{{#Wiki_filter:February 10, 2021
{{#Wiki_filter:
 
==SUBJECT:==
EDWIN I. HATCH NUCLEAR PLANT - INTEGRATED INSPECTION REPORT 05000321/2020004 AND 05000366/2020004 AND INDEPENDENT SPENT FUEL STORAGE INSTALLATION REPORT 07200036/2020003
 
==Dear Ms. Gayheart:==
On December 31, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Edwin I. Hatch Nuclear Plant. On January 25, 2021, the NRC inspectors discussed the results of this inspection with Johnny Weissinger and other members of your staff. The results of this inspection are documented in the enclosed report.
 
No findings or violations of more than minor significance were identified during this inspection.
 
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
 
Sincerely,
/RA/
Alan J. Blamey, Chief Reactor Projects Branch 2 Division of Reactor Projects Docket Nos. 05000321, 05000366, and 07200036 License Nos. DPR-57 and NPF-5
 
===Enclosure:===
As stated
 
==Inspection Report==
Docket Numbers: 05000321 and 05000366 and 07200036 License Numbers: DPR-57 and NPF-5 Report Numbers: 05000321/2020004, 05000366/2020004 and 07200036/2020003 Enterprise Identifier: I-2020-004-0043 and I-2020-003-0076 Licensee: Southern Nuclear Operating Co., Inc.
 
Facility: Edwin I. Hatch Nuclear Plant Location: Baxley, GA Inspection Dates: October 01, 2020 to December 31, 2020 Inspectors: B. Caballero, Senior Operations Engineer C. Dykes, Senior Health Physicist C. Fontana, Emergency Preparedness Inspector J. Hickman, Resident Inspector M. Kennard, Sr. Operations Engineer D. Lanyi, Senior Operations Engineer N. Peterka, Fuel Facility Inspector W. Pursley, Health Physicist A. Rosebrook, Senior Reactor Analyst S. Sanchez, Senior Emergency Preparedness Inspector S. Sandal, Senior Reactor Analyst R. Smith, Senior Resident Inspector N. Staples, Senior Project Engineer J. Walker, Emergency Response Inspector Approved By: Alan J. Blamey, Chief Reactor Projects Branch 2 Division of Reactor Projects Enclosure
 
=SUMMARY=
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Edwin I. Hatch Nuclear Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
 
===List of Findings and Violations===
 
No findings or violations of more than minor significance were identified.
 
===Additional Tracking Items===
None.
 
=PLANT STATUS=
 
Unit 1 began the inspection period at 100 percent rated thermal power (RTP). On October 30, 2020, the unit was down powered to 50 percent RTP due to removing the 1A Circulating Water Pump (CWP) from service due to motor bearing issue. On October 30, 2020, the unit increased in power to 63 percent RTP until repairs were completed to the 1A CWP. On November 6, 2020, the unit was returned to 100 percent RTP. On December 19, 2020, the unit was down powered to 90 percent RTP for turbine bypass valve testing. On December 19, 2020, the unit was returned to 100 percent RTP and operated there for the remainder of the inspection period.
 
Unit 2 began the inspection period at 100 percent RTP. On October 17, 2020, the unit was down powered to 70 percent RTP for sequence exchange and quarterly turbine testing. On October 18, 2020, the unit was returned to 98 percent RTP due to issues with computer hard drive associated with feedwater uncertainty recapture. On October 24, 2020, the unit was returned to 100 percent RTP after issues with the computer hard drive were resolved. On November 2, 2020, the unit was down powered to 88.5 percent RTP for a rod pattern adjustment and on November 2, 2020, it was return to 100 percent RTP. On November 12, 2020, the unit was down powered to 82.5 percent RTP for a rod pattern adjustment and on November 12, 2020, it was return to 100 percent RTP. On November 22, 2020, the unit was down powered to 87.5 percent RTP for a rod pattern adjustment and on November 22, 2020, it was return to 100 percent RTP. On December 5, 2020, the unit down powered to 70 percent RTP for turbine valve testing and on December 5, 2020, the unit was returned to 100 percent RTP. On December 9, 2020, the unit reached maximum core flow and began the coast down in power for the 2021, spring refueling outage.
 
==INSPECTION SCOPES==
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
 
Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the Coronavirus Disease 2019 (COVID-19), resident inspectors were directed to begin telework and to remotely access licensee information using available technology. During this time, the resident inspectors performed periodic site visits each week; conducted plant status activities as described in IMC 2515, Appendix D, Plant Status; observed risk-significant activities; and completed on-site portions of IPs. In addition, resident and regional baseline inspections were evaluated to determine if all or portions of the objectives and requirements stated in the IP could be performed remotely. If the inspections could be performed remotely, they were conducted per the applicable IP. In some cases, portions of an IP were completed remotely and on-site. The inspections documented below met the objectives and requirements for completion of the IP.
 
