Q Indian Point 3 | |||
~ | |||
Nuclear Powie Plant PO. Box 215 | |||
" e Buchanan New voA 10511 914 739 8700 | |||
#> NewYorkPower 4# Authority May 21, 1986 IP3-WAJ-027Z IP3-JAS-026B Docket No. 50-286 License No. DPR-64 Dr. Thomas E. Murley Regional Administrator Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406 | |||
==SUBJECT:== | |||
Indian Point 3 Nuclear Power Plant, Mid-Cycle Inspection of Steam Generators | |||
==Dear Dr. Murley:== | |||
The mid-cycle steam generator tube inspection committed to by the Authority during the August 20, 1985 meeting with the NRC staff has been completed. As agreed upon at the August meeting the mid-cycle inspection consisted of an inspection of 100% of the hot leg tubes up to the second support plate. | |||
Attachment I to this letter summarizes the results of this inspection. This report is provided in accordance with Section 4.9.C of the Indian Point 3 Technical Specifications. | |||
Based on the final inspection results, Steam Generator 31 was classified as Category C-3 (1% of the tubes inspected defective) as defined in Technical | |||
~~ | |||
Specification Table 4.9-1. | |||
All defective tubes identified by the inspection were plugged. | |||
The Authority will submit a written follow-up of this report in accordance with Technical Specifications. Included will be a review of the operating chemistry for the period since the last refueling outage. This status report was committed to by the Authority at the August 20 meeting. | |||
Sincerely, , | |||
, [ 'UM W iam A. Jos ger - " | |||
esident ana er r f | |||
WAJ:JAS: ad | |||
\ 3 M esident Inspectors' Office 8 l | |||
8606090145 860521 PDR ADOCK 05000286 G PDR | |||
ATTACHMEtiT I STEAM NUMBER OF NUMBER OF GENERATOR TUBES INSPECTED PLUGS INSTALLED 31 2690 27 32 2913 20 33 2941 21 34 2963 27 Inspection consisted of 100% of the hot leg tubes up to the second support plate. | |||
%}} | |||
Revision as of 14:33, 16 December 2020
| ML20195E585 | |
| Person / Time | |
|---|---|
| Site: | Indian Point |
| Issue date: | 05/21/1986 |
| From: | Josiger W, Josigner W POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK |
| To: | Murley T, Uurley T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| IP3-JAS-026B, IP3-JAS-26B, IP3-WAJ-027Z, IP3-WAJ-272, IP3-WAJ-27Z, NUDOCS 8606090145 | |
| Download: ML20195E585 (2) | |
Text
_ _ _ _ - _ _ _ _ _ _ _ _ _ _ _
Q Indian Point 3
~
Nuclear Powie Plant PO. Box 215
" e Buchanan New voA 10511 914 739 8700
- > NewYorkPower 4# Authority May 21, 1986 IP3-WAJ-027Z IP3-JAS-026B Docket No. 50-286 License No. DPR-64 Dr. Thomas E. Murley Regional Administrator Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406
SUBJECT:
Indian Point 3 Nuclear Power Plant, Mid-Cycle Inspection of Steam Generators
Dear Dr. Murley:
The mid-cycle steam generator tube inspection committed to by the Authority during the August 20, 1985 meeting with the NRC staff has been completed. As agreed upon at the August meeting the mid-cycle inspection consisted of an inspection of 100% of the hot leg tubes up to the second support plate.
Attachment I to this letter summarizes the results of this inspection. This report is provided in accordance with Section 4.9.C of the Indian Point 3 Technical Specifications.
Based on the final inspection results, Steam Generator 31 was classified as Category C-3 (1% of the tubes inspected defective) as defined in Technical
~~
Specification Table 4.9-1.
All defective tubes identified by the inspection were plugged.
The Authority will submit a written follow-up of this report in accordance with Technical Specifications. Included will be a review of the operating chemistry for the period since the last refueling outage. This status report was committed to by the Authority at the August 20 meeting.
Sincerely, ,
, [ 'UM W iam A. Jos ger - "
esident ana er r f
WAJ:JAS: ad
\ 3 M esident Inspectors' Office 8 l
8606090145 860521 PDR ADOCK 05000286 G PDR
ATTACHMEtiT I STEAM NUMBER OF NUMBER OF GENERATOR TUBES INSPECTED PLUGS INSTALLED 31 2690 27 32 2913 20 33 2941 21 34 2963 27 Inspection consisted of 100% of the hot leg tubes up to the second support plate.
%