UNITED STATES | |||
NUCLEAR REGULATORY COMMISSION | |||
f" | |||
g | |||
g | |||
;y | |||
. | |||
WASHINGTON, D. C 20666 | |||
\,^****/ | |||
SEP 3 01988 | |||
Docket Nos. 50-445 -- | |||
and 50-446 | |||
. APPLICANT: Texas Utilities Electric Company (TV Electric) | |||
FACILITY: Comanche Peak Steam Electric Station (CPSES), Units 1 and 2 | |||
SUBJECT: SUFFARY OF NEETING 01 MARCH 17-18,1988 - | |||
COMANCHE PEAK FIRE PPOTECTION PRCGRAM | |||
On March 17-18, 1988, tne staff met with representatives of TU Electric, lead | |||
applicant for the CPSES, to discuss (1) the status of TU Electric actions | |||
related to open and unresolved items in NRC Inspection Report 50-445/87-22 and | |||
(2) information needed by the staff to complete its revised safety evaluation | |||
on the fire protection program for the CPSES Units 1 and 2. The meeting | |||
notice, agenda, and list of attendees are provided as Enclosures 1, 2, and 3, | |||
respectively, to this summary. The handouts used by the applicant are included | |||
as Enclosurc 4. | |||
; The applicant provided the status of each of the open and unresolved items | |||
, | |||
appearing in Inspection Report 50-445/67-22 which ducu.nents the results of | |||
' | |||
NRC's site inspection of CPSES Unit 1 during the period October 19-23, 1987. | |||
TV Electric's responses to the items are documentea in a letter from W. G. | |||
' | |||
Counsil (TV Electric) to NDC dated March 11,1988(TXX-88309). Following this | |||
i | |||
status review, the staff and applicant discussed deviations frot Appendix A to | |||
' | |||
APCSB 9.51 and applicant evaluations (documentation) to demonstrate fire | |||
protection program compliance. In addition to pages 16-18 of Enclosure 4 the | |||
1 applicant provided scme preliminary information as a handout (Enclosure 5} on | |||
i numbers and areas of evaluations and deviations. | |||
l | |||
Following an NRC caucus TV Electric advised the staff that tney planned to | |||
submit an FSAR amendment describing recent changes in their evaluation process. | |||
< These changes have been made since the letters of April 15, 1987 (TXX-6376) and | |||
' | |||
August 4,1987 (TXX-6582), which providad TV Electric :oments and clarificai, ions | |||
a | |||
on the CPSES Fire Protection Program as it e,;4tes to NRC's discussion in | |||
' | |||
Section 9.5.1 of Supplement #12 to the Comanche Peek Safety Evaluation Report | |||
(SER). The staff advised TV Electric that it wanted to review some evaluations | |||
i | |||
on file at TV Electric demonstrating fire protection program Ocmpliance. | |||
. | |||
Following these discussions, the meeting broke into two working sessions, one | |||
group discussed staff information needed for the revised CPSES SER on fire | |||
protection and the other group reviewed several engineering evaluations | |||
demonstrating fire protection program compliance. | |||
DFol | |||
<s | |||
. | |||
! | |||
; 8G10140127 sgo939 | |||
hDR ADOCK 05000445 | |||
; PDC | |||
- | |||
> | |||
_ _ _ _ _ - - _ _ _ _ - _ _ _ - _ - _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ - _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ - _ - - | |||
* | |||
.. ., | |||
TV Electric -3- SEP 3 01988 | |||
In closing discussion, the staff noted that formal review of the applicant's | |||
responses to the open and unresolved itecis from Inspection Report 50-445/87-22 | |||
would take place at some time in the future. The staff expressed an intent to | |||
spend some time at the site and off site auditing a sample of TV Electric's | |||
fire protection program engineering evaluations. The staff also remarked that | |||
it would like to see better cross referencing or more direct linking of the | |||
engineering evaluations in the Comanche Peak Fire Protection Report to assure | |||
a clear licensing basis. TU Electric stated that it intends to submit advanced | |||
draft FSAR changes by early May 1988. | |||
original signed by: | |||
Melinda Malloy, Project Manager | |||
Comanche Peak Project Division | |||
Office of Special Projects | |||
Enclosures: | |||
1. Meeting Notice | |||
2. Agenda | |||
3. List of Attendees | |||
4. TV Electric Handouts | |||
5. Handouts on Engineering Evaluations | |||
cc w/ enclosure: | |||
See next page | |||
4 | |||
OISTRIBUTION: | |||
]~ | |||
cDocketFiles(50-445/446): | |||
NRC FDR | |||
; Local POR | |||
4 CPPD Reading | |||
i' OSP Reading | |||
JPartlow | |||
1 CGrimes | |||
! PNcKee | |||
j JWilson | |||
! JLyons | |||
l RWarnick | |||
PJtalloy | |||
JWiebe | |||
A51ngh | |||
} OKubicki | |||
; OGC.WF | |||
1 | |||
DCrutchfield - | |||
i EJordan | |||
1 BGricles | |||
l ACRS(10) | |||
! | |||
. | |||
: : : : : | |||
OFC :FM:CPPD AD/P:CPPD | |||
.. so M.::.............:............:............:............:...........:........... | |||
NAME .MHalloy: sam :JWil : : | |||
t qqd : : : | |||
.....:............:......r......:............:............:............:...........:........... : : : | |||
DATE :9 4 @ 88 :9/30/88 : : | |||
OFFICIAL RECORD COPY | |||
_ | |||
. | |||
.. | |||
. | |||
.. , i | |||
SEP 3 01988 | |||
/ | |||
' | |||
W. G. Counsil Comanche Peak Steam Electric Station | |||
: | |||
Texas Utilities Electric Company Units 1 and 2 | |||
cc: Asst. Director for Inspec. Programs | |||
Jack R. Newman, Esq. | |||
Newman & Holtzinger, P.C. Comanche Peak Project Division , | |||
Suite 1000 U.S. Nuclear Regulatory Commission l | |||
, | |||
1615 L Street, N.W. P. O. Box 1029 - | |||
! | |||
Washington, D.C. 20036 Granbury, Texas 76048 | |||
Robert A. Wooldridge, Esq. Regional Administrator, Regi' IV ! | |||
: | |||
, | |||
1 Worsham, Forsythe, Sampels & U.S. Nuclear Regulatory Consa;sion | |||
Wooldridge 611 Ryan Plaza Drive, Suite 1000 | |||
2001 Bryan Tower, Suite 2500 Arlington, Texas 76011 i | |||
Dallas, Texas 75201 . | |||
Lanny A. Sinkin | |||
' | |||
Mr. 8,omer C. Schmidt Christic Institute , | |||
Dirtctor of Nuclear Services 1324 North Capitol Street ' | |||
i | |||
Texas Utilities Electric Company Washington, D.C. 20002 | |||
; Skyway Tower | |||
400 North Olive Street, L.B. 81 Hs. Billie Pirner Garde. Esq. | |||
, | |||
Dallas, Texas 75201 Government Accountability Project | |||
Midwest Office | |||
Mr. R. W. Ackley 104 East Wisconsin Avenue i | |||
. Stone & Webster Appleton, Wisconsin 54911 | |||
j | |||
l Comanche Peak Steam Electric Staticn | |||
P. O. Box 1002 David R. Pigott, Esq. ; | |||
i | |||
J Glen Rose, Texas 76043 Orrick, Herrington & Sutcliffe ! | |||
600 Montgomery Street | |||
l | |||
Mr. J. L. Vota San Francisco, California 94111 | |||
! | |||
l Westinghouse Electric Corporation | |||
' | |||
P. O. Box 355 Anthony Z. Roisman, Esq. | |||
Pittsburgh, Pennsylvania 15230 , Suite 600 | |||
'l 1401 New York Avenue, NW | |||
i Susan M. Theisen Washington, D.C. 20005 ; | |||
' | |||
l | |||
Assistant Attorney General | |||
Environmental Protection Division Robert Jablon | |||
! | |||
: P. O. Box 12548, Capitol Station Bonnie S. Blair | |||
j Austin, Texas 78711-1548 Spiegel & McDiarmid t | |||
1350 New York Avenue, NW , | |||
Mrs. Juanita Ellis, President Washington, D.C. 20005-4798 i | |||
? | |||
Citizens Association for Sound Energy | |||
1426 South Polk George A. Parker, Chairnan i | |||
l | |||
; Dallas, Texas 75224 Public Utility Committee t | |||
Senior Citizens Alliance Of ! | |||
; Tarrant County, Inc. o | |||
Ms. Nancy H. Williams i | |||
CYGNA Energy Services 6048 Wonder Drive | |||
2121 H. California Blvd., Suite 390 Fort Worth Texas 76133 [ | |||
Walnut Creek, CA 94596 ; | |||
I | |||
. | |||
. | |||
' | |||
! , | |||
4 , | |||
l _- l | |||
_ _ _ - _ - _ _ _ _ - _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ | |||
L | |||
* ' | |||
. . . . . . | |||
' | |||
SEP 3 01988 | |||
W. G. Counsil -2- Comanche Peak Elat.tric Station | |||
. Texas Utilities Electric Company Units 1 and 2 | |||