==REACTOR SAFETY==
 
==71111.01 - Adverse Weather Protection==
 
===Seasonal Extreme Weather Sample (IP Section 03.01) (1 Sample)===
: (1) The inspectors evaluated readiness for seasonal extreme weather conditions prior to the onset of below freezing temperatures for the following systems on December 1, 2020:
1. Plant Service Water.
 
2. Residual Heat Removal Service Water.
 
3. Emergency Diesel Generators.
 
===Impending Severe Weather Sample (IP Section 03.02) (1 Sample)===
: (1) The inspectors evaluated the adequacy of the overall preparations to protect risk-significant systems from impending severe weather during a Tornado Watch on April 23, 2020.
 
==71111.04 - Equipment Alignment==
 
===Partial Walkdown Sample (IP Section 03.01) (2 Samples)===
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
: (1) Alignment of the 1E, 1F, and 1G switchgear during the 1B Emergency Diesel Generator (EDG) outage, using 34SO-R22-00-1, 4160 VAC System Attachment 1, 34SO-R43-001-1, Diesel Generator Standby AC System Attachment 2, and 34SV-SUV-013-1, Breaker Alignment Checks Attachments 2 and 3, on October 19 and 21, 2020.
: (2) Alignment of Unit 2 Residual Heat Removal (RHR) System following the 2B RHR maintenance outage, 34SO-E11-010-2, Residual Heat Removal System, Version 44.2 on December 21 and 23, 2020.
 
==71111.05 - Fire Protection==
 
===Fire Area Walkdown and Inspection Sample (IP Section 03.01) (3 Samples)===
The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:
: (1) Unit 2 Standby Gas and Heating Ventilation Air Conditioning (HVAC), Drawing A-
 
===43965 Sheets 115, 118, and 119 on October 9, 2020.
: (2) Unit 1 and Unit 2 Intake Structure, Drawing A-43966 Sheet 027 on November 24, 2020.
: (3) Unit 1 Railroad Airlock, Drawing A-43966 Sheet 41 on December 18, 2020.
 
Fire Brigade Drill Performance Sample (IP Section 03.02) ===
{{IP sample|IP=IP 43965|count=1}}
: (1) The inspectors evaluated the onsite fire brigade training and performance during an announced fire drill on October 14, 2020.
 
==71111.06 - Flood Protection Measures==
 
===Cable Degradation (IP Section 03.02) (1 Sample)===
The inspectors evaluated cable submergence protection in:
: (1) Safety related cable vaults PB1-DO, and PB1-DP,
 
==71111.11A - Licensed Operator Requalification Program and Licensed Operator Performance==
 
===Requalification Examination Results (IP Section 03.03) (1 Sample)===
On November 12, 2020, the licensee completed the annual requalification operating test, which is required to be administered to all licensed operators in accordance with Title 10 of the Code of Federal Regulations 55.59(a)(2), Requalification Requirements, of the NRCs Operators Licenses. On November 20, 2020, the inspector performed an in-office review of the overall pass/fail results of the individual operating examinations and the crew simulator operating examinations in accordance with Inspection Procedure (IP) 71111.11, Licensed Operator Requalification Program. These results were compared to the thresholds established in Section 3.02, Requalification Examination Results, of IP
 
===71111.11.
: (1) On November 20, 2020, the inspector reviewed and evaluated the licensed operator examination failure rates for the requalification annual operating test administration completed on November 12, 2020.
 
==71111.11B - Licensed Operator Requalification Program and Licensed Operator Performance==
 
Licensed Operator Requalification Program (IP Section 03.04) ===
{{IP sample|IP=IP 71111.11|count=1}}
: (1) Biennial Requalification Written Examinations The inspectors evaluated the quality of the licensed operator biennial requalification written examination administered in December 2019.
 
Annual Requalification Operating Tests The inspectors evaluated the adequacy of the facility licensees annual requalification operating test.
 
Administration of an Annual Requalification Operating Test The inspectors evaluated the effectiveness of the facility licensee in administering requalification operating tests required by 10 CFR 55.59(a)(2) and that the facility licensee is effectively evaluating their licensed operators for mastery of training objectives.
 
Requalification Examination Security The inspectors evaluated the ability of the facility licensee to safeguard examination material, such that the examination is not compromised.
 
Remedial Training and Re-examinations The inspectors evaluated the effectiveness of remedial training conducted by the licensee, and reviewed the adequacy of re-examinations for licensed operators who did not pass a required requalification examination.
 
Operator License Conditions The inspectors evaluated the licensees program for ensuring that licensed operators meet the conditions of their licenses.
 
Control Room Simulator The inspectors evaluated the adequacy of the facility licensees control room simulator in modeling the actual plant, and for meeting the requirements contained in 10 CFR 55.46.
 
