ML24026A077: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:January 25, 2024 Mr. Andrew Miller U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001
{{#Wiki_filter:January 25, 2024
 
Mr. Andrew Miller U.S. Nuclear Regulatory Commission
 
ATTN: Document Control Desk Wa  s hington      , D.C. 20555     -0001


==SUBJECT:==
==SUBJECT:==
Reply to a Notice of Violation IDAHO STATE UNIVERSITY-U.S. NUCLEAR REGULATORY COMMISSION INSPECTION REPORT NO. 05000284/2023201 AND NOTICE OF VIOLATION
Reply to a Notice of Violation IDAHO STATE UNIVERSITY                       -U.S. NUCLEAR REGULATORY COMMISSION INSPECTION REPORT NO.                                                                 05000284/2023201 AND NOTICE OF VIOLATION
 
==Dear Mr.        Miller    ,==
 
This letter is in response to                  U.S. Nuclear Regulatory Commission Inspection Report No. 05000284/2023201 and Notice of Violation.                During a U.S. Nuclear Regulatory Commission (NRC) inspection conducted                                                            from July 31,          2023 to August 3, 2023              , the NRC inspector discovered that                            two Senior Reactor Operators (SRO                              s) with active licenses did not    hav  e a biennial medical examination                          in accordance with                Title 10 of the          Code of Federal Regulations                        (10 CFR) 55.53(i)    . Nether SRO operated the reactor during the period when they were not in compliance with the biennial medical examination requirement.
The    reason for the violation was due to                            two SRO        s  not completing the biennial medical examination                                        as required by the regulations.            O  ne SRO      s previous medical examination was completed                                        on July 8, 2021, while a subsequent medical examination had not been completed by July 8,                                              2023    . T he    second SROs            previous medical examination was completed on July 19, 2021, while a subsequent medical                                              examination had not been completed by July 19, 2023                                            .
Medical exams were subseque                          nt  ly co  mpleted on          8/3/2023 and            8/17/2023 to            return the SROs              to  full compliance with the biennial medical examination requirement.
To ensure the biennial medical examinations are completed as required in the future,                                                                    the following corrective actions      have been taken              :  (1)  a ll ISU reactor personnel received training                              to emphasize the importance of complying with the regulations              ;  (2)  the ISU      R eactor      S upervisor has implemented an automatic email                                        notification program                  that will  remind reactor operators to have their medical examinations completed within the                                                                    2 -year    time frame          ; (3)  a permanent ISU reactor staff Training Coordinator was hired to keep track of all requalification training requirements            , including the biennial medical examination requirement.
 
Sincerely,
 
Mary      Lou Dunzik        -Gougar Reactor Administrator


==Dear Mr. Miller,==
(208) 569      -9915 mldg@isu.edu


This letter is in response to U.S. Nuclear Regulatory Commission Inspection Report No. 05000284/2023201 and Notice of Violation. During a U.S. Nuclear Regulatory Commission (NRC) inspection conducted from July 31, 2023 to August 3, 2023, the NRC inspector discovered that two Senior Reactor Operators (SROs) with active licenses did not have a biennial medical examination in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 55.53(i). Nether SRO operated the reactor during the period when they were not in compliance with the biennial medical examination requirement.
cc: Duane Hardesty               , Martin B      lair  , Larry Foulkrod           , Kermit Bunde
The reason for the violation was due to two SROs not completing the biennial medical examination as required by the regulations. One SROs previous medical examination was completed on July 8, 2021, while a subsequent medical examination had not been completed by July 8, 2023. The second SROs previous medical examination was completed on July 19, 2021, while a subsequent medical examination had not been completed by July 19, 2023.
Medical exams were subsequently completed on 8/3/2023 and 8/17/2023 to return the SROs to full compliance with the biennial medical examination requirement.
To ensure the biennial medical examinations are completed as required in the future, the following corrective actions have been taken: (1) all ISU reactor personnel received training to emphasize the importance of complying with the regulations; (2) the ISU Reactor Supervisor has implemented an automatic email notification program that will remind reactor operators to have their medical examinations completed within the 2-year time frame; (3) a permanent ISU reactor staff Training Coordinator was hired to keep track of all requalification training requirements, including the biennial medical examination requirement.
Sincerely, Mary Lou Dunzik-Gougar Digitally                          signed by Mary Lou Dunzik-Gougar Date: 2024.01.25 12:45:39 -07'00' Mary Lou Dunzik-Gougar Reactor Administrator (208) 569-9915 mldg@isu.edu cc: Duane Hardesty, Martin Blair, Larry Foulkrod, Kermit Bunde Department of Nuclear Engineering 921 South 8th Ave., Stop 8060 l Pocatello, ID 83209-8060 l (208) 282-2902


