IR 05000335/2017005: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 2: | Line 2: | ||
| number = ML17234A411 | | number = ML17234A411 | ||
| issue date = 08/22/2017 | | issue date = 08/22/2017 | ||
| title = Updated Inspection Plan for St. Lucie Plant, Units 1 and 2 ( | | title = Updated Inspection Plan for St. Lucie Plant, Units 1 and 2 (IR 05000335/2017005 and 05000389/2017005) | ||
| author name = Suggs L B | | author name = Suggs L B | ||
| author affiliation = NRC/RGN-II/DRP/RPB3 | | author affiliation = NRC/RGN-II/DRP/RPB3 | ||
Revision as of 15:46, 18 February 2018
| ML17234A411 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 08/22/2017 |
| From: | Suggs L B NRC/RGN-II/DRP/RPB3 |
| To: | Nazar M Florida Power & Light Co |
| References | |
| IR 2017005 | |
| Download: ML17234A411 (5) | |
Text
August 22, 2017
Mr. Mano Nazar President and Chief Nuclear Officer Nuclear Division Florida Power & Light Company Mail Stop: EX/JB 700 Universe Blvd. Juno Beach, FL 33408
SUBJECT: UPDATED INSPECTION PLAN FOR ST. LUCIE PLANT, UNIT 1 AND UNIT 2 - (REPORT 05000335/2017005 AND 05000389/2017005)
Dear Mr. Nazar:
The enclosed inspection plan lists the inspections scheduled through June 30, 2019 for St. Lucie Plant Unit 1 and Unit 2. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence. The NRC plans on conducting one non-routine inspection for Saint Lucie Unit 2 per IP 71003, "Post Approval Site Inspection for License Renewal," Phase II. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at 404-997-4539 with any questions you have regarding this letter.
Sincerely,/RA/
LaDonna B. Suggs, Chief Reactor Projects Branch 3 Division of Reactor Projects Docket Nos.: 50-335, 50-389 License Nos.: DPR-67, NPF-16
Enclosure:
St Lucie Inspection/Activity Plan (09/01/2017 - 06/30/2019) cc: Distribution via ListServ SUBJECT: UPDATED INSPECTION PLAN FOR ST. LUCIE PLANT, UNIT 1 AND UNIT 2 - (REPORT 05000335/2017005 AND 05000389/2017005) August 22, 2017 DISTRIBUTION: M. Kowal, RII K. Sloan, RII OE MAIL RIDSNRRDIRS PUBLIC RidsNrrPMStLucie Resource ROPassessment.Resource@nrc.gov ROPreports Resource Institute of Nuclear Power Operations (INPO) ADAMS Accession No. ML OFFICE RII:DRP RII:DRP NAME LPressley LSuggs DATE 8/16/2017 8/16/2017 OFFICIAL RECORD Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteSaint LucieInspection / Activity Plan09/01/2017-06/30/2019Page 1 of 208/18/2017 14:57:54LR-POST APPROVAL LR PHASE 2 (UNIT 2)42 IPPost-Approval Site Inspection for License Renewal7100308/28/201709/01/20172 IPPost-Approval Site Inspection for License Renewal7100309/11/201709/15/2017OL RQ-REQUAL INSPECTION21, 2 IPLicensed Operator Requalification Program7111111B10/16/201710/20/2017OL EXAM-INITIAL LICENSE EXAM PREP41 SAINT LUCIE/JULY 2017 INITIAL EXAM AT POWER FACILITIESV2349711/06/201711/10/2017OL EXAM-INITIAL LICENSE EXAM41 SAINT LUCIE/JULY 2017 INITIAL EXAM AT POWER FACILITIESV2349712/04/201712/22/2017RP-RP PUBLIC INSPECTION21, 2 IPRadioactive Gaseous and Liquid Effluent Treatment71124.0601/22/201801/26/20181, 2 IPRadiological Environmental Monitoring Program71124.0701/22/201801/26/20181, 2 IPOccupational Exposure Control Effectiveness71151-OR0101/22/201801/26/20181, 2 IPRETS/ODCM Radiological Effluent Occurrences71151-PR0101/22/201801/26/2018EP-EP EXERCISE61, 2 IPExercise Evaluation711140102/12/201802/16/20181, 2 IPEmergency Action Level and Emergency Plan Changes711140402/12/201802/16/20181, 2 IPExercise Evaluation - Scenario Review711140802/12/201802/16/20181, 2 IPPerformance Indicator Verification7115102/12/201802/16/2018ISI-UNIT 1 IN-SERVICE INSPECTION11 IPInservice Inspection Activities - PWR7111108P03/19/201803/23/2018RP-RAD HAZARDS AND TRANSPORTATION21, 2 IPRadiological Hazard Assessment and Exposure Controls71124.0103/19/201803/23/20181, 2 IPRadioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0803/19/201803/23/2018SGISI-UNIT 1 SG IN-SERVICE INSPECTION11 IPInservice Inspection Activities - PWR7111108P03/19/201803/23/2018PI&R-PROBLEM IDENTIFICATION AND RESOLUTION41, 2 IPProblem Identification and Resolution71152B05/07/201805/11/20181, 2 IPProblem Identification and Resolution71152B05/21/201805/25/2018ISI-UNIT 2 IN-SERVICE INSPECTION12 IPInservice Inspection Activities - PWR7111108P09/03/201809/07/2018SGISI-UNIT 2 SG IN-SERVICE INSPECTION12 IPInservice Inspection Activities - PWR7111108P09/03/201809/07/2018This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteSaint LucieInspection / Activity Plan09/01/2017-06/30/2019Page 2 of 208/18/2017 14:57:54EP-EP PROGRAM INSPECTION31, 2 IPAlert and Notification System Testing711140201/14/201901/18/20191, 2 IPEmergency Preparedness Organization Staffing and Augmentation System711140301/14/201901/18/20191, 2 IPEmergency Action Level and Emergency Plan Changes711140401/14/201901/18/20191, 2 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140501/14/201901/18/20191, 2 IPPerformance Indicator Verification7115101/14/201901/18/2019DBAI-DESIGN BASES ASSURANCE INSPECTION (TEAMS61, 2 IPDesign Bases Assurance Inspection (Teams)7111121M01/14/201901/18/20191, 2 IPDesign Bases Assurance Inspection (Teams)7111121M02/11/201902/15/20191, 2 IPDesign Bases Assurance Inspection (Teams)7111121M03/04/201903/08/2019TFPI-ST. LUCIE NFPA 80531, 2 IPFire Protection - NFPA 805 (Triennial)7111105X06/24/201906/28/2019This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.