Problem Identification and Resolution The inspectors evaluated the licensees ability to identify and resolve problems associated with licensed operator performance.
 
==71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance==
 
Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)
: (1) The inspectors observed and evaluated licensed operator performance in the Control Room during Unit 2 sequence exchange, deep control rod exercises and scram time testing on October 17, 2020.
 
===Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)===
: (1) The inspectors observed and evaluated License Operator Requalification Program (LORP) Scenario H-LTC-SE-00306, "Station Service Air Compressor Trip, Recirculation Pump Trip, Reactor Feed Pump Turbine High Vibration, Lost of Second Recirculation Pump, Anticipated Transient Without a Scram (ATWS), and Generator Output Breakers Failed to Auto Open," for two teams during annual simulator evaluations on October 28, 2020.
 
==71111.12 - Maintenance Effectiveness==
 
===Maintenance Effectiveness (IP Section 03.01) (2 Samples)===
The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:
: (1) Review of the Hatch Living a(3) Documentation Package with emphasis on Primary Containment penetration failure on January 4, 2020.
: (2) Unit 1 and Unit 2 Emergency Diesel Generator Fuel Oil Transfer System water intrusion issues on November 20, 2020.
 
==71111.13 - Maintenance Risk Assessments and Emergent Work Control==
 
===Risk Assessment and Management Sample (IP Section 03.01) (3 Samples)===
The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:
: (1) Unit 2 elevated risk due to the Reactor Core Isolation Cooling (RCIC) System Outage on October 7, 2020.
: (2) Unit 1 and Unit 2 elevated risk due to the liner replacement on 1B EDG on October 20, 2020.
: (3) Unit 1 elevated risk due to the liner replacement on 1C Emergency Diesel Generator on December 3, 2020.
 
==71111.15 - Operability Determinations and Functionality Assessments==
 
===Operability Determination or Functionality Assessment (IP Section 03.01) (4 Samples)===
The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:
: (1) Unit 1 water intrusion into terminal box of 'B' fuel oil transfer pump on 1B EDG on October 14, 2020.
: (2) Unit 1 'B' Plant Service Water (PSW) Pump inoperable due to low In-Service Test (IST) differential pressure ratio on October 30, 2020.
: (3) Unit 1 'B' Reactor Protection System (RPS) output breaker 52-3B failure to trip during function testing on November 12, 2020.
: (4) Unit 1 'A' Plant Service Water pump differential pressure (DP) in the required action range on November 12, 2020.
 
==71111.19 - Post-Maintenance Testing==
 
===Post-Maintenance Test Sample (IP Section 03.01) (7 Samples)===
The inspectors evaluated the following post-maintenance test activities to verify system operability and functionality:
: (1) 34SO-E51-001-2, RCIC Pump Discharge Line Venting, Version 28.2, following Unit 2 RCIC system outage on October 7, 2020.
: (2) 52SV-R43-001-0, Diesel, Alternator, and Accessories Inspection, Version 31.16, following the liner replacement on 1B EDG on October 22, 2020.
: (3) Work Order (WO) SNC814149 1C Residuals Heat Removal Service Water (RHRSW)
Pump Functional Test following the internal inspection of check-valve 1E11F005C on October 28, 2020.
: (4) Work Orders SNC631596 and SNC929660 for 2B Reactor Protection System (RPS)one-year preventive maintenance including inspections, lubrication and functional testing and calibration of the power monitoring breakers, on November 10, 2020.
: (5) Work Orders SNC1063991 and SNC1092799 for 1D Residual Heat Removal Service Water pump and check valve replacement functional testing on November 23, 2020.
: (6) 52SV-R43-001-0, Diesel, Alternator, and Accessories Inspection, Version 31.19, following the liner replacement on 1C EDG on December 9, 2020.
: (7) 34SV-R43-006-1, Diesel Generator 1C Semi-annual Test, Version 15.1, following the liner replacement on 1C EDG on December 10, 2020.
==71111.22 - Surveillance Testing==
 
The inspectors evaluated the following surveillance tests:
 
===Surveillance Tests (other) (IP Section 03.01)===
{{IP sample|IP=IP 71111.22|count=1}}
: (1) RCIC 2-E51-F012 Motor Operated Valve Acceptance Testing, Work Order
 
===SNC842422 on October 6, 2020.
Inservice Testing (IP Section 03.01) (1 Sample)===
: (1) 34SV-E51-002-1, RCIC Pump Operability, Version 28.8 (IST, Operating Pressure
 
===Test) on October 2, 2020.
FLEX Testing (IP Section 03.02) (1 Sample)===
: (1) Work Order SNC947907, FLEX PM: FLEX Pump Hose Trailer Hose Inspection &
Refold, on December 8, 2020.
 