CC* . | |||
. | |||
Joseph F. Fulbright | |||
Fulbright & Jaworski | |||
1301 McKinney Street | |||
Houston, Texas 77010 | |||
P.oger D. Walker | |||
Manager Nuclear Licensing | |||
Texas Utilities Electric Company | |||
Skyway Tower | |||
400 North Olive Street. L.B. 81 | |||
Dallas, Texas 75201 | |||
Texas Utilities Electric Company | |||
c/o Bethesda Licensing | |||
3 Hetro Center, Suite 610 | |||
Bethesda, Maryland 20614 | |||
William A. Burchette, Esq. | |||
Counsel for Tex-La Electric Cooperative | |||
of Texas | |||
Heron, Burchette, Ruckert & Rothwell | |||
Suite 700 | |||
1025 Thomas Jefferson Street, NW | |||
Washington, D.C. 20007 | |||
GDS ASSOCIATES, Ific. | |||
Suits 720 | |||
1650 Parkway Place | |||
Marietta, Georgia 30067-8237 | |||
_ | |||
' ' | |||
.. .. | |||
0*C | |||
/ '%; UNITED STATES | |||
NUCLEAR REGULATORY COMMISSION | |||
:i -'( ~, , ' i 8 W A$mNGTON, D C. 20555 | |||
March 3, 1988 | |||
,,, .$(/ | |||
..... | |||
Docket Nos. 50-445 | |||
and 50-446 | |||
MEMORANDUM FOR: Christopher 1. Grimes, Director | |||
Comanche Peak Project Division | |||
Office of Special Projects | |||
THRU: James H. Wilson, Assistant Directo | |||
for Projects | |||
Comanche Peak Project Division | |||
Office of Special Projects | |||
FROM: Melinda Malloy, Project Manager | |||
Comanche Peak Project Division | |||
Office of Special Projects | |||
SUBJECT: FORTHCOMING MEETING WITH TV ELECTRIC | |||
Date & Time: Thursday, March 17, 1988, 1:00 pm - 5:00 pm | |||
Friday, March 18, 1988, 8:30 am - 12:00 Noon | |||
Location: One White F1jnt North | |||
11555 Rockville Pike | |||
Room 10 8 13 | |||
Rockville, MD 20852 | |||
Purpse: For Applicant and Staff to discuss: | |||
1. information related to open and | |||
unresolved items in NRC Inspection . | |||
. | |||
, | |||
Report 50-445/87-22, and | |||
2. information needed by NRC to complete | |||
a revited safety evaluation for the | |||
implementation of the fire protection | |||
progrem for Comanche Peak, Units 1 and 2 | |||
Participants *: NRC Applicant | |||
C McKee R. Walker | |||
A. Singh | |||
* | |||
J. Seawright | |||
R. Layton | |||
M.Malley(contractor) | |||
T. Storey et al. | |||
A. Fresco (contr . / | |||
A&,y,f | |||
* s. | |||
# | |||
M in Malloy, P oject Many r | |||
Comanche Peak Project Divisten | |||
Office of Special Projects | |||
cc: See next page , | |||
. | |||
CONTACTS: Melinda Malloy or James H. Wilson | |||
(301)492 0738 (301)492-3306 | |||
* Meetings between NRC technical staff and applicants for licenses are open | |||
for interested members of the public, petitioners, intervenors, or other | |||
parties to attend as observers pursuant to "Open Meetings and Statement of | |||
" 43 Federal Register 28058,6/28/78. | |||
OD$ ~fr aff Policyh0/2 | |||
~ | |||
t$~T | |||
* | |||
. | |||
* * | |||
* | |||
., | |||
* | |||
., . , | |||
* | |||
. | |||
. | |||
. | |||
W. G. Counsil | |||
' | |||
Comanche Peak Steam Electric Station | |||
Texas Utilitics Electric Company Units 1 and 2 | |||
cc: | |||
Jack R. Newman, Esq. Asst. Director for Inspec. Prograns i | |||
Newman & holtzinger, P.C. Comar.che Peak Project Division | |||
Suite 1000 U.S. Nuclear Regulatory Comission | |||
1615 L Street, N.W. P. O. Box 1029 | |||
Washington. 0.C. 20036 - Granbury Texas 76048 | |||
Robert A. Wooldridge, Esq. Regional Administrator, Region IV | |||
Worsham, Forsythe, Sampels & U.S. Nuclear Regulatory Comission ' | |||
Wooldridge Gil Ryan Plaza Drive, Suite 1000 | |||
2001 Bryan Tower, Suite 2500 Arlington, Texas 76011 | |||
Dallas, Texas 75201 | |||
Lanny A. Sinkin | |||
Mr. Homer C. Schmidt Christic Institute | |||
Of rector of Nuclear Services 1324 North Capitol Street | |||
Texas Utilities Electric Company Washington 0.C. 20002 , | |||
' | |||
Skyway Tower | |||
400 North Olive Street, L.B. 81 Ms. Billie Pirner Garde, Esq. * | |||
Dallas, Texas 75201 Governrent Accountability Project | |||
Midwest Office | |||
Mr. Robert E. Ballard, Jr. 104 East Wisconsin Avenue | |||
Director of Projects Appleton, Wisconsin 54911 | |||
Gibbs and Hill, Inc. | |||
11 Penn Plaza | |||
New York, New York 10001 David R. Pigott, Esq. . | |||
. | |||
) | |||
l | |||
Orrick, Herrington & Sutcliffe | |||
: | |||
~ | |||
600 Montgomery Street | |||
r Mr. R. S. Howard San Francisco, California 94111 | |||
Westinghouse Electric Corporation | |||
P. O. Box 355 Anthony Z. Roisman, Esq. | |||
Pittsburgh, Pennsyl.:anta 15230 Suite 600 | |||
' 1401 New York Avenue, NW | |||
, Renea Hicks Esq. Washington 0.C. 20005 | |||
Assistant Attorney General | |||
Environmental Protection Division Robert Jablon | |||
P. O. Box 12548, Capitol Station Bonnte S. Blair | |||
Austin, Tuas 78711 Spiegel & McDiarmid | |||
1350 New York Avenue, NW | |||
Mrs. Juanita Ellis, President Washington, 0.t. 20005-4798 | |||
Citizens Association for Sound Energy | |||
1426 South Polk George A. Parker, Chairman | |||
Callas, Texas 75224 Public Utility Cemittee | |||
Senior Citizens Alliance Of | |||
Ms. Nancy H. Williams Tarrant County, Inc., | |||
CYGNA Energy Services 6048 'noncer Drive | |||
2121 N. California Blvd., Suite 390 Fort Worth, Texas 76133 | |||
Walnut Creek, CA 94596 | |||
' | |||
._- - . -_- - ._- -- .- | |||
_ _ _ _ - _ _ _ _ _ _ _ . | |||
* * | |||
.. .. . | |||
, | |||
* . | |||
W. G. Counsil | |||
~ | |||
-2- Cemanche Peak Electric Staticn | |||
Texas Utilities Electric Company Units 1 and 2 | |||
. | |||
cc: | |||
Joseph F. Fulbright | |||
Fulbright & Jaworski | |||
1301 McKinney Street | |||
Houston, Texas 77010 | |||
Roger D. Walker | |||
Manager Nuclear Licensing | |||
Texas Utilities Electric Company | |||
Skyway Tower . | |||
! | |||
400 North Olive Street, L.B. 81 . | |||
Dallas, Texas 75201 | |||
i | |||
Mr. Jack Redding | |||
c/o Bethesda Licersing | |||
Texas Utilities Electric Company | |||
3 Metro Center Suite 610 | |||
Bethesda, Maryland 20814 ; | |||
William A. Burchette. Esq. | |||
Counsel for Tex-La Electric Cooperative | |||
of Texas | |||
! Heron, Burchette, Ruckert & Rothwell | |||
Suite 700 | |||
1025 Thomas Jefferson Street, NW | |||
' | |||
Washington, D.C. 20007 | |||
, | |||
GOS ASSOCIATES, INC. .. | |||
Suite 720 ~ | |||
' 1850 Parkway place | |||
Marietta, Georgia 30067-8237 i | |||
Administrative Judge Peter Bloch | |||
U.S. Nuclear Regulatory Comission | |||
Washington. 0.C. 20555 | |||
i Elizabeth B. Johnson r | |||
' | |||
Administrative Judge l | |||
j Oak Ridge National Labora',orj , | |||
, | |||
i | |||
P. O. Box X. Building 3500 ! | |||
i Oak Ridge, Tennessee 37830 | |||
4 | |||
Dr. Xenneth A. McCollom | |||
1107 West Knapp | |||
Stillwater, Oklahorra 74075 | |||
; | |||
Dr. Walter H. Jordan . | |||
! | |||
) 881 West Cuter Drive | |||
Oak Ridge, TN 37830 l | |||
l | |||
* | |||
! | |||
[ | |||
! | |||
' | |||
' | |||
: | |||
o | |||
'~ | |||
\ / | |||
l | |||
FIRE PROTECTION MEETING AGENDA . | |||
, | |||
I. INTRODUCTION . | |||
II. COMPLETE | |||
G u-04 , | |||
9 O-04 | |||
9 O-08 | |||
111. PLAN COMPLETE WORK IN PROGRESS | |||
S O-01 | |||
O O-06 | |||
9 O-07 | |||
4 O-09 | |||
IV. PLANNED ACTIONS | |||
e U-02 | |||
6 U-03 | |||
V. UPCOMING FSAR AMENDMENT | |||
e O-05 | |||
9 O-02 | |||
9 U-01 E | |||
o | |||
e O-03 { | |||
4 EVALUATIONS E | |||
V!. CONCLUSIONS [ | |||
7 :oK | |||
. ._ .__ - _ | |||
__ _ _ | |||
- _ _ _ _ _ _ _ _ _ _ | |||
* | |||
. | |||
. | |||
'. . . | |||
. | |||
ENCLOSURE 3 | |||
NRC/TU ELECTRIC HEETING ON FIRE PROTECTION | |||
HARCH 17-18, 1988 | |||
ATTENDEES t | |||
NRC TU Electric | |||
_ | |||
0. Kubicki R. O. Babb | |||
J. E. Lyons* R. C. Howe | |||
M. Halloy R. Layton | |||
P. F. McKee 0. Lowe | |||
l A. Singh B. K. Riggs | |||
J. Wiebe J. D. Seawright | |||
J. H. Wilson N. L. Terrel | |||
R. D. Walker | |||
D. R. Woodlan | |||
Brookhaven National Laboratory (NRC Contractor) | |||
i | |||
A. Fresco | |||
H. Thenas | |||
