ML20062L694: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot change) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 2: | Line 2: | ||
| number = ML20062L694 | | number = ML20062L694 | ||
| issue date = 01/15/1981 | | issue date = 01/15/1981 | ||
| title = Public Version of Emergency Instruction I-4.4,Revision 10, Loss of Coolant (Leakage Greater than Max Charging Flow) | | title = Public Version of Emergency Instruction I-4.4,Revision 10, Loss of Coolant (Leakage Greater than Max Charging Flow) | ||
| author name = | | author name = | ||
| author affiliation = PUBLIC SERVICE ELECTRIC & GAS CO. OF NEW JERSEY | | author affiliation = PUBLIC SERVICE ELECTRIC & GAS CO. OF NEW JERSEY | ||
Revision as of 17:47, 6 January 2021
| ML20062L694 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 01/15/1981 |
| From: | Public Service Enterprise Group |
| To: | |
| Shared Package | |
| ML18085A819 | List: |
| References | |
| I-4.4-01, I-4.4-1, NUDOCS 8102170392 | |
| Download: ML20062L694 (37) | |
Text
..
l-4.4
.. EMERGENCY INSTRUCTION c l-4.4 p LOSS OF COOLANT (LE.AKAGE GREATER THAN MAXIMUM CHARGING FLOW) 1.0 PUCPOSE l.1 IH!$ INSTRUCT!CN PROVIDES Tb! NECESSARY CPERATOR ACTIONS REQUIRED TO PROVIDE MAXIMUM CORE COOLING TO MINIMlZE CORE DAMAGE FOLLOWING A LOSS OF COOLANT ACCIDENT.
1.2 THIS INSTRUCTION CONTAINS THE STEPS REQUIRED OF THE OPERATOR TO SWITCH FROM THE INJEC-T10N TO RECIRCULATION PHASES OF CORE C0 CLING AT THE APPROPRIATE TIMES.
1.3 THIS INSTRUCTION INCLUDES THE APPROPRIATE OPERATOR ACTIONS REGUIRED TO COPE WITH THE FOLLOW!NG FAILURES.
1.3.1 LOSS OF A RESIDUAL HEAT REMOVAL PUMP DUE TO EITHER OF THE FOLLOWING:
A. FAILURE OF THE ASCCCIATED SJ44, SIS SUMP VALVE, TO OPEN.
- s. FA! LURE OF AN RHE ? UMP.
1.3.2 LOSS OF 0FFSITE power WITH:
A. ALL DIESELS OPERA *!NG B. . FAILURE OF A $1NGLE DIESEL.
2.] INITIAL CO'iDI UDSS 2.1 SAFETY INJECTION HAS BEEN IN:TIATED AND IT HAS BEEN DETERMINED 3Y USE OF SECTION 5.0, "lDENTIFICATION OF FOLt0w-UP. ACTIONS' 0F El 1-4.0, " SAFETY INJECT 10N INITIATION",THAT A LOSS OF COOLANT ACCIDENT H;S OCCURRED.
3.0 I M DIAT: ACTIONS 3.1 VERIFY THAT ALL IMPEDIATE ANC SUBSECUENT ACTIONS DESCRIBED IN El 1-4.0, " SAFETY INJECTION INITIATION" HAVE BEEN PERFORTED. COMPLETE ANY ACTIONS WHICH HAVE NOT BEEN PREVICUSLY COMPLETED.
3.2 IF CONTAINMENT PRESSURE REAchig inE HI-HI SETPCINT OF 23.5 PSIG, VERIFY HE FOLL0wlNG AUTOMATIC ACTIONS MvE TAAEP: ' LACE BY CBSERVING TnE INDICATIONS ON THE STATUS PANEL CN RP-4.
3.2.1 CONTAINMENT SPRAY ACTUATION 3.2.2 CCNTAINMENT PHASE '3" !SCLATION i
3.2.3 MA!N STEAM ISCLATION 8202170 %
SALEM UNIT l'/ UNIT 2 1 CF 37 REv. 10