==71114.02 - Alert and Notification System Testing==
 
===Inspection Review (IP Section 02.01-02.04) (1 Sample)===
: (1) The inspectors evaluated the maintenance and testing of the alert and notification          system during the week of November 2, 2020.
 
==71114.03 - Emergency Response Organization Staffing and Augmentation System==
 
===Inspection Review (IP Section 02.01-02.02) (1 Sample)===
: (1) The inspectors evaluated the readiness of the Emergency Response Organization          during the week of November 2, 2020.
 
==71114.04 - Emergency Action Level and Emergency Plan Changes==
 
===Inspection Review (IP Section 02.01-02.03) (1 Sample)===
: (1) The inspectors evaluated submitted Emergency Action Level, Emergency Plan, and Emergency Plan Implementing Procedure changes during the week of November 2, 2020. This evaluation does not constitute NRC approval.
 
==71114.05 - Maintenance of Emergency Preparedness==
 
===Inspection Review (IP Section 02.01 - 02.11) (1 Sample)===
: (1) The inspectors evaluated the maintenance of the emergency preparedness program          during the week of November 2, 2020.
 
==71114.06 - Drill Evaluation==
 
Select Emergency Preparedness Drills and/or Training for Observation (IP Section 03.01) (1 Sample)
: (1) Emergency Preparedness Drill 20EX06, Seismic event with a loss of all offsite and onsite AC Power on October 28,
 
==RADIATION SAFETY==
 
==71124.06 - Radioactive Gaseous and Liquid Effluent Treatment==
 
===Walkdowns and Observations (IP Section 03.01) (4 Samples)===
The inspectors evaluated the following radioactive effluent systems during walkdowns:
: (1) Unit 1 Reactor building ventilation stack monitor.
: (2) Plant Main Stack Radiation Monitors.
: (3) Liquid Radwaste Monitor.
: (4) Unit 2 Reactor building ventilation stack monitor.
 
===Sampling and Analysis (IP Section 03.02) (3 Samples)===
: (1) Inspectors evaluated compensatory sampling on the Unit 2 Reactor building ventilation stack monitor.
: (2) Inspectors evaluated effluent particulate and iodine sampling on the main plant stack monitor.
: (3) Inspectors evaluated tritium sampling methodology on the Unit 2 Reactor building ventilation stack monitor.
 
===Dose Calculations (IP Section 03.03) (2 Samples)===
The inspectors evaluated the following dose calculations:
: (1) 64CH-RPT-006-0 Liquid Effluents Discharge Permit WSTA-1 L-20191225-624-B, 12/24/2019.
 
64CH-RPT-006-0 Liquid Effluents Discharge Permit L-20191219-606-C, Y22-N008A, 12/20/2019.
 
64CH-RPT-006-0 Liquid Effluents Discharge Permit L-2018213-372-C, Y22-N008A, 12/14/2018.
 
64CH-RPT-006-0 Liquid Effluents Discharge Permit L-20181213-373-C, Y22-N008A, 12/20/2018.
: (2) 64CH-RPT-007-0 GASEOUS EFFLUENTS: DISCHARGE PERMIT PARTICULATE, IODINE AND NOBLE GAS SAMPLE INFORMATION, G-20181211-200-C, 12/13/2018.
 
64CH-RPT-007-0 GASEOUS EFFLUENTS: DISCHARGE PERMIT PARTICULATE, IODINE AND NOBLE GAS SAMPLE INFORMATION, G-20181218-204-C, 12/19/2018.
 
64CH-RPT-007-0 GASEOUS EFFLUENTS: DISCHARGE PERMIT PARTICULATE, IODINE AND NOBLE GAS SAMPLE INFORMATION, G-20191210-198-C, 12/12/2019.
 
64CH-RPT-007-0 GASEOUS EFFLUENTS: DISCHARGE PERMIT PARTICULATE, IODINE AND NOBLE GAS SAMPLE INFORMATION, G-20191217-202-C, 12/28/2019.
 
Abnormal Discharges (IP Section 03.04)
There were no abnormal discharges during the period covered by the inspection which began in May 1, 2018.
 
==71124.07 - Radiological Environmental Monitoring Program==
 
===Environmental Monitoring Equipment and Sampling (IP Section 03.01) (1 Sample)===
: (1) The inspectors evaluated environmental monitoring equipment and observed          collection of environmental samples.
 
===Radiological Environmental Monitoring Program (IP Section 03.02) (1 Sample)===
: (1) The inspectors evaluated the implementation of the licensees radiological          environmental monitoring program.
 
===GPI Implementation (IP Section 03.03) (1 Sample)===
: (1) The inspectors evaluated the licensees implementation of the Groundwater          Protection Initiative program to identify incomplete or discontinued program elements.
 