SAIC (NRC Contractor) Impell (TV Electric Contractor) | |||
T. Storey C. A. Banning | |||
J. Echternacht | |||
J. H. Wawrzeniak | |||
_ _ _ _ _ _ _ _ _ _ . __ | |||
- | |||
.. | |||
/ c | |||
- | |||
\ | |||
.. . | |||
87-22 OPEN/ UNRESOLVED ITEMS | |||
9 9 OPEN ITEMS | |||
S 4 UNRESOLVED ITEMS | |||
EVALUATIONS USED AT CPSES | |||
' | |||
4 POSITION | |||
G UP COMING AMENDMENT OF FSAR | |||
. | |||
l o | |||
I | |||
o | |||
m | |||
u | |||
-l 15 | |||
l Page 1 | |||
_ _ . _ . _ _ _ . _ , | |||
' | |||
.. | |||
: | |||
~ | |||
\ _/ - | |||
' | |||
UNREs'OLVED ISSUE 445/8722-U-04 | |||
ACCUMULATOR ISOLATION VALVES 1-8808A,B,C AND D ARE | |||
MANUALLY OPERATED UTILIZING JUMPERS DURING HOT STANDBY. | |||
RESPONSE: | |||
O CPSES PROCEDURE ABN-803A USES MANUAL ACTIONS TO CLOSE | |||
THESE VALVES PRIOR TO RHR CUT-IN. JUMPERS ARE NOT USED TO | |||
CLOSE THESE VALVES. | |||
SCHEDULE: | |||
O COMPLETE | |||
. | |||
Page 2 | |||
=_ | |||
. - _ _ _ - - - - - - | |||
- | |||
. | |||
) | |||
~ | |||
' | |||
..- | |||
[ | |||
OPEN ITEM 445/8722-0-04 | |||
- | |||
COMMITMENT TO ENSURE THAT ALL FIRE DOOR MODIFICATIONS , | |||
! | |||
WILL CONFORM TO UNDERWRITERS LABORATORIES GUIDANCE. | |||
I | |||
RESPONSE: | |||
9 UNDERWRITERS LABORATORIES GUIDELINE FOR ATTRIBUTES | |||
HAVE BEEN ADDED TO SPECIFICATIONS. | |||
e FIELD VERIFICATION WILL BE PART OF THE POST | |||
CONSTRUCTION HARDWARE VALIDATION PROGRAM. | |||
SCHEDULE: | |||
O SPECIFICATION UPDATE COMPLETE | |||
G PCHVP AND RECONCILIATION SCHEDULES CALL FOR ALL | |||
WALKDOWNS BY AUGUST 1988 | |||
. | |||
' | |||
/ '\ | |||
Page 3 | |||
_ | |||
: | |||
- | |||
.. | |||
- | |||
.i | |||
'' | |||
\ | |||
r | |||
- | |||
// | |||
l | |||
.. | |||
; | |||
1 | |||
l OPEN ITEM 445/8722-0-08 | |||
l | |||
\ | |||
i LACK OF FUSE COORDINATION IN DIESEL GENERATOR | |||
i CONTROL CIRCUlT | |||
' | |||
RESPONSE: | |||
' | |||
j | |||
4 ADEOUATELY COORDINATED FUSES INSTALLED. | |||
; | |||
i | |||
: | |||
, | |||
I | |||
ij | |||
I | |||
] | |||
i SCHEDULE: | |||
1 | |||
! e COMPLETE | |||
/ 9\ | |||
Page 4 | |||
- _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ . _ _ - . | |||
- | |||
. | |||
' | |||
.. | |||
\ / f | |||
OPEN lTEM 445/8722-0-01 | |||
, | |||
. | |||
THE REACTOR COOLANT PUMP LUBE OIL COLLECTION SYSTEM SEISMIC | |||
ANALYSIS HAD NOT BEEN COMPLETED. | |||
RESPONSE: | |||
SEISMIC OUALIFICATION ACTIVITIES | |||
S WESTINGHOUSE INTERNAL TO MOTOR | |||
4 SWEC COLLECTION PIPING AND TANK | |||
9 IMPELL COLLECTION COWLINGS | |||
SCHEDULE: | |||
ENGINEER,.<G ANALYSIS - JULY 31,19 88 | |||
, | |||
CONSTRUCTION SCHEDULES CALL FOR MODIFICATIONS BY - OCTOBER 1,1988 | |||
ti!\ | |||
Page 5 | |||
---- - -- - | |||
. | |||
, | |||
~> | |||
. . | |||
N / | |||
OPEN ITEM 445/8722-0-06 - | |||
. P | |||
I CABLE SPREADING ROOM HALON SUPRESSION SYSTEM | |||
NFPA 12A COMPLIANCE | |||
RESPONSE: i | |||
l | |||
1 O COMPLETE NFPA 12A CODE COMPLIANCE REVIEW. | |||
1 , | |||
l | |||
l | |||
SCHEDULE: | |||
O CONSTRUCTION SCHEDULES CALL FOR COMPLETION OF CURRENT | |||
MODIFICATIONS BY JULY 15,1988. | |||
< | |||
9 NFPA 12A CODE COMPLIANCE REVIEW IS SCHEDULED FOR | |||
AUGUST 5,19 88. | |||
, \ | |||
Page 6 | |||
- _ _ - . - - ._. - . | |||
. | |||
' | |||
.. | |||
. | |||
\ / | |||
. | |||
i .. | |||
, | |||
; | |||
! OPEN ITEM 445/8722-0-07 - | |||
i | |||
INSTRUMENT AIR VALVES ASSOCIATED WITH A COLD SHUTDOWN | |||
! | |||
REPAIR PROCEDURE WERE POORLY LABELED. | |||
l > | |||
' | |||
! | |||
i | |||
RESPONSE: | |||
! | |||
O IDENTIFICATION AID REQUEST HAS BEEN INITIATED | |||
TO PROPERLY LABEL VALVES. | |||
i | |||
! | |||
. | |||
SCHEDULE: | |||
. | |||
O INSTALLATION APRIL 29,1988 | |||
l | |||
1 | |||
i | |||
[ r\ | |||
Page 7 | |||
- - -- _ _ _- - - - - - - - - - - - _ - - - - - - - - - - _ - - - - - - - - - - - - - - - - - -- - - - - - - | |||
.- | |||
. | |||
.. | |||
'.' | |||
\ / | |||
- | |||
.. | |||
OPEN ITEM 445 /8 7 22-0-0 9a . | |||
COMPLETE FIRE SAFE SHUTDOWN ANALYSIS MODIFICATIONS | |||
REQUIRING THERMO-LAG. | |||
RESPONSE: | |||
# FIRE SAFE SHUTDOWN ANALYSIS !S REVISED AS REQUIRED | |||
IN SUPPORT OF PLANT MODIFICATIONS. | |||
SCHEDULE: | |||
# THERMO-LAG DESIGN REQUIREMENTS JUNE 1,19 88 | |||
. | |||
/ A\ | |||
Page 8 | |||
- - - , - .. -- .-, - - - - | |||
~ | |||
- | |||
. | |||
:. | |||
\ / f | |||
' | |||
. | |||
. | |||
OPEN ITEM 445/8722-0-09b . | |||
, | |||
1 | |||
AMPACITY EFFECTS DUE TO THERMO-LAG HAS NOT BEEN COMPLETED. | |||
! | |||
I | |||
RESPONSE: | |||
! | |||
f 4 SDAR RESOLUTION | |||
l - CABLE RESIZING OR REROUTE | |||
- THERMO-LAG REMOVAL | |||
SCHEDULE: | |||
4 DCA TO ECE-M1-1700 COMPLETE | |||
4 AMPACITY ANALYSIS CABLE RESIZING APRIL 29,1988 | |||
< | |||
4 CONSTRUCTION SCHEDULES CALL FOR COMPLETION OF | |||
. MODIFICATIONS BY OCTOBER 23,1988. | |||
: | |||
l | |||
Page 9 | |||
. | |||
~ | |||
. | |||
\ / f | |||
. | |||
. | |||
4 | |||
UNRESOLVED ISSUE 445/8722-U-02 | |||
1 MANUAL ACTIONS IN THE SAME FIRE AREA AS THE | |||
POSTULATED FIRE | |||
' | |||
RESPONSE: | |||
4 PROVIDE TABLE OF MANUAL ACTIONS IN THE SAME | |||
] | |||
l FIRE AREA AS THE POSTULATED FIRE. | |||
I | |||
i | |||
i | |||
SCHEDULE: | |||
: | |||
! O REVISION 4 OF THE FIRE SnFE SHUTDOWN ANALYSIS | |||
i WILL BE AVAILABLE MAY 1,1988. | |||
! | |||
1 | |||
l / "\ | |||
1 | |||
Page 10 | |||
., | |||
- | |||
- | |||
/ :. | |||
\ | |||
! | |||
. | |||
' | |||
i UNRESOLVED ISSUE 445/8722-U-03 | |||
WCAP AND WESTINGHOUSE CALCULATIONS INDICATE CONSIDERING | |||
SPURIOUS SAFETY INJECTION PRT RUPTURE MAY PRECEDE MANUAL | |||
, | |||
OPERATOR ACTIONS INSIDE CONTAINMENT | |||
l | |||
RESPONSE: | |||
! | |||
O PROVIDE A REVISED CALCULATION THAT DEMONSTRATES | |||
l - PRT DOES NOT RUPTURE | |||
- WESTINGHOUSE CALCULATION IS CONSERVATIVE. | |||
' | |||
SCHEDULE: | |||
O CALCULATION IS COMPLETE. | |||
: | |||
! | |||
l / ~\ | |||
Page 11 | |||
! | |||
l _ _ _ _ _ - . _ - _ _ _ _ | |||
___ | |||
.- | |||
. | |||
. | |||
~ | |||
y / . | |||
OPEr4 r EM 445/8722-0-05 ' | |||
# NEW' EMERGENCY LIGHTING REQUIREMENTS RESULTING FROM | |||
REVISED FIRE SAFE SHUTDOWN ANALYSIS. | |||
. | |||
# NRC CONCERNS WITH EMERGENCY LIGHTING ADEQUACY. | |||
RESPONSE: | |||
# REVISION TO IMPELL CALCULATION WILL BE PERFORMED | |||
AS REQUIRED BY REVISED FIRE SAFE SHUTDOWN ANALYSIS. | |||
# EMERGENCY LIGHTS ARE USED TO ILLUMINATE MANUAL | |||
ACTIONS REQUIRED TO ACHIEVE AND MAINTAIN HOT STANDBY. | |||
SCHEDULE: - | |||
# REVISED CALCULATIONS MAY 27,1988 | |||
9 FSAR WILL BE CLARIFIED TO REFLECT AN UP COMING ' | |||
THAT EMERGENCY LIGHTING IS PROVIDED FSAR AMENDMENT | |||
- FOR MANUAL ACTIONS REQUIRED TO | |||
ACHIEVE AND MAINTAIN HOT STANDBY. | |||
' | |||
[ | |||
Page 12 | |||
. | |||
. | |||
. | |||
\ / i | |||
. | |||
OPEN IT M 445/8722-0-02 , | |||
UNRATED STEEL HATCHES ARE A DEVIATION TO | |||
APPENDIX A TO BTP APCSB 9.5-1 | |||
RESPONSE: | |||
9 THIS EVALUATION WILL BE IDENTIFIED AS A DEVIATION | |||
IN SECTION 9.5.1.6.2 OF THE CPSES FSAR | |||
SCHEDULE: | |||
e THIS CHANGE WILL BE INCLUDED IN AN UP COMING | |||
AIV.ENDMENT OF THE CPSES FSAR. | |||
~ | |||
l | |||
- | |||
. | |||
/ \ | |||
Page 13 | |||
. . _ _ . . _ | |||
_ | |||
- _ _ _ _ _ - - - . . _ . _ . - . , | |||
__ __ _ _ _ _ - _ _ _ _ _ _ _ _ _ __ _____________________ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ___________ ___ __ ____ __ | |||
l | |||
. | |||
: ~ | |||
.. | |||
_ | |||
; | |||
, \ / | |||
l | |||
l | |||
l . | |||
UNRESOLVED ISSUE 445/8722-U-01 - | |||
ADEQUACY OF JUSTIFICATION TO SUPPORT A TWO HOUR | |||
RATING FOR S!X STAIRWELL WALLS. | |||
RESPONSE: | |||
# THIS EVALUATION WILL BE IDENTIFIED AS | |||
DEVIATIONS IN SECTION 9-5.1.6.2. | |||
SCHEDULE: | |||
9 UP COMING AMENDMENT OF FSAR | |||
. | |||
'* | |||
l | |||
. | |||
Page 14 | |||
Q | |||
a | |||
. _ _ . , _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ ..___ ._ _ _____ __._ _ - . , _ _ _ , . , _ _ _ , . _ _ | |||
