ML20147C551: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 2: Line 2:
| number = ML20147C551
| number = ML20147C551
| issue date = 09/07/1978
| issue date = 09/07/1978
| title = Forwards IE Inspec Repts#50-366/78-32,on 780703-07 During Which No Items of Noncompliance Were Noted
| title = Forwards IE Inspec Repts 50-366/78-32,on 780703-07 During Which No Items of Noncompliance Were Noted
| author name = Long F
| author name = Long F
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)

Revision as of 04:20, 8 August 2022

Forwards IE Inspec Repts 50-366/78-32,on 780703-07 During Which No Items of Noncompliance Were Noted
ML20147C551
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 09/07/1978
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML20147C534 List:
References
NUDOCS 7810130047
Download: ML20147C551 (2)


See also: IR 05000366/1978032

Text

._. .._ - _ - - - - _ _ _ _ -

l

() '

UNITED STATES

/g* "80u9jeg NUCLEAR REGULATORY COMMISSION i

l

'c(, e REGloN 11

(

5 e ,' i 101 M ARIETTA STREET, N.W.

f ATLANTA, GEORGI A 30303

o

Q[' ,o8

%*O4 **e SEP 7 1978 i

.

In Reply Refer To:

RII:RVL

50-366/78-32

Georgia Power Company

Atta: Mr. J. H. Miller, Jr.

Executive Vice President

270 Peachtree Street, N. W.

Atlanta, Georgia 30303

Gentlemen:

This refers to the inspection conducted by Messrs. R. Vogt-Lowell,

H. L. Whitener, and C. Julian of this office on July 3-7, 1978, of

activities authorized by NRC Operating License No. NPF-5 for the

E. I. Hatch Unit 2 facility, and to the discussion of our findings

held with M. Manry at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in

the enclosed inspection report. Within these areas, the inspection

consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspectors.

Within the scope of this inspection, no items of noncompliance were

disclosed.

Three new unresolved items resulted from this inspection and are

discussed in the enclosed report. These items will be examined during

subsequent inspections.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

Room. If this report contains any information that you (or your con-

tractor) believe to be proprietary, it is necessary that you make a

written application within 20 days to this office to withhold such

information f rom public disclosure. Any such application must include

a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary

information identified in the application is contained in a separate part

of the document. If we do not hear from you in this regard within the

specified period, the report will be placed in the Public Docu=ent Room.

7&lo/300 L/ I 7

. . . . . . . - _ _ _

.

- *

.

,

Georgia Power Company -2- SEP 7 G78

Should you have any questions concerning this letter, we will be glad

to discuss daem with you.

Sincerely,  ;

-_ s~fs0 '

ti __ ' '73 y

F . J . Long , Chie'f

Reactor Operations and

Nuclear Support Branch

Enclosure:

Inspection Report No. 50-366/78-32 )

cc: H. Hanry, Plant Manager

Plant E. I. Hatch

P. O. Box 442

Baxley, Georgia 31513

C. E. Belflower

Site QA Supervisor

'

Plant E. I. Batch

P. O. Box 442 '

!

Baxley, Georgia 31513 l

l

I

l

!

l

l

l

l

l

- . - _ _ _ . . _ _ _ . _ - . _ _ - _ . . _ - . . _ .. . _ _ . _ . . , . . _ . . , . _ . . _ _ ...__.. , , ____ _. -