==OTHER ACTIVITIES - BASELINE==
 
===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:
EP01: Drill/Exercise Performance (IP Section 02.12) ===
{{IP sample|IP=IP 71151|count=1}}
: (1) EP01: Drill & Exercise Performance for the period July 1, 2019, through June 30, 2020.
 
===EP02: ERO Drill Participation (IP Section 02.13) (1 Sample)===
: (1) EP02: Emergency Response Organization Drill Participation for the period July 1,          2019, through June 30, 2020.
 
===EP03: Alert & Notification System Reliability (IP Section 02.14) (1 Sample)===
: (1) EP03: Alert & Notification System Reliability for the period July 1, 2019, through June          30, 2020.
 
===MS05: Safety System Functional Failures (SSFFs) Sample (IP Section 02.04) (2 Samples)===
: (1) Unit 1 (October 1, 2019 to September 30, 2020).
: (2) Unit 2 (October 1, 2019 to September 30, 2020).
 
===MS09: Residual Heat Removal Systems (IP Section 02.08) (2 Samples)===
: (1) Unit 1 (July 1, 2019 to September 30, 2020).
: (2) Unit 2 (July 1, 2019 to September 30, 2020).
 
===MS10: Cooling Water Support Systems (IP Section 02.09) (2 Samples)===
: (1) Unit 1 (October 1, 2019 to September 30, 2020).
: (2) Unit 2 (October 1, 2019 to September 30, 2020).
 
PR01: Radiological Effluent Technical Specifications/Offsite Dose Calculation Manual Radiological Effluent Occurrences (RETS/ODCM) Radiological Effluent Occurrences Sample (IP Section 02.16) (1 Sample)
: (1) Unit 1 January 1, 2019 through October 31, 2020.
 
Unit 2 January 1, 2019 through October 31, 2020.
 
==71152 - Problem Identification and Resolution==
 
===Semiannual Trend Review (IP Section 02.02) (1 Sample)===
: (1) The inspectors reviewed the licensees corrective action program for potential adverse trends in Appendix R Emergency Lighting failures, due to high number of failures through the year that might be indicative of a more significant safety issue.
 
==OTHER ACTIVITIES==
- TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL
 
===41502 - Nuclear Power Plant Simulation Facilities Nuclear Power Plant Simulation Facilities ===
{{IP sample|IP=IP 41502|count=1}}
: (1) The inspector completed inspection of the Unit 1 Plant Reference Simulator (PRS)
          "B" in accordance with Inspection Procedure (IP) 41502 "Nuclear Power Plant Simulation Facilities.
 
This inspection reviewed a sample of activities to ensure that Simulator B was being tested in accordance with ANSI/ANS-3.5-2009, Nuclear Power Plant Simulators for Use in Operator Training and Examination and appropriate approved plant procedures.
 
The inspectors reviewed testing to verify that the simulator utilizes models relating to nuclear and thermal-hydraulic characteristics replicating the most recent core load from cold shutdown to rated power plant conditions. Additionally, six transient tests, two steady state tests, five malfunction tests, and one core performance test. Additionally, inspectors reviewed a sample of simulator discrepancies to ensure that they were dispositioned in accordance with appropriate approved plant procedures.
 
Finally, this inspection reviewed simulator physical fidelity with its reference unit to ensure that PRS "B" was sufficiently designed to allow the performance of evolution's prescribed by 10 CFR 55.45 and 55.59.
 
The inspector reviewed simulator operation during performance of two Initial License Training (ILT) simulator scenarios using IP 41502 criteria for evaluation of plant-reference simulators under 10 CFR 55.46(c) and (d).
 
No findings were identified. Results of this inspection were discussed with members of the facility staff on October 28, 2020.
 
===60855.1 - Operation of an Independent Spent Fuel Storage Installation at Operating Plants Operation of an Independent Spent Fuel Storage Installation at Operating Plants ===
{{IP sample|IP=IP 60855|count=1}}
: (1) The inspectors evaluated the licensees activates related to long-term operation and monitoring of their independent spent fuel storage installation on November 6, 2020.
 
===92702 - Follow-Up on Traditional Enforcement Actions Including Violations, Deviations, Confirmatory Action Letters, and Orders Follow-Up on Traditional Enforcement Actions Including Violations, Deviations, Confirmatory Action Letters, and Orders ===
{{IP sample|IP=IP 92702|count=1}}
: (1) On November 20, 2019, as a result of Alternative Dispute Resolution the NRC issued Confirmatory Order (CO) EA-18-130 and EA-18-171 (ML19249B552). The CO was the result of an apparent violation of 10 CFR 53.5, Employee Protection at Vogtle Units 3 & 4 which contained actions for the Farley, Hatch and Vogtle Units 1 & 2 nuclear plants. During the week of November 30,2020, the inspectors reviewed corrective actions for this CO. Because the CO was fleet wide for the Southern Nuclear Company, the corrective actions reviewed by the inspectors included a review of corrective actions for the Hatch, Farley, and Vogtle Units 1 through 4 nuclear plants. The details can be found in inspection report 0500025/20200012, 0500026/2020012; 11/30/2020 through 12/11/2020; Vogtle Unit 3 Combined License, Vogtle Unit 4 Combined License, CO Follow-Up and SCWE inspection report.
 