Department of Nuclear Engineering 921 South 8th Ave., Stop 8060 l Pocatello, ID 83209-8060 l (208) 282-2902}}
Department of Nuclear Engineering 921 South 8th Ave., Stop 8060 l Pocatello, ID 83209-8060 l (208) 282-2902 Department of Nuclear Engineering 921 South 8th Ave., Stop 8060  l  Pocatello, ID 83209-8060  l  (208) 282-2902}}

Revision as of 19:34, 3 September 2024

Idaho State University - Reply to a Notice of Violation for NRC Inspection Report 05000284/2023201
ML24026A077
Person / Time
Site: Idaho State University
Issue date: 01/25/2024
From: Dunzik-Gougar M
Idaho State University
To: Miller A
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML24026A077 (1)


Text

January 25, 2024

Mr. Andrew Miller U.S. Nuclear Regulatory Commission

ATTN: Document Control Desk Wa s hington , D.C. 20555 -0001

SUBJECT:

Reply to a Notice of Violation IDAHO STATE UNIVERSITY -U.S. NUCLEAR REGULATORY COMMISSION INSPECTION REPORT NO. 05000284/2023201 AND NOTICE OF VIOLATION

Dear Mr. Miller ,

This letter is in response to U.S. Nuclear Regulatory Commission Inspection Report No. 05000284/2023201 and Notice of Violation. During a U.S. Nuclear Regulatory Commission (NRC) inspection conducted from July 31, 2023 to August 3, 2023 , the NRC inspector discovered that two Senior Reactor Operators (SRO s) with active licenses did not hav e a biennial medical examination in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 55.53(i) . Nether SRO operated the reactor during the period when they were not in compliance with the biennial medical examination requirement.

The reason for the violation was due to two SRO s not completing the biennial medical examination as required by the regulations. O ne SRO s previous medical examination was completed on July 8, 2021, while a subsequent medical examination had not been completed by July 8, 2023 . T he second SROs previous medical examination was completed on July 19, 2021, while a subsequent medical examination had not been completed by July 19, 2023 .

Medical exams were subseque nt ly co mpleted on 8/3/2023 and 8/17/2023 to return the SROs to full compliance with the biennial medical examination requirement.

To ensure the biennial medical examinations are completed as required in the future, the following corrective actions have been taken  : (1) a ll ISU reactor personnel received training to emphasize the importance of complying with the regulations  ; (2) the ISU R eactor S upervisor has implemented an automatic email notification program that will remind reactor operators to have their medical examinations completed within the 2 -year time frame  ; (3) a permanent ISU reactor staff Training Coordinator was hired to keep track of all requalification training requirements , including the biennial medical examination requirement.

Sincerely,

Mary Lou Dunzik -Gougar Reactor Administrator

(208) 569 -9915 mldg@isu.edu

cc: Duane Hardesty , Martin B lair , Larry Foulkrod , Kermit Bunde

Department of Nuclear Engineering 921 South 8th Ave., Stop 8060 l Pocatello, ID 83209-8060 l (208) 282-2902 Department of Nuclear Engineering 921 South 8th Ave., Stop 8060 l Pocatello, ID 83209-8060 l (208) 282-2902