_ . _ _ _ _ _ _ __ _ _ _ . - _ , _ , | |||
- | |||
- | |||
. | |||
. | |||
- | |||
. | |||
\ / - | |||
- | |||
. | |||
OPEN IT M 445/8722-0-03 | |||
COMM;T TO SEAL CONDUlTS FOUR INCHES AND SMALLER ON BOTH | |||
SIDES AT THE FIRST OPENING. SEAL INSTALLATION COMPLETION | |||
RESPONSE: | |||
: | |||
e UNRECOGNIZED COMMITMENT UNDER REVIEW | |||
l SCHEDULE: | |||
9 RESPONSE APRIL 29,1988 | |||
l | |||
l | |||
/ <\ | |||
Page 15 | |||
l | |||
_ _ _ - _ - | |||
. _ - - _ _ -- . _ | |||
_ - _ - _ _ _ _ , _ - , . __ | |||
._ - __- ._. | |||
__-_ .- -__.. _.-- - _. . . _ - _ - _ - . . _ _ . - . - - _ .- . . _. | |||
. . . . . . -- - - _ _ - - _ | |||
r | |||
. | |||
, | |||
: | |||
. | |||
4 | |||
' | |||
. | |||
' | |||
i ' " ' ' * | |||
:.S +. . ., ,<;-,s ..~.'~,<c.f...'l y ,ty- | |||
fi4 6 y.; 'V | |||
., | |||
,. | |||
, | |||
- | |||
..v ?,- g3 ;.<.ks q- r , | |||
. | |||
, ., - ~ | |||
-e * | |||
~ ., | |||
s ,- | |||
. . . . - - | |||
, | |||
~ | |||
1 | |||
. | |||
L, ,! *:e,p | |||
.. s. +. Q' ,- | |||
. _ .- 14 .. | |||
10 CFR 50 , | |||
- | |||
BTP APCSB 9.5-1 | |||
APPENDIX R | |||
APPENDIX A | |||
IDENTIFY | |||
-. | |||
{ COMMITMENT ' | |||
NONCONFO M ES ,M | |||
DOCUMENT | |||
l' . 1 | |||
I :' | |||
I a:' | |||
u, | |||
- | |||
t . .. .. ,. | |||
m. -w | |||
" | |||
l'- l | |||
d FSAR ". | |||
I.- | |||
.. -- | |||
...........]........: | |||
, | |||
, | |||
, ;l, | |||
,' EVALUATIONS I | |||
. s. . | |||
; | |||
, | |||
* , 7: 4 | |||
* | |||
l FPR ._ | |||
* | |||
l9MAIUTAINED I. .1 | |||
.L | |||
i . 15EVIATIONS l ON-FILE ,M | |||
* | |||
l 9 SUMMARY l | |||
, | |||
l........._..._..3 -I' ' . - | |||
OF FHA i | |||
* | |||
S APPENDIX A , | |||
- | |||
. . | |||
. te- | |||
AND FMA | |||
. | |||
l 9 APPENDIX R , f: | |||
EVALUATIONS'a '..** | |||
'.4 % | |||
.. | |||
n. | |||
1 | |||
' | |||
/\ U A. | |||
. | |||
l | |||
1 | |||
.o.' | |||
;_.......__..___...._ , | |||
; | |||
; FHA l 2., | |||
I l | |||
, | |||
AND FMA ! | |||
n | |||
.* | |||
; EVALUATIONS | |||
----..--.. ......---. | |||
l | |||
, _ __ | |||
..s. | |||
. | |||
. . .. . | |||
.,- | |||
.. , - . , , . . _; : , . - | |||
. , | |||
< | |||
. . .; . . . , - : * .: . . r . a | |||
- . | |||
s e ; , , 7, $ *2 . ~ , g - , | |||
' | |||
'~ ' | |||
l * | |||
, | |||
d | |||
4, | |||
' | |||
.: . / . . A sMg; . | |||
. | |||
.. . . * i a ,c | |||
. | |||
. - | |||
l | |||
l | |||
l | |||
, | |||
Page 16 | |||
- . - _ _ . - -__ - - - .- - .-- .- - - _-. _ _ _ _ | |||
- . _ _ _ _ - .- _ - _ - _.- - , . _, . - _ _ - - _ . . | |||
' l | |||
l | |||
'.- ~ | |||
~- | |||
/ | |||
- | |||
\= | |||
R | |||
E | |||
I | |||
R 6 1 1 2 | |||
E R 3 | |||
T A | |||
A B | |||
R | |||
T | |||
S A N | |||
N X O | |||
O ! I | |||
M D T | |||
E N C 0 _ _ 6 | |||
D E E 1 _ _ | |||
P T | |||
H P E | |||
C | |||
I | |||
A D | |||
H H | |||
WT | |||
7 | |||
1 | |||
, | |||
I e | |||
S W N P | |||
g | |||
a | |||
N O | |||
E I | |||
O C S | |||
I | |||
T N S | |||
E 8 1 8 | |||
A A R 3 | |||
_ | |||
_ | |||
U L | |||
I | |||
P | |||
L P P | |||
A M U | |||
V O S | |||
E | |||
C | |||
R | |||
A N | |||
S. | |||
F O | |||
I 2 | |||
T a. c. | |||
3 | |||
1 | |||
. C 1 1 | |||
. | |||
D D F F | |||
. | |||
1 | |||
. | |||
E | |||
S | |||
\ / | |||
. | |||
ll,! | |||
_ - _ . - _ . _ _ - _ . -- . _ _ __ __ _ _- _- | |||
~ | |||
. | |||
9 | |||
l . -- | |||
\ / : | |||
FSAR APPENDIX A DEVIATIONS | |||
. . | |||
I | |||
1 | |||
1. METAL HATCH COVERS IN AN UNTESTED CONFIGURATION - | |||
i | |||
l | |||
l | |||
l | |||
l | |||
2. DOOR / DAMPER CONFIGURATIONS OUTSIDE FIRE BARRIER | |||
l | |||
3. BUS DUCT PENETRATION IN AN UNTESTED CONFIGURATION | |||
' | |||
4. FLEXIBLE CONDUlT PENETRATIONS IN AN UNTESTED CONFIGURATION | |||
5. GYPSUM BOARD WALLS IN AN UNTESTED CONFIGURATION | |||
1 | |||
' | |||
. | |||
/ ==\ | |||
, | |||
1 Page 18 | |||
l | |||
-. - , _ _ - _ . . - - . - - . - , . _ _ - - _ _ _ - - - . - -- - . , - _ _ | |||
, ,_- | |||
. _ . . - _ _ _ _ | |||
' . .- | |||
' | |||
- | |||
Enclosure 5 | |||
. | |||
EVALUATION VERSES DEVIATIONS PRELIMINARY REVIEW | |||
. | |||
. | |||
Today 1984 | |||
Evaluations Deviations Evaluations Deviations | |||
36 10 Suppression 31 31- | |||
78 O III Detection O | |||
I4I O | |||
82(2) 24(3) Barriers 39 39(5) | |||
. | |||
196 34 Total 70 70 | |||
Notes: | |||
(1) 34 Design Modifications Being implemented | |||
(2) Engineering Evaluations Justifying the Acceptability of the 24 | |||
Deviations is included Within These Numbers | |||
t | |||
(3) Includes Five 20 Foot separation Deviations and 5 Proposed | |||
Additional Deviations < | |||
(4) Evaluation to Code 72E Not Required | |||
(5) Included Four 20 Foot Separation Deviation and 18 Fire Damper Deviation f | |||
i | |||
, | |||
6 | |||
e | |||
f | |||
! | |||
i | |||
f | |||
I | |||
k | |||
! I | |||
, | |||
_,--. | |||
___ __-_ __ _ _ _ . | |||
* | |||
, ,. , . | |||
. | |||
PRELIMINARY INFORMATION | |||
4 | |||
III.G.2.b | |||
BUILDING / FIRE AREA / ROOH !!!.G.2.c CASE 1984 | |||
ELEVATION FIRE ZONE NUMBER lil.G.3 CLASSIFICATION DEVIATIONS | |||
CONCERN . | |||
l | |||
i | |||
Auxiliary AA21a 174 !!!.G.2.b & c 4 13a 1 | |||
790' 6" 175 !!!.G.2.b & c 3 !3 | |||
179 !!!.G.2.c 3 | |||
* | |||
13 | |||
180 !!!.G.2.c 3 13 | |||
Auxiliary AAllb 203 !!!.G.2.b 3 13a 2 | |||
810' 6" 207 III.G.2.b & c 3 13a 2 | |||
Auxiliary AA27 198 !!!.G.2.b 4 13a | |||
810' 6" | |||
i | |||
Auxiliary AA21c 209 !!!.G.2.c 4 29-1 | |||
822'-6" | |||
Auxiliary AA21d 214 III.G.2.c 3 13a 3 | |||
831'-6" 226 !!!.G.2.c 3 13a-3 | |||
l | |||
Auxiliary AA21f 241 !!!.G.2.b & c 3 13a-4 2a | |||
852' 6" | |||
i | |||
E&C EA57 125 !!!.G.2.c 3 136 | |||
792' 0" EC50 118 !!!.G.2.c 4 2 r. | |||
L .': 8 119 I!!.G.2.c 4 2m | |||
EHb2 120 !!!.G.2.c 4 2m i | |||
EH53 121 III.G.2.c 4 2m | |||
l | |||
E&C E065 135 !!!.G 3 4 IVa ! | |||
830'-0" : | |||
E&C EA73 150 !!!.G.2.c 4 2L , | |||
854' 4" EA74 150a !!!.G.2.c 4 IVb | |||
I | |||
Safeguards . SAlc 63 Ill.G.2.c 3 2b | |||
I | |||
790 -6" | |||
i | |||
810'-6" SA142 77N III.G.2.c 4 21 1 | |||
' | |||
773'-0" & SB4 64 !!!.G.2.c 3 13d | |||
790'-6" 71 III.G.2.c 3 29 | |||
l | |||
l | |||
} | |||
i | |||
f | |||
! | |||
t , | |||
I | |||
_ _ _ _ _ _ _ - _ _ _ | |||
. | |||
. | |||
,, | |||
. | |||
PREllMINARY INFORMATION | |||
111.G.2.b | |||
BUILDING / FIRE AREA / ROOM !!!.G 2.c CASE 1984 | |||
ELEVATION FIk, ZONE NUMBER III.C.3 CLASSIFICATION DEVIATIONS | |||
CONCERN , | |||
- , | |||
Safeguards SB4 70 !!!.G.2.c 3 2j | |||
790 -6" SB2c 65 III.G.2.c 4 2f | |||
67 !!!.G.2.c 4 | |||
- | |||
13d | |||
810' 6" SB8 79 !!!.G.2.c 3 13d-l | |||
82 !!I.G.2.c 3 13d-l | |||
810' 6" S8143 77s III.G.2.c 3 21 | |||
831'-6" & SB15 94 !!!.G.2.c 3 13d l | |||
841' 6" 95 !!!.G.2.c 3 13d | |||
831'-6" SB144 88 !!!.G.2.c 3 13d | |||
, | |||
810' 6" SD9 83 Ill.G.2.c 3 2b | |||
831' 6" SE16 96 III.G.2.c 4 2d | |||
852' 6" SE18 103 III.G.2.c 4 2c | |||
Safeguards SE18 104 4 2c | |||
i. | |||
I | |||
l | |||
; | |||
e | |||
i | |||
I- | |||
i | |||
, | |||
b | |||
_ .___-__ | |||
* | |||
- | |||
.. c | |||
' | |||
. | |||
l | |||
' | |||
PRELIMINARY INFORMATION | |||
; | |||
. | |||
DETECTION EVALUATIQB1 USED TO JUSTIFY CODE COMPLlahff . | |||
Code Section Fire Area / Zone Room No, t | |||
. | |||
2 6.5 AA21a 168 i | |||
2 6.5 AA21a 169 ! | |||
2-6.5 AA21a 170 | |||
2 6.5 AA21a 171 - ; | |||
2 6.5 AA21a 172 | |||
2 6.5 AA21a 173 | |||
2 6.5 AA21a 182 | |||
2 6.5 AA21b 191 | |||
2 6.5 AA21b 192 | |||
2 6.5 AA21d 211 | |||
2 6.5 AA21d 215 | |||
l 2 6.5 AA21d 217 | |||
2 6.5 AA21f 238 | |||
2 6.5 AA21f 240 | |||
2-6.5 AA21f 242 | |||
2 6.5 AA22 207A, 181 | |||
2-6.5 AA34 220 | |||
2 6.5 AA35 221 | |||
2 6.5 AA36 222 , | |||
2 6.5 AA37 224 | |||
2-6.5 AA98 254 | |||
2-6.5 AA98 269 | |||
2-6.5 AA99b 271A | |||
2 6.5 AA99b 271b | |||
2-6.5 AA100 271 | |||
! 2-6.5 Sala 57 | |||
2-6.5 Sala 58 | |||
- | |||
2 6.5 Sala 61 : | |||