==INSPECTION RESULTS==
No findings were identified.
 
==EXIT MEETINGS AND DEBRIEFS==
The inspectors verified no proprietary information was retained or documented in this report.
* On January 25, 2021, the inspectors presented the integrated inspection results to Johnny Weissinger and other members of the licensee staff.
* On October 29, 2020, the inspectors presented the Licensed Operator Requalification and Simulator B inspection results to Johnny Weissinger and other members of the licensee staff.
* On November 6, 2020, the inspectors presented the Emergency Preparedness Program inspection results to Sonny Dean and other members of the licensee staff.
* On December 8, 2020, the inspectors presented the RP Baseline Inspection Exit inspection results to Sonny Dean and other members of the licensee staff.
 
=DOCUMENTS REVIEWED=
 
Inspection Type          Designation                      Description or Title                Revision or
Procedure                                                                                      Date
41502      Miscellaneous NMP-TR-422-004 Att 20 Section 3.4 Core Performance Testing - NMP-    1/22/2019
Criticality                      TR-422-004 Att 20 Section 3.4
Criticality
Test 503-1                        Loss of Coolant - Outside Primary  2/10/2020
Containment
Test 505-2                        Loss of Coolant - Small Reactor    2/14/2019
Coolant Breaks including
Demonstration of Saturation
Condition
Test 505-2                        Loss of Coolant - Small Reactor    2/14/2019
Coolant Breaks including
Demonstration of Saturation
Condition
Test 521-0                        Loss of Protective System Channel  2/14/2019
Test 522-1                        Control Rod Failure including Stuck 2/10/2020
Rods, Drifting Rods, Rod Drops,
and Misaligned Rods
Test 527-0                        Failure in Automatic Control        2/10/2020
Systems that Affect Reactivity and
Core Heat Removal
Test 604-0                        Reactor Trip Followed by Recovery  2/15/2019
to Rated Power
Test 707-0                        Transient Performance - Maximum    2/3/2020
Power Ramp Recirc Down to
Approximately 75% and Back up to
100%
Test 708-2                        Transient Performance - Maximum    2/12/2019
Size Reactor Coolant System
Rupture Combined with a Loss of
Off-Site Power
Test: 615-1                      SS Performance 35% Power            2/12/2019
Test: 704-0                      Transient Performance -            2/6/2019
Inspection Type        Designation      Description or Title                Revision or
Procedure                                                                    Date
Simultaneous Trip of all
Recirculation Pumps
60855.1    Engineering TE 1053015        Dry Cask Storage - 10 CFR 72.212    22
Evaluations                  Report - Revision for 2020 UFLO
Radiation                    Plant Hatch Radiological            04/28/2020
Surveys                      Information Survey # 179999 ISFSI
Plant Hatch Radiological            04/28/2020
Information Survey # 180018 ISFSI
71111.01  Procedures  34AB-Y22-002-0    Naturally Occurring Phenomena      19.1
NMP-OS-017        Attachment 1, Severe Weather        2.0
Preparation Checklist Maintenance
Section for 4/23/2020
NMP-OS-017        Attachment 2, Severe Weather        2.0
Preparation Checklist Chemistry for
4/23/2020
NMP-OS-017        Attachment 3, Severe Weather        2.0
Preparation Checklist Operations
for 4/23/2020
NMP-OS-017        Attachment 4, Severe Weather        2.0
Checklist Technology Organization
for 4/23/3030
NMP-OS-017        Attachment 5, Severe Weather        2.0
Preparation Checklist Security for
4/23/2020
NMP-OS-017        Attachment 6, Severe Weather        2.0
Preparation Checklist Supply Chain
for 4/23/2020
NMP-OS-017        Attachment 7, Severe Weather        2.0
Preparation Checklist Emergency
Preparedness for 4/23/2020
NMP-OS-017        Severe Weather                      3.0
71111.04  Drawings    H-13350          Unit 1 Master Single Line Diagram  30.0
H-13350          Unit 1 Master Single Line Diagram  30.0
Procedures  34SO-R22-001-1    4160 VAC System                    25.3
Inspection Type          Designation                              Description or Title              Revision or
Procedure                                                                                            Date
34SO-R43-001-1                            Diesel Generator Standby AC        29.3
System
34SV-SUV-013-1                            Breaker Alignment Checks          10.4
71111.05  Fire Plans    Drawing A-43965 Sheets 115, 118, and 119. Unit 2 Standby Gas and HVAC,      2
Miscellaneous                                          Fire Protection Fire Hazards      36.0
Analysis (FHA)
NMP-TR-425-F01                            Fire Drill Scenario Development    10/13/2020
