05000423/LER-1996-015, Forwards LER 96-015-05,documenting Event That Occurred at Plant,Unit 3 on 960610,per 10CFR50.73(a)(2)(ii)(B). Commitments Made within Ltr Submitted: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
Line 1: Line 1:
#REDIRECT [[05000423/LER-1996-015]]
{{Adams
| number = ML20198T261
| issue date = 11/05/1997
| title = Forwards LER 96-015-05,documenting Event That Occurred at Plant,Unit 3 on 960610,per 10CFR50.73(a)(2)(ii)(B). Commitments Made within Ltr Submitted
| author name = Hicks G
| author affiliation = NORTHEAST NUCLEAR ENERGY CO.
| addressee name =
| addressee affiliation = NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
| docket = 05000423
| license number =
| contact person =
| document report number = B16803, NUDOCS 9711140244
| package number = ML20198T267
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE
| page count = 5
}}
{{LER
| Title = Forwards LER 96-015-05,documenting Event That Occurred at Plant,Unit 3 on 960610,per 10CFR50.73(a)(2)(ii)(B). Commitments Made within Ltr Submitted
| Plant =
| Reporting criterion =
| Power level =
| Mode =
| Docket = 05000423
| LER year = 2096
| LER number = 15
| LER revision =
| Event date =
| Report date =
| ENS =
| abstract =
}}
 
=text=
{{#Wiki_filter:-                                                    - . . _
Nordicast -                                          ""I* F' m "* * "'' " ' * * " " "
Nuclear Energy                                      usioo, Noci,a, po. , siai3on Northeast Nuclear Energy Com; any
* P.O. Dos 128 -                                      I Waterford, CT 06385 0128 (860) 447 1791 Faz (860) 444-4277 The Northeast Utilitice System -
November 5,1997                                4 Docket No. 50-423 B16803 Re: 10CFR50.73(a)(2)(ii)(B) 10CFR50.73(a)(2)(v)(D) 10CFR50.73(a)(2)(vii)
U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Millstone Nuclear Power Station Unit 3 Licensee Event Report 96-015-05 Submitted Pursuant to 10CFR 50.73(a)(2)(ii)(B).10CFR50.73 (a)(2)(v)(D). and 10CFR50.73(a)(2)(vn)
This letter forwards Licensee Event Report (LER) 96-015-05, documenting a condition that was initially determined at Millstone Unit No. 3 on June 10,1996.
This LER was initially submitted pursuant to 10CFR50.73(a)(2)(ii)(B). The first                    / /.
through      fourth LER         supplements  were    submitted      pursuant            to 10CFR50.73(a)(2)(ii)(B),10CFR50.73(a)(2)(v)(D), and 10CFR50.73(a)(2)(vii).                      /
This supplement reports additional electrical separation issues determined
                                                                                                                'l. Y s            reportable on October 9,          1997, and is being submitted pursuant to 10CFR50.73(a)(2)(ii)(B). NNECO's additional commitments in response to this event are contained within Attachment 1 to this letter.
9711140244 971105        .
PDR      ADOCK 05000423L l                8                  pop b!,!Ik!    .      .
(3047J4 ILEY.1245 i
 
      = U.S. Nucber Regul:to:y Commission
: 816803\Page 2                                ,
4--
Should _you have any questions regarding this submittal, please contact Mr.
David A. Smith at (860) 437-5840.
Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY N      :
                                                      .HTcks Director, Mills'one Unit No. 3
 
==Attachment:==
: 1)              NNECO's commitments in response to LER 93-015-05
: 2)        - LER 96-015-05
      - cci        H. J. Miller, Region I Administrator A. C. Cerne, Senior Resident Inspector, Millstone Unit No. 3 J. W. Andersen, NRC Project Manager, Millstone Unit No. 3
: W. D. Travers, Dr., Director, Special Projects Corrective Actions Group File (CRs M3-97-3340,3343)
 
                                        -      2
                ,        - .--                                                              Decket No.' 50-423 -
                                '~
                    - ---                                                                                    B16803' Attachment 1 Millstone Nuclear Power Station, Unit No. 3
                                                            - NNECO's Commitments'
                                                                .In Response To
:(LER 96-015-05)
                                                                                                                      ~l l
l November 1997
  +
s
        -. >~
 
                  +-                                                        Encloeure .
List of Regulatory Commitments The following table.-identifies those' actions committed to by NNECO in this                                              '
document. Please notify the Manager - Nuclear Licensing at the Millstone Nuclear                                          -
Power Station Unit No. 3 of any questions regarding this document or any associated regulatory commitments.
Number                                Commitment                                                Due B16803-01    Identified electrical separation                                          Prior to entry into.
noncompliances will be corrected or                                                Mode 4.
restored to compliance with the design basis. (This corrective action includes those identified within section 2 of the main control board in October 1997.)
p      p-,              --
m -        n-    y wy, -                    -
w
 
