ML20129H263: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[IR 05000401/2005003]]
| number = ML20129H263
| issue date = 06/03/1985
| title = Forwards Safety Insp Repts 50-456/85-17 & 50-457/85-18 on 850401-0503.No Noncompliance Noted
| author name = Little W
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
| addressee name = Reed C
| addressee affiliation = COMMONWEALTH EDISON CO.
| docket = 05000456, 05000457
| license number =
| contact person =
| document report number = NUDOCS 8506070531
| package number = ML20129H266
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| page count = 2
}}
See also: [[see also::IR 05000456/1985017]]
 
=Text=
{{#Wiki_filter:r                                          -
              *
                                          JUN 3
                                                  E
  Docket No. 50-456
  Docket No. 50-457
  Commonwealth Edison Company
  ATTN: Mr. Cordell Reed
          Vice President
  Post Office Box 767
  Chicago, IL 60690
                                                                    '
  Gentlemen:
  This refers to the routine safety inspection conducted by Mr. L. G. McGregor
  of this office on April 1 through May 3, 1985, of activities at Braidwood
  Nuclear Power Station, Units 1 and 2, authorized by NRC Construction Permits
  No. CPPR-132 and No. CPPR-133 and to the discussion of our findings with
  Mr. M. Wallace at the conclusion of the inspection.
  The enclosed copy of our inspection report identifies areas examined during
  the inspection. Within these areas, the inspection consisted of a selective
  examination of procedures and representative records, observations, and
  interviews with personnel.
  No items of noncompliance with NRC requirements were identified during the
  course of this inspection.
  In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
  this letter and the enclosure (s) will be placed in the NRC's Public Document
  Room.
          8506070531 850603
        $DR ADOCK 05000456  PDR
                                                                                fo\
                                                                              / k\
 
  .
-;              .
          _,
    Commonwealth' Edison Company            2            JUN 3  1985
    We will gladly discuss any questions you have concerning this inspection.
                                            Sincerely,
                                                                  ,
                                            " Original signed by W. S. Little"
                                            W. S. Little, Director
                                            Braidwood Project
    Enclosure: Inspection Report
      No. 50-456/85017(DRP);
      No. 50-457/85018(DRP)
    cc w/ enclosure:
  'O.  L. Farrar, Director
      of Nuclear Licensing
    M. Wallace, Project Manager
    D. Shamblin, Construction
      Superintendent
    J. F. Gudac, Station
        Superintendent
    C. W. Schroeder, Licensing and
        Compliance Superintendent
    DMB/ Document Control Desk (RIDS)
    Resident Inspector, RIII
        Braidwood
    Resident Inspector, RIII Byron
    Phyllis Dunton, Attorney
      General's Office Environmental
        Control Division
    D. W. Cassel, Jr. , Esq.
    J. W. McCaffrey, Chief, Public
        Utilities Division
    H. S. Taylor, Quality Assurance
        Division
                                .
                            (              '' M
    PeINe/kja        F&rbd        Litkle    Rin
    05/30/85
}}

Latest revision as of 23:41, 25 September 2020