2 6.5 SB2e 81 | |||
2 6.5 SB2f 86 | |||
2-6.5 SB2f 87 | |||
4-3.5.1 AA21b 202 | |||
4 3.5.1 AA21c 208 , | |||
4-3.5.1 AA21c 209 l | |||
- | |||
' 4 3.5.1 AA21d 210 l | |||
' | |||
4 3.5.1 SB2a 563 | |||
4 3.7.3 AA21a 162 : | |||
4-3.7.3 AA21f 235 1 | |||
4 3.7.3 AA99b 247 ! | |||
4 3.7.3 AA99d 270 i | |||
4-3.7.3 EAS4 122 ! | |||
j 4-3.7.3 EA57 125 i | |||
4-3.7.3 WB104b 275 ! | |||
j 4 3.7.3 SA142 77N I | |||
TOTAL 44 t | |||
, | |||
1 | |||
\ | |||
. i | |||
* | |||
. ,- .. | |||
- PREllMINARY INFORMATION | |||
PARRIER EVALUATIQfG | |||
Sub_ieel IMZ 193 1 | |||
' | |||
Serv. Water Pumps 20' Sep, la la | |||
Chiller Units 20' Sep. Ib lb | |||
Boric Acid Pumps (FSSA Eval.) Ic ; | |||
Boric Acid Sky Tanks (FSSA Eval.) 2e | |||
Concrete Block Wall 3a . 3a : | |||
Concrete Block Wall 3a-1 3a.1 | |||
t Cont. Pen. Seals 3b 3b , | |||
~ | |||
Miss, Res. Doors 3c 3c | |||
Cont Rm. Missile Resis. Doors 3c-1 3c 1 | |||
Watertight Dooi's 3d 3d | |||
Containment Airlock 3e 3e | |||
Cont Mech. Pen. Seals 39 39 | |||
Cable Spreading Rm. Barrier 3h 3h ; | |||
PRV 20' Separation 4a 4a | |||
Cont. RHR Valves 20' Sep. 4a-1 4a 1 l | |||
' | |||
20' Separation (FSSA Eval.) 8a-1 | |||
20' Separation Bb Bb | |||
20' Sep. SK MS!V's Deleted 8e t | |||
HVAC Damper Penetrations By Upgrade lla | |||
HVAC Damper Penetrations By Upgrade lib | |||
HVAC Damper Penetrations By Upgrade lle ; | |||
; HVAC Damper Penetrations By Upgrade lld : | |||
' | |||
HVAC Damper Penetrations By Upgrade lle i | |||
HVAC Damper Penetrations By Upgrade 12a , | |||
' | |||
HVAC Damper Penetrations By Upgrade 12b | |||
i HVAC Damper Penetrations By Upgrade 12c ! | |||
i HVAC Damper Penetrations By Upgrade 12d l | |||
l HVAC Damper Penetrations By Upgrade 12e , | |||
' | |||
, | |||
HVAC Damper Penetrations By Upgrade 12f | |||
l HVAC Damper Penetrations By Upgrade 129 | |||
l HVAC Damper Penetrations By Upgrade 12h l | |||
l HVAC Damper Penetrations By Upgrade 121 , | |||
l | |||
HVAC Damper Penetrations BY Upgrade 12j | |||
i HVAC Damper Penetrations By Upgrade 12k | |||
l HVAC Damper Penetrations By Upgrade 121 | |||
l HVAC Damper Penetrations BY Upgrade 12m | |||
2 Hour Rated Penetrations Seals 14 14 | |||
Bus Duct Penetrations FSAR 9 5.1.6.2 i | |||
NRF #63, 64, 65, 66, 67, 68 < | |||
Oampers & Doors with frame Outside Banners FSAR 9 5.1.6.2 | |||
NRF #41, 86 | |||
Flexible Conduit Penetration FSAR 9-5.1.6.2 ! | |||
NRF #39, 40 | |||
Metal Hatches with Protective Coating FSAR 9-5.1.6.2 ! | |||
NRF #35, 36, 37, 38 ! | |||
Gypsum Board Walls FSAR 9 5.1.6.2 | |||
NRF # 74. 75 ; | |||
. | |||
. | |||
P | |||
! | |||
}} | }} | ||
Revision as of 08:38, 17 December 2020
| ML20155G204 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 09/30/1988 |
| From: | Malloy M NRC OFFICE OF SPECIAL PROJECTS |
| To: | NRC OFFICE OF SPECIAL PROJECTS |
| References | |
| NUDOCS 8810140127 | |
| Download: ML20155G204 (29) | |
See also: IR 05000445/1987022
Text
. _ _ _ - _ _ _ _ - .
'
'..
~ ..
. #*pn ** %,*o,, '
UNITED STATES
NUCLEAR REGULATORY COMMISSION
f"
g
g
- y
.
WASHINGTON, D. C 20666
\,^****/
SEP 3 01988
Docket Nos. 50-445 --
and 50-446
. APPLICANT: Texas Utilities Electric Company (TV Electric)
FACILITY: Comanche Peak Steam Electric Station (CPSES), Units 1 and 2
SUBJECT: SUFFARY OF NEETING 01 MARCH 17-18,1988 -
COMANCHE PEAK FIRE PPOTECTION PRCGRAM
On March 17-18, 1988, tne staff met with representatives of TU Electric, lead
applicant for the CPSES, to discuss (1) the status of TU Electric actions
related to open and unresolved items in NRC Inspection Report 50-445/87-22 and
(2) information needed by the staff to complete its revised safety evaluation
on the fire protection program for the CPSES Units 1 and 2. The meeting
notice, agenda, and list of attendees are provided as Enclosures 1, 2, and 3,
respectively, to this summary. The handouts used by the applicant are included
as Enclosurc 4.
- The applicant provided the status of each of the open and unresolved items
,
appearing in Inspection Report 50-445/67-22 which ducu.nents the results of
'
NRC's site inspection of CPSES Unit 1 during the period October 19-23, 1987.
TV Electric's responses to the items are documentea in a letter from W. G.
'
Counsil (TV Electric) to NDC dated March 11,1988(TXX-88309). Following this
i
status review, the staff and applicant discussed deviations frot Appendix A to
'
APCSB 9.51 and applicant evaluations (documentation) to demonstrate fire
protection program compliance. In addition to pages 16-18 of Enclosure 4 the
1 applicant provided scme preliminary information as a handout (Enclosure 5} on
i numbers and areas of evaluations and deviations.
l
Following an NRC caucus TV Electric advised the staff that tney planned to
submit an FSAR amendment describing recent changes in their evaluation process.
< These changes have been made since the letters of April 15, 1987 (TXX-6376) and
'
August 4,1987 (TXX-6582), which providad TV Electric :oments and clarificai, ions
a
on the CPSES Fire Protection Program as it e,;4tes to NRC's discussion in
'
Section 9.5.1 of Supplement #12 to the Comanche Peek Safety Evaluation Report
(SER). The staff advised TV Electric that it wanted to review some evaluations
i
on file at TV Electric demonstrating fire protection program Ocmpliance.
.
Following these discussions, the meeting broke into two working sessions, one
group discussed staff information needed for the revised CPSES SER on fire
protection and the other group reviewed several engineering evaluations
demonstrating fire protection program compliance.
DFol
_ _ _ _ _ - - _ _ _ _ - _ _ _ - _ - _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ - _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ - _ - -
.. .,
TV Electric -3- SEP 3 01988
In closing discussion, the staff noted that formal review of the applicant's
responses to the open and unresolved itecis from Inspection Report 50-445/87-22
would take place at some time in the future. The staff expressed an intent to
spend some time at the site and off site auditing a sample of TV Electric's
fire protection program engineering evaluations. The staff also remarked that
it would like to see better cross referencing or more direct linking of the
engineering evaluations in the Comanche Peak Fire Protection Report to assure
a clear licensing basis. TU Electric stated that it intends to submit advanced
draft FSAR changes by early May 1988.
original signed by:
Melinda Malloy, Project Manager
Comanche Peak Project Division
Office of Special Projects
Enclosures:
1. Meeting Notice
2. Agenda
3. List of Attendees
4. TV Electric Handouts
5. Handouts on Engineering Evaluations
cc w/ enclosure:
See next page
4
OISTRIBUTION:
]~
cDocketFiles(50-445/446):
NRC FDR
- Local POR
4 CPPD Reading
i' OSP Reading
JPartlow
1 CGrimes
! PNcKee
j JWilson
! JLyons
l RWarnick
PJtalloy
JWiebe
A51ngh
} OKubicki
- OGC.WF
1
DCrutchfield -
i EJordan
1 BGricles
l ACRS(10)
!
.
- : : : :
OFC :FM:CPPD AD/P:CPPD
.. so M.::.............:............:............:............:...........:...........
NAME .MHalloy: sam :JWil : :
t qqd : : :
.....:............:......r......:............:............:............:...........:........... : : :
DATE :9 4 @ 88 :9/30/88 : :
OFFICIAL RECORD COPY
_
.
..
.
.. , i
SEP 3 01988
/
'
W. G. Counsil Comanche Peak Steam Electric Station
Texas Utilities Electric Company Units 1 and 2
cc: Asst. Director for Inspec. Programs
Jack R. Newman, Esq.
Newman & Holtzinger, P.C. Comanche Peak Project Division ,
Suite 1000 U.S. Nuclear Regulatory Commission l
,
1615 L Street, N.W. P. O. Box 1029 -
!
Washington, D.C. 20036 Granbury, Texas 76048
Robert A. Wooldridge, Esq. Regional Administrator, Regi' IV !
,
1 Worsham, Forsythe, Sampels & U.S. Nuclear Regulatory Consa;sion
Wooldridge 611 Ryan Plaza Drive, Suite 1000
2001 Bryan Tower, Suite 2500 Arlington, Texas 76011 i
Dallas, Texas 75201 .
