|
|
| Line 14: |
Line 14: |
| | document type = License-Operator, Part 55 Examination Related Material | | | document type = License-Operator, Part 55 Examination Related Material |
| | page count = 2 | | | page count = 2 |
| | project = CAC:00050 | | | project = CAC:000500 |
| | stage = Other | | | stage = Other |
| }} | | }} |
Revision as of 16:26, 6 April 2022
Letter Sequence Other |
|---|
|
Results
Other: ML18074A052, ML18074A053, ML18074A054, ML18074A055, ML18134A128, ML18134A137, ML18149A494, ML18323A272, ML18323A273, ML18323A274, ML19038A054, ML19038A101, ML19038A126, ML19045A271, ML19045A343, ML19045A424, ML19065A224, ML19065A230, ML19066A204, ML19066A214, ML19092A047, ML19217A267, ML19217A268, ML19217A269, ML19217A272, ML19217A273, ML19217A274, ML19298B558, ML19298B559, ML19302E287, ML19302F311, ML19302F437, ML19302F487, ML19330E279, ML19330E366, ML20020A001, ML20020A002, ML20022A259, ML20022A260, ML20022A261, ML20022A262, ML20055D883, ML20055E009, ML20057E559, ML20057E560, ML20087G852, ML20087H514, ML20184A247, ML20184A248, ML20240A318... further results
|
MONTHYEARML18135A3332017-12-11011 December 2017 Draft Operating Test (Section a, Section B, Section C) (Folder 2) Project stage: Draft Other ML18323A2722018-01-29029 January 2018 Final Operating Test (Parts a, B and C) (Folder 3) Project stage: Other ML18323A2742018-01-29029 January 2018 Post Exam Comments and Resolution, and Technical References Project stage: Other ML18323A2732018-01-31031 January 2018 Final Written Examination with Answer Key (401-5 Format)(Folder 3) Project stage: Other ML18134A1282018-03-0909 March 2018 Final Qa/Related Forms (Forms 1) Project stage: Other ML18074A0522018-03-0909 March 2018 Final Written Examination and Operating Test Outlines (Folder 3) Project stage: Other ML18074A0552018-03-0909 March 2018 Final Operating Test (Section a, B, and C) (Folder 3) Project stage: Other ML18074A0532018-03-0909 March 2018 Final Written Examination with Answer Key (401-5 Format) (Folder 3) Project stage: Other ML18074A0542018-03-0909 March 2018 Handouts to Applicants (Folder 3) Project stage: Other ML18149A4942018-03-0909 March 2018 Final Qa/Related Forms - Form ES-401-6 RO (Folder 1) Project stage: Other ML18134A1372018-03-0909 March 2018 Final Qa/Related Forms - Form ES-401-6 SRO (Folder 1) Project stage: Other ML18135A2252018-03-20020 March 2018 Draft Written Examination and Operating Test Outlines (Folder 2) Project stage: Draft Other ML19050A3742018-04-25025 April 2018 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) Project stage: Draft Other ML18135A3012018-05-15015 May 2018 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) Project stage: Draft Other ML18135A2162018-05-15015 May 2018 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) Project stage: Draft Other ML18135A2482018-05-21021 May 2018 Draft Written Examination (Folder 2) Project stage: Draft Other ML19217A2712019-02-0101 February 2019 TMI - Draft Written Examination and Operating Test Outlines (Folder 2) Project stage: Draft Other ML19038A1262019-02-0707 February 2019 Post Exam Comments and Technical References (Folder 1) Project stage: Other ML19038A0542019-02-0707 February 2019 Final Operating Test (Sections a, B, and C)(Folder 3) Project stage: Other ML19038A1012019-02-0707 February 2019 Final Written Examination with Answer Key (401-5 Format)(Folder 3) Project stage: Other ML19044A5862019-02-13013 February 2019 Draft Written Examination (Folder 2) Project stage: Draft Other ML19044A6062019-02-13013 February 2019 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) Project stage: Draft Other ML19045A4162019-02-14014 February 2019 Draft Written Examination and Operating Test Outlines (Folder 2) Project stage: Draft Other ML19045A4242019-02-14014 February 2019 Final Written Examination and Operating Test Outlines (Folder 3) Project stage: Other ML19045A3432019-02-14014 February 2019 Final QA Related Forms (Folder 1) Project stage: Other ML19045A2712019-02-14014 February 2019 Handouts to Applicants (Folder 3) Project stage: Other ML19050A3652019-02-19019 February 2019 Draft Written Examination and