RBG-48134, Inservice Testing Program Relief Request VRR-RBS-2021-1 Pressure Isolation Valve Testing Frequency: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:}} | ||
Revision as of 14:40, 16 January 2022
| ML21333A187 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 11/29/2021 |
| From: | Couture P Entergy Operations |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| RBG-48134 | |
| Download: ML21333A187 (1) | |