{{#Wiki_filter:NRC Perspective on ASME Code Preservice Inspections John Honcharik US Nuclear Regulatory Commission June 15, 2023
{{#Wiki_filter:NRC Perspective on ASME Code Preservice Inspections


Outline
John Honcharik US Nuclear Regulatory Commission
 
June 15, 2023 Outline
* Regulations
* Regulations
* Regulations and ASME Code Requirements
* Regulations and ASME Code Requirements
* Removal of PSI
* Removal of PSI
* NRC Staff Position 2
* NRC Staff Position


Regulations
2 Regulations
* The National Technology Transfer and Advancement Act of 1995, Public Law 104-113 (NTTAA), - Federal agencies use voluntary consensus standards to develop regulatory requirements while taking exception to specific portions of the standard, if those provisions are deemed to be inconsistent with applicable law
* The National Technology Transfer and Advancement Act of 1995, Public Law 104-113 (NTTAA), - Federal agencies use voluntary consensus standards to develop regulatory requirements while taking exception to specific portions of the standard, if those provisions are deemed to be inconsistent with applicable law
* ASME Code - Voluntary Consensus Standard contains requirements for the design, construction, and inspection of nuclear power plant components
* ASME Code - Voluntary Consensus Standard contains requirements for the design, construction, and inspection of nuclear power plant components
* 50.55a Rulemaking - approves or mandates the use of certain parts of editions and addenda of these ASME Codes in § 50.55a through the rulemaking process of incorporation by reference to establish regulatory requirements for the design, construction, and inspection of nuclear power plants 3
* 50.55a Rulemaking - approves or mandates the use of certain parts of editions and addenda of these ASME Codes in § 50.55a through the rulemaking process of incorporation by reference to establish regulatory requirements for the design, construction, and inspection of nuclear power plants


Regulations
3 Regulations
* 10 CFR 50.55a(g)(3)(ii) states:
* 10 CFR 50.55a(g)(3)(ii) states:
* For a boiling or pressurized water-cooled nuclear power facility, whose construction permit under this part, or design certification, ..
* For a boiling or pressurized water-cooled nuclear power facility, whose construction permit under this part, or design certification,..
that are classified as ASME BPV Code Class 1, Class 2, and Class 3 ..
that are classified as ASME BPV Code Class 1, Class 2, and Class 3..
must meet the preservice examination requirements set forth in the editions and addenda of Section III or Section XI of the ASME BPV Code incorporated by reference in paragraph (a)(1) of this section (or the optional ASME BPV Code Cases listed in NRC Regulatory Guide 1.147, as incorporated by reference in paragraph (a)(3)(ii) of this section) applied to the construction of the particular component.
must meet the preservice examination requirements set forth in the editions and addenda of Section III or Section XI of the ASME BPV Code incorporated by reference in paragraph (a)(1) of this section (or the optional ASME BPV Code Cases listed in NRC Regulatory Guide 1.147, as incorporated by reference in paragraph (a)(3)(ii) of this section) applied to the construction of the particular component.
4


Regulation and ASME Code 10 CFR 50.55a(g) Requires ASME Code Class 1, 2 and 3 components must meet the preservice examination requirements in Section III (new construction) or Section XI (repair/replacement)
4 Regulation and ASME Code 10 CFR 50.55a(g) Requires ASME Code Class 1, 2 and 3 components must meet the preservice examination requirements in Section III (new construction) or Section XI (repair/replacement)
 
ASME Boiler and Pressure Vessel (BPV) Code Section III, Division 1, Rules for Construction of Nuclear Facility Components (with conditions)
ASME Boiler and Pressure Vessel (BPV) Code Section III, Division 1, Rules for Construction of Nuclear Facility Components (with conditions)
* NCA-3252(c) (NCA-3211.19(b)(3) in 2021 Edition) - Specifies that design specifications to include all items requiring PSI to be performed in accordance with Section XI
* NCA-3252(c) (NCA-3211.19(b)(3) in 2021 Edition) - Specifies that design specifications to include all items requiring PSI to be performed in accordance with Section XI
* NB-5332, etc. -Provides acceptance criteria for preservice examination including use of Section XI acceptance criteria
* NB-5332, etc. -Provides acceptance criteria for preservice examination including use of Section XI acceptance criteria
* NB-5280, etc. - provides reporting requirements
* NB-5280, etc. - provides reporting requirements
* NB-5281 - Preservice Examination shall be completed prior to completing N-5 data report 5
* NB-5281 - Preservice Examination shall be completed prior to completing N-5 data report
 
5 Regulation and ASME Code 10 CFR 50.55a(g) Requires ASME Code Class 1, 2 and 3 components must meet the preservice examination requirements in Section III (new construction) or Section XI (repair/replacement)


