ENS 54569: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 10: | Line 10: | ||
| utype = W-4-LP | | utype = W-4-LP | ||
| cfr = 10 CFR 50.72(b)(3)(xiii) | | cfr = 10 CFR 50.72(b)(3)(xiii) | ||
| emergency class = | | emergency class = Non Emergency | ||
| notification date = 03/05/2020 21:14 | | notification date = 03/05/2020 21:14 | ||
| notification by = Eric Mallett | | notification by = Eric Mallett | ||
| Line 16: | Line 16: | ||
| event date = 03/05/2020 21:00 EST | | event date = 03/05/2020 21:00 EST | ||
| last update date = 03/05/2020 | | last update date = 03/05/2020 | ||
| title = Planned Plant Computer Outage for System Upgrade | | title = Planned Plant Computer Outage for System Upgrade | ||
| event text = On March 05, 2020, at 2100 EST, the site commenced a planned upgrade of the main plant computer system (MPCS). During this upgrade, the normal computer data will not be available to the emergency response facilities, but compensatory capabilities will be in place. The scheduled duration for the MPCS upgrade is 96 hours. Since the compensatory measures will be in place in excess of 72 hours, this condition is being reported pursuant to 10 CFR 50.72(b)(3)(xiii). | | event text = On March 05, 2020, at 2100 EST, the site commenced a planned upgrade of the main plant computer system (MPCS). During this upgrade, the normal computer data will not be available to the emergency response facilities, but compensatory capabilities will be in place. The scheduled duration for the MPCS upgrade is 96 hours. Since the compensatory measures will be in place in excess of 72 hours, this condition is being reported pursuant to 10 CFR 50.72(b)(3)(xiii). | ||
The NRC Resident Inspector has been notified. | The NRC Resident Inspector has been notified. | ||
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2020/20200306en.html#en54569 | | URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2020/20200306en.html#en54569 | ||
}} | }} | ||
{{ENS-Nav}}[[Category:Power Reactor]] | {{ENS-Nav}}[[Category:Power Reactor]] | ||
Latest revision as of 11:52, 15 January 2021
| Where | |
|---|---|
| Seabrook New Hampshire (NRC Region 1) | |
| Reporting | |
| 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness | |
| Time - Person (Reporting Time:+-4.77 h-0.199 days <br />-0.0284 weeks <br />-0.00653 months <br />) | |
| Opened: | Eric Mallett 21:14 Mar 5, 2020 |
| NRC Officer: | Andrew Waugh |
| Last Updated: | Mar 5, 2020 |
| 54569 - NRC Website
| |