| issue date = 08/14/1989 | | issue date = 08/14/1989 | ||
| title = Ack Receipt of | | title = Ack Receipt of Informing NRC of Steps Taken to Correct Deviations Noted in Insp Repts 50-313/89-26 & 50-368/89-26 | ||
| author name = Milhoan J | | author name = Milhoan J | ||
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) | | author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) | ||
| Line 11: | Line 11: | ||
| contact person = | | contact person = | ||
| document report number = NUDOCS 8908180119 | | document report number = NUDOCS 8908180119 | ||
| title reference date = 07-21-1989 | |||
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE | | document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE | ||
| page count = 2 | | page count = 2 | ||
Revision as of 23:29, 18 March 2021
| ML20245J668 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 08/14/1989 |
| From: | Milhoan J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Campbell G ARKANSAS POWER & LIGHT CO. |
| References | |
| NUDOCS 8908180119 | |
| Download: ML20245J668 (2) | |
See also: IR 05000313/1989026
Text
, .
,.
,. ,
. _.. .-_
--
, ,9 y af- ,
[ Ip ,"g
,
' ; '
3.[ ' 4
7y
-
~
.
.
+
.w ,, ..
'
Y
> .g. ,
m . ,
,
g :In Reply; Refer To: .
- %y ,, ,
LDockets:?50-313/89-26-
'
,
s ~50-368/89-26
n' >
-x +
.;.
~
"
i (Arkansas' Power & Light Company
'
.ATTNi Mr. Gene Campbell
X
.
,
Vice' President.. Nuclear
ug 7 .. :0perations
%, P.O. Box 551 l.
, .
'- i *
Little Rock, Arkansas 72203 y
- .. . .
' Gentlemen:'
.
.
lThank you.'for your letteridated -July 21,1989, _in - response to our. letter-
,
'and Notice of; Deviation dated June 22, 1989. We have reviewed your reply and
- .. find it responsive to the' concerns raised'in our Notice of Deviation. We will
(
,,
review theLimplementat. ion of your cor/ective actions duping a future inspection
t.,
'
,
'to determine that full compliance has been achieved and will be maintained.
T ',. ,_
N -Sincerely,
Driginal Signed By
'
J. L. Milhoan
6-
'
Ja'mes L. Milhoan, Director
7
4 '
< Division-of Reactor Projects s
,
CC: ,
'
- Arkansas: Nuclear One '
ATTN:_'N. S.1Carns, Director.
Nuclear Operations
^
-P.O.. Box 608
Russellville,' Arkansas '72801
Arkansas' Radiation Control' Program Director
i
IRIV:RI':PSS*' C:PSS* AD:DRS* D
'
'
ASingh/cjg TStetka JJaudon JLMi]hoan
-/L/89 / /89 {(/ft/89
'
/ /89
j. , ' *previously concurred
o
.
MRS2nais SMS$p
Q
-
.Si ..,
.., . ._. - - - _ _ _ _ . . _ _ - _ _ - _ -
.
..- .
1
Arkansas Power & Light Company -2-
'
L
bec to DMB (IE01).
bec distrib..by RIV:
RRI. R. D.' Martin, RA
RPB-DRSS Section Chief (DRP/A)
Lisa Shea. RM/Al.F , RIV File
DRP ~ MIS System .
.
RSTS Operator ProjectEngineer(DRP/A)
C. Harbuck, NRR Project Manager-(MS:: 13-D-18)
.
C. Poslusny, NRR Project Manager- (MS: 13-D-18)-
"
.
A. Singh
T. Stetka
.
(
h
-
T
_ _ . . _ _ _ . _ _ _ _ _ _ _ - . _ _ _ _ _ - _
_ _ __ _
._
.g -
- e
...- , r ~ ~ nl/
e- -
gn. w e _. : Jt!qd' FG,
4
Y(g)j{ t
Q Jlb 24 BW h;
- .
' g. u"'_
'
.
M
ARKANSAS POWER & LIGHT COMPANY . -_ r
July 21, 1989 ' " ~~~
'
OCAN078918
J. L. Milhoan, Director
Division of Reactor Projects
U. S. Nuclear Regulatory Commission
Region IV.
611 Ryan Plaza Drive, Suite 1000
Arlington, Texas 76011
SUBJECT: Arkansas Nuclear One - Units 1 and 2
Docket Nos. 50-313/50-368
Response to Inspection Report
50-313/89-26 and 50-368/89-26
Dear Mr. Milhoan:
Pursuant to the provisions of 10CFR2.201, a response to the
deviation identified in the subject. inspection report is submitted.
Very truly yours,
- -
,.
