ML21111A077: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:TENNESSEE VALLEY AUTHORITY Sequoyah Nuclear      Post Plant,  Office Box2000,Soddy  Daisy,        37384 Tennessee April20,2021 10CFR50.4 ATTN:Document        Control Desk U.S. Nuclear      Regulatory  Commission Washington,      D.C.20555-0001 Sequoyah    Nuclear  Plant, Units 1and      2 Renewed    Facility Operating    License  Nos. DPR-77      andDPR-79 NRCDocket      Nos. 50-327    and 50-328
{{#Wiki_filter:}}
 
==Subject:==
Response              toNRCRegulatoryIssue            Summary        2021-01,  Preparation      and Scheduling    ofOperator    Licensing    Examinations
 
==References:==
1 NRCRegulatory        Issue    Summary    2021-01,    "Preparation    and Scheduling    ofOperator    Licensing  Examinations,"    dated    March  24,2021 2.TVAletter    toNRC,"Response          toNRCRegulatory        Issue  Summary2020-01, Preparation    andScheduling        ofOperator  Licensing    Examinations,"      dated May12,2020 TheNuclear      Regulatory  Commission's      (NRC)    Regulatory  Issue    Summary    (RIS) 2021-01 (Reference      1) requested  specific  information    regarding Sequoyah      Nuclear    Plant's (SQN) projected  operator  licensing  examination    schedules    andtheestimated        number    ofapplicants.
Theenclosure      tothisletter  provides  theinformation      toaddress      theNRC's    request  and provides anestimate      oftheexamination    requirements      forSQNonNRCForm536,"Operator                  Licensing Examination      Data." Theinformation      provided    inthisenclosure      updates  theinformation previously    provided  inReference    2.
There  arenocommitments          contained  inthis  submittal. Should    yourequire    additional  information regarding  this  matter,please    contact Mr.Jeffrey    Sowa,  SQNLicensing        Manager    at (423) 843-8129.
Sincerely, Marshall, E'sYfgned    byMarshall, Thomas  B.        Po"Jo?o2to+2on:no ThomasMarshall Site Vice  President Sequoyah      Nuclear  Plant
 
==Enclosure:==
NRCForm536,        Operator    Licensing  Examination      Data
 
U.S. Nuclear  Regulatory Commission Page  2 April 20, 2021 cc(Enclosure)
NRC Regional  Administrator Region ATTN:Operations II,          Branch NRC Senior  ResidentInspector-Nuclear Sequoyah    Plant
 
ENCLOSURE NRCForm536 OperatorLicensing  Examination Data Tennessee  Valley Authority Sequoyah  Nuclear Plant NRC  Docket  Nos.50-327 and50-328
 
NRC FORM536                    U.S.NUCLEAR REGULATORY  COMMISSIONAPPROVED    BY OMB: NO.3150-0131                EXPIRES:  01/31/2024 (01-2021)                                                          Estimated burden per response      with tocomply  this  information voluntary    collection  45minutes.
request:
p      g E
s~          )*t 2
OPERATOR        LICENSING This information A10M),
collection regarding comments U.S.
isused burden Nuclear toplan estimate Regulatory tothe and budgets FOlA, Commission, Library, for resources andInformation DC 20555-0001, Washington, Send examinations.
operator Collections  (T-6 Branch orbye-mail to g n,g        /          EXAMINATION      DATA                                    OMB infocoitects.Resource@nrc.gov, andthe            OMB reviewer at:  Office ofInformation andRegulatory
            *
* Affairs, (3150-0131),
Attn:Desk01ficerthe for  Nuclear    Commission, Regulatory      72517th    NW, Street DC 20503; Washington,      e-mail:oira                  TheNRCmaynot submission@ombsp.gov.            conduct or anda person sponsor,      isnotrequired torespond acollection to,      ofinformation unlessthedocument orrequiring requesting    thecollection displays        OMB acurrently valid  control number.
FACILITY                                                                                          NRCREGION Sequoyah      Unit      1and Unit 2                                                              Region  II A. PROPOSED                  EXAMINATION        PREPARATION    SCHEDULE PROPOSED    NUMBER              Cy    23            CY 24                        CY 25                      CY 26 ESTIMATED    NUMBEROF LICENSEE-PREPARED                        0                  1                            0                          1 EXAMINATIONS ESTIMATED    NUMBER      OF NRC-PREPARED                        0                  0                              0                        0 EXAMINATIONS B.INITIAL        OPERATOR            LICENSE      EXAMINATIONS PROPOSEDNUMBER                    CY 23              CY 24                    CY 25                      CY 26 NUMBEROFREACTOR                          g OPERATORS                                            [g                              g                        1g NUMBEROFSENIOR              REACTOR OPERATORSINSTANT 0                  6                            0                        5 NUMBER    OFSENIORREACTOR OPERATORSUPGRADE 0                  5                            0                        4 NUMBEROFSENIOR              REACTOR            g                  g                              g                        g OPERATORSLIMITED -
PROPOSED        DATES PRIMARYDATE                      N/A              May2024                        N/A                    May2026 ALTERNATE      DATE              N/A              June 2024                      N/A                    June  2026 NRCFORM536(01-2021)}}

Revision as of 17:02, 8 September 2021