Regulation and ASME Code 10 CFR 50.55a(g)  Requires ASME Code Class 1, 2 and 3 components must meet the preservice examination requirements in Section III (new construction) or Section XI (repair/replacement)
ASME BPV Code Section XI, Division 1, Rules for Inservice Inspection of Nuclear Power Plant Components (with conditions)
ASME BPV Code Section XI, Division 1, Rules for Inservice Inspection of Nuclear Power Plant Components (with conditions)
* IWx-2200 - Provides components to be examined and inspection method
* IWx-2200 - Provides components to be examined and inspection method
* IWA-4520, IWX-3112 - Provides acceptance criteria for preservice examination
* I WA -4520, IWX-3112 - Provides acceptance criteria for preservice examination
* IWA-4530 - Preservice Examination for Items subject to repair/replacement to be completed prior to return of system to service
* I WA -4530 - Preservice Examination for Items subject to repair/replacement to be completed prior to return of system to service
* IWA-6230 - Provides recording requirements 6
* I WA -6230 - Provides recording requirements


Proposed Removal Of PSI
6 Proposed Removal Of PSI
* Various ASME Code actions include:
* Various ASME Code actions include:
* R22-630 - Delete PSI requirements from Section XI
* R22-630 - Delete PSI requirements from Section XI
* R23-113
* R23-11 3
* Limiting PSI in Section XI to specific material and degradation mechanisms.
* Limiting PSI in Section XI to specific material and degradation mechanisms.
* Removing PSI acceptance criteria
* Removing PSI acceptance criteria
* Since ASME Code Section III references Section XI for certain PSI requirements, these changes may also apply to Section III 7
* Since ASME Code Section III references Section XI for certain PSI requirements, these changes may also apply to Section III


Staff Position
7 Staff Position
* Based on the regulations:
* Based on the regulations:
* PSI must be performed -
* PSI must be performed -
* When the design report requires a weld to have PSI performed, the PSI of the weld must be performed and dispositioned to satisfactorily place the weld into service.
* When the design report requires a weld to have PSI performed, the PSI of the weld must be performed and dispositioned to satisfactorily place the weld into service.
* PSI provides a baseline for the ISI while also ensuring the weld meets all applicable requirements of Section III and XI, including that no unacceptable flaws are placed into service.
* PSI provides a baseline for the ISI while also ensuring the weld meets all applicable requirements of Section III and XI, including that no unacceptable flaws are placed into service.
8


Staff Position
8 Staff Position
* Based on the regulations:
* Based on the regulations:
* Results of PSI appropriately dispositioned -
* Results of PSI appropriately dispositioned -
Line 72: Line 74:
* If flaws cannot be determined to be acceptable using above criteria, the licensee may request an alternative under 10 CFR 50.55a(z) to utilize the provisions of Section XI, IWB-3600, Analytical Evaluation of Flaws, to evaluate and disposition the flaws.
* If flaws cannot be determined to be acceptable using above criteria, the licensee may request an alternative under 10 CFR 50.55a(z) to utilize the provisions of Section XI, IWB-3600, Analytical Evaluation of Flaws, to evaluate and disposition the flaws.
* If the flaws cannot be demonstrated to be acceptable to be placed into service using the provisions of Section XI, IWB-3600, in the alternative request they must be repaired.
* If the flaws cannot be demonstrated to be acceptable to be placed into service using the provisions of Section XI, IWB-3600, in the alternative request they must be repaired.
9


Staff Position
9 Staff Position
* Based on the regulations:
* Based on the regulations:
* Results of PSI recorded -
* Results of PSI recorded -
* Documentation of the PSI results and disposition of recordable flaws shall be included in the appropriate data reports and/or forms specified by Section III or XI
* Documentation of the PSI results and disposition of recordable flaws shall be included in the appropriate data reports and/or forms specified by Section III or XI
* Preservice Examination for new construction shall be completed prior to completing N-5 data report
* Preservice Examination for new construction shall be completed prior to completing N-5 data report
* Preservice Examination for repair/replacement to be completed prior to return of system to service 10
* Preservice Examination for repair/replacement to be completed prior to return of system to service


Conclusion
10 Conclusion
* The NRC approves or mandates the use of certain parts of editions and addenda of these ASME Codes in § 50.55a through the rulemaking process of incorporation by reference which includes associated regulatory conditions.
* The NRC approves or mandates the use of certain parts of editions and addenda of these ASME Codes in § 50.55a through the rulemaking process of incorporation by reference which includes associated regulatory conditions.
* ASME Code and the regulations (§ 50.55a) provide requirements for PSI.
* ASME Code and the regulations ( § 50.55a) provide requirements for PSI.
* If necessary, conditions to ASME Code can be applied if PSI requirements are removed from the ASME Code.
* If necessary, conditions to ASME Code can be applied if PSI requirements are removed from the ASME Code.
11}}
11}}

Revision as of 20:36, 13 November 2024

24 - NRC - ASME Preservice Inspection
ML23159A178
Person / Time
Issue date: 06/15/2023
From: John Honcharik
NRC/NRR/DNRL/NPHP
To:
References
Download: ML23159A178 (1)