Lanny A. Sinkin
'
Mr. 8,omer C. Schmidt Christic Institute ,
Dirtctor of Nuclear Services 1324 North Capitol Street '
i
Texas Utilities Electric Company Washington, D.C. 20002
- Skyway Tower
400 North Olive Street, L.B. 81 Hs. Billie Pirner Garde. Esq.
,
Dallas, Texas 75201 Government Accountability Project
Midwest Office
Mr. R. W. Ackley 104 East Wisconsin Avenue i
. Stone & Webster Appleton, Wisconsin 54911
j
l Comanche Peak Steam Electric Staticn
P. O. Box 1002 David R. Pigott, Esq. ;
i
J Glen Rose, Texas 76043 Orrick, Herrington & Sutcliffe !
600 Montgomery Street
l
Mr. J. L. Vota San Francisco, California 94111
!
l Westinghouse Electric Corporation
'
P. O. Box 355 Anthony Z. Roisman, Esq.
Pittsburgh, Pennsylvania 15230 , Suite 600
'l 1401 New York Avenue, NW
i Susan M. Theisen Washington, D.C. 20005 ;
'
l
Assistant Attorney General
Environmental Protection Division Robert Jablon
!
- P. O. Box 12548, Capitol Station Bonnie S. Blair
j Austin, Texas 78711-1548 Spiegel & McDiarmid t
1350 New York Avenue, NW ,
Mrs. Juanita Ellis, President Washington, D.C. 20005-4798 i
?
Citizens Association for Sound Energy
1426 South Polk George A. Parker, Chairnan i
l
- Dallas, Texas 75224 Public Utility Committee t
Senior Citizens Alliance Of !
- Tarrant County, Inc. o
Ms. Nancy H. Williams i
CYGNA Energy Services 6048 Wonder Drive
2121 H. California Blvd., Suite 390 Fort Worth Texas 76133 [
Walnut Creek, CA 94596 ;
I
.
.
'
! ,
4 ,
l _- l
_ _ _ - _ - _ _ _ _ - _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _
L
- '
. . . . . .
'
SEP 3 01988
W. G. Counsil -2- Comanche Peak Elat.tric Station
. Texas Utilities Electric Company Units 1 and 2
CC* .
.
Joseph F. Fulbright
Fulbright & Jaworski
1301 McKinney Street
Houston, Texas 77010
P.oger D. Walker
Manager Nuclear Licensing
Texas Utilities Electric Company
Skyway Tower
400 North Olive Street. L.B. 81
Dallas, Texas 75201
Texas Utilities Electric Company
c/o Bethesda Licensing
3 Hetro Center, Suite 610
Bethesda, Maryland 20614
William A. Burchette, Esq.
Counsel for Tex-La Electric Cooperative
of Texas
Heron, Burchette, Ruckert & Rothwell
Suite 700
1025 Thomas Jefferson Street, NW
Washington, D.C. 20007
GDS ASSOCIATES, Ific.
Suits 720
1650 Parkway Place
Marietta, Georgia 30067-8237
_
' '
.. ..
0*C
/ '%; UNITED STATES
NUCLEAR REGULATORY COMMISSION
- i -'( ~, , ' i 8 W A$mNGTON, D C. 20555
March 3, 1988
,,, .$(/
.....
Docket Nos. 50-445
and 50-446
MEMORANDUM FOR: Christopher 1. Grimes, Director
Comanche Peak Project Division
Office of Special Projects
THRU: James H. Wilson, Assistant Directo
for Projects
Comanche Peak Project Division
Office of Special Projects
FROM: Melinda Malloy, Project Manager
Comanche Peak Project Division
Office of Special Projects
SUBJECT: FORTHCOMING MEETING WITH TV ELECTRIC
Date & Time: Thursday, March 17, 1988, 1:00 pm - 5:00 pm
Friday, March 18, 1988, 8:30 am - 12:00 Noon
Location: One White F1jnt North
11555 Rockville Pike
Room 10 8 13
Rockville, MD 20852
Purpse: For Applicant and Staff to discuss:
1. information related to open and
unresolved items in NRC Inspection .
.
,
Report 50-445/87-22, and
2. information needed by NRC to complete
a revited safety evaluation for the
implementation of the fire protection
progrem for Comanche Peak, Units 1 and 2
Participants *: NRC Applicant
C McKee R. Walker
A. Singh
J. Seawright
R. Layton
M.Malley(contractor)
T. Storey et al.
A. Fresco (contr . /
A&,y,f
- s.
M in Malloy, P oject Many r
Comanche Peak Project Divisten
Office of Special Projects
cc: See next page ,
.
CONTACTS: Melinda Malloy or James H. Wilson
(301)492 0738 (301)492-3306
- Meetings between NRC technical staff and applicants for licenses are open
for interested members of the public, petitioners, intervenors, or other
parties to attend as observers pursuant to "Open Meetings and Statement of
" 43 Federal Register 28058,6/28/78.
OD$ ~fr aff Policyh0/2
~
t$~T
.
- *
.,
., . ,
.
.
.
W. G. Counsil
'
Comanche Peak Steam Electric Station
Texas Utilitics Electric Company Units 1 and 2
cc:
Jack R. Newman, Esq. Asst. Director for Inspec. Prograns i
Newman & holtzinger, P.C. Comar.che Peak Project Division
Suite 1000 U.S. Nuclear Regulatory Comission
1615 L Street, N.W. P. O. Box 1029
Washington. 0.C. 20036 - Granbury Texas 76048
Robert A. Wooldridge, Esq. Regional Administrator, Region IV
Worsham, Forsythe, Sampels & U.S. Nuclear Regulatory Comission '
Wooldridge Gil Ryan Plaza Drive, Suite 1000
2001 Bryan Tower, Suite 2500 Arlington, Texas 76011
Dallas, Texas 75201
Lanny A. Sinkin
Mr. Homer C. Schmidt Christic Institute
Of rector of Nuclear Services 1324 North Capitol Street
Texas Utilities Electric Company Washington 0.C. 20002 ,
'
Skyway Tower
400 North Olive Street, L.B. 81 Ms. Billie Pirner Garde, Esq. *
Dallas, Texas 75201 Governrent Accountability Project
Midwest Office
Mr. Robert E. Ballard, Jr. 104 East Wisconsin Avenue
Director of Projects Appleton, Wisconsin 54911
Gibbs and Hill, Inc.
11 Penn Plaza
New York, New York 10001 David R. Pigott, Esq. .
.
)
l
Orrick, Herrington & Sutcliffe
~
600 Montgomery Street
r Mr. R. S. Howard San Francisco, California 94111
Westinghouse Electric Corporation
P. O. Box 355 Anthony Z. Roisman, Esq.
Pittsburgh, Pennsyl.:anta 15230 Suite 600
' 1401 New York Avenue, NW
, Renea Hicks Esq. Washington 0.C. 20005
Assistant Attorney General
Environmental Protection Division Robert Jablon
P. O. Box 12548, Capitol Station Bonnte S. Blair
Austin, Tuas 78711 Spiegel & McDiarmid
1350 New York Avenue, NW
Mrs. Juanita Ellis, President Washington, 0.t. 20005-4798
Citizens Association for Sound Energy
1426 South Polk George A. Parker, Chairman
Callas, Texas 75224 Public Utility Cemittee
Senior Citizens Alliance Of
Ms. Nancy H. Williams Tarrant County, Inc.,
CYGNA Energy Services 6048 'noncer Drive
2121 N. California Blvd., Suite 390 Fort Worth, Texas 76133
Walnut Creek, CA 94596
'
._- - . -_- - ._- -- .-
_ _ _ _ - _ _ _ _ _ _ _ .
- *
.. .. .
,
- .
W. G. Counsil
~
-2- Cemanche Peak Electric Staticn
Texas Utilities Electric Company Units 1 and 2
.
cc:
Joseph F. Fulbright
Fulbright & Jaworski
1301 McKinney Street
Houston, Texas 77010
Roger D. Walker
Manager Nuclear Licensing
Texas Utilities Electric Company
Skyway Tower .
!
400 North Olive Street, L.B. 81 .
Dallas, Texas 75201
i
Mr. Jack Redding
c/o Bethesda Licersing
Texas Utilities Electric Company
3 Metro Center Suite 610
Bethesda, Maryland 20814 ;
William A. Burchette. Esq.
Counsel for Tex-La Electric Cooperative
of Texas
! Heron, Burchette, Ruckert & Rothwell
Suite 700
1025 Thomas Jefferson Street, NW
'
Washington, D.C. 20007
,
GOS ASSOCIATES, INC. ..
Suite 720 ~
' 1850 Parkway place
Marietta, Georgia 30067-8237 i
Administrative Judge Peter Bloch
U.S. Nuclear Regulatory Comission
Washington. 0.C. 20555
i Elizabeth B. Johnson r
'
Administrative Judge l
j Oak Ridge National Labora',orj ,
,
i
P. O. Box X. Building 3500 !
i Oak Ridge, Tennessee 37830
4
Dr. Xenneth A. McCollom
1107 West Knapp
Stillwater, Oklahorra 74075
Dr. Walter H. Jordan .
!
) 881 West Cuter Drive
Oak Ridge, TN 37830 l
l
!
[
!
'
'
o
'~
\ /
l
FIRE PROTECTION MEETING AGENDA .
,
I. INTRODUCTION .
II. COMPLETE
G u-04 ,
9 O-04
9 O-08
111. PLAN COMPLETE WORK IN PROGRESS
S O-01
O O-06
9 O-07
4 O-09
IV. PLANNED ACTIONS
e U-02
6 U-03
V. UPCOMING FSAR AMENDMENT
e O-05
9 O-02
9 U-01 E
o
e O-03 {
4 EVALUATIONS E
V!. CONCLUSIONS [
7 :oK
. ._ .__ - _
__ _ _
- _ _ _ _ _ _ _ _ _ _
.
.
'. . .
.
ENCLOSURE 3
NRC/TU ELECTRIC HEETING ON FIRE PROTECTION
HARCH 17-18, 1988
ATTENDEES t
NRC TU Electric
_
0. Kubicki R. O. Babb
J. E. Lyons* R. C. Howe
M. Halloy R. Layton
P. F. McKee 0. Lowe
l A. Singh B. K. Riggs
J. Wiebe J. D. Seawright
J. H. Wilson N. L. Terrel
R. D. Walker
D. R. Woodlan
Brookhaven National Laboratory (NRC Contractor)
i
A. Fresco
H. Thenas
SAIC (NRC Contractor) Impell (TV Electric Contractor)
T. Storey C. A. Banning
J. Echternacht
J. H. Wawrzeniak
_ _ _ _ _ _ _ _ _ _ . __
-
..
/ c
-
\
.. .
87-22 OPEN/ UNRESOLVED ITEMS
9 9 OPEN ITEMS
S 4 UNRESOLVED ITEMS
EVALUATIONS USED AT CPSES
'
4 POSITION
G UP COMING AMENDMENT OF FSAR
.
l o
I
o
m
u
-l 15
l Page 1
_ _ . _ . _ _ _ . _ ,
'
..
