ML20070U933: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 2: Line 2:
| number = ML20070U933
| number = ML20070U933
| issue date = 02/04/1983
| issue date = 02/04/1983
| title = Responds to NRC 830107 Ltr Re Violations Noted in IE Insp Rept 50-293/82-29.Corrective Actions Withheld (Ref 10CFR73.21)
| title = Responds to NRC Re Violations Noted in IE Insp Rept 50-293/82-29.Corrective Actions Withheld (Ref 10CFR73.21)
| author name = Harrington W
| author name = Harrington W
| author affiliation = BOSTON EDISON CO.
| author affiliation = BOSTON EDISON CO.
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = NUDOCS 8302140090
| document report number = NUDOCS 8302140090
| title reference date = 01-07-1983
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| page count = 1
| page count = 1

Revision as of 05:20, 31 May 2023

Responds to NRC Re Violations Noted in IE Insp Rept 50-293/82-29.Corrective Actions Withheld (Ref 10CFR73.21)
ML20070U933
Person / Time
Site: Pilgrim
Issue date: 02/04/1983
From: Harrington W
BOSTON EDISON CO.
To: Starostecki R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
NUDOCS 8302140090
Download: ML20070U933 (1)


Text

,, __,.

BOSTON EpisDN COMPANY B00 BOYLETON STREET B O STO N, M AS E AC F8'J E ETTa 0 219 9 WILLIAM O. HARRINGTON u............... February 4, 1983 BECo Letter No. 83-30 =.

I Mr. Richard W. Starostecki, Director Division of Project and Resident Programs U.S. Nuclear Regulatory Commission SAFEGUARDS y e

M'a"rkAvenue King of Prussia, PA 19406 License No. DPR-35 g Docket No. 50-293 g

s

Subject:

Response to Inspection 50-293/82-29 $

Reference:

Letter from R.W. Starostecki (NRC) to W.D. Harrington (BECo) dated 3 January 7,1983 (BECO Letter 1.83.002) +'

3

Dear Sir:

y l This letter responds to five Notices of Violation contained in Appendices A and B ,,

! of the referenced letter. These Notices of Violation were identified by Messrs. 8 J. Johnson and H. Eichenholz of the NRC during a routine safety inspection con- h ducted October 19 through November 15, 1982 at the Pilgrim Nuclear Power Station. 8

'U Attachment A to this letter contains our responses to the Notices of Violation di l contained in Appendix A of the referenced letter. Attachment B to this letter e contains our responses to the riotices of Violation contained in Appendix B of 2

'+-

the referenced letter.

E In accordance with 10CFR73.21 the information contained in Attachment B is deemed  %

Safeguards Information. Therefore, Boston Edison Company requests that Appendix B h be protected against unauthorized disclosure, that it not be placed in the Public @

Document Room, and that it be distributed in accordance with 10CFR73.21(c).

E We believe the attached responses satisfactorily address your concerns. Should s you require further information regarding them, please contact us.

Very trq1y yours, Attachments Commonwealth of Massachusetts)

County of Suffolk ) $OOj Then personally appear 6.d before me W.D. Harrington, who, being duly sworn, did state that he is Senic a Vice President - Nuclear of Boston Edison Company, the h 17 7

/

applicant herein, and that he is duly authorized to execute and file the submittal contained herein in the name and on behalf of Boston Edison Company and that the statements in said submittal are true to the best of ,his knowledge and belief.

My Commission expires: 7uly ( /ffV Is AfdTIa Ahl>

Notafy Public I l

8302140090 830204 PDR ADOCK 05000293 C PDR

._. _