Text

NRC Perspective on ASME Code Preservice Inspections

John Honcharik US Nuclear Regulatory Commission

June 15, 2023 Outline

  • Regulations
  • Regulations and ASME Code Requirements
  • NRC Staff Position

2 Regulations

  • The National Technology Transfer and Advancement Act of 1995, Public Law 104-113 (NTTAA), - Federal agencies use voluntary consensus standards to develop regulatory requirements while taking exception to specific portions of the standard, if those provisions are deemed to be inconsistent with applicable law
  • ASME Code - Voluntary Consensus Standard contains requirements for the design, construction, and inspection of nuclear power plant components
  • 50.55a Rulemaking - approves or mandates the use of certain parts of editions and addenda of these ASME Codes in § 50.55a through the rulemaking process of incorporation by reference to establish regulatory requirements for the design, construction, and inspection of nuclear power plants

3 Regulations

  • For a boiling or pressurized water-cooled nuclear power facility, whose construction permit under this part, or design certification,..

that are classified as ASME BPV Code Class 1, Class 2, and Class 3..

must meet the preservice examination requirements set forth in the editions and addenda of Section III or Section XI of the ASME BPV Code incorporated by reference in paragraph (a)(1) of this section (or the optional ASME BPV Code Cases listed in NRC Regulatory Guide 1.147, as incorporated by reference in paragraph (a)(3)(ii) of this section) applied to the construction of the particular component.

4 Regulation and ASME Code 10 CFR 50.55a(g) Requires ASME Code Class 1, 2 and 3 components must meet the preservice examination requirements in Section III (new construction) or Section XI (repair/replacement)

ASME Boiler and Pressure Vessel (BPV) Code Section III, Division 1, Rules for Construction of Nuclear Facility Components (with conditions)

  • NCA-3252(c) (NCA-3211.19(b)(3) in 2021 Edition) - Specifies that design specifications to include all items requiring PSI to be performed in accordance with Section XI
  • NB-5332, etc. -Provides acceptance criteria for preservice examination including use of Section XI acceptance criteria
  • NB-5280, etc. - provides reporting requirements
  • NB-5281 - Preservice Examination shall be completed prior to completing N-5 data report

5 Regulation and ASME Code 10 CFR 50.55a(g) Requires ASME Code Class 1, 2 and 3 components must meet the preservice examination requirements in Section III (new construction) or Section XI (repair/replacement)

ASME BPV Code Section XI, Division 1, Rules for Inservice Inspection of Nuclear Power Plant Components (with conditions)

  • IWx-2200 - Provides components to be examined and inspection method
  • I WA -4520, IWX-3112 - Provides acceptance criteria for preservice examination
  • I WA -4530 - Preservice Examination for Items subject to repair/replacement to be completed prior to return of system to service
  • I WA -6230 - Provides recording requirements

6 Proposed Removal Of PSI

  • Various ASME Code actions include:
  • R22-630 - Delete PSI requirements from Section XI
  • R23-11 3
  • Limiting PSI in Section XI to specific material and degradation mechanisms.
  • Removing PSI acceptance criteria
  • Since ASME Code Section III referencesSection XI for certain PSI requirements, these changes may also apply to Section III

7 Staff Position

  • Based on the regulations:
  • PSI must be performed -
  • When the design report requires a weld to have PSI performed, the PSI of the weld must be performed and dispositioned to satisfactorily place the weld into service.
  • PSI provides a baseline for the ISI while also ensuring the weld meets all applicable requirements of Section III and XI, including that no unacceptable flaws are placed into service.

8 Staff Position

  • Based on the regulations:
  • Results of PSI appropriately dispositioned -
  • The ASME Code does not allow unacceptable flaws to be placed into service for any ASME Code class.
  • Whether the flaw was detected during a PSI, ISI or other examination, the flaw shall be dispositioned.
  • Provisions of Section III or Section XI, IWB-3500, Acceptance Standards, to evaluate such flaws and repair as necessary to meet acceptance criteria.
  • If flaws cannot be determined to be acceptable using above criteria, the licensee may request an alternative under 10 CFR 50.55a(z) to utilize the provisions of Section XI, IWB-3600, Analytical Evaluation of Flaws, to evaluate and disposition the flaws.
  • If the flaws cannot be demonstrated to be acceptable to be placed into service using the provisions of Section XI, IWB-3600, in the alternative request they must be repaired.

9 Staff Position

  • Based on the regulations:
  • Results of PSI recorded -
  • Documentation of the PSI results and disposition of recordable flaws shall be included in the appropriate data reports and/or forms specified by Section III or XI
  • Preservice Examination for new construction shall be completed prior to completing N-5 data report
  • Preservice Examination for repair/replacement to be completed prior to return of system to service

10 Conclusion

  • The NRC approves or mandates the use of certain parts of editions and addenda of these ASME Codes in § 50.55a through the rulemaking process of incorporation by reference which includes associated regulatory conditions.
  • ASME Code and the regulations ( § 50.55a) provide requirements for PSI.
  • If necessary, conditions to ASME Code can be applied if PSI requirements are removed from the ASME Code.

11