W o, L
                      , -      :--                                                                                    Docket No. 50-423 i                                                                                                      B16803
                  .A Attachment 2
                                                    - Millstone Nuclear Power Station, Unit No. 3                                                1 NNECO's Submittal of (LER 96-015-05) t November 1997 j
i
                    --.. _ -;,.                            .L-_.,--
                                                                                            - , _ . . . . . . . , . .  ,-- , _ .        . - . ,-
}}
 
{{LER-Nav}}

Revision as of 03:21, 2 January 2021

Forwards LER 96-015-05,documenting Event That Occurred at Plant,Unit 3 on 960610,per 10CFR50.73(a)(2)(ii)(B). Commitments Made within Ltr Submitted
ML20198T261
Person / Time
Site:  Dominion icon.png
Issue date: 11/05/1997
From: Hicks G
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20198T267 List:
References
B16803, NUDOCS 9711140244
Download: ML20198T261 (5)


LER-2096-015, Forwards LER 96-015-05,documenting Event That Occurred at Plant,Unit 3 on 960610,per 10CFR50.73(a)(2)(ii)(B). Commitments Made within Ltr Submitted
Event date:
Report date:
4232096015R00 - NRC Website

text

- - . . _

Nordicast - ""I* F' m "* * " " ' * * " " "

Nuclear Energy usioo, Noci,a, po. , siai3on Northeast Nuclear Energy Com; any

  • P.O. Dos 128 - I Waterford, CT 06385 0128 (860) 447 1791 Faz (860) 444-4277 The Northeast Utilitice System -

November 5,1997 4 Docket No. 50-423 B16803 Re: 10CFR50.73(a)(2)(ii)(B) 10CFR50.73(a)(2)(v)(D) 10CFR50.73(a)(2)(vii)

U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Millstone Nuclear Power Station Unit 3 Licensee Event Report 96-015-05 Submitted Pursuant to 10CFR 50.73(a)(2)(ii)(B).10CFR50.73 (a)(2)(v)(D). and 10CFR50.73(a)(2)(vn)

This letter forwards Licensee Event Report (LER) 96-015-05, documenting a condition that was initially determined at Millstone Unit No. 3 on June 10,1996.

This LER was initially submitted pursuant to 10CFR50.73(a)(2)(ii)(B). The first / /.

through fourth LER supplements were submitted pursuant to 10CFR50.73(a)(2)(ii)(B),10CFR50.73(a)(2)(v)(D), and 10CFR50.73(a)(2)(vii). /

This supplement reports additional electrical separation issues determined

'l. Y s reportable on October 9, 1997, and is being submitted pursuant to 10CFR50.73(a)(2)(ii)(B). NNECO's additional commitments in response to this event are contained within Attachment 1 to this letter.

9711140244 971105 .

PDR ADOCK 05000423L l 8 pop b!,!Ik! . .

(3047J4 ILEY.1245 i

= U.S. Nucber Regul:to:y Commission

816803\Page 2 ,

4--

Should _you have any questions regarding this submittal, please contact Mr.

David A. Smith at (860) 437-5840.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY N  :

.HTcks Director, Mills'one Unit No. 3

Attachment:

1) NNECO's commitments in response to LER 93-015-05
2) - LER 96-015-05

- cci H. J. Miller, Region I Administrator A. C. Cerne, Senior Resident Inspector, Millstone Unit No. 3 J. W. Andersen, NRC Project Manager, Millstone Unit No. 3

W. D. Travers, Dr., Director, Special Projects Corrective Actions Group File (CRs M3-97-3340,3343)

- 2

, - .-- Decket No.' 50-423 -

'~

- --- B16803' Attachment 1 Millstone Nuclear Power Station, Unit No. 3

- NNECO's Commitments'

.In Response To

(LER 96-015-05)

~l l

l November 1997

+

s

-. >~

+- Encloeure .

List of Regulatory Commitments The following table.-identifies those' actions committed to by NNECO in this '

document. Please notify the Manager - Nuclear Licensing at the Millstone Nuclear -

Power Station Unit No. 3 of any questions regarding this document or any associated regulatory commitments.

Number Commitment Due B16803-01 Identified electrical separation Prior to entry into.

noncompliances will be corrected or Mode 4.

restored to compliance with the design basis. (This corrective action includes those identified within section 2 of the main control board in October 1997.)

p p-, --

m - n- y wy, - -

w

W o, L

, -  :-- Docket No. 50-423 i B16803

.A Attachment 2

- Millstone Nuclear Power Station, Unit No. 3 1 NNECO's Submittal of (LER 96-015-05) t November 1997 j

i

--.. _ -;,. .L-_.,--

- , _ . . . . . . . , . . ,-- , _ . . - . ,-