ML20236V433: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 26: Line 26:
==Dear Mr. Spangenberg:==
==Dear Mr. Spangenberg:==


i This is to acknowledge receipt of your letter dated October 1, 1987, which            )
i This is to acknowledge receipt of your {{letter dated|date=October 1, 1987|text=letter dated October 1, 1987}}, which            )
transmitted changes, identified as Revision 8, to the " Physical Security Plan        l for Clinton Power Station," under the provisions of 10 CFR 50.54(p).                  j i
transmitted changes, identified as Revision 8, to the " Physical Security Plan        l for Clinton Power Station," under the provisions of 10 CFR 50.54(p).                  j i
We have reviewed the submitted changes and have determined that, except for those items identified in the enclosure, they are consistent with the provisions of 10 CFR 50.54(p) and are therefore acceptable.
We have reviewed the submitted changes and have determined that, except for those items identified in the enclosure, they are consistent with the provisions of 10 CFR 50.54(p) and are therefore acceptable.

Revision as of 20:34, 19 March 2021

Advises That 871001 Rev 8 to Physical Security Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable W/Encl Listed Exceptions.Rev Withheld
ML20236V433
Person / Time
Site: Clinton Constellation icon.png
Issue date: 11/06/1987
From: Mallett B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Spangenberg F
ILLINOIS POWER CO.
References
NUDOCS 8712040303
Download: ML20236V433 (2)


Text

_ - - - -- -

.. 4 SVM+GV4M3

^

NOV 0 61987  ;

1 Docket No. 50-461 Mr. Frank A. Spangenberg Manager - Licensing and Safety Illinois Power Company Clinton Power Station  ;

P. O. Box 678 -

Clinton, IL 61727

Dear Mr. Spangenberg:

i This is to acknowledge receipt of your letter dated October 1, 1987, which )

transmitted changes, identified as Revision 8, to the " Physical Security Plan l for Clinton Power Station," under the provisions of 10 CFR 50.54(p). j i

We have reviewed the submitted changes and have determined that, except for those items identified in the enclosure, they are consistent with the provisions of 10 CFR 50.54(p) and are therefore acceptable.

For those items identified as being unacceptable under the provisions of 10 CFR 50.54(p), the previously approved plan revisions must be followed.

Should you want to pursue changing the plan under the provisions of 10 CFR 50.54(p), you must resubmit the changes modified to address our comments.

In those instances where you desire to pursue the changes without modification, they must be resubmitted under the provisions of 10 CFR 50.90.

The reporting and/or recordkeeping requirements contained in this letter affect fewer than ten respondents; therefore, OMB clearance is not required under P. L.95-511.

The enclosures to your letter contain Safeguards Information of a type specified in 10 CFR 73.21 and are being withheld from public disclosure.

i Endicsore Contefns SAFECUARDS INF05MATl0N Upon Sepn ation This Po m is i otrolled 8712040303 871106 i PDR ADOCK 05000461 F PDR e ,)

par- o eannn ! Mf O n n A lit

., ma ,m u u ... m .m.,

ijo

3RuGUAt)b 11#UiVIA IUN The enclosure to this letter also contaias Safeguards Information and should be withheld from public disclosure.

Sincerely, feYk Bruce S. Mallett, Chief Nuclear Materials Safety and Safeguards Branch

Enclosure:

Conrnents (Unclassified i Safeguards Information) l cc w/o enclosure: See Attached List bec w/ enclosure, w/o attached list: NRR/DRIS/RSGB SG Case File: 0500046105WA 0500046106WC 0500046107WG l SG Inspector File: Drouin SG Reviewer File NRR Docket File Enclosure Contains I

SAFEGUARDS IfEORMATION Upon Separation This Page Is Decontrolled RII RIII RIIIj RIII i

'# Qtx /J" l Belanger/md Cree Knop Mallett 11/ /87 '#//)

@A~"A A7TO \ " A } jp, p "

on u an \ >v , u,.... _

\

1 J

_ _ _ _ _ _ - _ . - _ - - _ _ - . .