,
i. ; /
,
_,
A
'E. C. Ewing
General Manager,
Technical Support
and Assessment
ECE:PLC:sgw
enclosure
cc w/ enc 1: U. S. Nuclear Regulatory Commission
Document Control Desk
Mail Station P1-137
Washington, D. C. 20555
i
f & ( j> {^ $ M
9
e9 i a
o
4c,' MEMBEA MfDOLE SOUTH UTILITIES SYSTEM
=
_-_. __ __ -- . _ _ ]
-
- ' *
.. .. OCANB78918
*
July 21, 1989
Page 2 of 4
Notice of Deviation
Based on the results of an WRC inspection conducted on June 5-9,
1989, a deviation from a commitment to the NRC was identified. The
deviation consisted of failure to complete and implement the
Preventive Maintenance Program (PMP). In accordance with the
" General Statement of Policy and Procedure for NRC Enforcement
Actions," 10 CFR Part 2, Appendix C (1988), the deviation is listed
below:
In a letter dated November 30, 1987, in response to Violation
313/8730-01; 368/8730-01, concerning an inadequate PMP for
safety-related components, the licensee committed to complete
and implement a new PMP by October 1988.
Contrary to the above, as of June 9,1989, the new PMP has not
been completed and implemented. Deviation 313-368/8926-01
Response to Deviation 313-368/8926-01
(1) The reason for the deviation if admitted:
AP&L does admit that the Preventive Maintenance Program (PMP)
was not completed and implemented by October 1988. The program
status for October 1988 was as follows:
Procedures for Preventive Maintenance:
Mech Elect I&C Total
Required 207 193 450 850
Draft / Planned 185 163 285 635
Approved 146 107 108 361
% Complete (Draft) 89 84 63 74
% Complete (Approved) 70 55 22 42
Preventive Maintenance Engineering Evaluations:
Required 174
Draft / Planned 151
Approved 149
% Complete (Oraft) 86
% Complete (Approved) 85
Repetitive Tasks:
Mech Elect I&C Total
Required 2039 2995 2216 7250
Draft / Planned 1435 2690 500 4615
,
Approved 898 1034 97 2035
l % Completed (Draft) 70 89 22 63
% Complete (Approved) 44 34 4 28
l
i
l
!
l
c _ ___ _ _ _ i
- - - - - _ -
.. . SCAN 878918
' ' .'#- - *
,e i July 21,1989
Pag 2 3 of 4-
The status through July 16, 1989, is as follows:
Procedures for Preventive Maintenance:
Mech Elect I&C Total
Required 207 193 450 850
Draft / Planned 198 193 412 803
Approved 187 162 252 601
% Complete (Draft) 95 100 91 94
% Complete (Approved) 90 83 56 70
Preventive Maintenance Engineering Evaluations:
Required 174
Draft / Planned 164
Approved 162
% Complete (Draft) 93
% Complete (Approved) 92
Repetitive Tasks:
Mech Elect I&C Total
Required 1700 3450 .2100 7250
Draft / Planned 1696 3450 1891 7037
Approved 1470 2653 979 5102
% Complete (Draft) 99 100 90 97
% Complete (Approved) 86 76 46 70
The completion of the project was delayed due to the following:
1. Scope addition
- Vibration analysis
- Oil analysis
- Setpoint development
- Equipment configuration verifications
2. Revisions to procedures after issuance required additional
resources.
The responsibility for execution of the program was transferred
from one group to another, and due to an oversight, AP&L failed
to notify NRC of our projected schedule overrun. It is expected
l that procedures will be revised or added based on addition of
equipment, maintenance history, and industry experience. This
^should be part of normal naaintenance of the program and not part
of the development.
.
(
- - - . _ . - _ - - - _ - _ . - - - - . _ _ _ _ _ . _ . _ _ - _ - . - . - - w
- _ _ - _ - .
'
. . . _ .
,. 9 :::, r. -
.-c %. 9CAN878918
. July.21, 1989
Page 4 of 4;
,
,
. (2) The corrective steps that have been taken and~the results-
- achieved:
1The program status was reviewed-and the scope defined. A
completion .cate for safety-related. and other selected components c
. procedures wasLestablished. . A review of AP&L's outstanding NRC
commitments was performed. The results identified three additional
commitments related to NRC inspection. reports which were not-
completed by.the expected'due date. These were' discussed
between Mrc Dwight Chamberlain of NRC Region IV' and Mr. Charles
Turk,: Acting Licensing Manager on July 17, 1989, and in followup
correspondence (SCAN 078917).
(3) The corrective steps that will be taken to avoid further
deviations:
The current method of tracking NRC commitments is being evaluated.
LIf an improved method is deemed necessary, actions will be
directed.toward implementing the changes. The Preventive ~
Maintenance Program progress will be closely tracked and if
~
delays result, notification to the NRC will be provided.
(4) The date when- full compliance will be achieved:
By.0ctober 31, 1990, the preventive maintenance procedure for
- the current scope of safety-related and other selected components.
will.he completed. . Implementation.of specific-preventive
maintenance procedures will be governed by the schedule
established as part of the. program. ..This date is based on
continuing with the current level of progress. The evaluation
of the method for tracking NRC commitments will be completed by
October 15, 1989. This date will allow for identification of
the various management reports to be issued from the tracking-
system data.
,
m.___._ ___mm. ~- -..m_. . _ _ _. .s ..m_ _ - - . ._ _ _ - . . _ _ _ __ . _ _ _ _ _ _
-
-
-__-_..s_.____--___.__._m.._-___..__..- ________-__.__m______m_-._._____.__.___.__._____._._-__
-