~
\ _/ -
'
UNREs'OLVED ISSUE 445/8722-U-04
ACCUMULATOR ISOLATION VALVES 1-8808A,B,C AND D ARE
MANUALLY OPERATED UTILIZING JUMPERS DURING HOT STANDBY.
RESPONSE:
O CPSES PROCEDURE ABN-803A USES MANUAL ACTIONS TO CLOSE
THESE VALVES PRIOR TO RHR CUT-IN. JUMPERS ARE NOT USED TO
CLOSE THESE VALVES.
SCHEDULE:
O COMPLETE
.
Page 2
=_
. - _ _ _ - - - - - -
-
.
)
~
'
..-
[
OPEN ITEM 445/8722-0-04
-
COMMITMENT TO ENSURE THAT ALL FIRE DOOR MODIFICATIONS ,
!
WILL CONFORM TO UNDERWRITERS LABORATORIES GUIDANCE.
I
RESPONSE:
9 UNDERWRITERS LABORATORIES GUIDELINE FOR ATTRIBUTES
HAVE BEEN ADDED TO SPECIFICATIONS.
e FIELD VERIFICATION WILL BE PART OF THE POST
CONSTRUCTION HARDWARE VALIDATION PROGRAM.
SCHEDULE:
O SPECIFICATION UPDATE COMPLETE
G PCHVP AND RECONCILIATION SCHEDULES CALL FOR ALL
WALKDOWNS BY AUGUST 1988
.
'
/ '\
Page 3
_
-
..
-
.i
\
r
-
//
l
..
1
l OPEN ITEM 445/8722-0-08
l
\
i LACK OF FUSE COORDINATION IN DIESEL GENERATOR
i CONTROL CIRCUlT
'
RESPONSE:
'
j
4 ADEOUATELY COORDINATED FUSES INSTALLED.
i
,
I
ij
I
]
i SCHEDULE:
1
! e COMPLETE
/ 9\
Page 4
- _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ . _ _ - .
-
.
'
..
\ / f
OPEN lTEM 445/8722-0-01
,
.
THE REACTOR COOLANT PUMP LUBE OIL COLLECTION SYSTEM SEISMIC
ANALYSIS HAD NOT BEEN COMPLETED.
RESPONSE:
SEISMIC OUALIFICATION ACTIVITIES
S WESTINGHOUSE INTERNAL TO MOTOR
4 SWEC COLLECTION PIPING AND TANK
9 IMPELL COLLECTION COWLINGS
SCHEDULE:
ENGINEER,.<G ANALYSIS - JULY 31,19 88
,
CONSTRUCTION SCHEDULES CALL FOR MODIFICATIONS BY - OCTOBER 1,1988
ti!\
Page 5
- -- -
.
,
~>
. .
N /
OPEN ITEM 445/8722-0-06 -
. P
I CABLE SPREADING ROOM HALON SUPRESSION SYSTEM
NFPA 12A COMPLIANCE
RESPONSE: i
l
1 O COMPLETE NFPA 12A CODE COMPLIANCE REVIEW.
1 ,
l
l
SCHEDULE:
O CONSTRUCTION SCHEDULES CALL FOR COMPLETION OF CURRENT
MODIFICATIONS BY JULY 15,1988.
<
9 NFPA 12A CODE COMPLIANCE REVIEW IS SCHEDULED FOR
AUGUST 5,19 88.
, \
Page 6
- _ _ - . - - ._. - .
.
'
..
.
\ /
.
i ..
,
! OPEN ITEM 445/8722-0-07 -
i
INSTRUMENT AIR VALVES ASSOCIATED WITH A COLD SHUTDOWN
!
REPAIR PROCEDURE WERE POORLY LABELED.
l >
'
!
i
RESPONSE:
!
O IDENTIFICATION AID REQUEST HAS BEEN INITIATED
TO PROPERLY LABEL VALVES.
i
!
.
SCHEDULE:
.
O INSTALLATION APRIL 29,1988
l
1
i
[ r\
Page 7
- - -- _ _ _- - - - - - - - - - - - _ - - - - - - - - - - _ - - - - - - - - - - - - - - - - - -- - - - - - -
.-
.
..
'.'
\ /
-
..
OPEN ITEM 445 /8 7 22-0-0 9a .
COMPLETE FIRE SAFE SHUTDOWN ANALYSIS MODIFICATIONS
REQUIRING THERMO-LAG.
RESPONSE:
- FIRE SAFE SHUTDOWN ANALYSIS !S REVISED AS REQUIRED
IN SUPPORT OF PLANT MODIFICATIONS.
SCHEDULE:
- THERMO-LAG DESIGN REQUIREMENTS JUNE 1,19 88
.
/ A\
Page 8
- - - , - .. -- .-, - - - -
~
-
.
- .
\ / f
'
.
.
OPEN ITEM 445/8722-0-09b .
,
1
AMPACITY EFFECTS DUE TO THERMO-LAG HAS NOT BEEN COMPLETED.
!
I
RESPONSE:
!
f 4 SDAR RESOLUTION
l - CABLE RESIZING OR REROUTE
- THERMO-LAG REMOVAL
SCHEDULE:
4 DCA TO ECE-M1-1700 COMPLETE
4 AMPACITY ANALYSIS CABLE RESIZING APRIL 29,1988
<
4 CONSTRUCTION SCHEDULES CALL FOR COMPLETION OF
. MODIFICATIONS BY OCTOBER 23,1988.
l
Page 9
.
~
.
\ / f
.
.
4
UNRESOLVED ISSUE 445/8722-U-02
1 MANUAL ACTIONS IN THE SAME FIRE AREA AS THE
POSTULATED FIRE
'
RESPONSE:
4 PROVIDE TABLE OF MANUAL ACTIONS IN THE SAME
]
l FIRE AREA AS THE POSTULATED FIRE.
I
i
i
SCHEDULE:
! O REVISION 4 OF THE FIRE SnFE SHUTDOWN ANALYSIS
i WILL BE AVAILABLE MAY 1,1988.
!
1
l / "\
1
Page 10
.,
-
-
/ :.
\
!
.
'
i UNRESOLVED ISSUE 445/8722-U-03
WCAP AND WESTINGHOUSE CALCULATIONS INDICATE CONSIDERING
SPURIOUS SAFETY INJECTION PRT RUPTURE MAY PRECEDE MANUAL
,
OPERATOR ACTIONS INSIDE CONTAINMENT
l
RESPONSE:
!
O PROVIDE A REVISED CALCULATION THAT DEMONSTRATES
l - PRT DOES NOT RUPTURE
- WESTINGHOUSE CALCULATION IS CONSERVATIVE.
'
SCHEDULE:
O CALCULATION IS COMPLETE.
!
l / ~\
Page 11
!
l _ _ _ _ _ - . _ - _ _ _ _
___
.-
.
.
~
y / .
OPEr4 r EM 445/8722-0-05 '
- NEW' EMERGENCY LIGHTING REQUIREMENTS RESULTING FROM
REVISED FIRE SAFE SHUTDOWN ANALYSIS.
.
- NRC CONCERNS WITH EMERGENCY LIGHTING ADEQUACY.
RESPONSE:
- REVISION TO IMPELL CALCULATION WILL BE PERFORMED
AS REQUIRED BY REVISED FIRE SAFE SHUTDOWN ANALYSIS.
- EMERGENCY LIGHTS ARE USED TO ILLUMINATE MANUAL
ACTIONS REQUIRED TO ACHIEVE AND MAINTAIN HOT STANDBY.
SCHEDULE: -
- REVISED CALCULATIONS MAY 27,1988
9 FSAR WILL BE CLARIFIED TO REFLECT AN UP COMING '
THAT EMERGENCY LIGHTING IS PROVIDED FSAR AMENDMENT
- FOR MANUAL ACTIONS REQUIRED TO
ACHIEVE AND MAINTAIN HOT STANDBY.
'
[
Page 12
.
.
.
\ / i
.
OPEN IT M 445/8722-0-02 ,
UNRATED STEEL HATCHES ARE A DEVIATION TO
APPENDIX A TO BTP APCSB 9.5-1
RESPONSE:
9 THIS EVALUATION WILL BE IDENTIFIED AS A DEVIATION
IN SECTION 9.5.1.6.2 OF THE CPSES FSAR
SCHEDULE:
e THIS CHANGE WILL BE INCLUDED IN AN UP COMING
AIV.ENDMENT OF THE CPSES FSAR.
~
l
-
.
/ \
Page 13
. . _ _ . . _
_
- _ _ _ _ _ - - - . . _ . _ . - . ,
__ __ _ _ _ _ - _ _ _ _ _ _ _ _ _ __ _____________________ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ___________ ___ __ ____ __
l
.
- ~
..
_
, \ /
l
l
l .
UNRESOLVED ISSUE 445/8722-U-01 -
ADEQUACY OF JUSTIFICATION TO SUPPORT A TWO HOUR
RATING FOR S!X STAIRWELL WALLS.
RESPONSE:
- THIS EVALUATION WILL BE IDENTIFIED AS
DEVIATIONS IN SECTION 9-5.1.6.2.
SCHEDULE:
9 UP COMING AMENDMENT OF FSAR
.
'*
l
.
Page 14
Q
a
. _ _ . , _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ ..___ ._ _ _____ __._ _ - . , _ _ _ , . , _ _ _ , . _ _
_ . _ _ _ _ _ _ __ _ _ _ . - _ , _ ,
-
-
.
.
-
.
\ / -
-
.
OPEN IT M 445/8722-0-03
COMM;T TO SEAL CONDUlTS FOUR INCHES AND SMALLER ON BOTH
SIDES AT THE FIRST OPENING. SEAL INSTALLATION COMPLETION
RESPONSE:
e UNRECOGNIZED COMMITMENT UNDER REVIEW
l SCHEDULE:
9 RESPONSE APRIL 29,1988
l
l
/ <\
Page 15
l
_ _ _ - _ -
. _ - - _ _ -- . _
_ - _ - _ _ _ _ , _ - , . __
._ - __- ._.
__-_ .- -__.. _.-- - _. . . _ - _ - _ - . . _ _ . - . - - _ .- . . _.
. . . . . . -- - - _ _ - - _
r
.
,
.
4
'
.
'
i ' " ' ' *
- .S +. . ., ,<;-,s ..~.'~,<c.f...'l y ,ty-
fi4 6 y.; 'V
.,
,.
,
-
..v ?,- g3 ;.<.ks q- r ,
.
, ., - ~
-e *
~ .,
s ,-
. . . . - -
,
~
1
.
L, ,! *:e,p
.. s. +. Q' ,-
. _ .- 14 ..
-
BTP APCSB 9.5-1
APPENDIX R
APPENDIX A
IDENTIFY
-.
{ COMMITMENT '
NONCONFO M ES ,M
DOCUMENT
l' . 1
I :'
I a:'
u,
-
t . .. .. ,.
m. -w
"
l'- l
d FSAR ".
I.-
.. --
...........]........:
,
,
, ;l,
,' EVALUATIONS I
. s. .
