05000423/LER-1996-015, Forwards LER 96-015-05,documenting Event That Occurred at Plant,Unit 3 on 960610,per 10CFR50.73(a)(2)(ii)(B). Commitments Made within Ltr Submitted: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot change) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 1: | Line 1: | ||
# | {{Adams | ||
| number = ML20198T261 | |||
| issue date = 11/05/1997 | |||
| title = Forwards LER 96-015-05,documenting Event That Occurred at Plant,Unit 3 on 960610,per 10CFR50.73(a)(2)(ii)(B). Commitments Made within Ltr Submitted | |||
| author name = Hicks G | |||
| author affiliation = NORTHEAST NUCLEAR ENERGY CO. | |||
| addressee name = | |||
| addressee affiliation = NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) | |||
| docket = 05000423 | |||
| license number = | |||
| contact person = | |||
| document report number = B16803, NUDOCS 9711140244 | |||
| package number = ML20198T267 | |||
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE | |||
| page count = 5 | |||
}} | |||
{{LER | |||
| Title = Forwards LER 96-015-05,documenting Event That Occurred at Plant,Unit 3 on 960610,per 10CFR50.73(a)(2)(ii)(B). Commitments Made within Ltr Submitted | |||
| Plant = | |||
| Reporting criterion = | |||
| Power level = | |||
| Mode = | |||
| Docket = 05000423 | |||
| LER year = 2096 | |||
| LER number = 15 | |||
| LER revision = | |||
| Event date = | |||
| Report date = | |||
| ENS = | |||
| abstract = | |||
}} | |||
=text= | |||
{{#Wiki_filter:- - . . _ | |||
Nordicast - ""I* F' m "* * "'' " ' * * " " " | |||
Nuclear Energy usioo, Noci,a, po. , siai3on Northeast Nuclear Energy Com; any | |||
* P.O. Dos 128 - I Waterford, CT 06385 0128 (860) 447 1791 Faz (860) 444-4277 The Northeast Utilitice System - | |||
November 5,1997 4 Docket No. 50-423 B16803 Re: 10CFR50.73(a)(2)(ii)(B) 10CFR50.73(a)(2)(v)(D) 10CFR50.73(a)(2)(vii) | |||
U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Millstone Nuclear Power Station Unit 3 Licensee Event Report 96-015-05 Submitted Pursuant to 10CFR 50.73(a)(2)(ii)(B).10CFR50.73 (a)(2)(v)(D). and 10CFR50.73(a)(2)(vn) | |||
This letter forwards Licensee Event Report (LER) 96-015-05, documenting a condition that was initially determined at Millstone Unit No. 3 on June 10,1996. | |||
This LER was initially submitted pursuant to 10CFR50.73(a)(2)(ii)(B). The first / /. | |||
through fourth LER supplements were submitted pursuant to 10CFR50.73(a)(2)(ii)(B),10CFR50.73(a)(2)(v)(D), and 10CFR50.73(a)(2)(vii). / | |||
This supplement reports additional electrical separation issues determined | |||
'l. Y s reportable on October 9, 1997, and is being submitted pursuant to 10CFR50.73(a)(2)(ii)(B). NNECO's additional commitments in response to this event are contained within Attachment 1 to this letter. | |||
9711140244 971105 . | |||
PDR ADOCK 05000423L l 8 pop b!,!Ik! . . | |||
(3047J4 ILEY.1245 i | |||
= U.S. Nucber Regul:to:y Commission | |||
: 816803\Page 2 , | |||
4-- | |||
Should _you have any questions regarding this submittal, please contact Mr. | |||
David A. Smith at (860) 437-5840. | |||
Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY N : | |||
.HTcks Director, Mills'one Unit No. 3 | |||
==Attachment:== | |||
: 1) NNECO's commitments in response to LER 93-015-05 | |||
: 2) - LER 96-015-05 | |||
- cci H. J. Miller, Region I Administrator A. C. Cerne, Senior Resident Inspector, Millstone Unit No. 3 J. W. Andersen, NRC Project Manager, Millstone Unit No. 3 | |||
: W. D. Travers, Dr., Director, Special Projects Corrective Actions Group File (CRs M3-97-3340,3343) | |||
- 2 | |||
, - .-- Decket No.' 50-423 - | |||
'~ | |||
- --- B16803' Attachment 1 Millstone Nuclear Power Station, Unit No. 3 | |||
- NNECO's Commitments' | |||
.In Response To | |||
:(LER 96-015-05) | |||
~l l | |||
l November 1997 | |||
+ | |||
s | |||
-. >~ | |||
+- Encloeure . | |||
List of Regulatory Commitments The following table.-identifies those' actions committed to by NNECO in this ' | |||
document. Please notify the Manager - Nuclear Licensing at the Millstone Nuclear - | |||
