out of service, but it does not cue the operators into expected events.
2. The scenarios consist mostly of related events. '( '/
3. Each event description consists of the following:
  • the point in the scenario when it is to be initiatedf 1* the malfunction(s) or conditions that are entered to initiate the event* the symptoms/cues that will be visible to the crew* the expected operator actions (by shift position)* the event termination point (if applicable)

QUALITATIVE ATTRIBUTES (continued) a (Y)es / (N)o b* c#

4. The events are valid with regard to physics and thermodynamics. y '/
5. The sequencing and timing of events is reasonable and allows the examination team toy y observe and evaluate applicant performance.
6. If time compression techniques are used, the scenario summary clearly so indicates.

f Operators have sufficient time to carry out expected activities without undue timey constraints. Cues are given.

7. The simulator modeling is not altered. '-I y
8. The scenarios have been validated. Pursuant to 10 CFR 55.46(d}, any open simulatoryperformance deficiencies or deviations from the referenced plant have been evaluated to ensure that functional fidelity is maintained while running the planned scenarios.
9. Scenarios are new or significantly modified in accordance with ES-3.4. '( y y

y y

y y

y y

y y

y y

Form 3.4-1 Events and Evolutions Checklist

Facility: GRAND GULF NUCLEAR Date of Exam: 10/10/2022 Operating Test No.:GGNS-2022 E Scenarios A V M P E I P N 1 2 3 4 T N L T O I I T M C T POSITION POSITION POSITION POSITION A U A Y S A B S A B S A B S A B L M*

N P R T O R T O R T O R T O T E O C P O C P O C P O C P RO I U RO RX 1 1 1 1 0

NOR 1 1 2 1 1 1 SRO-I I/C 3 3 6 4 4 2

SRO-U MAJ 2 1 3 2 2 1

Man. C trl 2 1 3 1 1 0

TS 0 2 2

RX 1 1 1 1 0 RO NOR 1 1 2 1 1 1

SRO -I I/C 3 3 6 4 4 2

MAJ 2 1 3 2 2 1 SRO -U Man. C trl 1 2 3 1 1 0

TS 0 2 2 RO RX 1 1 2 1 1 0

NOR 2 1 3 1 1 1 SRO -I I/C 6 3 9 4 4 2

SRO -U MAJ 2 1 3 2 2 1 Man. C trl 3 1 4 1 1 0

TS 2 2 0 2 2

RO RX 1 1 1 1 0

NOR 2 1 3 1 1 1 SRO -I I/C 6 3 9 4 4 2

SRO -U MAJ 2 1 3 2 2 1 Man. C trl 3 2 5 1 1 0

TS 2 2 0 2 2

RO RX 1 1 1 1 0

NOR 2 2 1 1 1 SRO -I I/C 6 6 4 4 2

SRO -U MAJ 2 2 2 2 1

Man. C trl 3 3 1 1 0

TS 2 2 0 2 2

Form 3.4-1 Events and Evolutions Checklist

Facility: GRAND GULF NUCLEAR Date of Exam: 10/10/2022 Operating Test No.:GGNS-2022 E Scenarios A V M P E I P N 1 2 3 4 T N L T O I I T M C T POSITION POSITION POSITION POSITION A U A Y S A B S A B S A B S A B L M*

N P R T O R T O R T O R T O T E O C P O C P O C P O C P RO I U RO RX 1 1 1 1 0

NOR 1 2 3 1 1 1 SRO-I I/C 3 6 9 4 4 2

SRO-U MAJ 2 1 3 2 2 1 Man. Ctrl 2 3 5 1 1 0

TS 2 2 0 2 2

RX 1 1 2 1 1 0 RO NOR 1 2 3 1 1 1

SRO -I I/C 3 6 9 4 4 2

MAJ 2 1 3 2 2 1 SRO -U Man. Ctrl 1 3 4 1 1 0 TS 2 2 0 2 2

IP 21 Operator Licensing Exam Schedule

From 01/01/2022 to 12/31/2022

Phase Code: 2 - Construction, 5 - Operational

Region: 4

  1. Candidates Exam Site / Docket # / Insp Rpt # RO LSRO SROI SROU Type Exam Author Chief Examiner Examiners Assigned Week 09/11/2022 Grand Gulf / 05000416 / 2022301 FB-OR-Osterholtz, Clyde Hernandez,Nick CAC #: 000956 ONSITE Kirkland,John VALIDATI Murphy,Kevin ON OF Osterholtz,Clyde INITIAL You,David LICENSE EXAMIN ATION (OV) 10/09/2022 Grand Gulf / 05000416 / 2022301 4 0 7 1 FB-OR-NFF Osterholtz, Clyde Hernandez,Nick CAC #: 000500 INITIAL Kirkland,John LICENSE Murphy,Kevin EXAM Osterholtz,Clyde ADMINIS You,David TRATION (EXAD)

Sites: GG

Orgs: ALL

Exam Author: ALL

Activity Codes: EXAD, NEXAD, NOV, OV

11/16/2022 1:14:50 PM Page 1 of 4 IP 21 Operator Licensing Exam Schedule

From 01/01/2022 to 12/31/2022

Phase Code: 2 - Construction, 5 - Operational

Region: 4

Summary by Date RO SROI SROU LSRO Total 10/2022 4 7 1 0 12

Sites: GG

Orgs: ALL

Exam Author: ALL

Activity Codes: EXAD, NEXAD, NOV, OV

11/16/2022 1:14:50 PM Page 2 of 4 IP 21 Operator Licensing Exam Schedule

From 01/01/2022 to 12/31/2022

Phase Code: 2 - Construction, 5 - Operational

Region: 4

Summary by Site RO SROI SROU LSRO Total Grand Gulf 4 7 1 0 12

Sites: GG

Orgs: ALL

Exam Author: ALL

Activity Codes: EXAD, NEXAD, NOV, OV

11/16/2022 1:14:50 PM Page 3 of 4 IP 21 Operator Licensing Exam Schedule

From 01/01/2022 to 12/31/2022

Phase Code: 2 - Construction, 5 - Operational

Region: 4

Summary by Region RO SROI SROU LSRO Total Region 4 4 7 1 0 12

Sites: GG

Orgs: ALL

Exam Author: ALL

Activity Codes: EXAD, NEXAD, NOV, OV

11/16/2022 1:14:50 PM Page 4 of 4