and Approval Sheet for fire in
drywell
Procedures    NMP-TR-425                                Fire Drill Program                9.0
NMP-TR-425-F14                            Fire Drill Package                1.1
71111.06  Procedures    52PM-Y46-001-0                            Inground Pullbox Debris            10.0
Removal/Inspection
71111.11B  Miscellaneous H-LTC-SE-00314                            314 NRC 2                          Ver 1.0
19-7A RO                                  2019 RO Written Exam              12/15/2019
19-7A SRO                                2019 SRO Written Exam              12/15/2019
H-LCT-SE-00302                            302 Pilot 2                        Rev 0.1
H-LT-JP-C11-010155                        Vent the Scram Header              Ver 16.5
H-LT-JP-C82-01013A                        Perform Plant Operations in        Ver 1.0
Support of a Remote Plant
Shutdown (Alternate Path)
H-lT-JP-E41-00515A                        Establish Reactor Cooldown with    Ver 0.1
HPCI (Alternate Path)
H-LT-JP-EAL-25068                        FG1 Emergency Classification -    Ver 3.1
Complete NMP-EP-141-F01
H-LT-JP-EAL-25208                        Determine PARS (SRO only)          Ver 10.1
H-LT-JP-N33-01702B                        Perform TC-1, Seal Steam Failure  Ver 0.1
                                                                  (Alternate Path)
H-LT-JP-R42-02744                        Place the 125/250 VDC Station      Ver 19.3
Service Battery Charger in Service
H-LT-JP-SUV-10022                        Conduct of Operations, 34SV-SUV-  Ver 2.2
019-1 Average Drywell
Temperature Surveillance
H-LT-JP-T48-01362A                        Fast Vent the Drywell (Alternate  Ver 0.5
Inspection Type          Designation                                  Description or Title                Revision or
Procedure                                                                                                Date
Path)
H-LTC-SE-00341                              341 Pilot 1                        Ver 1.0
H-LTC-SE-00342                              314 NRC 1                          Ver 0.1
NDE Reports  H-LT-JP-R43-02824A                          Locally Start U2 EDG with Air Start Ver 1.6
and Energ Bus (Alternate Path)
71111.11Q Corrective    CR10746882, 10746887, 10746968,
Action        10747001
Documents
Miscellaneous H-LTC-SE-00306                              Station Service Air Compressor Trip 1.0
                                                                      , Recirculation Pump Trip , Reactor
Feed Pump Turbine High Vibration,
Lost of Second Recirculation Pump,
Anticipated Transient Without a
Scram (ATWS), and Generator
PCBs (Output Breakers) Failed to
Auto Open
Procedures    42CC-ERP-011-0                              Control Rod Exchange                15.4
NMP-OS-001                                  Reactivity Management Program      20.1
NMP-OS-007-001                              Conduct of Operations Standards    17.0
and Expectations
NMP-RE-008-F01                              Detailed Reactivity Management      2.1
Plan (Unit 2 Sequence Exchange)
71111.12  Corrective    CAR 277277                                  Root Cause Determination Report    05/27/2020
Action                                                    for PCIVs 2T28F319 and 2T48F320
Documents    CR10737209
Miscellaneous Maintenance Rule a(1) Action Plan for 2T23-0
Procedures    34SO-T48-002-2                              Containment Atmospheric Control    29.5
and Dilution System
2-PM-T48-013-0                              Purge and Vent Valve T-Ring        12.6
Replacement
MNP-ES-027                                  Maintenance Rule Program            10.2
Self-                                                      Hatch Living (a)(3) Documentation  08/01/2018-
Assessments                                                Package                            05/01/2020
71111.13  Calculations                                              Equipment Out of Service            October 20,
Inspection Type          Designation        Description or Title                Revision or
Procedure                                                                      Date
Calculations                        2020.
Equipment Out of Service            October 7,
Calculations                        2020.
Corrective    CR 10746694
Action
Documents
Procedures    NMP-DP-001        Operational Risk Awareness          16.0
NMP-OS-010-002    Hatch Protected Equipment Logs      11.0
71111.15  Corrective    CR 10747548
Action        CR10753268
Documents    CR10753270
Engineering  TE1077753
Evaluations
Miscellaneous                    Unit 1 Technical Specifications    Amendment
294
Unit 2 Technical Specifications    Amendment
239
