{{#Wiki_filter:" " October 25, 2012 Donna Jacobs, Vice President, Operations Entergy Operations, Inc.
{{#Wiki_filter:" " October 25, 2012 Donna Jacobs, Vice President, Operations Entergy Operations, Inc.


Waterford Steam Electric Station, Unit 3 17265 River Road Killona, LA 70057-0751
Waterford Steam Electric Station, Unit 3 17265 River Road Killona, LA 70057-0751


SUBJECT: WATERFORD STEAM ELECTRIC STATION, UNIT 3 - NRC SECURITY INSPECTION REPORT 05000382/2012403
SUBJECT: WATERFORD STEAM ELECTRIC STATION, UNIT 3 - NRC SECURITY INSPECTION REPORT 05000382/2012403


==Dear Ms. Jacobs:==
==Dear Ms. Jacobs:==
Line 31: Line 31:
Four NRC identified findings of very low security significance (i.e., Green as determined by the Physical Protection Significance Determination Process) were identified during this inspection. The deficiencies were promptly corrected or compensated for and the plant was in compliance with applicable physical protection and security requirements within the scope of this inspection before the inspector left the area.
Four NRC identified findings of very low security significance (i.e., Green as determined by the Physical Protection Significance Determination Process) were identified during this inspection. The deficiencies were promptly corrected or compensated for and the plant was in compliance with applicable physical protection and security requirements within the scope of this inspection before the inspector left the area.


If you contest any noncited violation (NCV) in the enclosed report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspectors at Waterford Steam Electric Station, Unit 3.
These four findings were also violations of NRC requirements. If you contest any noncited violation (NCV) in the enclosed report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspectors at Waterford Steam Electric Station, Unit 3.


Three of the findings were assigned crosscutting aspects in the area of Human Performance [H.1(b), H.1(c), and H.2(b)]. If you disagree with a crosscutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the Regional Administrator, Region IV; and the NRC Resident Inspectors at Waterford Steam Electric Station, Unit 3.
Three of the findings were assigned crosscutting aspects in the area of Human Performance [H.1(b), H.1(c), and H.2(b)]. If you disagree with a crosscutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the Regional Administrator, Region IV; and the NRC Resident Inspectors at Waterford Steam Electric Station, Unit 3.
Line 38: Line 38:


Sincerely,/RA/
Sincerely,/RA/
Mark S. Haire, Chief       Plant Support Branch-1 Division of Reactor Safety  
Mark S. Haire, Chief Plant Support Branch-1 Division of Reactor Safety  


Docket No.:   50-382 License No.:   NPF-38 Nonpublic  
Docket No.: 50-382 License No.: NPF-38 Nonpublic  


===Enclosure:===
===Enclosure:===
Inspection Report 05000382/2012403  
Inspection Report 05000382/2012403  


===w/Attachment:===
===w/Attachment:===
Supplemental Information
Supplemental Information
}}
}}

Revision as of 22:39, 18 February 2018

Waterford Steam Electric Station, Unit 3 - NRC Security Inspection Report 05000382/2012403
ML12299A525
Person / Time
Site: Waterford Entergy icon.png
Issue date: 10/25/2012
From: Haire M S
Plant Support Branch-1
To: Jacobs D
Entergy Operations
References
IR-12-403
Download: ML12299A525 (4)


Text

" " October 25, 2012 Donna Jacobs, Vice President, Operations Entergy Operations, Inc.

Waterford Steam Electric Station, Unit 3 17265 River Road Killona, LA 70057-0751

SUBJECT: WATERFORD STEAM ELECTRIC STATION, UNIT 3 - NRC SECURITY INSPECTION REPORT 05000382/2012403

Dear Ms. Jacobs:

On September 13, 2012, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Waterford Steam Electric Station, Unit 3. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on September 13, 2012, with Ms. K. Cook, General Manager Plant Operations, and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license. The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.

Four NRC identified findings of very low security significance (i.e., Green as determined by the Physical Protection Significance Determination Process) were identified during this inspection. The deficiencies were promptly corrected or compensated for and the plant was in compliance with applicable physical protection and security requirements within the scope of this inspection before the inspector left the area.

These four findings were also violations of NRC requirements. If you contest any noncited violation (NCV) in the enclosed report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspectors at Waterford Steam Electric Station, Unit 3.

Three of the findings were assigned crosscutting aspects in the area of Human Performance H.1(b), H.1(c), and H.2(b). If you disagree with a crosscutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the Regional Administrator, Region IV; and the NRC Resident Inspectors at Waterford Steam Electric Station, Unit 3.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. If Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Sincerely,/RA/

Mark S. Haire, Chief Plant Support Branch-1 Division of Reactor Safety

Docket No.: 50-382 License No.: NPF-38 Nonpublic

Enclosure:

Inspection Report 05000382/2012403

w/Attachment:

Supplemental Information