Operating Test Outlines (Folder 2) Project stage: Draft Other ML19065A2302019-03-0606 March 2019 Final Qa/Related Forms (Folder 1) Project stage: Other ML19065A2242019-03-0606 March 2019 Post Exam Comments Resolution References (Folder 1) Project stage: Other ML19065A0662019-03-0606 March 2019 Draft Written Examination (Folder 2) Project stage: Draft Other ML19065A0772019-03-0606 March 2019 Draft Operating Test (Section a, Section B, Section C)(Folder 2) Project stage: Draft Other ML19066A2142019-03-0707 March 2019 Final Written Examination and Operating Test Outlines (Folder 3) Project stage: Other ML19066A2042019-03-0707 March 2019 Final QA Related Form - Form ES-401-6 (Folder 1) Project stage: Other ML19092A0472019-04-0202 April 2019 Handouts to Applicants (Folder 3) Project stage: Other ML20055E0202019-04-22022 April 2019 Draft Operating Test (Section a, Section B, Section C) (Folder 2) Project stage: Draft Other ML19217A2722019-07-0202 July 2019 TMI - Final Written Examination with Answer Key (401-5 Format) (Folder 3) Project stage: Other ML19217A2692019-07-15015 July 2019 TMI - Post Exam Comments and NRC Resolution (Folder 1) Project stage: Other ML19330E3662019-07-17017 July 2019 Final Qa/Related Form - Form ES-401-6 (Folder 1) Project stage: Other ML19302F6342019-07-23023 July 2019 Draft Operating Test (Section a, Section B, Section C) (Folder 2) Project stage: Draft Other ML19302F5982019-07-23023 July 2019 Draft Written Examination (Folder 2) Project stage: Draft Other ML19217A2732019-07-26026 July 2019 TMI - Handouts to Applicants (Folder 3) Project stage: Other ML19217A2742019-07-26026 July 2019 TMI - Final Operating Test (Sections a, B, and C) (Folder 3) Project stage: Other ML19217A2672019-07-26026 July 2019 TMI - Final Qa/Related Forms (Folder 1) Project stage: Other ML19217A2682019-07-26026 July 2019 TMI - Final Qa/Related Form - Form ES-401-6 (Folder 1) Project stage: Other ML19298B5582019-08-26026 August 2019 Final Written Examination with Answer Key (401-5 Format) (Folder 3) Project stage: Other ML19298B5592019-08-26026 August 2019 Final Operating Test (Sections a, B, and C) (Folder 3) Project stage: Other ML19302F4872019-09-13013 September 2019 Final Operating Test (Sections a, B, and C) (Folder 3) Project stage: Other ML19302E2872019-09-13013 September 2019 Final Written Examination and Operating Test Outlines (Folder 3) Project stage: Other ML19302F3112019-09-13013 September 2019 Final Written Examination with Answer Key (401-5 Format) (Folder 3) Project stage: Other ML19302F4372019-09-27027 September 2019 Handouts to Applicants (Folder 3) Project stage: Other 2019-02-07
[Table View] |
Text
ES-401 Record of Rejected K/As Form ES-401-4 Tier / Randomly Reason for Rejection Group Selected K/A 1/1 295021 There is no tie between loss of SDC and Drywell Temperature. Replace with 295021 AA1.02, Ability to operate and/or monitor the following as Q #9 AA1.06 the apply to LOSS OF SHUTDOWN COLLING: RHR/Shutdown Cooling 2/1 205000 On the LGS Suppressed KA list. Replaced with 205000 K4.02 High Pressure Isolation Q #29 K4.01 2/1 211000 SLC system oversampled in Tier/Group. Concept of Chugging unknown at LGS. Consider for Suppressed KA list. Replaced #33 with 215004 K5.03, Q #33 K5.02 Changing Detector Position.
2/1 262002 On the LGS suppressed KA List. Replaced #46 with 262002 K4.01, Transfer from Preferred Power to Alternate Power Supplies.
Q #46 A1.02 2/1 300000 Oversampled system and K1 for Tier/Group. Effect that a loss of temperature indication would have on instrument air system is limited.
Q #50 K6.03 Replaced #50 with 300000 K%.01 Air Compressors 2/1 400000 Oversampled System for Tier/Group. Replaced with 263000 K1.02, D.C.
Battery Charger and Battery.
Q #53 K1.01 2/1 261000 Overlap with Q #18 Q #44 K4.05 Replaced with 261000 K4.01 2/2 268000 Draft exam review, two implausible distractors. Could not write good question for this K/A.
Q #62 A2.01 Replaced with 226001 A2.11 3 2.2.14 Draft exam review, two implausible distractors. Could not write good question for this K/A.
Q #96 Replaced with Generic 2.1.35
ES-401 Record of Rejected K/As Form ES-401-4