,
- , 7: 4
l FPR ._
l9MAIUTAINED I. .1
.L
i . 15EVIATIONS l ON-FILE ,M
l 9 SUMMARY l
,
l........._..._..3 -I' ' . -
OF FHA i
S APPENDIX A ,
-
. .
. te-
AND FMA
.
l 9 APPENDIX R , f:
EVALUATIONS'a '..**
'.4 %
..
n.
1
'
/\ U A.
.
l
1
.o.'
- _.......__..___...._ ,
- FHA l 2.,
I l
,
AND FMA !
n
.*
- EVALUATIONS
..--.. ......---.
l
, _ __
..s.
.
. . .. .
.,-
.. , - . , , . . _; : , . -
. ,
<
. . .; . . . , - : * .: . . r . a
- .
s e ; , , 7, $ *2 . ~ , g - ,
'
'~ '
l *
,
d
4,
'
.: . / . . A sMg; .
.
.. . . * i a ,c
.
. -
l
l
l
,
Page 16
- . - _ _ . - -__ - - - .- - .-- .- - - _-. _ _ _ _
- . _ _ _ _ - .- _ - _ - _.- - , . _, . - _ _ - - _ . .
' l
l
'.- ~
~-
/
-
\=
R
E
I
R 6 1 1 2
E R 3
T A
A B
R
T
S A N
N X O
O ! I
M D T
E N C 0 _ _ 6
D E E 1 _ _
P T
H P E
C
I
A D
H H
7
1
,
I e
S W N P
g
a
N O
E I
O C S
I
T N S
E 8 1 8
A A R 3
_
_
U L
I
P
L P P
A M U
V O S
E
C
R
A N
S.
F O
I 2
T a. c.
3
1
. C 1 1
.
D D F F
.
1
.
E
S
\ /
.
ll,!
_ - _ . - _ . _ _ - _ . -- . _ _ __ __ _ _- _-
~
.
9
l . --
\ / :
FSAR APPENDIX A DEVIATIONS
. .
I
1
1. METAL HATCH COVERS IN AN UNTESTED CONFIGURATION -
i
l
l
l
l
2. DOOR / DAMPER CONFIGURATIONS OUTSIDE FIRE BARRIER
l
3. BUS DUCT PENETRATION IN AN UNTESTED CONFIGURATION
'
4. FLEXIBLE CONDUlT PENETRATIONS IN AN UNTESTED CONFIGURATION
5. GYPSUM BOARD WALLS IN AN UNTESTED CONFIGURATION
1
'
.
/ ==\
,
1 Page 18
l
-. - , _ _ - _ . . - - . - - . - , . _ _ - - _ _ _ - - - . - -- - . , - _ _
, ,_-
. _ . . - _ _ _ _
' . .-
'
-
Enclosure 5
.
EVALUATION VERSES DEVIATIONS PRELIMINARY REVIEW
.
.
Today 1984
Evaluations Deviations Evaluations Deviations
36 10 Suppression 31 31-
78 O III Detection O
I4I O
82(2) 24(3) Barriers 39 39(5)
.
196 34 Total 70 70
Notes:
(1) 34 Design Modifications Being implemented
(2) Engineering Evaluations Justifying the Acceptability of the 24
Deviations is included Within These Numbers
t
(3) Includes Five 20 Foot separation Deviations and 5 Proposed
Additional Deviations <
(4) Evaluation to Code 72E Not Required
(5) Included Four 20 Foot Separation Deviation and 18 Fire Damper Deviation f
i
,
6
e
f
!
i
f
I
k
! I
,
_,--.
___ __-_ __ _ _ _ .
, ,. , .
.
PRELIMINARY INFORMATION
4
III.G.2.b
BUILDING / FIRE AREA / ROOH !!!.G.2.c CASE 1984
ELEVATION FIRE ZONE NUMBER lil.G.3 CLASSIFICATION DEVIATIONS
CONCERN .
l
i
Auxiliary AA21a 174 !!!.G.2.b & c 4 13a 1
790' 6" 175 !!!.G.2.b & c 3 !3
179 !!!.G.2.c 3
13
180 !!!.G.2.c 3 13
Auxiliary AAllb 203 !!!.G.2.b 3 13a 2
810' 6" 207 III.G.2.b & c 3 13a 2
Auxiliary AA27 198 !!!.G.2.b 4 13a
810' 6"
i
Auxiliary AA21c 209 !!!.G.2.c 4 29-1
822'-6"
Auxiliary AA21d 214 III.G.2.c 3 13a 3
831'-6" 226 !!!.G.2.c 3 13a-3
l
Auxiliary AA21f 241 !!!.G.2.b & c 3 13a-4 2a
852' 6"
i
E&C EA57 125 !!!.G.2.c 3 136
792' 0" EC50 118 !!!.G.2.c 4 2 r.
L .': 8 119 I!!.G.2.c 4 2m
EHb2 120 !!!.G.2.c 4 2m i
EH53 121 III.G.2.c 4 2m
l
E&C E065 135 !!!.G 3 4 IVa !
830'-0" :
E&C EA73 150 !!!.G.2.c 4 2L ,
854' 4" EA74 150a !!!.G.2.c 4 IVb
I
Safeguards . SAlc 63 Ill.G.2.c 3 2b
I
790 -6"
i
810'-6" SA142 77N III.G.2.c 4 21 1
'
773'-0" & SB4 64 !!!.G.2.c 3 13d
790'-6" 71 III.G.2.c 3 29
l
l
}
i
f
!
t ,
I
_ _ _ _ _ _ _ - _ _ _
.
.
,,
.
PREllMINARY INFORMATION
111.G.2.b
BUILDING / FIRE AREA / ROOM !!!.G 2.c CASE 1984
ELEVATION FIk, ZONE NUMBER III.C.3 CLASSIFICATION DEVIATIONS
CONCERN ,
- ,
Safeguards SB4 70 !!!.G.2.c 3 2j
790 -6" SB2c 65 III.G.2.c 4 2f
67 !!!.G.2.c 4
-
13d
810' 6" SB8 79 !!!.G.2.c 3 13d-l
82 !!I.G.2.c 3 13d-l
810' 6" S8143 77s III.G.2.c 3 21
831'-6" & SB15 94 !!!.G.2.c 3 13d l
841' 6" 95 !!!.G.2.c 3 13d
831'-6" SB144 88 !!!.G.2.c 3 13d
,
810' 6" SD9 83 Ill.G.2.c 3 2b
831' 6" SE16 96 III.G.2.c 4 2d
852' 6" SE18 103 III.G.2.c 4 2c
Safeguards SE18 104 4 2c
i.
I
l
e
i
I-
i
,
b
_ .___-__
-
.. c
'
.
l
'
PRELIMINARY INFORMATION
.
DETECTION EVALUATIQB1 USED TO JUSTIFY CODE COMPLlahff .
Code Section Fire Area / Zone Room No, t
.
2 6.5 AA21a 168 i
2 6.5 AA21a 169 !
2-6.5 AA21a 170
2 6.5 AA21a 171 - ;
2 6.5 AA21a 172
2 6.5 AA21a 173
2 6.5 AA21a 182
2 6.5 AA21b 191
2 6.5 AA21b 192
2 6.5 AA21d 211
2 6.5 AA21d 215
l 2 6.5 AA21d 217
2 6.5 AA21f 238
2 6.5 AA21f 240
2-6.5 AA21f 242
2 6.5 AA22 207A, 181
2-6.5 AA34 220
2 6.5 AA35 221
2 6.5 AA36 222 ,
2 6.5 AA37 224
2-6.5 AA98 254
2-6.5 AA98 269
2-6.5 AA99b 271A
2 6.5 AA99b 271b
2-6.5 AA100 271
! 2-6.5 Sala 57
2-6.5 Sala 58
-
2 6.5 Sala 61 :
2 6.5 SB2e 81
2 6.5 SB2f 86
2-6.5 SB2f 87
4-3.5.1 AA21b 202
4 3.5.1 AA21c 208 ,
4-3.5.1 AA21c 209 l
-
' 4 3.5.1 AA21d 210 l
'
4 3.5.1 SB2a 563
4 3.7.3 AA21a 162 :
4-3.7.3 AA21f 235 1
4 3.7.3 AA99b 247 !
4 3.7.3 AA99d 270 i
4-3.7.3 EAS4 122 !
j 4-3.7.3 EA57 125 i
4-3.7.3 WB104b 275 !
j 4 3.7.3 SA142 77N I
TOTAL 44 t
,
1
\
. i
. ,- ..
- PREllMINARY INFORMATION
PARRIER EVALUATIQfG
Sub_ieel IMZ 193 1
'
Serv. Water Pumps 20' Sep, la la
Chiller Units 20' Sep. Ib lb
Boric Acid Pumps (FSSA Eval.) Ic ;
Boric Acid Sky Tanks (FSSA Eval.) 2e
Concrete Block Wall 3a . 3a :
Concrete Block Wall 3a-1 3a.1
t Cont. Pen. Seals 3b 3b ,
~
Miss, Res. Doors 3c 3c
Cont Rm. Missile Resis. Doors 3c-1 3c 1
Watertight Dooi's 3d 3d
Containment Airlock 3e 3e
Cont Mech. Pen. Seals 39 39
Cable Spreading Rm. Barrier 3h 3h ;
PRV 20' Separation 4a 4a
Cont. RHR Valves 20' Sep. 4a-1 4a 1 l
'
20' Separation (FSSA Eval.) 8a-1
20' Separation Bb Bb
20' Sep. SK MS!V's Deleted 8e t
HVAC Damper Penetrations By Upgrade lla
HVAC Damper Penetrations By Upgrade lib
HVAC Damper Penetrations By Upgrade lle ;
- HVAC Damper Penetrations By Upgrade lld
'
HVAC Damper Penetrations By Upgrade lle i
HVAC Damper Penetrations By Upgrade 12a ,
'
HVAC Damper Penetrations By Upgrade 12b
i HVAC Damper Penetrations By Upgrade 12c !
i HVAC Damper Penetrations By Upgrade 12d l
l HVAC Damper Penetrations By Upgrade 12e ,
'
,
HVAC Damper Penetrations By Upgrade 12f
l HVAC Damper Penetrations By Upgrade 129
l HVAC Damper Penetrations By Upgrade 12h l
l HVAC Damper Penetrations By Upgrade 121 ,
l
HVAC Damper Penetrations BY Upgrade 12j
i HVAC Damper Penetrations By Upgrade 12k
l HVAC Damper Penetrations By Upgrade 121
l HVAC Damper Penetrations BY Upgrade 12m
2 Hour Rated Penetrations Seals 14 14
Bus Duct Penetrations FSAR 9 5.1.6.2 i
NRF #63, 64, 65, 66, 67, 68 <
Oampers & Doors with frame Outside Banners FSAR 9 5.1.6.2
NRF #41, 86
Flexible Conduit Penetration FSAR 9-5.1.6.2 !
NRF #39, 40
Metal Hatches with Protective Coating FSAR 9-5.1.6.2 !
NRF #35, 36, 37, 38 !
Gypsum Board Walls FSAR 9 5.1.6.2
NRF # 74. 75 ;
.
.