Power Station Unit No. 3 of any questions regarding this document or any associated regulatory commitments. | |||
Number Commitment Due B16803-01 Identified electrical separation Prior to entry into. | |||
noncompliances will be corrected or Mode 4. | |||
restored to compliance with the design basis. (This corrective action includes those identified within section 2 of the main control board in October 1997.) | |||
p p-, -- | |||
m - n- y wy, - - | |||
w | |||
W o, L | |||
, - :-- Docket No. 50-423 i B16803 | |||
.A Attachment 2 | |||
- Millstone Nuclear Power Station, Unit No. 3 1 NNECO's Submittal of (LER 96-015-05) t November 1997 j | |||
i | |||
--.. _ -;,. .L-_.,-- | |||
- , _ . . . . . . . , . . ,-- , _ . . - . ,- | |||
}} | |||
{{LER-Nav}} | |||
Revision as of 03:21, 2 January 2021
| ML20198T261 | |
| Person / Time | |
|---|---|
| Site: | |
| Issue date: | 11/05/1997 |
| From: | Hicks G NORTHEAST NUCLEAR ENERGY CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20198T267 | List: |
| References | |
| B16803, NUDOCS 9711140244 | |
| Download: ML20198T261 (5) | |
| Event date: | |
|---|---|
| Report date: | |
| 4232096015R00 - NRC Website | |
text
- - . . _
Nordicast - ""I* F' m "* * " " ' * * " " "
Nuclear Energy usioo, Noci,a, po. , siai3on Northeast Nuclear Energy Com; any
- P.O. Dos 128 - I Waterford, CT 06385 0128 (860) 447 1791 Faz (860) 444-4277 The Northeast Utilitice System -
November 5,1997 4 Docket No. 50-423 B16803 Re: 10CFR50.73(a)(2)(ii)(B) 10CFR50.73(a)(2)(v)(D) 10CFR50.73(a)(2)(vii)
U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Millstone Nuclear Power Station Unit 3 Licensee Event Report 96-015-05 Submitted Pursuant to 10CFR 50.73(a)(2)(ii)(B).10CFR50.73 (a)(2)(v)(D). and 10CFR50.73(a)(2)(vn)
This letter forwards Licensee Event Report (LER) 96-015-05, documenting a condition that was initially determined at Millstone Unit No. 3 on June 10,1996.
This LER was initially submitted pursuant to 10CFR50.73(a)(2)(ii)(B). The first / /.
through fourth LER supplements were submitted pursuant to 10CFR50.73(a)(2)(ii)(B),10CFR50.73(a)(2)(v)(D), and 10CFR50.73(a)(2)(vii). /
This supplement reports additional electrical separation issues determined
'l. Y s reportable on October 9, 1997, and is being submitted pursuant to 10CFR50.73(a)(2)(ii)(B). NNECO's additional commitments in response to this event are contained within Attachment 1 to this letter.
9711140244 971105 .
PDR ADOCK 05000423L l 8 pop b!,!Ik! . .
(3047J4 ILEY.1245 i
= U.S. Nucber Regul:to:y Commission
- 816803\Page 2 ,
4--
Should _you have any questions regarding this submittal, please contact Mr.
David A. Smith at (860) 437-5840.
Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY N :
.HTcks Director, Mills'one Unit No. 3
Attachment:
- 1) NNECO's commitments in response to LER 93-015-05
- 2) - LER 96-015-05
- cci H. J. Miller, Region I Administrator A. C. Cerne, Senior Resident Inspector, Millstone Unit No. 3 J. W. Andersen, NRC Project Manager, Millstone Unit No. 3
- W. D. Travers, Dr., Director, Special Projects Corrective Actions Group File (CRs M3-97-3340,3343)
- 2
, - .-- Decket No.' 50-423 -
'~
- --- B16803' Attachment 1 Millstone Nuclear Power Station, Unit No. 3
- NNECO's Commitments'
.In Response To
- (LER 96-015-05)
~l l
l November 1997
+
s
-. >~
+- Encloeure .
List of Regulatory Commitments The following table.-identifies those' actions committed to by NNECO in this '
document. Please notify the Manager - Nuclear Licensing at the Millstone Nuclear -
Power Station Unit No. 3 of any questions regarding this document or any associated regulatory commitments.
Number Commitment Due B16803-01 Identified electrical separation Prior to entry into.
noncompliances will be corrected or Mode 4.
restored to compliance with the design basis. (This corrective action includes those identified within section 2 of the main control board in October 1997.)
p p-, --
m - n- y wy, - -
w
W o, L
, - :-- Docket No. 50-423 i B16803
.A Attachment 2
- Millstone Nuclear Power Station, Unit No. 3 1 NNECO's Submittal of (LER 96-015-05) t November 1997 j
i
--.. _ -;,. .L-_.,--
- , _ . . . . . . . , . . ,-- , _ . . - . ,-