Procedures    34SV-P41-001-1    Plant Service Water Pump            15.2
Operability
NMP-AD-012        Operability Determinations and      13.3
Functional Assessments
NMP-AD-012-GL04    Mission Times                      1.1
71111.19  NDE Reports  NMP-ES-024-515    Ultrasonic Gas/Void Examination    10/07/2020
Report for Unit 2 RCIC
Procedures    34SO-E51-001-2    RCIC Pump Discharge Line Venting    28.2
2SV-R43-001-0    Diesel, Alternator, and Accessories 31.16
Inspection
57SV-R43-001-0    Diesel, Alternator, and Accessories 31.19
Inspection
NMP-MA-014        Post Maintenance Testing/Post      2.2
Modification Testing
NMP-MA-014-001    Maintenance Testing Guidance        5.2
Work Orders  SNC 814149        Internal inspection of check-valve  October 28,
1E11F005C                          2020.
Inspection Type          Designation                        Description or Title              Revision or
Procedure                                                                                    Date
SNC631596, SNC929660                                                11/10/2020
71111.22  Miscellaneous NEI 12-06                          Diverse and Flexible Coping      Revision 4
Strategies (FLEX) Implementation
Guide
Procedures    34SV-E51-002-1                    RCIC Pump Operability            28.8
Work Orders  SNC842422                          RCIC 2-E51-F012 Motor Operated    10/06/2020
Valve Acceptance Testing
71114.06  Corrective    CR 10749692
Action
Documents
Miscellaneous                                    Southern Nuclear Operating        1.0
Company (SNC) Standard
Emergency Plan (SEP)
SNC Standard Emergency Plan      1.0
Annex for Hatch Nuclear Plant
                                                            (HNP) Units 1 & 2
20EX06                            Emergency Preparedness Drill      10/07/2020
Guide
Procedures    NMP-EP-141                        Event Classification              1.0
NMP-EP-142                        Emergency Notification            1.0
NMP-EP-143                        Facility Activation,              1.0
71124.06  Calibration  64CH-RCL-006-0                    Interlaboratory Cross-Check;      08/2019
Records                                          Gamma Spec
Corrective    10559574, 10724533
Action
Documents
Miscellaneous Annual Radioactive Effluent Report                                  2018; 2019
Procedures    NMP-EN-002;                        Radiological Groundwater          VERSION
NMP-EN-002-GL02                    Protection Program;              9.1, 9.2;
Hatch Nuclear Plant Groundwater  Version 1.1
Monitoring Plan for Radionuclides
71124.07  Corrective    10616583
Action        10697831
Inspection Type          Designation                                Description or Title                Revision or
Procedure                                                                                                Date
Documents    10726878
10724533
Miscellaneous                                            Annual Radiological Environmental  2018; 2019
Operating Report
71151      Miscellaneous NEI 99-02                                  Regulatory Assessment              Revision 7
Performance Indicator Guideline
Procedures    NMP-AD-029                                  Preparation and Reporting of        Version 1.1
Regulatory Assessment
Performance Indicator Data and the
Monthly Operating Report
71152      Corrective    CR10674923,10674928,10674930,10683597,
Action        106844712, 10691713, 10692524, 10693660,
Documents    10702308, 10702309, 10702310, 10707157,
10707157, 10708283, 10711197, 10714683,
10719206, 10721524, 10743478, 10743512,
10743517, 10743783, 10743785, 10743797,
10743800, 10743801, 10744767, 10744769,
10744792, 10745209, 10745211, 10745214,
10747562, 10683988, 10687821, 10698864,
10698867, 10698868, 10698871, 10698926,
10698928, 10698929, 10721527, 10721529,
10721530, 10721531, 10732840, 10737206,
10743805, 10744770, 10744794, 10745187
Engineering  TE1061317, 1062509, 1062593, 1065490,
Evaluations  1065491, 1066692, 1068404,
1068405,1068406,1068407, 1068407,
1070192, 1071151
Fire Plans                                                Edwin I. Hatch Nuclear Plant Unit 1 38.0
and 2 Fire Hazards Analysis,
Sections 4.12, 1.9.1, and IV.B5.a/b
Miscellaneous FAS 1-20-003, 004, 005, 020, 030, 048, 068,
069, 070, 075, 079, 080, 081
Work Orders  SNC1117152, 1107322
21
}}
}}

Revision as of 05:29, 18 January 2022

Integrated Inspection Report 05000321/2020004 and 05000366/2020004 and Independent Spent Fuel Storage Installation Report 07200036/2020003
ML21041A073
Person / Time
Site: Hatch, 07200036  Southern Nuclear icon.png
Issue date: 02/10/2021
From: Alan Blamey
Division Reactor Projects II
To: Gayheart C
Southern Nuclear Operating Co
References
IR 2020003, IR 2020004
Download: ML21041A073 (23)


Text